Loading...
HomeMy WebLinkAbout20011231 All Versions_Mitigation Closeout Request_20150730d �,a.STATF °� ��y, m,� � ` v.,. '1`' :���, STATE OF NORTH CAROLINA DEPARTIV�NT OF TRANSPORTATION PAT MCCRORY GOVERNOR July 30, 2015 Ms. Crystal Amschler Asheville Regulatory Office ACOE 151 Patton Avenue, Room 208 Asheville, NC 28805 NICK TENNYSON. ACTING SECRETARY Re: Tributary to Dixon Branch Site #16, Mecklenburg County, WBS # 34410.1.1; TIP No. R-2248D, Action ID No. 200131321; DWQ Project No. 011231 Ms. Amschler: As you are aware, the Department has monitored the Tributary to Dixon Branch Site #16 stream relocation site since its construction in February of 2005. The Tributary to Dixon Branch Site #16 is located in Mecklenburg County, adjacent to the Charlotte Outer loop at Sta. 13+50 Ramp 2D. This site provides 548 linear feet of stream relocation for impacts associated with the R-2248D project. The stream relocation was constructed and planted with the appropriate hardwood species. Per permit requirements, NCDOT was required to monitor the stream mitigation site for stream channel stability on a biannual basis for five years or until success criteria were met. During the monitoring period, annual monitoring reports were submitted to the appropriate regulatory agencies via the PDEA Natural Environment Section (NES) website: https: //connect. ncdot. g,ov/resources/Environmental/Pages/Permits-and-Mitigation. aspx After five years of vegetation and stream stability monitoring, the Tributary to Dixon Branch Site #16 stream relocation indicates that the planted vegetation is surviving and the streambanks remain stable at this time. Individual annual monitoring reports are available on NES's website for 2009-2014. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER Rn�EicH NC 27699-1598 TELEPHONE: 919-707-6000 FAX: 919-212-5785 Weas�re: WWW.NCDOT.GOV LOCATION: CENTURY CENTER BUILDING B 1020 BIRCH RIDGE DRIVE RALEIGH, NC 27610 A site visit was conducted on June 16t�', 2015 with regulatory agencies and NCDOT personnel present. It was determined at that meeting that the site success criteria had been met and that no further monitoring would be required. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 707-6121 Sincerely, c�� w . � � �lip S. Harris, III, P.E., Section Head PDEA- Natural Environment Section cc: Ms. Virginia Baker, NCDWR Ms. Marla Chambers, NCWRC Mr. Todd Bowers, USEPA Ms. Marella Buncick, USFWS Mr. Henry Wicker, USACOE Ms. Amy Chapman, NCDWR Ms. Donna Hood, NCDWR Mr. Tyler Crumbley, USACOE Mr. David Harris, P.E., NCDOT-REU Mr. Lany Thompson, NCDOT-DEO10 Mr. Randy Griffin, NCDOT-NES