Loading...
HomeMy WebLinkAbout20230733 Ver 1_revised impact table_20230807D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project (check all that apply): 0 Wetlands 0 Buffers ❑ Pond Construction 0 Streams - tributaries ❑ Open Waters 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. 2a1. 2b. 2c. 2d. 2e. 2f. 2g. Site #* Impact Impact Wetland Name* Wetland Type* Forested Jurisdiction Impact Area Reason/Type* Duration* ?* Type* (ac)* W1 Fill (Incl. Permanent WA Bottomland Yes Both 0.069 Riprap) Hardwood Forest W2 Fill (Incl. Permanent WB Bottomland Yes Both 0.002 Riprap) Hardwood Forest W3 Fill (Incl. Permanent WC Bottomland Yes Both 0.007 Riprap) Hardwood Forest W4 Fill (Incl. Permanent WD Bottomland Yes Both 0.010 Riprap) Hardwood Forest W5 Fill (Incl. Permanent WE Bottomland Yes Both 0.004 Riprap) Hardwood Forest W6 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts 0.092 ac 2g3. Total wetland impacts 0.092 ac 2h. Comments: Permanent wetland impacts W1, W2, W3 and W4 are associated with proposed roads that will provide access to the site. The impacts include the associated grading limits to bring the roads up to grade, head walls and end walls and associated rip rap to be placed as fill. Permanent Impact W5 is associated with fill from a slope associated with the building pad for apartment building #2. Page 9 of 22 PCN Form - Version 1.5, September 2020 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site #* 3a. Impact Reason/ Type* 3b. Impact Duration* 3d. Stream Name* 3e. Stream Type* 3f. Jurisdiction Type* 3g. Stream Width (avg ft) * 3h. Impact length (linear ft) S1 Crossing/ Culvert Permanent SA Perennial Both 5 62 S2 Fill (Intl. Riprap) Permanent SA Perennial Both 5 30 S3 Dewatering Temporary SA Perennial Both 5 5 S4 Crossing/ Culvert Permanent SA Perennial Both 5.7 93 S5 Fill (Incl. Riprap) Permanent SA Perennial Both 5.7 30 S6 Dewatering Temporary SA Perennial Both 5.7 10 S7 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S8 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S9 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S10 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S11 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S12 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S13 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S14 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S15 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to enter. linear ft 3i2. Total permanent stream impacts: 215 linear ft M. Total temporary stream impacts: 15 linear ft 34. Total stream and ditch impacts: 230 linear ft 3j. Comments: Crossing 1 - The culvert/head walls and end walls will impact 0.0071 acres of stream channel. The rip rap will impact 0.0034 acres of stream channel. The pump around will temporarily impact 0.0006 acres of stream channel. Crossing 2 - The culvert/head walls and end walls will impact 0.0122 acres of stream channel. The rip rap will impact 0.0039 acres of stream channel. The pump around will temporarily impact 0.0013 acres of stream channel. Page 10 of 22 PCN Form - Version 1.5, September 2020 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. 4b. 4c. 4d. 4e. 4e1. 4f. Site #* Impact Reason/ Impact Waterbody Name* Waterbody Jurisdiction Impact area (ac)* Type* Duration* Type* Type* 01 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 02 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 03 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 04 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter. ac 4g. Total open water impacts Click to enter. ac 4h. Comments: Open water impacts are not proposed. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5g. Comments: Pond or lake construction is not proposed. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 11 of 22 PCN Form - Version 1.5, September 2020 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? * (Check all that apply.) ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑x Randleman ❑ Other: Click to enter. Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) B1 Crossing/ Culvert/ Bridge Permanent SA/Unnamed No 7,654 4,052 B2 Crossing/ Culvert/ Bridge Permanent SA/Unnamed No 7,603 4,390 B3 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B4 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B5 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B6 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B7 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B8 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B9 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 6h. Total temporary impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6h. Total permanent impacts: Zone 1: 15,257 sq ft Zone 2: 8,442 sq ft 6h. Total combined buffer impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6i. Comments: Buffer impacts at each of the crossings is less than 1/3 of an acre and 150 linear feet. Buffer mitigation is not proposed. Buffer authorization for the proposed impacts is being obtained from the City of High Point. Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 12 of 22 PCN Form - Version 1.5, September 2020