Loading...
HomeMy WebLinkAbout20030056 Ver 4_Modifications_20150728ngineering, Inc. to —Since 1974 - En&eees SurMYCIM Ph=M Post Office Box 10285 GREENSBORO, N.C. 27404 Telephone. (336) 854 -8877 Fax (336) 854 -8876 To: Sue Homewood ............................. ............................... MM RECEIVED N.0 Deot o'. t--NR JUL 2 2 2095 i Winston -salem Regional Ofre Date: 7 -15 -15 ...... ............................... . . Subject: Villages at Reedy Fork ........................ .... .......... , Subdivision .................. ............................... .... ................... , Please process paperwork for the proposed permit modification, Included: .................... ......................... ........................ ............................... . ......... ............................... . ......................... (3) copies of the permit modification letter and all associated maps (1) $270.00 permit review fee check ......... ............................ ................. ..................................... ............................... .................... ............................... . .............................. ... ............................... ............................. ........................................................................................ ............................... .. ............................... Please let me know if you have any questions: Thanks, ................... .......... .. ......................... . ........................ $ .... . ..................... ... Lee Bryant ................. . ...................... ......................................................................................................................... ............................... ......... XPlease reply ❑ No reply necessary Signed 1 - Vans lrngi neerinng, Inc. —Since 1974- 1 Engineers Surveyors Planners July 15, 2015 Mr. David Bailey USACE Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 lia& �S JX"-)00a0 V q Subject: Villages at Reedy Fork Subdivision — Permit modification request USACE Action ID No. SAW- 2003 -20436 (DWR # 03 -0056 v3) Dear David: On behalf of AF -Reedy Fork LLC (owners of this project) we would like to request a modification to the above reference permit for two separate temporary stream impacts due to the proposed installation of a public sanitary sewer outfall. Temporary Impacts: To install the sanitary sewer outfall a temporary stream impact of 40 LF per stream crossing will occur. All portions of the outfall are to be placed permanently below grade with no permanent impact on the stream. Construction of these temporary stream impacts are to be constructed per City of Greensboro standard detail number 213 (attached to this letter). Once the sanitary sewer line is installed, rip rap is to be depressed into stream bed until the top of rip rap is level with stream bottom (construction sequence and detail provided). Factors Preventinz Implementation of Practical Alternatives: Waste water generated from this project is required by the city ordinance to tie into a public sanitary sewer system, eliminating on -site treatment as a practical alternative for future development. Due to the topography of this project, this outfall is needed to provide sanitary sewer to multiple future phases of The Villages of Reedy Fork Ranch that at this time have no connection point to public sanitary sewer. The use of a public pump station and force main are highly discouraged by the city when gravity sewer is available. The only other alternative to not cross the streams at these two locations would be to run the outfall on the western side of the stream (tributary to Reedy Fork creek) which would in turn require multiple stream crossings of a much larger stream. 4609 Dundas Drive Greensboro, NC 27407 Phone 336 - 854 -8877 Fax 336 - 854 -8876 License #C -0168 I vans ngineer$ng9 Inc. —Since 1974- I Engineers Surveyors Planners Supplemental Maps: - Overall project map showing temporary impact locations (Temporary impacts labeled as "T -1 & T -2 ") - Plan and profile sheet of both impacts. - City of Greensboro Standard Detail ( #213) Thank you for your consideration of this matter. Please notify me if additional information is required. Sincerely, Lee Bryant Project Manager cc: Sue Homewood, NCDENR Winston -Salem Regional Office 4609 Dundas Drive Greensboro, NC 27407 Phone 336 - 854 -8877 Fax 336 - 854 -8876 License #C -0168 j - , v, o PUMP Lu L, -i q (a C, 't STREAM FLOW 1 %w7j�iLv 0 4 v- a TEMP. 24" TO MIN 42" cmp — - -- t - - - - -- 2' CLASS "A" 10 , x 10 CLASS "I"-j CROSS. G EROSION CONTROL -1,0EMATERING-84511V RIP RAP PIPE STONE WEIR @ 2• 1 SIDE SLOPE 20' OR SIL T84G. EARTH BERM MIN. PROPOSED I (TYP.) 50' CONSTRUCTION EASEMENT ME NOTE 5) PROPOSED EARTH "E"m PLAN POLYETHYLENE FABRIC ON FACE (8 ML. THICK) TO MIN TOP OF FROM PUMP A Jff PUMP DwAff-., TEMP. .. . .. ..... ..... .. 24 11 TO 421, cmp ......... . ........... .. .. . ..... - ............ ....... .. .. .. .. ........ . .......... T 1-8 .. ... ...... . . . ....... ... MIN. EX. INV. .TEMPORARY CREEK STONE DAM POL METHYLENE FABRIC ON FACE (8 ML. THICK) CROSSING cu PIPE in tn A IN57 -ALL SAM58ASS IN PIPE INVERT 6 FABRIC WHILE PUMPING C3 AROUND DURING CONSTRUCTION IN STREAM. POLYETHYLENE FABRIC w in ON FACE (8 X. THICK) B REMOVE SANDBAGS cg FABRIC TO ALLOY FLOW THROUGH I PIPE WHEN NOT PUMPING AROUND. U. m SECTION A -A I OF 2 r Y ®F GREENS00R0 STANDARD TEMPORA R Y CREEK STD. NO. REV. 0 -9105-05 CROSSING DURING CONSTRUCTION 213 03-05 03-97 09-05 0 0 N O n W J LL J a H H 0 NOTES.' 1) EROSION STONE TO BE "CLASS I" RIP -RAP UNLESS DESIGNATED DIFFERENTLY ON CONSTRUCTION PLAN. 2) PIPE SIZE AND AMOUNT NEEDED TO BE DETERMINED BY ENGINEER ON CONSTRUCTION PLAN. 3) TEMPORARY STREAM CROSSING TO BE CONVERTED TO COG #214 UPON PROJECT CONSTRUCTION COMPLETION IF CALLED FOR ON THE CONSTRUCTION PLANS. 4) PUMP AND LINE SIZE TO BE DETERMINED BY THE CONTRACTOR USING THE BASE FLOW SHOWN ON THE CONSTRUCTION PLANS. 5) WIDTH OF CONSTRUCTION EASEMENT SHALL BE MINIMIZED BASED UPON FIELD CONDITIONS. ANY DISTURBANCE (S) EXCEEDING 40' MAY REQUIRE ADDITIONAL WATER DUALITY PERMITTING OR MI TIGA TION. CONSTRUCTION SEQUENCE FOR STREAM CROSSING 1) INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF TEMPORARY STREAM CROSSING TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUING PUMPING WHILE WORKING WITHIN THE STREAM 2) INSTALL UPSTREAM DAM, FIL TER FABRIC. AND TEMPORARY CMP. COVER PIPE INLET WITH FABRIC AND SAND BAGS AS SHOWN IN INSET "A " WHILE WORKING IN THE STREAM. ALLOW STREAM FLOW THROUGH CMP AS SHOWN IN INSET "B" WHEN NOT WORKING WITHIN THE STREAM. 3) INSTALL DOWNSTREAM TEMPORARY STONE DAM AND FIL TER FABRIC TO PREVENT BACK FLOW INTO CONSTRUCTION AREA. 4) INSTALL PROPOSED EARTH BERMS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA. 5) INSTALL DEWA TERING BASIN OR SIL T BAG A T TOP OF BANK. DEWA TER CONSTRUCTION AREA BETWEEN TEMPORARY DAM USING THIS BASIN. 6) INSTALL THE 10' X 10' SEDIMENT TRAP OR SILT BAG. 7) UPON CONSTRUCTION COMPLETION, REMOVE TEMPORARY DAMS, FILTER FABRIC, AND TEMPORARY CMP. DEPRESS TEMPORARY DAM BOTTOMS INTO STREAM BED UNTIL TOP OF RIP RAP IS LEVEL WITH STREAM BOTTOM. CONVERT TO COG STANDARD 0214 IF CALLED FOR IN THE CONSTRUCTION PLANS. B) UPON STABILIZATION OF CLEARED AREAS, REMOVE TEMPORARY EARTH BERM, SEDIMENT TRAP, AND DEWA TERING BASIN. 2OF2 C I T Y O F O R E ENSB0,®7 0 STANDARD TEMPORARY CREEK STD. NO. REV. 01-9106-05 CROSSING DURING CONSTRUCTION 213 03-9709-05 03 -05 H: \ \DRAWINGS \REEDY FORK \TRACT 14 TO TURNER SMITH OUTFALL \EXHIBIT MAP -ARMY CORP.DWG GRAPHIC SCALE •�• g0 100 200 J 50 0 25 -� ( IN FEET) / 1 inch = 50 ft. / — — — — — — — PROP. 8" SEWER (PUBLIC - .. -- - -----22 +00 { / 21 +00 — - -19 +00 — — _ — — — — — — j 35' SEWER EA S N / 710- . . . I , - -- . ---- -- C05 A9 1 F 8' • - SIP PLBL.0 Sf�NI -A� tE vEWER S4NIl AR't @ � -REAM — — ,24+00 25 +00 26+QV - _ PROP. 8" SEWER BLIC) 35' SEWER EASEMENT SSMH #7- SSMH � T_ t i RIM: 709.16 , RIM: 695.63 INV. IN: 693.73 — INV. IN: 687.08 INV. OUT: 693.93 INV. OUT: 686.88 =u 777r_ r, 4 OD —� it i ti > z 680 -19 +00 20 +00 L1 +00 BE ETC M OF 4- 23 +00 �4 +00 �5 +00 �6 +00 i ro1h i0 7 Z H i 50 L 720 710 700 690 GRAPHIC SCALE 0 25 50 100 ( IN FEET ) 1 inch = 50 ft. EX SSMH ##8 TOP: IN: 707.14 696 INV. IN: 696 66 INV. OUT:696.46 200 EXISTING p L4 m STRE o z � 1 UN N 50, SAM l �il // ' N ��� l �� �- B- S�TREA�L �� FFER FFEI; �- 30 SEWER ESMT (TYP) (_� — — — — _ — — (Typ ' [F PROP 8" SEWER OUTFALL TYP — EX. 8„ SEWER ° °... ®. ° °. ®. PROP... B' SEWER OUTFALL ,TYP) �. ,.�,.. _ _ (PUBLIC) rc T 27 +00- - 28 +00 --71 - -- -- --- - - - - -- _ SSMH ##9 W , / ��T� ° TOP: 707 68 INV. IN:699.27 INV. OUT: 699.07 An COMMON ELEMENTS 30' SEWER ESMT. (TYP)