Loading...
HomeMy WebLinkAboutSW6230602_Supplement-EZ Form_20230831 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name B&B Loop&Blueberry Lane Improvement 2 Project Area(ac) 2.69 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? Low 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: ' 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: C.Scott Brown,PE 28 Organization: 4D Site Solutions Inc. 29 Street address: 409 Chicago Drive,Ste.112 30 City,State,Zip: Fayetteville,NC 28306 31 Phone number(s): 910-426-6777 32 Email: sbrown@4dsitesolutions.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer Seal Date DRAINAGE AREAS Is this a high density project? 1No 2 If so,number of drainage areas/SCMs _ 0 3 Does this project have low density areas? _ Yes 4 If so,number of low density drainage areas _ 1 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION I Entire Site LD I 4 Type of SCM n/a n/a 5 Total drainage area(sq ft) 117059 _ 117059 6 Onsite drainage area(sq ft) 117059 117059 7 Offsite drainage area(sq ft) 0 0 8 Total BUA in project(sq ft) 44802 sf 44802 New BUA on subdivided lots(subject to 9 permitting)(sq ft) sf 0 New BUA not on subdivided lots(subject to 10 permitting)(sf) 22817 sf 22817 11 Offsite BUA(sq ft) sf sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) -Roof(sq ft) -Roadway(sq ft) 17620 sf 17620 -Future(sgft) 5197sf 5197sf -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) sf sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) 21985 sf 21985 16 Existing BUA that is already permitted(sq ft) sf sf 17 Existing BUA that will be removed(sq ft) sf sf 18 Percent BUA 24% 24 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) n/a n/a 21 Calculation method for design volume n/a n/a ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances(H:V) I 3 sf 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 5.47 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s)(%) 8 Bottom width of curb outlet swale(s)(feet) 9 Maximum side slope of curb outlet swale(s)(H:V) 10 Minimum length of curb outlet swale(s)(feet) 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule.1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: Drainage Pervious Swale BUA Q Slope Vallow V,,„ai Flow depth Area area (ac) (cfs) (%) (fps) (fps) (ft) (ac) (ac) 1 1.23 0.38 0.85 0.50 4.83 4.60 15.00 3.80 0.62 2 1.44 0.44 0.99 0.50 5.66 4.80 15.00 4.03 0.66 3 1.58 0.85 0.73 0.65 8.09 2.60 4.50 3.38 0.81 4 5.89 1.80 4.09 0.45 16.72 2.00 4.50 3.67 1.15 5 0.13 0.07 0.06 0.65 0.65 0.60 4.50 1.05 0.39 6 1.69 0.52 1.17 0.50 6.66 3.20 15.00 3.48 0.72 7 0.46 0.21 0.25 0.60 2.18 1.10 4.50 1.77 0.57 8 0.36 0.19 0.16 0.65 1.83 1.20 4.50 1.73 0.51 9 13.29 2.04 11.25 0.40 41.89 2.90 15.00 5.47 1.40 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30