Loading...
HomeMy WebLinkAbout20230094 Ver 1_More Info Received_20230828 (7)Revised Proposed Impacts Inventory (August 2023) Wetland Impacts 2a. Site # 2a1. Reason 2b. Impact type 2c. W. name 2d. W. name 2e. Forested 2f. Type of Jurisdiction 2g. Impact area WA Pipe crossing 1 T PFO W1 Yes Both 0.28 WB Maintenance corridor 1 P PFO W1 Yes Both 0.53 We Pipe crossing 2 T PSS W2 No Both 0.09 WD Maintenance corridor 2 P PSS W2 Yes Both 0.14 WE Pipe crossing 3 T PEM W3 No Both 0.13 WF Pipe crossing 4 T PSS W4 No 113oth 0.09 WG Maintenance corridor 3 P PSS W4 Yes Both 0.24 WH Limits of disturbance 1 T PEM W5 No Both 0.005 WI Fill P PSS W6 No Both 0.03 Stream Impacts 3a. Reason for impact 3b. Impact type 3c. Type of impact 3d. S. name 3e. Stream type 3f. Type of jurisdiction 3g. S. width 3h. Impact length 51 Pipe crossing 1 T Excavation SA Perennial Both 7 82 S2 Intake impact 1 T Dewatering Cape Fear River Perennial Both 247 133 S3 Intake impact 2 P Fill Cape Fear River Perennial Both 5 52 S4 Pipe crossing 2 T Excavation SB Intermittent Both 4 69 S5 I Permanent Access Road 1 T IlDewatering ISC lintermittent 113oth 1 41 90 56 I Permanent Access Road 2 P IFill ISC lIntermittent 113oth 1 41 141