HomeMy WebLinkAboutNCS000405_MS4 Annual Report (2022-23 FY)_20230830 NPDES Phase II Stormwater
Annual Report
Town of Gibsonville
Fiscal Year
2022 — 2023
Prepared by:
Josh Johnson, P.E.
And
Trenton Novelli, E.I.
alley, williams, carmen & king, inc.
engineers and architects
740 chapel hill road - post office box 1179
burlington, north carolina 27216-1179
Phone: (336) 226-5534
Fax: (336)226-3034
Town of Gibsonville Stormwater Annual Report
2022 -2023
Report Outline
• Introduction
• NPDES Phase II
• Minimum Control Measures
■ Public Education and Outreach
■ Public Involvement and Participation
■ Illicit Discharge Detection and Elimination
■ Construction Site Runoff Controls
■ Post Construction Stormwater Management
■ Pollution Prevention and Good Housekeeping
• Impaired Waters and TMDL Waters
• Listing of Impaired Waters
■ Impairment Type
■ Timeline for Improvements
■ Current Status
• Jordan Lake Rules Compliance
• Overview, Background, and Implementation Schedule
• Riparian Buffer Protection Program
• New Development Program
• Existing Development Stage 1 Programs
• Future Existing Development Stage 2 Programs
• Jordan Lake One Water
• Stormwater and Storm Drainage Project and Maintenance Policy
• Stormwater Funding
• Future Issues
• Program Contacts
Page 2 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
Introduction
On July 1, 2005,The North Carolina Division of Water Quality(DWQ) in the Department of
Environmental Quality,formerly DENR, began issuing Phase II stormwater permits to municipalities in
North Carolina under the National Pollutant Discharge Elimination System Program (NPDES). At the
time,the NPDES Phase II Program was the latest stormwater program stemming from the Federal Clean
Water Act of 1972. Prior to the Phase II program, EPA and NC DEQ had issued NPDES Phase I Stormwater
Permits to Cities larger than 100,000 persons. In North Carolina these cities were Raleigh, Charlotte,
Fayetteville, Durham, Greensboro, and Winston Salem.The Phase II Program included distribution of
Phase II permits to municipalities less than 100,000 residents and began with municipalities within
Municipal Spheres of Influence (MSI)that were greater than 50,000 citizens.The Burlington Corridor
represented a MSI of greater than 50,000 residents and each municipal separate storm sewer system
(MS4)was given a Phase II permit.
NPDES Phase I/II Communities, Exempted Municipalities*, &
Tipped Counties with County-wide Post-Construction
idoPojiiirif- --. - tr 41110,V.);
SWF 4ijk- i4111.,,Y D
'4") t\ U4W
Reflects 2011 Corporate Boundaries.
Post-Construction Areas per Session Law 2006-246
Post-Construction requirements still apply inside exempted municipality boundanes and will
be implemented by DVVC)or delegated authority(e.g.,County)
Legend
▪NPDES-Exempt Phase II Mlnimpelibes+ETJs I Phase II MSIs(from 2011 BourWanes)
Phase II NPDES Entities -Designated Phase II Municipalities(as of March 20101 Note:Although Brunswick,New Hanover,and
▪NPDES Permit-Phase I MS4IMilitaiy -Urbanized Areas(2000 Census) Onslow are Phase II Tipped Counties,projects ^\\1
NPDES Permitted Ph II MS4/Co _Urbanized Areas(2010 Census) there are subject to the Coastal Stormwater Rules.
NPDES Permitted Phase I MS4 Phase II Tgped Counties(Post-Consbuctan)
▪NPDES Permitted Phase I/O city ETJ 0 20 40 80 boles
NPDES Permitted Phase II MS4 2/12/2013 l r r r t r r r l
The Phase II stormwater program was created with the intention of improving the quality of the nation's
waterways by reducing the quantity of pollutants that stormwater transports into stormwater systems
and discharges to surface water bodies. The permit require permittees at a minimum to develop,
implement, and enforce a stormwater program designed to reduce the discharge of pollutants from the
municipal separate storm sewer system (MS4) to the maximum extent practicable.
Page 3 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
The stormwater program is composed of the following six management measures:
1. Public Education and Outreach
2. Public Involvement and Participation
3. Illicit Discharge Detection and Elimination
4. Construction Site Runoff Controls
5. Post-Construction Site Runoff Controls
6. Pollution Prevention and Good Housekeeping for Municipal
Operations
Each of these measures consists of required Best Management Practices (BMPs), measurable goals for
each BMP and an implementation schedule for the 5 year permit cycle. Additionally, the Town of
Gibsonville has a Comprehensive Stormwater Management Plan and completes annual reporting about
the NPDES Phase II Program. Because the NPDES Program concentrates on water quality it has limited
provisions concerning water quantity and flooding controls.
In February 2017, after several months of discussion, NC DEQ issued a renewal of the Town's NPDES
Phase II Permit.This renewed permit is similar to the original permit with a few additional requirements
included. A copy of the permit is available either through Josh Johnson, P.E. or through NC DEMLR. The
Town was audited on November 16,2021. DEQ has reviewed a new Comprehensive Stormwater
Management Plan and a new permit takes effect in 2023-24.
This Report is intended to complete the Annual Report specifying the Town's progression in
implementing the NPDES Permit and Comprehensive Stormwater Management Plan. It is also intended
to give readers a comprehensive idea of the Town's full Stormwater Program including the Town's
Jordan Lake and Water Quantity Programs as well as the Town's current funding structure.
NPDES Phase II Minimum Control Measures
Each of the 6 Minimum Control Measures (MCM's) has a set of best management practices (BMP's)that
are intended to foster compliance with both the Town's Permit and CSWMP.These specific BMP's can
be found in both the Permit and the CSWMP but highlights and specific actions will be noted in the
report.
Public Education and Outreach
The Town operates a Public Education and Outreach program that is designed to educate the general
public about the need to improve water quality in stormwater.The general objectives are to distribute
education materials to the community and/or to conduct equivalent outreach activities about the
impacts of storm water discharges on surface waters and the steps the public can take to reduce
pollutants in stormwater runoff. These objectives have been further refined to target residents, school
children, local businesses (specifically gas station owners and landscaping companies) and industry
because these groups have the most impact on stormwater pollution prevention.
Page 4 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
The education program targets total suspended solids (TSS and Sediment) and nutrient loading because
turbidity, sedimentation, and nutrients are the pollutants of concern in downstream waters.
The Town partners with Stormwater SMART, an education and outreach organization hosted by the
Piedmont Triad Regional Council (PTRC). Stormwater SMART is a cooperative group that is funded by
several Piedmont municipalities. It was created in 2005 to provide education and outreach for the new
MS4 Permittees (like Gibsonville) and concentrates on direct education of school children and residents.
Danica Heflin is the Stormwater Smart Outreach and Education Coordinator.She can be contacted at
dheflin@ptrc.org or at(336)904-0300. The Stormwater SMART's Annual Report is available at
http://www.ptrc.org/services/regional-planning/planning-documents . It provides a comprehensive
outlook for the Fiscal Year 2022-2023 period.The annual report also provides specific details of
outreach efforts within the Town of Gibsonville.
Gibsonville 2022 — 2023
Location/Event Date Program #Participants
Homeschool Resource March 25, Educational Stormwater 250
Fair at the Gibsonville 2023 Activity Books (2023 Nature
Public Library Notebook)
Gibsonville Fall Festival October 8, Outreach—Rainscaping Guides 355
2022 and Rain Garden Seed Packets
Alamance Creek Week May 13—May Outreach—Countywide - CW 413
20, 2023
Social Media Outreach July 1, 2022— Impressions on Meta (Facebook& Instagram): 21,496
June 30, 2023 Visits to www.stormwatersmart.org: 22,321
Stormwater Educational Outreach Efforts in Gibsonville
The Town also has handouts on display at Town Hall, included an educational article in the Town
newsletter( October 2023) as well as maintaining an education website located at
http://www.gibsonville.net/,then click"Stormwater" link.This page also has a direct link to the
Stormwater Smart website.
Page 5 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
•
0110,0110411
61/
Typical Stormwater Education at the Gibsonville Fall Festival
Public Participation and Involvement
The Town has a responsibility to solicit and consider public opinion on all matters, including stormwater
management.The Town originally involved the public with a public hearing in 2005 and created a
citizen's committee during the first permit cycle but the committee had limited effectiveness and
interest.The Town has been receptive to any questions from citizens and maintains a Helpline: Town
Hall at (336)449-4144 and has worked with Stormwater Smart to educate the public but continues to
struggle to establish effective Public Participation and Involvement. Future public meetings will seek
input on the stormwater program and will provide both input to the Town as well as education to the
citizens.
Illicit Discharge Detection and Elimination
The Town of Gibsonville has a full Illicit Discharge Detection and Elimination (IDDE) Program.The IDDE
Program is intended to reduce discharges to the stormwater system that are not entirely composed of
stormwater.There are a few permitted discharges and firefighting related discharges that are allowed.
An illicit discharge is typically dirt, soap, pet waste, litter, oil, fertilizer, pesticides, or raw sewage and
often times comes from "generating sites." Generating sites are points of pollution that continue over a
period and are recurring at regular or irregular intervals.
The backbone of the IDDE program is the IDDE Ordinance that the Town passed in June 2007.The IDDE
ordinance provides permits specific discharges into the MS4 as legal, provides legal authority to restrict
illegal discharges, prohibits illicit connections, provides conditions for cleaning up and preventing
polluted spills, provides for right of entry into property to investigate prohibited activities, and provides
Page 6 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
the Town with options for enforcing the Ordinance.The IDDE Ordinance is based on NC DWQ's Model
Ordinance.
The second basis for the IDDE program is the Town's MS4 Map. The mapping program was completed in
the first permit cycle by GPS mapping and is now usable in a GIS format.The map includes the entire
MS4 system and provides for easy access to aid in the investigation of illicit discharges.An investigator
with the map could find an illicit discharge and then easily follow the flow of the discharge upstream
until finding a source of the discharge.
`_ ,,.• ,__ _ Ley - I
W . 4 ... * f` e r e S L kd ' ,!
d, P} w
Tb 'x , ice° .F C
- .41p-t •,,
8 ° „.. • ..
?c ..i
�� e
4 A .
s
ws' 6�. d ✓y�. R
uNI, • I.4.
dW . E ° E .A" ,_ ., A ill . .<..a"", s
OK � ,_�_.N -a _.. ,., 4-
MS4 Sample Maps
The map was originally published as a map book but generally is used on a watershed basis or through
ArcGIS software. If a specific area is needed it can be printed by either Stormwater or Town Staff.The
map is intended to be updated on a regular basis as new development happens but updates since the
completion of the map have been sporadic.
The IDDE program also includes dry weather testing of outfalls into the stream system. In the first
permit cycle this was conducted in coordination with the mapping. Outfalls that had dry weather flows
were reported and investigated. Since the first permit cycle, most dry weather flow testing has been
done in conjunction with complaints or Town staff investigations.
The Town had no sanitary sewer overflows, one illicit discharge reported by public works employees, no
illegal dumping, or wastewater connections were found rerouted to the stormwater system in 2020-21.
Currently the town does not maintain any pet waste stations or pet waste signs in Gibsonville.
Page 7 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
Town Staff are trained on an annual basis to identify illicit discharges and know the reporting process for
these discharges. Future training will be combined with the Pollution Prevention and Good
Housekeeping training of public works, utilities, planning, and administrative staff. Training of new hires
may be an additional benefit.
Construction Site Runoff Controls
The Town of Gibsonville delegates the Construction Site Runoff Controls to the NC Division of Energy,
Mineral, and Land Resources Sediment and Erosion Control Program.The Town of Gibsonville does not
have a delegated erosion control program but does make sure that plans it approves that will disturb
greater than 1.0 acres of land apply for, and receive, and erosion control plan.The Town of Gibsonville
also has the ability to call NC DEMLR to report known sedimentation issues. A possible improvement
could be NC DEMLR's responsiveness to Town generated complaints, which has been less than effective
in the past.
Post Construction Site Runoff Controls
The Town of Gibsonville has a typical NPDES Phase II Post Construction Program.This includes a Post
Construction Ordinance, administrative forms that support it, and a review process. The Post
Construction Program applies to projects that exceed 1 acre of disturbance or have a common plan of
development that will cumulatively exceed 1.0 acres of disturbance. Projects that exceed 24% built-
upon area are considered high density projects, projects that are less than 24% BUA are low density
projects. High Density Projects are then required to meet the following requirements:
• Treat runoff from the first 1" of rain (the first flush).
• Treated Runoff is to be for 85%TSS removal.
• Discharge treated water at a rate less than or equal to the Predevelopment rate for the 1 year
24 hour storm.
• Discharge treated water between 48-120 hours.
• Stormwater Control Measures must be in easements and must have a recorded operation and
maintenance agreement.
• Compliance with the Jordan Lake Riparian Buffer Protection Ordinance.
Stormwater Control Measures, as well as runoff calculations, are prepared based upon the NC DEQ BMP
Manual and then reviewed by Josh Johnson, P.E.
Low Density projects are required to comply with the Jordan Lake Buffer Protection Ordinance that went
into effect in fall 2011. Both Low and High Density Projects are required to comply with the Town's
Storm Sewer Design Manual which governs storm drainage design as well as peak runoff rates and
provides for evaluation of the 10 and 100 year design storms.
When a project is submitted to the Town, it goes through the Town Planning Department.Then the
plans are distributed to a Technical Review Committee (TRC).The TRC includes Engineering and
Stormwater Reviewers as well as assorted Town staff. At this point the project is determined to be
subject to the Stormwater Ordinance and High Density or Low Density. At that point review comments
Page 8 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
are made about the project and addressed. After approval of the project,the owner is required to
complete an Operation and Maintenance Agreement for the stormwater control measures.This O&M
agreement is then recorded with the register of deeds so that it can reviewed at a later point in time.
There was a total of five plan reviews conducted in 2022-23 that triggered the Stormwater Ordinance.
No projects were completed.
The Town of Gibsonville requires as-builts and annual inspection reports from new stormwater control
measures (SCM) but has had trouble getting annual inspection reports submitted. The Town of
Gibsonville has a few ponds and/or dry detention devices that have been installed to prevent localized
flash flooding and these devices are inspected and reviewed on an ongoing basis.
Pollution Prevention and Good Housekeeping
Pollution Prevention is an overall goal of the Town's stormwater management plan and Good
Housekeeping is a key to that goal. Municipalities in general conduct many activities that can pose a
threat to water quality. Municipal facilities are the primary potential source of contamination but with
good housekeeping habits this potential can be reduced or eliminated. The Town attempts to minimize
stormwater pollution from municipal operations by complying with best management plans for each
Town facility.The BMP's are written into a Town Facilities O&M Plan that is intended to reduce or
eliminate stormwater exposure of oil,grease, pesticides, herbicides,fertilizers, sediment, and other
materials used by the Town. Each of the Town facilities is inspected annually and any issues are noted,
written into the Facility O&M Plan, and discussed with the facility supervisor.
The Town operates a Town Hall/Police Station, Library, Fire Department, Senior Center, Community
Center, Moricle Park, Murrell Park, a public works facilities as well as several water and waste water
facilities (primarily water tanks, old wells and sewer pump stations). Each of the Town facilities is
inspected annually and any new facilities will be added to the inspection list.
Town staff with the greatest exposure to stormwater are trained on PPGH once annually.Typical
training is combined with illicit discharge detection and elimination training.The PPGH portion of the
training concentrates on good housekeeping functions.This often includes identification of bad habits
that can take place and how to fix the situation to reduce the risk of pollution to stormwater.
The Town of Gibsonville sweeps downtown streets on a roughly monthly basis for a total of 1.5 miles
monthly/bi-monthly(or 18 miles annually).The Town picks up about 350 pounds per sweeping
(monthly/bi-monthly) of material which is roughly 2,800 pounds annually.
The Town of Gibsonville put out 0 pounds of road salt prior to and during inclement weather in 2022-23.
The Town contracts out most vehicle service and did not actively recycle any oil. Hazardous household
waste events are held at public works twice a year for residents,the oil is collected by Clean Harbors.
The Town also checks all storm drains on an as needed basis and uses jet trucks to clean storm drain
pipes that have issues as well as cleaning some storm drain inlets by hand.
Page 9 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
Impaired Waters and Total Maximum Daily Loads (TMDL)
The Town of Gibsonville does not have any impaired waters within its jurisdictional area.
Jordan Lake Rules
The Town of Gibsonville is within the Jordan Lake Watershed and is subject to the Jordan Lake Nutrient
Strategy.The Jordan Lake Nutrient Strategy is composed of a set of regulatory rules enacted in 2009 that
have since been augmented or replaced by a series of NC General Assembly Session Laws.The following
rules are often referred to as the Jordan Lake Rules.:
15A NCAC 02B .0262 - Purpose and Scope (See#4 below.)
15A NCAC 02B .0263 - Definitions
15A NCAC 02B .0264-Agriculture
15A NCAC 02B .0265 -Stormwater Management for New Development (See#2,#5 and#6 below.)
15A NCAC 02B .0266—Stormwater Management for Existing Development (Replaced by#1 below.)
15A NCAC 02B .0267—Protection of Existing Riparian Buffers (See#2 below.)
15A NCAC 02B .0268—Mitigation for Riparian Buffers
15A NCAC 02B .0269—Riparian Buffer Mitigation Fees to NC EEP
15A NCAC 02B .0270—Wastewater Discharge Requirements (See#1 and#3 below.)
15A NCAC 02B .0271—Stormwater Requirements for State and Federal Entities (See#2 below.)
15A NCAC 02B .0272 - Fertilizer Management
15A NCAC 02B .0273 -Options for Offsetting Nutrient Loads
15A NCAC 02B .0311 -Cape Fear River Basin
1. Session Law 2009-216 signed into law June 30, 2009. (Disapproves the Jordan Stormwater
Management for Existing Development Rule and establishes substitute requirements.Also delays the
nitrogen compliance date by two years for existing dischargers under the Wastewater Discharge
Requirements Rule.)
2. Session Law 2009-484 was signed into law Aug. 26, 2009. (Part II revises three Jordan rules, including
Stormwater Management for New Development, Stormwater Requirements for State and Federal
Entities and Protection of Existing Riparian Buffers.)
3. Session Law 2011-394 signed into law July 1, 2011. (Section 14 provides a further, conditional two-
year delay of the nitrogen wastewater compliance date for existing dischargers under the Wastewater
Discharge Requirements Rule.)
4. Session Law 2012-187 signed into law July 16, 2012. (Section 12.1 creates a limitation affecting the
Purpose and Scope Rule to narrow the applicability of certain surface water standards in WS-V waters.)
5. Session Law 2012-200 signed into law Aug. 1, 2012. (Section 11.(c) extends the allowable local
program implementation date of the New Development Stormwater Rule.)
6. Session Law 2012-201 signed into law Aug. 1, 2012. (Section 9.(e) of this law revised the local program
implementation date of the New Development Stormwater Rule by two years. Separate SL 2012-201
contains the same provision).
Page 10 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
7. Session Law 2013-395 signed into law Aug. 23, 2013 (SB 515 continues the current Jordan Lake water
quality measures, including 15A NCAC 02B .0267 Protection of Existing Riparian Buffers Rule, but delays
additional measures that were to be implemented July 1, 2013 or later,for three years.The law also
modifies existing Protection of Existing Riparian Buffers Rule to allow some exempt uses, including the
permitted piping of streams by the U.S.Army Corps of Engineers and an expanded definition of"airport
facilities."These changes are required to be adopted by the Environmental Management Commission in
an amended rule.The delayed measures include the Jordan Lake Rules, 15A NCAC 02B .0262 - .0267,
.0270- .0272, .0311, as well as the Jordan Lake Session Laws.)
8. Session Law 2013-360 Effective July 26th, 2013 In-Lake Water Quality Improvement Demonstration
Project:This lengthy session law has a three- page section (14.3A)that authorizes a 24 -month "Jordan
Lake Water Quality Improvement Demonstration Project" funded by$1.95 million from the Clean Water
Management Trust Fund and the N.C. Department of Environment and Natural Resources (DENR.)The
intent of the project is to improve water quality in the lake by suppressing phytoplankton activity such
that chlorophyll-a, pH and turbidity measurements will meet state water quality standards within the
project areas.
• The session law required DENR to contract with a third party that can deploy floating arrays of 36 in-
lake, long-distance water circulators.Twenty-four circulators will be placed in the Morgan Creek arm of
the lake and 12 in the Haw River arm.
• The department is required to monitor, evaluate, and report on the performance of the circulators in
reducing the adverse impacts of harmful algal blooms and excessive chlorophyll in the lake by focusing
on nutrient related physical, chemical and biological parameters. DENR shall submit an interim report on
the findings of the demonstration project to the Environmental Review Commission and the Fiscal
Research Division of the General Assembly by October 1, 2015.A final report shall be submitted by April
1, 2016.
Status:The U.S. Army Corps of Engineers' public comment period for the project's Environmental
Assessment document ended on April 6, 2014.The Corps issued a Finding of No Significant Impact
(FONSI) on July 10, 2014, and the circulators were deployed on July 21, 2014.
The Environmental Assessment can be found on the Corps'Jordan Lake website at:
http://www.saw.usace.army.mil/Locations/DistrictLakesandDams/BEverettJordan.aspx
Division monitoring reports and other information for the circulator project are being posted at
http://portal.ncdenr.org/web/wq/jordancirculator
9. Session Law 2014-90 Applies to state stormwater programs. Section 2 adds the following language to
the definition of"development" in G.S. 143-214.7. "..When additional development occurs at a site that
has existing development,the built-upon area of the existing development shall not be included in the
density calculations for additional stormwater control requirements, and stormwater control
requirements cannot be applied retroactively to existing development, unless otherwise required by
federal law.The significance of this session law for the Jordan stormwater rules is being evaluated by
NCDEQ.
10. Session Law 2015-241
Page 11 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
Section 14.5(a):Two-year extension of the Jordan Lake In-Lake Water Quality Improvement
Demonstration Project (aka Solar Bees)
Section 14.5(c):Three year delay for New Development Stormwater implementation.
11. Session Law 2015-246
Sections 2(a) &2(b): Prohibits local governments from voluntarily implementing State rule
Section 13.1.(b): Riparian Buffer Reform
12. HB 1030/Session Law 2016-94 2016 Appropriations Act
Section 14.13:
• Senate version called for review of all the State's Nutrient Management Strategies, and any
other rules imposing riparian buffer requirement for the purpose of nutrient management. Final
budget limited applicability of Jordan and Falls Lake Rules.
• Terminates SolarBee Project
• Funds a UNC Study of nutrient rules focused on Jordan Lake and Falls Lake Rules, directs EMC to
review and re-adopt those nutrient management rules based on recommendations from the
study.
• Delayed implementation of Jordan Lake and Falls Lake Rules not currently in effect, no earlier
than March 15, 2019.
• Includes further DEQ study of in-situ technologies to address nutrient-related water quality
problems.
• Excludes areas within Jordan Lake watershed from stormwater requirements.
o States new impervious surface added in the Jordan Lake watershed between July 31,
2013 and December 2020 should not be counted as built-upon area for the purposes of
developing nutrient reduction targets under the Jordan Lake stormwater rules.
• Cross-reference to Chesapeake Bay stormwater measures
o Allows stormwater measures approved to meet the Chesapeake bay TMDL to be used to
meet the Jordan Lake and Falls Lake TMDL's based on the same nutrient reduction
credit allowed under the Chesapeake Bay Program.
Jordan Lake Background, Rules, and Implementation Schedules
Jordan Lake was impounded in 1983 by damming the Haw River near its confluence with the Deep River.
It was created to provide flood control,water supply, protection of water quality downstream,fish and
wildlife conservation, and recreation.
The lake has had water quality issues from the beginning, with the North Carolina Environmental
Management Commission declaring it as nutrient-sensitive waters (NSW)the same year it was
impounded. Since that time,Jordan Lake has consistently rated as eutrophic or hyper-eutrophic, with
excessive levels of nutrients present. "Eutrophic" is an over-abundance of nutrients in the lake, primarily
nitrogen and phosphorus,which can result in algal blooms and poor water quality. Nutrients make their
way to the lake from sources such as wastewater discharges, rainfall runoff from agriculture and
Page 12 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
stormwater runoff from new and existing developed lands throughout the watershed. Excessive nutrient
inputs can drive excessive growth of microscopic algae, which imparts a greenish, murky appearance to
the water, causes taste and odor problems in potable water, and robs the water of oxygen.This can
then stress or kill fish and other aquatic life. Excess nutrients also favor the growth of undesirable algae
that does not support the food chain and can release toxins into the water. While not necessarily
making the lake unfit for fishing, swimming or drinking uses, excessive nutrients can impact these uses
and produce undesirable algae in the lake.
The Jordan Lake Rules are designed to protect and improve water quality in the lake. The rules were
developed over several years through a process that involved extensive meetings, public hearings and
negotiations between residents, environmental groups, local and state government agencies and other
stakeholders in the watershed. Specific issues addressed by the rules include reducing pollution from
wastewater discharges, stormwater runoff from new and existing development, agriculture and fertilizer
application.The Rules continue to be discussed and amended through the NC General Assembly.
The primary rules that affect local governments (like the Town of Gibsonville) are the Stormwater
Management for New Development, Stormwater Management for Existing Development, Protection of
Existing Riparian Buffers, Wastewater Discharge Requirements, Options for Offsetting Nutrients Loads,
Session Law 2009-216, Session Law 2009-484, Session Law 2011-394 and to a lesser extent the Fertilizer
Management Rule.The Protection of Existing Riparian Buffer Rules was implemented in 2011 after the
Stage 1 Existing Development Programs were adopted in 2009 and Waste Water Treatment Plant
compliance with Total Phosphorous limitations by January 1, 2010.The New Development Programs,
Stage 2 Existing Development Program, and Wastewater Treatment Plant Compliance with Total
Nitrogen Limitations have all been delayed several times.The current implementation schedule is cloudy
because of delays that are contingent upon future monitoring results. This establishes the following
compliance timeframes for these rules:
• New Development Programs—Currently being worked on and amended..
• Stage 2 Existing Development Programs—Delayed until at least 2024.
• Wastewater Treatment Total Nitrogen Limits—Enacted with 2016 Permit Renewals.
Additionally, Session Bill 2013-395 created a study to determine if"mechanical circulation" within
Jordan Lake could reduce algal growth within the lake.This study was conducted by NDEQ and Medora
Corporation for$1.44 million and originally included the leasing of 36 Solar Bee Circulators (the study
was expanded in 2014).The Solar Bee's, similar to the ones in the Graham-Mebane Lake, are a relatively
new technology and the study was extended several years. However, in the spring of 2016, NC DEQ
announced that the Solar Bees had failed and would be removed from the lake. It is unclear how this will
impact future regulation of the Lake.
In January 2014, a Legislative Jordan Lake Committee met and did not recommend any changes to the
Rules. Despite this, additional rules have been implemented since 2014 with regards to Jordan Lake.
Page 13 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
In 2016 the North Carolina General Assembly(NCGA) approved legislation directing UNC-Chapel Hill
(UNC)to conduct a multi-year study and analysis of nutrient management strategies and compilation of
existing water quality data specifically in the context of Jordan Lake and Falls Lake (Sections 14.13.(a)
through (c) of Session Law 2016-94 as amended by Sections 13.8.(a)through (e) of Session Law 2018-5).
The legislation outlines two specific provisions that are to be included in the study:
• Review data collected by the Department of Environmental Quality and by other stakeholders from
water sampling in the areas subject to the Jordan Lake or Falls Lake Water Supply Nutrient Strategies
and compare trends in water quality to the implementation of the various elements of each of the
Strategies; and
• Examine the costs and benefits of basin wide nutrient strategies in other states and the impact (or lack
of impact)those strategies have had on water quality.
This Report was released In December of 2019. Considerations for actions are still ongoing.
Jordan Lake One Water
As water quality and water supply challenges continue to increase from growing populations,there is an
opportunity to reevaluate water resource management within the Jordan Lake Watershed and move
towards a more collaborative, interdisciplinary, and innovative approach.Jordan Lake One Water
(JLOW) is a partnership to facilitate cooperation and integrated water resource management in the
Jordan Lake watershed.The group is comprised of local governments, conservation groups, universities,
water utilities, agriculture,and private industry stakeholders interested in sharing the cost of water
quality and quantity improvements in order to realize watershed-wide social, economic, and
environmental benefits. In 2017,Triangle J Council of Governments (TJCOG) began holding meetings to
discuss One Water management concepts in the Jordan Lake watershed. Interest was so high, among so
many different groups, including elected officials,that a JLOW advisory committee was formed to
develop a work plan and begin moving forward on collaborative planning efforts.The Advisory
Committee, NCDWR, and numerous stakeholders will now be collaborating to develop a recommended
One Water/Integrated Water Management framework for the Jordan Lake watershed as part of the
Jordan Lake Nutrient Management Strategy Rules Readoption opportunity.
One Water is a transformative approach to how we view, value, and manage water.The One Water
approach views all water—from the water resources in our ecosystems to our drinking water,
wastewater, and stormwater—as resources that must be managed holistically and sustainably in order
to secure a bright, prosperous future for our children, our communities, and our country. A One Water
approach can take many different forms, but has some unifying characteristics:
• A mindset that all water has value
• A focus on achieving multiple benefits-economic, environmental, &social
• Approaching decisions with a systems mindset
• Utilizing watershed-scale thinking& action
Page 14 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
• Relying heavily on partnerships & inclusion
The Town is supportive of the JLOW process and is very interested in alternative compliance strategies
for Jordan Lake.The Town has been represented in the JLOW process through there AWCK
representatives Josh Johnson.
Riparian Buffer Protection Program
The Town's Riparian Buffer Protection Program was implemented in December 2010.The enforcement
mechanism for the Buffer Protection Program is the Jordan Riparian Buffer Protection Ordinance that
was approved by the Town of Gibsonville in November 2010.The Buffer Program establishes a
protected buffer along surface waters (primarily perennial and intermittent streams but also ponds and
other surface waters) shown on the USGS Quad maps or the NRCS Soil Survey Maps.The buffer has two
different zones: Zone 1 is the closest 30'from the top of bank in all directions; Zone 2 is from 30'to 50'
from the top of bank in all directions. Zone 1 is to remain undisturbed while Zone 2 is to remain
vegetated.
The Buffer Ordinance is a change of use ordinance; therefore the regulations only apply if new
development or a change in use takes place within the buffer. Changes in use can range from new
development that goes through an approval process to clearing of the buffer for residential or
commercial landscaping but any change of use within the buffer is subject to the buffer ordinance.The
Buffer Ordinance also includes a Table of Uses that breaks down uses within the buffer to Exempt,
Allowable, and Allowable with Mitigation.Any uses not in the Table of Uses are prohibited without a
variance. Uses that fall in the Allowable or Allowable with Mitigation categories must submit a request
to the Town for written authorization prior to disturbing the buffer. These uses also must show that
there are no practical alternatives to the requested use. In showing the no practical alternatives, users
must show how they are minimizing the impacts if possible.
.1r:. . . z ,4s ' ,. Ml i...... il,,
� elf ditilk 4.,'J.,' ',„, r .old
4 :;uil i.l..i,4 %
,*--to"' a '
Zone 1-30 feet Zone 2-20 feet
Stream Bed Trees cool water and Soil traps nutrient,
stabilize stream bank that plants use to.
growth
Page 15 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
The Town includes Riparian Buffer Protection Program training with its annual employee training but
generally limits inspections of buffers to complaints about buffer clearing or Town Staff reporting of
impacts.The Town tracks buffer impacts but tries to handle first time offenders by requiring
replacement of the buffer and education of the offender, rather than fining first time offenders.
New Development Programs
The Jordan Lake New Development Rule, 15A NCAC2B .0265, sets out standards that named
communities are to incorporate into local stormwater programs, and requires the Division of Water
Quality to develop a model local stormwater program for those communities to use to create a New
Development Program that complies with the rule.The Jordan Lake New Development Ordinance is the
legal mechanism that local governments will use to enforce these standards on new development
projects greater than %2 acre in disturbed area (or 1 acre for single family residential).
Most communities within the Jordan Lake watershed are existing NPDES MS4 Phase II communities that
have existing Phase II Stormwater Post-Construction Ordinances which are centered around 85%TSS
treatment of the 1" storm for developments over 24% impervious and a 1 acre disturbance threshold.
The Jordan Lake New Development Rule is centered on removal of Nitrogen and Phosphorous from
stormwater and a %acre disturbance threshold.These two pollutants can be removed with many of the
same processes as TSS but at differing removal rates and with a different calculation to determine the
effectiveness of the treatment processes.
The Town of Gibsonville will combine its NPDES Phase II and Jordan Lake New Development Standards
into one comprehensive stormwater ordinance.This will reduce confusion between the two ordinances
on the part of developers, designers, reviewers, staff, and the public by creating one set of standards for
review.
The Town created, submitted, and had a full program approved in the summer of 2012. However,the
Town chose to delay implementation until a future date (in accordance with legislation from 2012 and
2013).The Town's future study of the overall Jordan Lake Compliance Strategies may contain
recommendations about early adoption of the Program. In order to gather data for future compliance,
the Town will begin requiring new development to complete the Jordan/Falls Nutrient Load Accounting
Tool in 2014.The tool will not be used for regulatory compliance at this time but will be used to educate
the Town on future development.
Existing Development Stage 1 Programs
The Town of Gibsonville submitted a Stage 1 Adaptive Management Program to reduce existing nutrient
loading to Jordan Lake in 2009. Often referred to as the Stage 1 Existing Development Program,the
Program credits the NPDES Phase II Stormwater Program as the primary steps in the program along with
requiring the Town to create a Retrofit Identification Program.The Existing Development Program
requires annual updates but full reporting is only required for the Retrofit Program because of this
annual NPDES Phase II Report.
Page 16 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
This retrofit program is intended to provide a framework for identifying retrofit opportunities to reduce
nutrient loading in the Jordan Lake Watershed.The program is intended to identify both structural and
non-structural retrofits that seek to reduce pollution,and nutrients,from being carried downstream by
stormwater runoff. By either controlling stormwater runoff or reducing the pollution in the runoff,
stormwater retrofits reduce downstream pollution in streams, rivers, and lakes.Typical structural
stormwater retrofits are stormwater wetlands, bio-retention basins,water quality ponds, and other
devices found in the NC Division of Water Quality Best Management Practices Manual (NC DWQ BMP
Manual). Non-structural retrofits include but are not limited to fertilizer programs, reducing animal
waste programs, urban forestry programs, and leaking septic tank replacement programs.
The Town of Gibsonville will use this program annually in a review of the stormwater program that will
include reviewing the public education program, reviewing the illicit discharge program, and using this
program to have an accurate and up to date list of potential retrofit projects.The Town is required to
select a number of projects based on the following chart:
Table 1: Minimum Number of Existing Development Nutrient Load-Reducing Projects
Population in the Jordan Lake Minimum Number of Existing Development Load Reducing
Watershed Activities to be Identified Annually
Less than 15,000 1
15,000-30,000 2
30,000-60,000 3
60,000+ 4
The Town completed Phase I of a Flood Control retrofit of the Avondale (Brown Bark) Dry Detention
Basin in 2013. Phase II would be a conversion of the Dry Detention Basin to a Water Quality pond or
Wetland.
In 2016 the Town of Gibsonville identified three projects to pursue in the future,these projects are still
under consideration in 2020-21.These three projects included the selected Avondale (Brown Bark)
Subdivision Water Quality Pond, a wetland and stream stabilization project at Moricle Recreational
Complex, and a stream stabilization project behind 1st Street.The Brown Bark Subdivision Water Quality
Pond would be the installation of a water quality pond along the stream behind Brown Bark Drive.The
project would be downstream of two other BMP's and may not be preferred after improvements were
made to the dry detention basin upstream.The Town would prefer to use any BMP's to address minor
flooding issues in addition to water quality wherever possible.
Page 17 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
xo 17"W""W''.:. --7--(0004•••`71:-..,Arrt ,:.i ' V"----*4' ...4°,
�9 ,„, F4,, w.„.
gSti. #:.„ 1j a iy,. . ,� rt ,
t.... ..
wanam.F; +F +.`See'+f�� .. aeJ...: ✓. `A y',R_`
.. r,„_1„.„.„-,„- r-il,
ff __
,. ,io,
g 'At.'
C`4,4;‘,;A :2 '4P-.1:Vt.4•7..' 1.-,:,',076! ' . `, 2 -': '-'?:-....*t:Tir I 14.4 4181C .'‘i ;' ,-,
4
.,.*,..-e., ,, „1,Lt ,, w _ _ , ,,,,,..., , ky,...,:,„02,4,,,
,,,1... .„.... .. ,4,,,..., .. , , ,,....,,..0
r'',.,"',e(ttlyokie.X1,41e-iit'::ts?e,:i ; ,, ;,eeiiigitirt7:1't f."-f:i.:41,44 kir,
sztio
�n s, r
, ucroM n ,e n',La. '�!' - ``,iL.. l t, ;c�,
.. ,r➢'f¢�'r� Y c WATERyQUAL p �' /<,+°
C (,tT 1 I>? t t� .r." /�,{ ��Y I S �I �P�OND� y�9 ���((�Iyy'1
Qom. %?5 f 42, y ;{:� d ' "' $ � , :p. iisw-
a �Y- —,;,' / ' <. -"IA; �T , ,- :,y,,s i 4 1
..f .i
]S�
s
alley,williams,carmen,8 king,rocs °PO°0''® XO ipan' """'^r'^E3 i allay,wllliams.c rrnen,8 king,inc. °M'" 0XV1E
r I �Nwrr� cwMArwmP 'I I , .7. .77 se1...
♦J ENGINEERS 8 ARCHITECTS � ENGINEERS 8 ARCHITECTS
OurINAr nc MI6 1Si ',g49 t n=1,0.4..>F, ”I.::"!:. =774 iwl»655ar "••`'1 M'5.x II."
aMmn l w"ov "
A future strategy for the Town to consider would to fund a full study of potential BMP's.The Town
regularly responds to minor flooding and drainage complaints and could use a full study to prioritize
small improvements that could be done to reduce flooding/drainage complaints while reducing nutrient
loading. This could be addressed with future information on Compliance Strategies for Jordan Lake.
Future Existing Development Stage 2 Programs
The Town of Gibsonville will probably be required to establish a Stage 2 Adaptive Management Program
in the future.This requirement will be based upon the future testing of the water quality within Jordan
Lake. At this point in time we view this requirement as likely.The Stage 2 Existing Development
Programs will be intended to eventually reduce 8%of Total Nitrogen Loads and 5%Total Phosphorous
Loads from the 2001 Baseline Period along with all TN and TP Loads from the Baseline Period until
adoption of the New Development Program.
NC DWQ, through a contract process that involved the Nutrient Scientific Advisory Board (NSAB),
remodeled the Jordan Lake Watershed previously.The remodeling study, completed by Tetra Tech,
provided nutrient loadings for individual jurisdictions for the baseline period and for the post baseline
period through 2010.These jurisdictional loadings are the first jurisdictional modeled loads that have
been produced for Jordan Lake and will allow for the most accurate estimate (to date)for the retrofits
needed and the costs associated with reaching water quality standards within the lake.These loads have
not been assigned at this point and the exact loading for each community is still unclear.
Page 18 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
The Stage 2 Programs will also have additional nutrient reduction measures that credit will be available
for.These nutrient credits were established through another contract from NC DWQ and the NSAB that
established accounting a new crediting program for the following items:
• Remedy Malfunctioning Septic System.
• Remedy Discharging Sand Filters.
• Volume Pond Retrofits.
• Improved Street Sweeping.
• Stream Restoration/Enhancements.
• Diverting Impervious Runoff to Pervious Areas/Impervious Disconnection.
Crediting of these measures will greatly improve the flexibility that affected parties (like Municipalities)
have in achieving the required load reductions.The cost of these load reductions will be substantially
reduced by including these strategies into the overall compliance strategy.
The release of these recent studies will be included in an overall Compliance Strategy Study for the
Town of Gibsonville that will be completed after the loading is released.This study will evaluate the
feasibility of all options for the Town of Gibsonville,will include trading options, and will include the
most comprehensive and accurate financial assessment of compliance for the Town to date.
Stormwater and Storm Drainage Project and Maintenance Policy
As evidenced by the rest of this report,the Town of Gibsonville's stormwater program is almost entirely
centered on regulatory compliance.This is at odds with the most resident's specific issues. By far the
most common concern from residents is localized storm flooding. These are primarily related to a lack of
stormwater controls and a lack of sufficient stream buffers in residential developments.The Town's
Phase 2 Stormwater Ordinance, Buffer Ordinance, and Storm Drainage Design Manual have improved
this situation with new development but subdivisions developed prior to those standards are a
significant issue. In an effort to address these issues, the Town of Gibsonville created a formal
Stormwater and Storm Drainage Project and Maintenance Policy in the fiscal year 2019-2020.The policy
allows the Town to participate in local stormwater improvements in a partnership with property
owners.These projects are centered on environmentally friendly projects that address flooding and
erosion.The policy also clearly defines maintenance responsibilities for the storm drainage system
between the Town and private property owners.The policy is a step in using stormwater fee funds to
improve the daily lives of citizens within the town. Funding for the policy will be provided through the
stormwater fund but will be in addition to regulatory centered funding.
Stormwater Funding
The Town of Gibsonville funds it's Stormwater Programs through a Stormwater Fee.The Town collects a
flat fee of$0.75/month from all utility users.This fee produces$66,000 annually(2022-23 budget).The
Town uses this fee to pay for its Water Quality Programs including its NPDES Phase II and Jordan Lake
Programs.
Page 19 of 20
Town of Gibsonville Stormwater Annual Report
2022 -2023
In the future,the stormwater budget may need to be increased in order to cover additional expenses for
the Jordan Lake Rules.These increases may be done through creation of an Existing Residential Unit
(ERU) style fee.The ERU is based on an impervious area per property calculation and is considered an
equitable fee for stormwater cost calculations. However, the ERU will have a substantially higher startup
and maintenance costs than a flat fee does.
The Future of Stormwater
Stormwater, and Water Quality in particular, is an evolving field of regulation.The Town of Gibsonville is
already involved in NPDES Phase II and Nutrient Sensitive Waters. Within the next decade the Town
needs to plan for further regulation of these issues as well as several other outstanding issues. EPA
continues to work on two potentially large future items that include a Numerical Nutrient Criteria for all
surface waters and a National Stormwater Rule.The Numerical Nutrient Criteria is an EPA supported
push towards establishing nutrient limits for all surface waters. Currently in North Carolina, generally
only reservoirs have nutrient limits and the limits are based upon response indicators.
Stormwater Program Contacts
Name Position Phone# Email
Ben Baxley Town Manager (336)449-4144 bbaxley@gibsonville.net
Brandon Parker Planner/SW administrator (336)449-4144 planning@gibsonville.net
Rob Elliott Public Works Director (336)449-7188 relliott@gibsonville.net
Josh Johnson Stormwater Engineer (336)226-5534 josh@awck.com
Page 20 of 20