Loading...
HomeMy WebLinkAboutSW6230705_Design Calculations_20230831 (35) 4D Site Solutions, Inc. DESIGN REQUIREMENTS: A. Post development discharge<or=Predevelopment discharge SCM 16 Pre-Development Runoff-10-yr Drainage Area,(DA)= 12.60 acres Intensity,(I)= 5.99 inches/hr Composite Runoff Coefficient,(C)=> 0.30 Maximum Release Rate,(Q10)=> 22.64 cfs SCM 16 Post-Development Runoff-10-yr Drainage Area,(DA)= 12.60 acres Intensity,(I)= 7.49 inches/hr Composite Runoff Coefficient,(C)=> 0.64 Peak Release Rate,(Qio)=> 60.40 cfs Detention Pond Stage-Storage Function Contour Contour Incr. Accum. Stage Elev. Area Storage Storage(S) (Z) (ft) (sf) (cf) (cf) (ft) In(S) In(Z) Z est 279.5 15,446 - - - 280.0 16,933 8,095 8,095 0.50 9.00 -0.69 0.53 280.5 17,492 8,606 16,701 1.00 9.72 0.00 1.02 281.0 18,061 8,888 25,589 1.50 10.15 0.41 1.50 282.0 19,229 18,645 44,234 2.50 10.70 0.92 2.46 283.0 20,437 19,833 64,067 3.50 11.07 1.25 3.45 284.0 21,687 21,062 85,129 4.50 11.35 1.50 4.46 285.0 22,976 22,332 107,461 5.50 11.58 1.70 5.51 285.5 23,637 11,653 119,114 6.00 11.69 1.79 6.05 286.0 24,533 12,043 131,157 6.50 11.78 1.87 6.60 Regression Output: b= 1.10 (X Variable Coeff) Ks= 16,410 (eY"intercept) Stage-Storage Equation is of the form:S=(Ks)(Z)b printed: 7/7/2023 131 PM Page 1 of 3 4D Site Solutions, Inc. Primary Spillway Barrel Number of Barrels= 1 Dia.of Barrel= 24 inches Area of Barrel,(Ab)= 3.14 sf Pipe Length,(L)= 80 feet Friction Coeff.,(Kp)= 0.01058 Inv.of Barrel= 279.50 feet Riser Elev.of Riser Crest= 283.50 feet Rectangular Length Weir= 36 inches Width Weir= 48 inches Total Weir Length= 14.00 feet Area of Riser= 12.00 sq.ft. Orifice in Riser Dia.of Orifice= 2.70 inches Number of Orifices= 1 Area of Orifice,(Ab)= 0.04 sf Orifice Coefficient(CO= 0.60 Inv.of Orifice= 279.50 feet Length of weir= 1.80 feet Top of weir= 281.01 feet Weir Coefficient(Cw)= 3.00 Emergency Spillway Width of Spillway(Approx.)= 25 feet Weir Coefficient= 3.3 Crest Elevation= 284.50 feet Summary of Results Maximum Release Rate,(Qlo)= 22.64 cfs Release Rate,(Q10)= 22.52 cfs Normal Water Surface Elev.= 279.50 feet Water Surface Elev.@ Outlet(Qlo)= 283.54 feet printed: 7/7/2023 131 PM Page 2 of 3 4D Site Solutions, Inc. Inflow Hydrograph-10-yr Peak Inflow,(Qp)_> 60.40 cfs Time to Peak Calculation: CN= 74 P= 5.24 in. S= 3.51 in. Q*= 2.56 in. (depth of runoff) Vol= 116,959 cf (vol.of runoff) Time to Peak,(Tp)=> 23.2 minutes (SCS TR-55) printed: 7/7/2023 1:31 PM Page 3 of 3