Loading...
HomeMy WebLinkAboutSW6230705_Design Calculations_20230831 (12) 4D Site Solutions, Inc. DESIGN REQUIREMENTS: A. Pass the storm event SCM 13 Pre-Development Runoff-100-yr Drainage Area,(DA)= 22.47 acres Intensity,(I)= 7.57 inches/hr Composite Runoff Coefficient,(C)=> 0.30 Maximum Release Rate,(Qloo)=> 51.03 cfs SCM 13 Post-Development Runoff-100-yr Drainage Area,(DA)= 22.47 acres Intensity,(I)= 9.52 inches/hr Composite Runoff Coefficient,(C)=> 0.61 Peak Release Rate,(Qloo)=> 130.49 cfs Detention Pond Stage-Storage Function Contour Contour Incr. Accum. Stage Elev. Area Storage Storage(S) (Z) (ft) (sf) (cf) (cf) (ft) ln(S) ln(Z) Z est 307.5 20,932 - - - 308.0 23,019 10,988 10,988 0.50 9.30 -0.69 0.54 308.5 24,084 11,776 22,764 1.00 10.03 0.00 1.03 309.0 25,164 12,312 35,076 1.50 10.47 0.41 1.50 310.0 27,365 26,265 61,340 2.50 11.02 0.92 2.45 311.0 29,622 28,494 89,834 3.50 11.41 1.25 3.42 312.0 31,936 30,779 120,613 4.50 11.70 1.50 4.43 313.0 34,306 33,121 153,734 5.50 11.94 1.70 5.48 314.0 36,733 35,520 189,253 6.50 12.15 1.87 6.58 315.0 39,216 37,975 227,228 7.50 12.33 2.01 7.72 Regression Output: b= 1.14 (X Variable Coeff) Ks= 22,121 (eY"mtercePt) Stage-Storage Equation is of the form:S=(Ks)(Z)b printed: 7/7/2023 1.09 PM Page 1 of 3 4D Site Solutions, Inc. Primary Spillway Barrel Number of Barrels= 1 Dia.of Barrel= 24 inches Area of Barrel,(Ab)= 3.14 sf Pipe Length,(L)= 80 feet Friction Coeff.,(Kp)= 0.01058 Inv.of Barrel= 307.50 feet Riser Elev.of Riser Crest= 312.50 feet Rectangular Length Weir= 36 inches Width Weir= 48 inches Total Weir Length= 14.00 feet Area of Riser= 12.00 sq.ft. Orifice in Riser Dia.of Orifice= 3.00 inches Number of Orifices= 1 Area of Orifice,(Ab)= 0.05 sf Orifice Coefficient(CO= 0.60 Inv.of Orifice= 307.50 feet Length of weir 2.50 feet Top of weir= 309.42 feet Weir Coefficient(Cw)= 3.00 Emergency Spillway Width of Spillway(Approx.)= 20 feet Weir Coefficient= 3.3 Crest Elevation= 314.00 feet Summary of Results Maximum Release Rate,(Qloo)= 51.03 cfs Release Rate,(Q1oo)= 103.67 cfs Normal Water Surface Elev.= 307.50 feet Water Surface Elev.@ Outlet(Q100)= 313.45 feet printed: 7/7/2023 1.09 PM Page 2 of 3 4D Site Solutions, Inc. Inflow Hydrograph-100-yr Peak Inflow,(Qp)_> 130.49 cfs Time to Peak Calculation: CN= 73 P= 7.91 in. S= 3.70 in. Q*= 4.73 in. (depth of runoff) Vol= 385,830 cf (vol.of runoff) Time to Peak,(Tp)=> 35.5 minutes (SCS TR-55) printed: 7/7/2023 1:09 PM Page 3 of 3