HomeMy WebLinkAboutNCC232514_ESC Approval Submitted_20230831// t d
. ' .(40 \ �, /41. -iY))
ROY COOPER �� +,<
Governor ;r # /�G-I/LI
ELIZABETH S.BISER rr,
Secretary
w0`.r..
DOUGLAS R.ANSEL NORTH CAROLINA Lam) -----'--_.
interim Diret tva Environmental Quality
August 8,2023 RECEINIED
AEG 1 4 2023
LETTER OF APPROVAL T1DEATR
Coastal Bay Developers,LLC
ATTN: -Elijah T Morton,Manager
121 Garnet Lane
Jacksonville,NC 28540
RE: Project Name: Coastal Village Duplexes
Project ID: ONSLO-2024-002
County: Onslow
City: Sandpiper
Address: Sneads Ferry
Acres Approved: 5.08
River Basin: White Oak
Stream Classification: HQW
Submitted By: Jason Houston, Tidewater Associates, Inc.
Date Receive by LQS: July 14,2023
Plan Type: Residential
Dear Mr. Morton:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of
Approval with Modifications and Performance Reservations. A list of the modifications and reservations is
attached if required. This plan approval shall expire three(3)years following the date of approval.If no land
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B.0129. Should the plan not perform
adequately,a revised plan will be required(G.S. 113A-54.1)(b).
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of
Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially
Responsible Party shown on the FRF from submitted for this project you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov NCGO1.Please
direct questions about the eNOI changes to the Stormwater Program Staff in the Raleigh central office. If the
owner/operator of the project changes in the future,the new responsible party MUST obtain a new COC.
Title 15A NCAC 4B .0118(a)and the NCG01 permit require that the following documentation be kept on file at
the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resou ces
Wilmington Regional Office 1127 Cardinal Drive Extension ;wihnington,North Carolina 28405
NORTH.CAP4.:NA
fieportatat w Em4FortmeKtsi IlosPiy /'� 910.796.7215