HomeMy WebLinkAboutNCS000604_MS4 Annual Report (2022-23 FY)_20230831 Reporting
Line Year BMP Reporting
Measurable Goal Comments
No. (July 1- Ref. Metric
June 30)
Did Cajah's Mountain submit the Annual Self-Assessment to
2 2 1 NCDEQ prior to August 31 each year? YES
Did Cajah's Mountain develop and distribute new educational
11 2 3.B.2. fliers about illicit discharges? YES
If so, how many educational fliers about illicit discharges were
12 2 3.B.2. distributed? 75
Did Cajah's Mountain attend a community event to disperse
stormwater outreach materials/awareness through the use of
21 2 4.B.1. interactive educational games and activities? YES Butterfly Festival
If so, how many event attendees were engaged in stormwater
22 2 4.B.1. outreach? 75
Did Cajah's Mountain provide alternative outreach
opportunities if a community event was canceled or as an
31 2 4.B.2. additional outreach supplement? NO
32 2 4.B.2. If so, how many attendees were engaged in stormwater 0
Did Cajah's Mountain have WPCOG provide instruction and
42 2 5.B.1. stormwater educational activities to youth? YES
If so, how many WPCOG youth education activities/events
43 2 5.B.1. were provided? 1
44 2 5.B.1. If so, how many WPCOG youth event participants were 75
55 2 5.B.2. How many storm drains were stenciled? 0
Did Cajah's Mountain create a presentation covering
62 2 5.B.3. stormwater topics to be presented in digital classrooms and/or NO
If so, how many classroom presentations were provided by
63 2 5.B.3. teachers or staff? 0
64 2 5.B.3. If so, how many students were reached by classroom 0
Did Cajah's Mountain provide one presentation about one of
the six NPDES Minimum Control Measures at each annual
77 2 7.B.1. WPCOG Water Quality Conference? YES
If so, how many attendees were reached during the annual
78 2 7.B.1. WPCOG Water Quality Conference stormwater presentation? 95
Did Cajah's Mountain evaluate the target pollutants and
88 2 8.B.1. audiences to identify where outreach can be improved? YES No adjustments needed at this time
89 2 8.B.1. If so, were any revisions made to target pollutants? NO
90 2 8.B.2. If so, were any revisions made to target audiences? NO
Did Cajah's Mountain maintain and update the stormwater
104 2 10.B.1. program web page? PARTIAL In progress of an update to their website
It has been uploaded on WPCOG's
Was the annual selflhssessment uploaded to the Town of website. Cajahs Mountain needs an
105 2 10.B.2. Cajah's Mountain's website? PARTIAL overall website update
Did any web page links, contact information, or documents
106 2 10.B.2. need to be updated? YES forms, contacts, and documents
107 2 10.B.3. How many hits did the stormwater program web page YES 123
Did Cajah's Mountain provide citizen education as part of the
122 2 11.B.3. illicit discharge and illegal dumping enforcement process? YES
If so, how many educational citizen interactions were there
123 2 11.B.3. during as part of the illicit discharge and illegal dumping 0 There were no Illicit discharges
133 2 12.B.3. How many stormwater hotline calls were received? 0
Did Cajah's Mountain stormwater hotline staff receive training
in general stormwater awareness, complaint call protocols,
138 2 12.B.4. appropriate contacts for referral, and typical stormwater YES
Did Cajah's Mountain publicize contact information on the
Cajah's Mountain's Facebook page, and the stormwater
143 2 12.B.5. program and WPCOG webpages? YES WPCOG's website
How many messages were received via the web based
148 2 15.B.2. complaint/reporting/input form? 0
Was the web based complaint/ reporting/input form Updated form to microsoft form, as it
152 2 15.B.3. maintianed/ updated? YES works better with government emails.
Did Cajah's Mountain utilize the existing Facebook page to
promote public involvement in stormwater programs, events
158 2 16.B.1. and projects and provide outreach/general stormwater NO No facebook page
If so, how many posts were made on the Facebook page
159 2 16.B.1. related to the stormwater program? 0
Did Cajah's Mountain participate in quarterly Water Resource
169 2 17.B.1. Committee meetings? YES
If so, how many quarterly Water Resource Committee
170 2 17.B.1. meetings did Cajah's Mountain participate in? 2 of 2
If so, how many attendees (total of all meetings)were at
quarterly Water Resource Committee meetings that Cajah's
171 2 17.B.1. Mountain participated in? 32
Did Cajah's Mountain provide a survey to engage the public
183 2 18.B.1. and gauge public interest in stormwater issues and the YES
No surveys have been received by the
184 2 18.B.1. If so, how many surveys were completed? 0 time of reporting
Did Cajah's Mountain provide and promote volunteer stream
195 2 19.B.1. cleanup activities? YES
196 2 19.B.1. If so, how many stream cleanup events were held? 1
197 2 19.B.1. If so, how many stream cleanup participants were there? 2
198 2 19.B.1. If so, how many trash bags were filled during stream cleanup 8
Did Cajah's Mountain provide materials for volunteer stream
212 2 19.B.2. cleanup activities hosted by Cajah's Mountain and WPCOG? YES
Did Cajah's Mountain supplement or replace stream clean-up
time with outdoor educational activities if streams do not have
219 2 19.B.4. adequate litter available for cleanup? NO
If so, how many supplemental or replacement outdoor
220 2 19.B.4. educational activities were held? 0
If so, how many supplemental or replacement outdoor
221 2 19.B.4. educational activity participants were there? 0
Did Cajah's Mountain update the existing MS4 map to include In progress, Caldwell County Stormwater
233 2 20.B.1. open channels, storm drain information and flow direction? PARTIAL Mapping is being completed by WPCOG
234 2 20.B.1. If so, was at least 20%of the MS4 area mapped? Yes
Did Cajah's Mountain add newly constructed infrastructure to
242 2 20.B.2. the existing MS4 map? PARTIAL In Progress
247 2 21.B.1. Did Cajah's Mountain review the IDDE ordinance and update if YES
Did Cajah's Mountain review/update priority areas likely to There are no priority areas that have been
254 2 23.B.1. have illicit discharges? PARTIAL discovered
Did Cajah's Mountain perform dry weather inspections in
259 2 24.B.2. accordance with the SOP and schedule? NO
There are only a few outfalls for Cajahs
260 2 24.B.2. If so, how many dry weather inspections were performed? 0 Mountain
261 2 24.B.2. If so, how many potential illicit/dry weather discharges were 0
Did Cajah's Mountain screen priority areas likely to have illicit There are no priority areas that have been
274 2 26.B.1. discharges? YES discovered
275 2 26.B.1. If so, how many illicit discharges were identified in priority 0
Did Cajah's Mountain evaluate and assess the IDDE
283 2 26.B.3. plan/program and revise if necessary? YES No adjustments needed at this time
289 2 27.B.2. How many verified IDDE issues were identified? 0
Did Cajah's Mountain enforce illicit discharge and illegal
296 2 27.B.3. dumping violations? YES
How many illicit discharge and illegal dumping
297 2 27.B.3. violations/enforcement actions were issued? 0
How many illicit discharge and illegal dumping
298 2 27.B.3. violations/enforcement actions were resolved? 0
310 2 27.B.4. Did Cajah's Mountain establish and maintain a list of chronic PARTIAL No violators
311 2 27.B.4. If so, how many chronic violators were identified? 0
Did Cajah's Mountain evaluate and assess the IDDE Program
318 2 27.B.5. documentation to identify areas for improvement? YES
319 2 27.B.5. If so, were revisions made to the IDDE tracking sheet? NO
Did Cajah's Mountain train new staff and contractors to
329 2 28.B.2. identify and report illicit discharges, illicit connections, illegal NO Everyone had been trained in prior year
How many new staff and contractors were trained to identify
330 2 28.B.2. and report illicit discharges, illicit connections, illegal dumping 0
Did Cajah's Mountain utilize social media and the stormwater A new website is needed &there is no
338 2 29.B.2. webpage(s)to publicize contact information for IDDE NO facebook page
Did Cajah's Mountain evaluate the IDDE complaint response No IDDE this year, so no average response
344 2 32.B.2. time? NO time to report
If so, what was the average response time for IDDE complaints
345 2 32.B.2. /reports? 0
Did Cajah's Mountain train new municipal staff on proper
355 2 33.B.1. handling of construction site runoff complaints? PARTIAL Everyone had been trained in prior year
How many new staff were trained on proper handling of
356 2 33.B.1. construction site runoff complaints? 0
How many construction site runoff complaints were received
357 2 33.B.2. from municipal staff? 0
Did Cajah's Mountain administer a public survey to receive
369 2 34.B.1. perspective on construction site runoff? NO
Did Cajah's Mountain publicize the ability to report concerns
about construction runoff issues via the online form on the
370 2 34.B.4. Cajah's Mountain and WPCOG websites and social media? YES WPCOG's website
Did Cajah's Mountain maintain/update the adopted
379 2 35.B.4. construction site waste ordinance? YES
Town Manager was the only staff at time
of training in the prior year, who was
Did Cajah's Mountain train new municipal staff on identifying trained to inform WPCOG IDDE/SW staff
385 2 35.B.3. and reporting construction site violations? YES for complaints
How many new staff were trained on identifying and reporting
386 2 35.B.3. construction site violations? 0 No new staff
393 2 35.B.5. Did Cajah's Mountain enforce construction site violations? YES
394 2 35.B.5. How many construction site enforcement actions were issued? 0
395 2 35.B.5. How many construction site violations were remedied? 0
Did Cajah's Mountain track the number of low-density and
410 2 36 high-density plan reviews performed? YES
411 2 36 If so, how many low density project reviews were performed? 0
412 2 36 If so, how many high density project reviews were performed? 0
413 2 36 If so, how many low density project reviews were approved? 0
414 2 36 If so, how many high density project reviews were approved? 0
Did Cajah's Mountain maintain a current inventory of low-
density projects and constructed SCMs, including SCM type or No phase II qualifying projects were
low-density acreage, location, last inspection date and type of permitted/submitted during this permit
431 2 36 enforcement action (if any)? YES cycle
How many high density non-municipally owned SCM
436 2 36 inspections were performed? 0
441 2 36 How many low-density inspections were performed? 0
446 2 36 How many post-construction enforcement actions were 0
Did Cajah's Mountain train field and office staff in Stormwater
452 2 38.B.1. Ordinance procedures and enforcement actions? YES
How many staff were trained in Stormwater Ordinance WPCOG staff are also trained on these
453 2 38.B.1. procedures and enforcement actions? 1 procedures and enforcement actions
463 2 38.B.2. How many post-construction notices of violation were issued? 0
464 2 38.B.2. How many post-construction Civil Citations were issued? 0
How many post-construction violations are still in process of
465 2 38.B.2. abatement? 0
Did Cajah's Mountain review post-construction procedures and
476 2 39.B.1. documents and update as needed? YES No updates needed at this time
488 2 42.B.1. How many pre-CO SCM inspections were completed? 0
489 2 42.B.1. How many repeat pre-CO SCM inspections were completed? 0
490 2 40.B.1. How many permitted projects with O&M Plans received their 0
491 2 42.B.2. How many SCM inspections were completed by municipal 0
492 2 42.B.2. How many SCM inspections performed by municipal staff were 0
How many qualified licensed professional inspections
493 2 42.B.3. completed with documentation received? 0
494 2 42.B.3. How many SCMs are under annual inspection enforcement? 0
Did Cajah's Mountain conduct inspections of
495 2 42.6.4. 20% of low-density projects this year? YES There is only 1 low density site
Materials are avaiable and typically
Did Cajah's Mountain provide educational materials about low provided during permitting, but were
density developments during the issuance of zoning permits, created during this permit cycle and no
distributed through mailings, posted on social media, and new Phase II qualifying projects have been
522 2 43.B.3. handed out at events? PARTIAL submitted to the town
523 2 43.B.3. How many low density educational materials were 0
Materials are avaiable and typically
provided during permitting, but were
created during this permit cycle and no
Did Cajah's Mountain provide educational materials to new Phase II qualifying projects have been
532 2 44.B.2. developers about high density development? PARTIAL submitted to the town
533 2 44.B.2. How many high density educational materials were 0
Did Cajah's Mountain establish/maintain links to all post-
construction ordinances, manuals, policies, checklists, design
541 2 44.B.3. standards, and/or other materials on the website? YES Via WPCOG
547 2 45.B.1. Did Cajah's Mountain maintain a Pet Waste Ordinance? YES
548 2 45.B.1. Did Cajah's Mountain implement and enforce the Pet Waste YES
How many educational awareness materials on fecal coliform
557 2 45.B.2. pollution associated with maintenance of septic systems were 35
The town of cajahs mountain only owns 2
adjacent properties (Town hall and a
Park), neither of which has signifigant
How many O&M Plans for municipal facilities with stormwater potential to generate stormwater
563 2 46.B.2. pollution potential does Cajah's Mountain have? 0 pollution
Did Cajah's Mountain verify the existing list of municipal
570 2 47.B.1. facilities with stormwater pollution potential? YES
How many municipal facilities were verified to have
571 2 47.B.2. stormwater pollution potential and/or spill risk? 0
572 2 47.B.2. How many municipal facilities need a SPCC Plan? 0
Did Cajah's Mountain perform annual good housekeeping
584 2 47.B.3. facility inspections? YES
How many annual good housekeeping facility inspections were
585 2 47.B.3. performed? 2
How many annual inspections required good housekeeping ROW ditch at the town park needs repairs
593 2 47.B.4. corrective actions? 0 but is owned/maintained by NCDOT
Documentation is available should the
Did Cajah's Mountain develop a written spill response town build a property with spill potential.
599 2 48.B.1 procedure plan for each facility that requires one? NO At this time neither property has spill risks
How many municipal facilities implemented spill response
600 2 48.B.2. procedure plans? 0
607 2 48.B.3. Did Cajah's Mountain review/maintain written spill response YES Maintained
608 2 48.B.3. How many spill response procedure plans were revised? 0
How many non-reportable spills were documented according
617 2 48.B.5. to the spill response SOP? 0
How many reportable spills were documented according to the
618 2 48.B.5. spill response SOP? 0
Submitted along side IDDE plan on
627 2 49.B.3. Did Cajah's Mountain implement the MS4 O&M Plan? YES 11/03/2020
The town of cajahs mountain does not
own any MS4 infrastucture outside of
drainage found at Town Hall and on the
631 2 49.B.4. How many MS4 inspections were completed? 0 park parcel
How many comprehensive stormwater training sessions for
638 2 50.B.2. new staff were held? 0 No new staff
How many new municipal and contractor staff received
639 2 50.B.2. comprehensive stormwater training? 0 No new staff
The town of cajahs mountain does not
own any MS4 infrastucture outside of
drainage found at Town Hall and on the
650 2 51.B.1. Did Cajah's Mountain inspect the MS4 infrastructure? YES park parcel
651 2 51.B.1. How many MS4 catch basins were inspected? 0 The Town does not own any catch basins
The Town does not own any MS4
652 2 51.B.1. How many MS4 conveyances were inspected? 0 conveyances
653 2 51.B.1. How many MS4 issues were documented? 0
667 2 52.B.2. How many MS4 cleanings/maintenance actions were 0
The Town of Cajahs Moutain does not
Did Cajah's Mountain maintain an inventory of municipally- own any SCMs. If one is built it will be
owned SCMs with information including type,year built, date required to have an O&M maintenance
674 2 53.B.1. of last inspection and maintenance actions? NO plan
675 2 53.B.1. How many municipally-owned SCMs are in the inventory? 0
The Town of Cajahs Moutain does not
own any SCMs. If one is built it will be
Did Cajah's Mountain develop/maintain a SCM Operation and required to have an O&M maintenance
676 2 53.B.2. Maintenance Plan for each muncipally-owned SCM? NO plan
687 2 54.B.3. How many municipally-owned SCMs were inspected? 0
How many municipally-owned SCMs had documented
693 2 54.B.4. deficiencies/required maintenance? 0
How many municipally-owned SCM corrective actions/repairs
694 2 54.B.4. were performed? 0
Did Cajah's Mountain ensure that only certified The Town maintains a landscaper to
landscapers/applicators are applying pesticides, herbicides and maintain park grounds and yard
703 2 56.B.1. fertilizers? YES surrounding town hall
How many certified landscapers/applicators are applying
704 2 56.B.1. pesticides, herbicides and fertilizers? 1
Did Cajah's Mountain implement standard operating Procedure is in place, but the Town does
713 2 57.B.1. procedures for vehicle and equipment washing? YES not own any municipal vehicles
Did Cajah's Mountain distribute educational flyers regarding Procedure is in place, but the Town does
724 2 59.B.4. street ruoff pollution? YES not own any municipal vehicles
How many educational flyers regarding street ruoff pollution
725 2 59.B.4. were distributed?
732 2 59.B.1. Did Cajah's Mountain perform street and parking lot sweeping YES
The single municipal road was swept, and
the 2 parking lots owned by the towns are
733 2 59.B.1. How many lane miles were swept? <1 hand swept on an at least monthly basis
Did Cajah's Mountain track conveyances/inlets that have
734 2 59.B.2. frequent problems with pollution to prioritize their NO
Did Cajah's Mountain service public waste receptacles on an as
746 2 60.B.1. needed basis? NO
747 2 60.B.1. How many trash bags were used/collected? 0
Litter on municipal park is removed, but
need to establish tracking with the
756 2 60.B.2. Did Cajah's Mountain collect litter on an as-needed basis? YES landscaper
757 2 60.B.2. How much trash was collected (pounds)? _Unknown _
766 2 61.B.1. Did Cajah's Mountain bag and collect leaves on municipal YES
767 2 61.B.1. How many bags of leaves were collected from municipal 8
775 2 61.B.2. How many leaf/litter/yard waste flyers were distributed? 0
Was leaf/yard debris identified as an issue during the annual
780 2 61.B.3. MS4 O&M Plan review? NO
Did Cajah's Mountain train first responders on minimizing, Town of Cajahs Mountain utilizes Caldwell
collecting and disposing of fluids and other vehicular pollutants County and other municipal response
786 2 62.B.1. following an accident? NO teams
How many first responders were trained on minimizing,
787 2 62.B.1. collecting and disposing of fluids and other vehicular pollutants 0
Did Cajah's Mountain enforce significant vehicle leaks from
796 2 62.B.3. parked cars under the IDDE ordinance? PARTIAL No signifigant leaks were reported
How many enforcement actions were issued for significant
797 2 62.B.3. vehicle leaks from parked cars? 0