Loading...
HomeMy WebLinkAboutNCC232514_ESC Approval Submitted_20230831// t d . ' .(40 \ �, /41. -iY)) ROY COOPER �� +,< Governor ;r # /�G-I/LI ELIZABETH S.BISER rr, Secretary w0`.r.. DOUGLAS R.ANSEL NORTH CAROLINA Lam) -----'--_. interim Diret tva Environmental Quality August 8,2023 RECEINIED AEG 1 4 2023 LETTER OF APPROVAL T1DEATR Coastal Bay Developers,LLC ATTN: -Elijah T Morton,Manager 121 Garnet Lane Jacksonville,NC 28540 RE: Project Name: Coastal Village Duplexes Project ID: ONSLO-2024-002 County: Onslow City: Sandpiper Address: Sneads Ferry Acres Approved: 5.08 River Basin: White Oak Stream Classification: HQW Submitted By: Jason Houston, Tidewater Associates, Inc. Date Receive by LQS: July 14,2023 Plan Type: Residential Dear Mr. Morton: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached if required. This plan approval shall expire three(3)years following the date of approval.If no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B.0129. Should the plan not perform adequately,a revised plan will be required(G.S. 113A-54.1)(b). As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRF from submitted for this project you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov NCGO1.Please direct questions about the eNOI changes to the Stormwater Program Staff in the Raleigh central office. If the owner/operator of the project changes in the future,the new responsible party MUST obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC,once it is received. 3. Records of inspections made during the previous 12 months. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resou ces Wilmington Regional Office 1127 Cardinal Drive Extension ;wihnington,North Carolina 28405 NORTH.CAP4.:NA fieportatat w Em4FortmeKtsi IlosPiy /'� 910.796.7215