Loading...
HomeMy WebLinkAboutNCS000435_MS4 Annual Report (2022-23 FY)_20230831 Permit Fiscal BMPf Measurable Goal Reporting e Comments Line No. Year Did Asheville develop and distribute a stormwater flier in combined utility bill 7 3 3.B.3. statements? Yes 8 3 3.B.3. If so,was illicit discharges covered in the distributed fliers? Yes Topics discussed: Illicit discharge, Illicit Activities,Stormwater Runoff, Illicit Discharge Detection& Elimination Program,and the Types of Stormwater Systems 9 3 3.B.3. If so,how many utility bill insert fliers were distributed? 45,500 within the COA. 20 3 4.B.3. Did Asheville display illicit discharge fliers at locations throughout the City? Yes 21 3 4.B.3. If so,how many fliers were distributed(total)? 150 Topics are same as above. Various dates of training were provided. In person training began on 1/30/23 and we could then handout fliers. Total number of Did Asheville train/provide an NPDES training flier to new employees during fliers given to new employees is 30 3 5 orientation? Yes 99. 31 3 5 If so,how many staff were trained? 196 42 _ 3 6 Did Asheville provide general stormwater awareness fliers at public events? Yes Various dates of events were attended and brochures handed out. Events included Truck City, School Career Days and Field 43 3 6 If so,how many fliers were distributed? 4,170 Days. Did Asheville develop and distribute stormwater fliers on stormwater pollutants,illicit 54 3 7.B.3 discharges and illegal dumping to general contractors and painters? Yes Topics included Water Quality Regulations for Construction Sites, Encroachment&ROW Cut Permits,SCMs and Stormwater Pollutants,Illicit Discharges and 55 3 7.B.3 If so,how many fliers were distributed? 268 Illegal Dumping. Did Asheville attend local events for school aged children to discuss the impacts of 66 3 8 stormwater discharges? Yes Various dates of events were attended and included topics such as stormwater infrastructure, stormwater operations,and stormwater pollution and 67 3 8 If so,how many events were attended? 15 prevention and litter clean-up. 68 3 8 If so,how many participants were reached? 5,514 84 3 9 Did Asheville post stormwater information/topics on social media? Yes Posts were made on various dates. Topics included Pollinator Gardens, River Cleanups,Road Cleanups, The Clean Water Act,Stormwater Projects,DIY Cleanups and 85 3 9 If so,how many posts were made? 17 Neighborhood Cleanups. 86 3 9 If so,how many views were there? 22,097 FB=18,973;IG=3,124 100 _ 3 10.B.1 Did Asheville maintain the stormwater web page? Yes 101 3 10.B.1 If so,how many web page views were there? 13,093 111 3 10.B.3 Did Asheville update the city's stormwater web page? Yes Jul 2022,Nov 2022-Jun 2023, 112 3 10.B.3 If so,how many web page updates were there? 10 3/14/23,3/21/23,4/20/23,6/16/23 Did Asheville add one educational component to the city's stormwater web page that 121 3 10.B.4 addresses a target pollutant/audience? No Was added on 8/2/23. 133 3 11 Did Asheville maintain the hotline/helpline? Yes 134 3 11 If so,was the hotline/helpline publicized on the city's web page? Yes _ 135 3 11 If so,was the hotline/helpline publicized in the city's educational fliers? Yes General type of inquiries were complaint based. This is the number of calls from 12/2/22- 6/30/23. COA converted to a new phone system and data is not 136 3 11 If so,how many hotline/helpline inquiries were there? 613 available for the old system. Depending on the stormwater topic,staff can go before the Sustainability Advisory Board; Policy,Finance&Human Resources Committee; Environment&Safety Committee; Did Asheville develop/review guidelines and procedures for board/commission to or Planning&Economic 151 3 12.B.1 include stormwater in agendas? Yes Development Committee. Did Asheville coordinate with the board/commission to include stormwater in 152 3 12.B.2 agendas? Yes •2/14/2023 Policy,Finance& Human Resources Committee and City Council-Project Challenges, Climate Change Impacts, Stormwater Program and Fee Study;Stormwater Fee Increase (Mayor and 2 Council members,15 staff,88 YouTube views) •3/28/2023 City Council- Stormwater Fee Increase(Mayor,6 Council members,5 staff,5 community members,1.4k YouTube views) •6/26/2023 Neighborhood Advisory Committee-Stormwater Program and Fee Study(4 committee members,4 staff,1 153 3 12.8.2 If so,how many stormwater topics were discussed? 4 consultant and 50 YouTube views) Did Asheville maintain the Asheville App or related tool for citizens to provide 166 3 14 information on stormwater issues? Yes 167 3 14 If so,how many stormwater issues were reported? 264 168 3 14 If so,how many stormwater issues were addressed? 233 Did Asheville hold community meeting(s)to gain input/feedback on capital 182 3 15 improvement projects? Yes •2/6/2023 Shiloh Community Meeting-'Shiloh Park Culvert Rehab Project'(33) •Various Dates-Stormwater 183 3 15 If so,how many attendees were present? 33 Program Outreach Events(110) Partnership w/Asheville Greenworks.Collected 4,250 pounds of trash with the Adopt a Street Program.Also removed 1,744.3 pounds of trash with the Trash Trout Program. Trash Trout volunteers(138)&Adopt-a-Street 194 3 17 Did Asheville coordinate litter pick-up through Adopt-A-Street? Yes volunteers(204). 3 miles=3 new streets for a total 195 3 17 If so,how many street miles were adopted? 70 miles of 72 streets=70 street miles Partnership w/RiverLink as part of 206 3 18 Did Asheville coordinate volunteer storm drain stenciling? Yes the Adopt-A-Drain Program 28 new volunteers performed stenciling on various dates. Total number of volunteers participating in the Adopt-A-Drain Program is 99. This program is performed in the Central Asheville Watershed, Smith Mill Creek Watershed,Haw Creek Area and North Asheville 207 3 18 If so,how many volunteers participated? 28 (Reed Creek). All areas from the 4 year plan have been identified by the CCTV crew and camered. The City also applied for a grant and will contract with a consultant to assist with 216 3 19.B.2 Did Asheville implement the four-year plan to update the MS4 inventory? Yes more detailed system mapping. Data from CCTV is going through a QA/QC process before being 217 3 19.B.2 If so,what percent of the MS4 is mapped? 81% integrated with the other GIS data. 218 3 19.B.2 If so,how many major outfalls were mapped? 0 Did Asheville maintain a process for collecting CIP as-built data of stormwater 232 3 20 infrastructure and incorporate into GIS database? Yes Sulphur Springs was sent to GIS for mapping but has not been 233 3 20 If so,how many CIP projects were incorporated into the MS4 mapping? 0 incorporated into the system yet. Did Asheville maintain a process for collecting infrastructure data using pipe cameras 242 3 21 and incorporate data into the GIS database? Yes Did Asheville maintain a process for collecting private development as-built data and 252 3 22 incorporating it into the GIS database? Yes 31 have been submitted to GIS for 253 3 22 If so,how many project as-builts were incorporated into the MS4 mapping? 0 incorporation in FY3. 36 total outfalls were added from 254 3 22 If so,how many outfalls were added? 0 RADTIP for FY2. 266 3 23 Did Asheville maintain an IDDE ordinance and administration and enforcement of it? Yes Did Asheville develop procedures/guidelines for administration and enforcement of 272 3 24.B.1 the IDDE ordinance? Yes New Regulatory Manager position will start in FY4. A final update will Did Asheville update procedures/guidelines for administration and enforcement of be provided then and sent to Legal 273 3 24.B.2 the IDDE ordinance? Partial for review. Once final update of the SOP is approved by Legal,additional staff/positions will be trained. Those responsible for enforcement are already trained on 277 3 24.B.3 Did Asheville train specific staff/positions on IDDE procedures/guidelines? Partial procedures/guidelines. Those responsible for enforcement are already trained on procedures/guidelines. Review of 278 3 24.B.3 If so,how many staff were trained? 2 documentation was in June 2023. New Regulatory Manager position will start in FY4.A consultant will also be hired to assist with Plan review.A final update will be provided then,sent to Legal for 287 3 25.B.2 Did Asheville submit the IDDE Plan to DEQ? No review,and then sent to DEQ. 288 3 25.B.2 If so,what is the date of IDDE Plan submittal? Will be submitted in FY4. Will be finalized in FY4 after 3 25.B.3 Did Asheville finalize IDDE Plan? No submitted and approved by DEQ. New Regulatory Manager position will start in FY4.A consultant will also be hired to assist with any SOP documentation.A final update will be provided then,sent to Legal for review,and then sent to DEQ. We also contract with Environmental Quality Institute (EQI)for the testing of six stream site samples within the city. EQI has developed an on-going water quality database of Western North Carolina watersheds. The purpose of the research is to continue and expand the long-term monitoring of stream sites within Buncombe 302 3 26.B.2 Did Asheville submit the dry weather screening procedures to DEQ? No County. 303 3 26.B.2 If so,what is the date of IDDE Plan submittal? Will be submitted in FY4. New Regulatory Manager position will start in FY4.A consultant will also be hired to assist with any SOP documentation.A final update will be provided then,sent to Legal for review,and then sent to DEQ. Did Asheville submit the written SOP for conducting illicit discharge and illegal We have completed a draft 319 3 27.B.2 dumping investigations to DEQ? No inspection form. 320 3 27.B.2 If so,what is the date of SOP submittal? Will be submitted in FY4. 343 3 28 Did Asheville maintain the IDDE complaint spreadsheet? Yes 344 3 28 If so,how many complaints were received? 11 If so,how many complaints were verified as illicit discharges,connections or One was a dechlorinated 345 3 28 dumping? 10 swimming pool being drained. One complaint was addressed via email,however,a follow up letter 346 3 28 If so,how many verified complaints were resolved? 10 was sent in FY4. Did Asheville provide illicit discharge and illegal dumping training to staff and 361 3 29 contractors? Yes New employee orientation(199); Brochure mailed to contractors (193);Street Div(38). New employee orientation 1/30/23, 2/27/23,3/27/23,4/24/23,6/26/23, 7/11/22,7/25/22,8/8/22,9/6/22, 9/19/22,10/3/22,10/17/22, 10/31/22,11/14/22,11/28/22. Street Division training 10/20/22. Topics covered: Why we have an NPDES Permit,Pollution Prevention and Good Housekeeping,Best Management Practices,Illicit Discharge& 362 3 29 If so,how many people were trained? 430 Dumping. Did Asheville maintain an after hours on-call duty officer to investigate illicit 373 3 31 discharges and illegal dumping? Yes 374 3 31 If so,how many investigations were performed after hours? 0 No calls received. Did Asheville maintain and publicize an email address for the public to report erosion 385 3 33 and sedimentation problems? Yes stormwater@ashevillenc.gov 386 3 33 If so,how many emails reports were received? 19 Did Asheville maintain an after hours on-call duty officer to investigate after hours 397 3 35 erosion and sedimentation problems? Yes 8 calls received but only 4 were for erosion and sedimentation problems.The other 4 were for other departments or for outside city limits where the County was 398 3 35 If so,how many investigations were performed after hours? 4 notified. Did Asheville provide staff training on proper handling of construction site runoff 409 3 36 control complaints? Yes July 2022,Oct 2022,Jan 2023,Apr 2023 Meetings;Apr 19-20,2023 Conference; Construction Supervisor; Construction Inspector III(2); 410 3 36 If so,how many staff were trained? 5 Construction Inspector II(2). New Regulatory Manager position will start in FY4.A consultant will also be hired to assist with ordinance language creation.A final update will be provided then, Did Asheville develop and adopt an ordinance requiring construction waste sent to Legal for review,and then 418 3 37.B.1 management? No sent to DEQ. New Regulatory Manager position will start in FY4.A consultant will also be hired to assist with ordinance language creation.A final update will be provided then, sent to Legal for review,and then 419 3 37.B.2 Did Asheville maintain an ordinance requiring construction waste management? No sent to DEQ. 427 3 38 Did Asheville conduct pre-construction conferences? Yes 428 3 38 If so,how many pre-construction conferences were conducted? 32 435 3 39.B.1 Did Asheville develop a pre-construction stormwater fact sheet? Yes 437 3 39.B.2 Did Asheville add the pre-construction stormwater fact sheet to the web page? Yes _ An agenda with information is provided at pre-construction meetings.This information is reviewed in detail with meeting attendees. A list of detailed comments is also provided as part of a preliminary plan review and approval to provide substantial plans prior to the construction phase. A new additional stormwater fact-sheet created in Did Asheville distribute the pre-construction stormwater fact sheet at pre-construction FY3 will be distributed starting in 439 3 39.B.3 meetings? Yes FY4. 440 3 39.B.3 If so,how many stormwater pre-construction fact sheets were distributed? 32 Did Asheville track the number of low-density and high-density plan reviews 457 _ 3 40.B.1. performed? Yes 458 3 40.B.1. If so,how many low density project reviews were performed? 1,413 997 Residential;416 Commercial 459 3 40.B.1. If so,how many high density project reviews were performed? 315 460 3 40.B.2 If so,how many low density project reviews were approved? 594 517 Residential;77 Commercial 461 3 40.B.2 If so,how many high density project reviews were approved? 22 Did Asheville maintain a current inventory of low-density projects and constructed SCMs,including SCM type or low-density acreage,location,last inspection date and 479 3 40.B.3. type of enforcement action(if any)? Yes 485 3 40.B.4 How many SCM inspections were performed? 39 There were 504 projects to inspect with a minimum of 2 inspections up 491 3 40.13.5 How many low-density inspections were performed? 504 to 22 inspections for some. 497 3 40.B.6 How many post-construction enforcement actions were issued? 0 New Regulatory Manager position will start in FY4.A consultant will also be hired to assist with Plan review.A final update will be provided then,sent to Legal for 503 3 41.B.2 Did Asheville submit the written O&M Plan for municipal facilities to DEQ? No review,and then sent to DEQ. 504 3 41.B.2 If so,what is the date of IDDE Plan submittal? Will be submitted in FY4. Will be finalized in FY4 after 3 41.B.3 Did Asheville finalize O&M Plan for municipal facilities? No submitted and approved by DEQ. Inventory is updated by Community Did Asheville review and update the municipal facility inventory with any new &Economic Development 520 3 42.B.3 facilities? Yes Department Completed the evaluation of 404 parcels of city owned or leased properties in FY3. Determined which properties had no pollution potential,some pollution potential or needed further investigations. New Regulatory Manager position will start in FY4.A consultant will also be hired to assist with documentation needs.A final schedule will be provided then. Did Asheville develop a schedule and documentation for performing municipal facility Each site that is inspected is 525 3 43.B.1 inspections? Partial documented on a standard form. Although schedule is not complete yet,15 facilities were evaluated for pollution potential.When the schedule is complete for the Did Asheville perform municipal facility inspections in accordance with the developed additional properties,they will be 534 3 44 schedule? Partial inspected as per schedule. 535 3 44 If so,how many facility inspections were performed? 15 Did Asheville train staff on general stormwater awareness, pollution prevention and Part of the new employee 540 3 45 good housekeeping? Yes orientation. New employee orientation(199); Street Div(38). New employee orientation 1/30/23,2/27/23, 3/27/23,4/24/23,6/26/23,7/11/22, 7/25/22,8/8/22,9/6/22,9/19/22, 10/3/22,10/17/22,10/31/22, 11/14/22,11/28/22. Street Division training 10/20/22. Topics covered: Why we have an NPDES Permit, Pollution Prevention and Good Housekeeping,Best Management Practices,Illicit Discharge& 541 3 45 If so,how many staff were trained? 199 Dumping. Did Asheville maintain written spill response procedures in the municipal facility 550 3 46.B.1 SPPPs? Yes 554 3 46.B.2 Did Asheville train staff at SPPP facilities on spill response? Yes Reviewed items in the onsite notebook and provided the completed inspection form along with pictures taken as the inspection was performed. Dates inspections performed were on 6/15/23,6/26/22,6/27/23& 555 3 46.6.2 If so,how many staff were trained? 9 6/28/23. Did Asheville train O&M staff on stormwater awareness,pollution prevention,and 562 3 47 proper MS4 O&M? Yes 563 3 47 If so,how many staff were trained? 38 10/20/22 Did Asheville develop a SOP with frequencies,schedules and documentation for inspection and maintenance of city owned infrastructure,including catch basins and 569 3 48.B.1 conveyances? Partial We have a document in draft form. Did Asheville verify,document and prioritize maintenance activities identified by This is done in Cityworks. 580 3 48.B.3 inspections and/or citizen reports? Yes CCTV Inspections-113 completed •Constr/Maint/Ditch-58 completed,174 pending,30 service req pending •Vac-Con-1238 completed •Sweeping-620 completed 581 3 48.B.3 If so,how many activities were prioritized? 2,058 •Utility Locate-142 completed Did Asheville create/maintain an inventory of municipal SCMs including type and 592 3 49.B.1 description? Yes 593 3 49.B.2 If so,how many municipal SCMs are in the inventory? 30 Various types of SCMs 600 3 50.B.1 Did Asheville perform documented inspections of all municipal SCMs? Yes Inspectors were unclear of one location-will review to determine 601 3 50.B.1 If so,how many municipal SCM inspections were performed? 29 its function. 8/11/2022-Silt removed and 602 3 50.B.2 If so,how many SCMs were maintained as a result of the inspection? 1 wetland restored Did Asheville verify that Parks&Recreation staff maintained appropriate applicator 613 3 51 licenses? Yes 614 3 51 If so,how many staff hold valid licenses? 8 Did Asheville inspect all municipal facilities that hold an industrial stormwater permit 624 3 52.B.1 for compliance with the permit? Yes 625 _ 3 52.13.1 If so,how many municipal facilities hold industrial stormwater permits? _ 2 Fleet and Transit If so,how inspections were performed for municipal facilities that hold industrial 626 3 52.B.1 stormwater permits? 2 Fleet and Transit Did Asheville train municipal industrial stormwater permitted facility staff on the 635 3 52.B.2 permit requirements and SPPP? Yes Transit-2(November 2022) 636 3 52.B.2 If so,how many staff were trained? 13 Fleet-11 Did Asheville update the vehicle and equipment maintenance facility inspection 642 3 53.B.1 checklist? Yes Fleet-No updates were needed. Did Asheville train municipal vehicle and equipment maintenance facility staff on 647 _ 3 53.B.3 pollution prevention and good housekeeping? Yes Transit-2(November 2022) 648 3 53.B.3 If so,how many staff were trained? 13 Fleet-11 Did Asheville develop a written SOP for street sweeping,including schedules and 654 3 54.13.1 zones/locations? Yes Did Asheville develop a written SOP for proper disposal of collected wash waters This is included in the SOP for 656 3 54.B.2 and solids? Yes Street Sweeping. 668 3 55.13.1 Did Asheville maintain an inventory of public trash receptacles? Yes Did Asheville collect and properly dispose of waste from public trash receptacles 676 3 55.8.2 weekly? Yes If so,what is the total annual estimated amount of trash collected/disposed of Trash=529,300 lbs 677 3 55.B.2 (pounds)? 724,660 Recycling=195,360 lbs Did Asheville establish and publicize protocols for residential brush and bagged leaf 686 3 56.13.1 collections? Yes 694 3 56.B.2 Did Asheville collect brush and bagged leaves per the established schedule? Yes _ If so,what is the total annual amount of brush and leaves collected/disposed of 695 3 56.B.2 (pounds)? 12,960,000