HomeMy WebLinkAbout20150402 Ver 1_More Info Received_20150804Strickland, Bev
From: Devane, Boyd
Sent: Tuesday, August 04, 2015 9:52 AM
To: Strickland, Bev
Subject: FW: Sketch Plan - Courthouse Dr. Extension #15 -0402
Attachments: C2.3.1.pdf
., N,
From: Justin Church rmailto:iustin(abbrec.bizJ
Sent: Friday, July 31, 2015 9:23 AM
To: Devane, Boyd
Cc: Derek Goddard; Homewood, Sue
Subject: Re: Sketch Plan - Courthouse Dr. Extension #15 -0402
Per our conversation, please see the revised sheet attached. Let me know if there is anything else you need to
allow Sue to release our permit.
Thanks
/jc
On Tue, Jul 28, 2015 at 4:58 PM, Devane, Boyd <bovd.devane(amcdenr.�4ov> wrote:
From: Justin Church [mailto:iustin(a)brec.bizJ
Sent: Tuesday, July 28, 2015 4:52 PM
To: Devane, Boyd
Cc: Derek Goddard
Subject: Re: Sketch Plan - Courthouse Dr. Extension 415 -0402
:• •
Have you had a chance to look at this? We will document there are no wetland impacts per Sue's request. Do
you see any other issues?
Thanks
1
(}nTuc Jul |4,20|5md||13AM, Devane, B«vJ dcvanc �4nv>vvrntc:
From: ]ustn Church [maiKo:1ustn(d)brec bizl
Sent: Tuesday, ]uh 14, 2015 10:40 AM
To: Oevane,Boyd
Cm: Homewood, Sue; Strickland, Bev; Derek Goddard
Subject: Re: Sketch Plan - Courthouse Dr. Extension #15-0402
Please see the attached items you requested. Let n\c know if you have additional questions.
Thanks
On Fri, Jul 10, 2015 at 9:57 AM, Devane, Boyd <bovd.devaneamcdenr.�4ov> wrote:
| will have to look atit more next week. I've got several projects in line ahead of this one. | think the system may beok
but |will need some additional information.
1. | need to see the volume of runoff calculations and more information on the size of the basin to make sure that it
will treat the one inch storm.
4. You will need to delineate a drainage area adjacent to the road to show that a certain area will be protected at a
low density impervious percentage of 24% or less.
PEI
This is based on my initial look at your drawing and I may have a need for more information after I study the site and
proposed treatment structure in more detail.
From: Justin Church [mailto:iustin(gi)brec.bizI
Sent: Thursday, July 09, 2015 10:51 AM
To: Devane, Boyd
Cc: Derek Goddard
Subject: Sketch Plan
:• •
Would you mind looking at this sketch plan of a bmp to handle stormwater based on our conversations last
week? This is sort of a hybrid plunge pool/dry detention basin. I could make it larger, but I would have to clear
a substantial amount of trees to do so. This detention basin would capture all runoff from the impervious road
surface that is being installed. In my opinion, this would be more effective than swales. Let me know what you
think. I can get you a more polished plan quickly if you think this concept will be acceptable.
Thanks
/jc
"Please note our change of address as of 2/1/2015.
Justin Church, PE, CFM
Principal Engineer
BREC, P.A.
126 Executive Drive, Suite 220
Wilkesboro, NC 28697
(o) 336.844.4088
(c) 828.773.6543
httb: / /brec.biz
"Please note our change of address as of 2/1/2015.
Justin Church, PE, CFM
Principal Engineer
BREC, P.A.
126 Executive Drive, Suite 220
Wilkesboro, NC 28697
(o) 336.844.4088
(c) 828.773.6543
httb: / /brec.biz
"Please note our change of address as of 2/1/2015.
------------------------------
Justin Church, PE, CFM
Principal Engineer
BREC, P.A.
126 Executive Drive, Suite 220
Wilkesboro, NC 28697
(o) 336.844.4088
(c) 828.773.6543
httb: / /brec.biz
"Please note our change of address as of 2/1/2015.
Justin Church, PE, CFM
Principal Engineer
BREC, P.A.
126 Executive Drive, Suite 220
Wilkesboro, NC 28697
(o) 336.844.4088
(c) 828.773.6543
http: / /brec.biz
o I I
W I
Q
Z _
I
N\
cn
o _
j \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ PIPE -3 \ \ I
o o\ \
1\ \\ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ ' C \ \� \ I ' I
m — — \ \ \ \ \ \ \ �r'0 \ \ \ \ \ \ \ \ \ \ \ \ \ h \W \ M\ \
- --01 \ \\ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ o z z \
� � r
m 00
Ul
a
Z
o
m
\ o
o \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \y \ \ \
°o \\ o
Z - - -\ \\ \ \ \ \\ GT \ \\ I l ��\ \\ �. \ \ m
\ \� \ \\ \ \ \ \ RFF�i \_ \ -- I \ \
50' WETLAND \ \ \ \ \ \ \ \ \ \
o�\
�U� I \ �n
o
By
\\
Z O - -_ —
)
IJII/ - - -- \\ o \ \ \
\ ( \ \
m m \ \\`\ \ \\\
E
343.18'
\ \
\
— \ `\
/ / a P PE -14
o z - „
o�/ / / o� / \� \ \.A /
—jam i�-- ��-- r' / / / \ \� �— �\\' - -/ / I / / / / /i� I �\ l I _ �3 I
CP
/ 0
o <
m
z / / / //
D
A —
o —
D
O
— / / / \
o - - -- / //� /
/
n — -
/ / I
.Z{I -
- - - - - - - - - -
--- - - - - -- /—------------ - - - - -
-- — — — — — — — — —/ - - -- _1
Z - -- 1035--------- -
----- - - - - -- - �.
_ -o -- ---- - - - - --
ca
mca
-------- - - - - -/ ' -
Z— - - - - - - - --
m --
-u - - - - -- - - - - - -- Z
- ---------- -_ C�� _ == — - - -- ///
------ - - - - -- -1045- -
a------ - - - - --
m---- - - - - -- w p� w/
-n PIPE-7
m
1065
/ ss�ss ss— ss _ss — ss— ss— ss— ss— ss— ss— ss— ss
z ss
o n � ss� ss
--- - - -� \I o p <z c_ s s
\I I U) C= s ssJ
ss__ ss o rn
„ n ii n ss o
° — — — O I s
00 o 0 o Z
/ A 4� 41 41. u,
CD c9 co iv 0
— N j 1
N I / cn cn cn X v \
EX. 1 RCP / , �►`� 1070
1� ► s +.rte ?. - --
/ - -
r� �S mowmo\�_�---- __ - - -� -- '1055 - - - - -- - -- - --
m n m n o � � /i DATE: REVISIONS:
m m o z COURTHOUSE DRIVE EXTENSION BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA \�.` ��N �ARO�� %,�
T W z ENGINEERING I PLANNING I ENVIRONMENTAL 0 •�FESS /O'••.-Y 75 PREPARED FOR: B _ : Q < • _
0 � -
N 0 SEAL
NCBELS ENGINEERING FIRM #C -3448 =
W WILKES COUNTY `: 035736
in 0 110 NORTH STREET - .•
WILKESBORO, NC 28697
c D N N 1305 SOUTH COLLEGIATE DRIVE 336.844.4088
_ ° o WILKESBORO, NC 28697 http: //brec.biz
V c" cn -Q W tv
ID
o
oo�
ti �
J \
/
I I
/ I
I
I I I \ \
I \ \
\ \ \ \\ \\\ \\
\ \ z> \ \ \ \
\\ \\ :'z — >o \\ \\ \ \
\ vS
M--±
\ \ \ \
\°,ten°-
D C')
-� cn = \ \ \ \ \ \ \ \
`07 O \ \ \ \ \ \ \ \ \
\ ovo\
\ \ \-n O N O \\ \\ \\ \
U) D \ \\ \\ \ \
\ \�7 MZ7 C D \ \ \
rA
\ \\ \ \ m\
\ \ \\ moo\ \\ \ \ \ \ \
\ \ \,c�•\ ono\ \ \ \ \ \
r
\\ \ \ \ \\ \ \\ \ \\ \ \\ \
\
I —
o f \-7,
-us__m__
\
I D ' 70mm— \ \ \ \ \ \\
m m z
-m °m
m` — \
s
\ II
$S
1 s —ca cn/6
/ \ -
1060 -
_
-Do��
_ z _71;
\� /
PLAN & PROFILE
RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION 07/31/2015 DO NOT SCALE - PLANS MUST BE RECEIVED AS A COMPLETE SET