August 4, 2015
DWR # 13-1070-V-2
Avery County
Elk Creek Development Company of Banner Elk, LLC
Attn: Angelo Accetturo, Manager
P.O. Box 725
Banner Elk, NC 28604
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
Elk Creek at Banner Elk
Dear Mr. Accetturo:
You have our approval for the impacts listed below for the purpose described in your application dated April 9,
2015, and received by the Division of Water Resources (Division) on April 13, 2015, with subsequent
information dated June 10, 2015 and July 13, 2015. These impacts are covered by the attached Water Quality
General Certification Number 3890 and the additional conditions listed below. This certification is associated
with the use of Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers.
Please note that you should get any other federal, state or local permits before proceeding with your project,
including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply
Watershed, and Trout Buffer regulations.
This approval requires you to follow the conditions listed in the enclosed certifications) or general permit and
the following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and general
conditions of the Certification are met. No other impacts are approved, including incidental impacts.
[15A NCAC 02H .0506(b) and/or (c)]
Division of Water Resources—Asheville Regional Office
2090 US Hwy 70, Swannanoa, NC 28778
Phone 828-296-4500 \ FAX 828-299-7043
Internet http HPortal.ncdenr.org/web/wq/ws
An Equal Opportunity\Affirmative Action Employer
Elk Creek at Banner Elk
DWR# 13-1070-V-2
401 APPROVAL
Page 2 of 4
Type of Impact
Amount Approved
(acres)
Permanent
Amount Approved
(units)
Temporary
404/401 Wetlands
Impact W1
0.057
Impact W2
0.007
Impact W3
0.001
Impact W4
0.033
This approval is for the purpose and design described in your application and additional information
provided. The plans and specifications for this project are incorporated by reference as part of the
Certification/Authorization. If you change your project, you must notify the Division and you may be
required to submit a new application package with the appropriate fee. If the property is sold, the
new owner must be given a copy of this approval letter and General Certifications) and is responsible
for complying with all conditions. [15A NCAC 02H .0507(d)(2)]
3. The Division approves the Stormwater Management Plan (SMP) consisting of a detention/sediment
basin with wet retention area and all associated stormwater conveyances, inlet and outlet structures,
and the grading and drainage patterns depicted on plan sheets dated March 3, 2015, with revised plan
sheets signed on June 12, 2015, which are incorporated by reference and are enforceable by the
Division. The following conditions also apply [15A NCAC 02H .0506(b)(5)]:
The maximum allowable drainage area for -the approved detention/sediment basin with wet
retention shall be 8.0 acres and the maximum allowable built -upon area within that
drainage area shall be 134,950.9 square feet. Any changes to these maximum areas shall
require the applicant to submit and receive approval for a revised SMP by the Division. [15A
NCAC 02H .0506(b)(b)]
The footprint of all stormwater management devices as well as an additional 10 -foot wide
area on all sides of the devices shall be located in either: public rights-of-way; dedicated
common areas; or recorded easement areas. The final plats for the project showing all such
rights-of-way, common areas and easement areas shall be in accordance with the approved
plans. [15A NCAC 02H .0506(b)(5)]
The approved SMP shall be constructed and operational before any permanent building or
other structure is occupied at the site. [15A NCAC 02H .0506(b)(5)]
The SMP may not be modified without prior written authorization from the Division. A copy
of the approval letter and the modified SMP shall be submitted to the DWR 401 & Buffer
Permitting Unit prior to the commencement of the modifications. [15A NCAC 02H
.0506(b)(5)]
Elk Creek at Banner Elk
DWR# 13-1070-V-2
401APPROVAL
Page 3 of 4
The applicant and/or authorized agent shall provide a completed Certificate of Completion
form to the Division within thirty (30) days of project completion (available at
http://Portal.ncdenr.org/web/wq/swp/`ws/401/certsand Perm its/apply/forms). [15A NCAC
02H .0506(b)(5)]
This approval and its conditions are final and binding unless contested. [G.S. 143-215.51
This Certification can be contested as provided in Articles 3 and 4 of General Statute 1506 by filing a written
petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within
sixty (60) calendar days.
A petition form maybe obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office
at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with
any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday
between 8:00am and 5:00pm, excluding official state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DENR:
Sam M. Hayes, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699-1601
Elk Creek at Banner Elk
DWR# 13-1070-V-2
401 APPROVAL
Page 4 of 4
This letter completes the review by,the Division under section 401 of the Clean Water Act as described in 15A
NCAC 02H .0500. Please contact Tim Fox at 828-296-4664 or Tim.Fox@ncdenr.gov if you have any questions
or concerns.
Sincerely,
)0-01 ��
f'd r
G. Landon Davidson, P.G., Regional Supervisor
Water Quality Regional Operations
Asheville Regional Office
Enclosures: GC 3890
Certificate of Completion
cc: David F. Ramsey - R&S Engineering and Construction Corporation (via email)
Tasha Alexander - USACE Asheville Regulatory Field Office (via email)
Andrea Leslie - NCWRC (via email)
Fred Walker- DEMLR (via email)
DWR ARO 401 files
DWR 401 and Buffer Permitting Unit
1-0
G \WR\WQ\Avery\401s\Non-DOT\Elk Creek @ Banner Elk\New Application as of 3-6-15\APRVL ElkCreekAtBannerElk 8-4-15 doc
t}1Water Quality Certificati�o1n Nj(j�joo... 3890
[(QQ�T
NUMBERS 18NERA�r.el ? N ETIAG. 0 Li1PM�NT1.
FOR S. ^YD /R(e j�� I�
39 CO RC LA I O IONALD(RP�.yELOP TS
41 IRESH API
AN l�P R1 � a 60 I Lp1S( kFER ULFEFACILiT[ESI,, _
Water Quality Certification Number 3890 is issued in conformity with the requirements of Section
401, Public Laws 92.500 and 95 -217 of the United States: and subject to the North Carolina
Division of Water Quality (DWQ) Regulations in 15A NCAC 02H.0500 and 15A NCAC 028.0200
for the discharge of fill material to waters and adjacent wetland areas or to wetland areas that are
not a part of the surface tributary system to interstate waters or navigable waters of the United
States as described in 33 CFR 330 Appendix (B) (18 29, 39, 41, 42, 44, and 46) of the Corps
of Engineers regulations and for the Riparian Area Protection Rules (Buffer Rules) In 15A NCAC
02B.0200.
The State of North Carolina certifies that the specified category of activity will not violate
applicable portions of Sections 301, 302, 303, 305 and 307 of the Public Laws 92 -500 and 95-217
if conducted in accordance with the conditions hereinafter set forth.
Activities meeting any one (1) of the following thresholds or circumstances require written
approval for a 401 Water Quality Certification from the Division of Water Quality (the
"Division"):
a. Any impacts to streams involving excavation or dredging; or
b. Total stream impacts within the project boundaries equal to or greater than 150 linear feet
of stream, . including temporary and/or permanent impacts; or
c. Any stream relocation; or l
d. Any impact associated with a high . density project (as defined in Item(A)(Iv) of the 401
Stormwater Requirements) that is not subject to either state stormwater program (such
as but not limited to, Coastal Counties, HOW, ORW or state - implemented Phase II
NPDES) of a certified community's stormwater program; or
e. Temporary . or permanent impacts equal to or greater than one -tenth (9710) acre of wetlands
or open waters;. or
f. Any impacts to wetlands adjacent to waters designated as: ORW, $A, WS -I, WS -II, or
Trout, or wetlands contiguous to waters designated as a North Carolina or National Wild
and Scenic River;: or
g. Any impacts . to coastal wetlands [15A NCAC 07H.0205)], or Unique Wetlands (UWL) [15A
NCAC '02H .0505]; or
h.. Any impact associated with a Notice of Violation or an enforcement action for violations) of -
DWQ Wetland Rules (15A. NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H
1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC
028.:0200);: or
I. Any impacts to streams and/or buffers in the Neuse, Tar - Pamlico, or Catawba River Basins
or in the Randleman, Jordan or Goose Creek Watersheds (or any other basin or watershed
with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application)
unless the activities are listed as "EXEMPT" from these rules or a Buffer Authorization
Certificate is issued through N.C. Division of Coastal Management (DCM) delegation for
"ALLOWABLE" activities.
In accordance with North Carolina General Statute 143- 215.3D(e), written approval for a 401
Water Quality General Certification must include the appropriate fee. If a project also requires
CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the
two fees.
Water Quality Certification No. 3890 1
Water Quality Certification No. 3890
Activities. included In this General Certification that do not meet one of the thresholds
listed above do not require written approval from the Division as long as they comply with
the Conditions of Certification listed below, If any of these Conditions cannot be met, than
written approval from the Division Is required.
Conditions of Certification:
1. No Impacts Beyond those Authorized in the Written Approval. or Beyond the Threshold of Use
of this Certification
No waste, spoil, solids or fill of any kind shall occur in wetlands waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre - Construction Notification, as
authorized in the written approval from the Division or beyond the thresholds established for
use of this Certification without written authorization, including incidental impacts. All
construction activities, including the design, installation, operation and maintenance of
sediment and erosion control Best Management Practices shall be performed so that no
violations of state water quality standards, statutes, or rules occur, Approved plans and
specifications for this project are Incorporated by reference and are enforceable parts of this
permit.
2. Standard Erosion and Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the properdesign, installation and operation and - maintenance of such Best
Management Practices and if applicable, comply with the specific conditions and
requirements of the NPDES Construction Stormwater Permit issued to the site:.
a. Design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equator exceed the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, . and waste pile (spoil) projects, .
including contractor -owned or leased borrow pits associated with the project.
.b;_ Forborrow.pitsnea the erosion and sediment control measures must be designed _ _.......
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining. Manual.
a Reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act and the
Mining Act of 1971.
d. Sufficient materials required for stabilization and/or repair of erosion control measures
and stormwater routing and treatment shall be on site at all times.
e. If the project occurs in waters or watersheds classified. as Primary Nursery Areas (PNAs),
SA, WS -I, WS -II, High Quality (HOW), or Outstanding Resource (ORW). waters, then the
sedimentation and erosion control designs must comply with the requirements set forth
in 15A NCAC 04B. 0124, Design Standards in Sensitive Watersheds.
Water Quality Certification No.: 3890
Water Quality Certification No. 3890
3, No Sediment and Erosion Control Measures in Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters.
Exceptions to this condition require application submittal to and written approval by the
Division. If placement of sediment and erosion control devices in wetlands and waters Is
unavoidable, then design and placement of temporary erosion control measures shall not be
conducted in a manner that may result in dis- equilibrium of wetlands, stream beds; or banks,
adjacent to or upstream and downstream of the above structures. All sediment and erosion
control devices shall be removed and the natural grade restored within two (2) months of the
date that the Division of Land Resources (DLR) or locally delegated program has released
the specific area within the project. - -
4. Construction Stormwater Permit NCGO10000
An NPDES Construction$tormwaterPermit. is required for construction projects that disturb
one (1) or more acres of land. This Permit allows stormwater to be discharged during land
disturbing construction activities as stipulated in the conditions of the permit. if your project
Is covered by this permit, full compliance with permit conditions including the erosion &
sedimentation control plan, inspections and maintenance, self - monitoring, record keeping
and reporting requirements is required. A copy of the general permit (NCG010000),
inspection log sheets, and other information may be found at
htto:// oortal. ncdenr. cro /we,h /wolws /su /nodessw#tab•w_.
The North Carolina Department of Transportation (NCDOT) she)) be required to be in full i
compliance with the conditions related to construction activities within the most recent version
of their individual NPDES (NCS000250) stormwater permit,
5. Construction Moratoriums and Coordination
If activities must occur during periods of high biological activity (i.e. sea turtle nesting, fish
spawning, or bird nesting), then biological monitoring may be required at the request of other
state or federal agencies and coordinated with these activities.
- -- All moratoriums on. construction activities. established by the NC Wildlife Resources
Commission (WRC), US Fish and Wildlife Service (USFWS), NO Division of Marine Fisheries
(DMF),. or National Marine Fisheries. Service (NMFS) to lessen impacts on trout, anadromous
fish, larval /post- larval fishes and crustaceans, or other aquatic species of concern shall be
implemented. Exceptions to this condition require written approval . by the resource agency
responsible for the given moratorium. I
Work within the twenty -five (25) designated trout counties or identified state or federal
endangered or threatened species habitat shall be coordinated with the appropriate WRC,
USFWS, Ni and /or DMF personnel
Q Work in the Dry
All work in or adjacent to stream waters shall be conducted so that the flowing stream does
not come in contact with the disturbed area.. Approved best: management practices from the
most current version of the NO Sediment and Erosion Control Manual, or the NO DOT
Construction and Maintenance Activities Manual such as sandbags, rock berms, cofferdams,
and other diversion structures shall be used to minimize excavation in flowing water.
Exceptions to this condition require application submittal to and written approval by the
Division.
Water Quality Certification No. 3690 - 3
Water Quality Certification No. 3890
7. Riparian Area Protection (Buffer) Rules
Activities located in the protected riparian areas (whether jurisdictional wetlands or not),
within the Neuse, Tar - Pamlico, or Catawba River Basins or in the Randleman, Jordan, or
Goose Creek Watersheds (or any other basin or watershed with buffer rules) shall be limited
to "uses" identified within and constructed in accordance with 15A NCACO2B ,0233, .0259,
.6243 0250_0267 and :0605, and shall be located, designed, constructed, and maintained
to have minimal disturbance to protect water quality to the maximum extent practicable
through the use of best management practices. All buffer rule requirements, including diffuse
flow requirements, must be met.
8. If concrete is used during the construction, . then all necessary measures shall be taken to
prevent direct contact between uncured or curing concrete and waters of the state. Water
that inadvertently contacts uncured concrete shall not be discharged to waters of the state
due to the potential for elevated pH and possible aquatic life/ fish kills.
9. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed
across the bridge and pre- treated through site - appropriate means (grassed swales, pre-
formed scour holes, vegetated buffers, etc.) before entering the stream, Please refer to the
most current version of Sformwater Best Management Practices. Exceptions to this condition
require written approval by the Division.
10 Compensatory Mitigation
In accordance with 15A NCAC 02H :0506 (h), compensatory mitigation maybe required for
losses of equal to or greater than 150 linear feet of streams (intermittent and perennial)
and /or equal to or greater than one (1) acre of wetlands. For linear public transportation
projects, impacts equal to or exceeding 150 linear feet per stream shall require mitigation.
Buffer mitigation may be required for any project with Buffer Rules in effect at the time of
application for activities classified as "Allowable with Mitigation" or "Prohibited" within the
Table. of Uses.
- -- A- determination -of buffer,.welland and. stream mitigation requirements shalt be made for any_ _.. _.. .
General Water Quality Certification for this Nationwide and /or Regional General Permit,
Design and monitoring protocols shall follow the US Army Corps of Engineers Wilmington
District Stream Mitigation Guidelines (April 2003) or its subsequent updates, Compensatory
.mitigation plans shall be submitted to the Division for written approval as required in those
protocols. The mitigation plan must be implemented and /or constructed before any impacts
occur on site. Alternatively, the Division will accept payment into an in -lieu fee program or a
mitigation bank. In these cases, proof of payment shall be provided to the Division before
any impacts occur on site.
Water Quality Certification. No. 3890
Water Quality Certification No. 3890
11. Relocated stream designs should include the same dimensions, patterns, and profiles as the
existing channel (or astable reference reach if the existing channel is unstable) to the
maximum extent practical. The new channel should be constructed in the dry and water shall
not be turned into the new channel until the banks .. are stabilized. vegetation used for bank. _
stabilization shall be limited to native woody species, and should include establishment of a
30 -foot wide wooded and an adjacent 20400t wide vegetated buffer on both sides of the
relocated channel to the maximum extent practical.. A transitional phase incorporating
appropriate erosion control matting materials and seedling establishment is allowable,
however matting that incorporates plastic mesh and /or plastic twine shall not be used in
wetlands, riparian buffers or floodplamsas recommended by the North Carolina Sediment
and Erosion Control Manual. Rip -rap, A- Jacks, concrete, gabions or other hard structures
may be allowed if it is necessary to maintain the physical integrity of the stream, however, the
applicant must provide written justification and any calculations used to determine the extent
of rip -rap coverage Please note that if the stream relocation is conducted as a stream
restoration as defined in the US Army Corps of Engineers Wilmington District, April 2003
Stream Mitigation Guidelines (or its subsequent updates), the restored length may be used
as compensatory mitigation for the impacts resulting from the relocation.
12. Stormwater Management Plan Requirements
All applications shall address stormwater management throughout the entire project area per
the 401 Stormwater Requirements, referenced herein as "Attachment A" at the end of this
Certification
13. Placement of Culverts and Other Structures in Waters and Wetlands
Culverts required for this project shall be designed and installed in such a manner that the
original stream profiles are not altered and allow for aquatic life movement during low flows.
Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal
profile) must be maintained above and below locations of each culvert.
Placement of culverts and other structures In waters and streams must be below the
elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
_....
and 20 percent of the culvert diameter for culverts having a diameter less than or equal to 48 _.
inches to allow low flow passage of water and aquatic life.
When topographic constraints indicate culvert slopes of greater than 5 %, culvert burial is not
required, provided that all alternative options for flattening the slope have been Investigated
and aquatic life movement/ connectivity has been provided when possible (rock ladders;
crossvanes, etc). Notification to the Division including supporting documentation to include a
location map of the culvert, culvert profile drawings, and slope calculations shall be provided
to the Division 60 days prior to the installation of the culvert.
When bedrock is present in culvert locations, culvert burial is not required provided that there
is sufficient documentation of the presence of bedrock. Notification to the Division including
supporting documentation such as but not limited to, a location map of the: culvert,
geotechnical reports, photographs etc shall be provided to the Division a minimum of 60
days prior to the Installation of the culvert. If bedrock is discovered during construction, then
the Division shall be notified by phone or email within 24 hours of discovery.
If other site - specific topographic constraints preclude the ability to bury the culverts as
described above and/or it can be demonstrated that burying the culvert would result in
destabilization of the channel, then exceptions to this condition require application submittal
to, and written approval by, the Division of Water Quality, regardless of the total impacts to
streams or wetlands from the project.
Water Quality Certification No. 3890
Water Quality Certification No. 3890
Installation of culverts in wetlands must ensure continuity of water movement and be
designed to adequately accommodate high water or flood conditions. Additionally, when -
roadways, causeways, or other fill projects are constructed across FEMA- designated
floodways or wetlands, openings such as culverts or bridges must be provided to maintain
the natural hydrology of the system as well as prevent constriction of the floodway that may
result to destabilization of streams or wetlands.
The establishment of native, woody vegetation and other soft stream bank stabilization I.
techniques must be used where practicable Instead of rlprapor other bank hardening
methods. I
14. All temporary fill and culverts shall be removed and the impacted area returned to natural
conditions within 60 days of the determination that the temporary impact is no longer
necessary. The impacted areas shall be restored to original grade, including each stream's
original cross sectional dimensions, plan form pattern and longitudinal bed and bed profile, .
and the various sites shall be stabilized with natural woody vegetation (except for the
approved maintenance areas) and restored to prevent erosion.
15. All temporary pipesy culverts/ riprap pads etc, shall be installed in all streams as outlined in
the most recent edition of the North Carolina Sediment and Erosion Control Planning and
Design Manual or the North Carolina Surface Minmg Manual so as not to restrict stream flow
or cause dis-equilibrium during use of this General Certification.
16. Any riprap required for proper culvert placement stream stabilization, or restoration of
temporarily disturbed areas shall be restricted to the area directly impacted by the approved
construction activity. All rip -rap shall buried and/or keyed in" such that the original . stream
elevation and streambank contours are restored and maintained. Placement of rip -rap or
other approved materials shall not result In de- stabilization of the stream bed or banks
upstream or downstream of the area.
17. Any rip -rap used for stream stabilization shall be of a size and density so as not to be able to
be carried off by wave, current action, or stream flows and consist of clean rock or masonry
material free of debris or toxic pollutants Rip -rap shall not be installed in the streambed
- _except m specific -areas required for velocity control and to ensure structural_ integrity ofbank
stabilization measures.
18.. A one -time application of fertilizer to re-establish vegetation is allowed in disturbed areas
including riparian buffers, but is restricted to no closer than 10 feet from top of bank of
streams. Any fertilizer application must comply with all other Federal, State and Local
regulations.
19. If this Water Quality Certification is used to access building sites, then all lots owned by the
applicant must be buildable without additional impacts to streams or Wetlands. The applicant
is required to provide evidence that the lots are buildable without requiring additional impacts
to wetlands, waters, or buffers if required to do so in writing by the Division, For road
Construction purposes, this Certification shall only be utilized from natural high ground to
natural high ground.
20.. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional
wetlands waters, and protective buffers within the project boundaries in order to assure
compliance for future wetland, water, and buffer impact. These mechanisms shall be put in
place at the time of recordina;of the orooertv or of individual lots whichever is apnronriate,. A.
sample deed notification can be downloaded from the 4011Wetends Unit web site at
httoVl portal. ncdgar. oroiweb /wolswo /wsjgOlicertsandneem!W /apply /forms Thetextofthe
sample deed notification may be modified as appropriate to suit to a specific project.
Documentation of deed notifications shall be provided to the Division upon request.
Water Quality Certification No. 3890
Water Quality Certification No. 3890
21. If an environmental document is required under the National or State Environmental Policy
Act (NEPA or SEPA), then this General Certification is not valid until a Finding of No
Significant Impact.(FONSI) or Record of Decision (ROD) is issued by the State.
Clearinghouse.
22, In the twenty (20) coastal counties, the appropriate DWQ Regional Office must be contacted
to determine if Coastal Stormwater Regulations will be required.
23. This General Certification does not relieve the applicant of the responsibility to obtain all other
required Federal, State, or Local approvals.
24. Theappiicant/permittee and their authorized agents shall conduct all activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of
State and Federal Law. If the Division determines that such standards or laws are not being
met, including failure to sustain a designated or achieved use, . or that State or Federal law is
being violated, or that further conditions are necessary to assure compliance, then the
Division may reevaluate and modify this General Water Quality Certification.
25. When written authorization is required for use of this certification, upon completion of all
permitted impacts included within the approval and any subsequent modifications, the
applicant shall be required to return the certificate of completion attached to the approval,
One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail
Service Center, Raleigh, NC, 27699 -1650.
26. Additional site - specific conditions, including monitoring and /or modeling requirements, may
be added to the written approval letter for projects proposed under this Water Quality
Certification in order to ensure compliance with all applicable water quality and effluent
standards.
27. This certification grants permission to the director, an authorized representative of the
Director, or DENR staff, upon the presentation of proper credentials, to enter the property
during normal business hours.
This General Certification shall expire on the same day as the expiration dale of the
corresponding Nationwide and /or Regional General Permit The conditions in effect on the date
of issuance of Certification for a. specific project shall remain in effect for the life of the project,
regardless of the expiration date of this Certification.
Non - compliance with or violation of the conditions herein set forth by a specific project may result
in revocation of this General Certification for the project and may also result In criminal and/or civil
penalties.
The Director of the North Carolina Division of Water Quality may require submission of a formal
application for Individual Certification for any project in this category of activity if it is determined
that the project is likely to have a significant adverse effect upon water quality, including state or
federally listed endangered or threatened aquatic species, or degrade the waters so that existing
uses of the wetland or downstream waters are precluded.
Water Quality Certification No. 3890
Water Quality Certification No. 3890
Public hearings may be held for specific applications or group of applications prior to a.
Certification decision if deemed In the public's best interest by the Director of the North Carolina
Division of Water Quality.
Effective date: March 19, 2012
DIVISION OF WATER QUALITY
By
Charles Wakild, P.E.
Director
History Note: Water quality Certification (WQC) Number 3890 issued March 19, 2012 replaces
WQC Number 3621 issued April 6, 2010; WQCNumber3631 issued March 19, 2007; WQC 3402
issued March, 2003; WQC Number 3362, issued March 18, 2002, WQC 3267, issued June 1,
2000; tNQCs 3106 and 3108 Issued February 11, 1997, This Water quality Certification is
rescinded when the Corps of Engineers reauthorizes any of the corresponding Nationwide or
Regional General Permits: and /or when deemed appropriate by the Director of the Division of
Water quality.
Water Quality Certifidatlon No. 3890 8
Water Quality Certification No, 3890
Attachment A: 401 Stormwater Requirements
The requirements listed below shall be implemented in order to comply with Condition. 12 of this
General Certification.. For the North Carolina Department of Transportation, compliance with
NCDOT's Individual NPDES permit NCS000250. shall serve to satisfy the 401 and Isolated
Wetland Stormwater Requirements,'
A. Design and Implementation Requirements. All projects, regardless of project area,
amount of buift -upon area or amount offunsdictlonal impact, shall meet the following
stormwater design requirements:
i. Non-Erosive Discharge to Streams and Wetlands. Stormwater conveyances that
discharge . to streams and wetlands must discharge at a non - erosive velocityprior to
entering the stream or wetland during the peak flow from the ten -year storm.
ii. Vegetated Setbacks. A 30400t wide vegetated setback must be maintained adjacent to
streams, rivers and tidal waters in areas that are not subject to a state Riparian Area
Protection Rule or other more stringent vegetated setback requirements. The width of
the setback shall be measured horizontally from the normal pool elevation of impounded
structures, the top -of -bank of streams and rivers, and the mean high waterline of tidal
waters, perpendicular to shoreline. Vegetated setback and filters required by state rules
or local governments may be met concurrently with this requirement and may contain
coastal, isolated or 404 jurisdictional wetlands.. Non - jurisdictional portions of the
vegetated setback may be cleared and graded, but must be planted with and maintained
in grass or other vegetative or plant material?
iii. Construction and Operation. The stormwater management plan must be constructed
and operational before any.. permanent building or other structure is occupied or utilized at
the site,. The stormwater management plan, including drainage patterns, must be
maintained in perpetuity.4
iv. Coordination with Other Stormwater Programs. Projects that are subject to another
Division of Water Quality (DWQ) stormwater program, including (but not limited to) the 20
Coastal Counties, HOW,, ORW or state - implemented Phase 1( NPDES, or a Certified
Community's stormwater management program, . must be constructed and maintained in
compliance with the approved stormwater management plan.' -
v. Stormwater Deaii Requirements for Projects Not Covered Under Item (iv).
Projects that are not subject to another DWQ stormwater program or a Certified
Community's stormwater program shall meet all of the following requirements:
a. Low Density.. A site Is low density if all the following requirements are met:
1. The development has a built upon area of twenty -four percent (24 %) or less,
considering both current and future development. When determining the amount
of built upon area, coastal wetlands shall be Included; however, ponds, . fakes and
rivers as specified in North Carolina's Schedule of Classifications shall be
excluded If a portion of project has a density greater than 24 %, the higher
density area must be located in an upland area and away from surface waters
and drainageways to the maximum extent practicable'
2. All stormwater runoff from the built upon areas is transported primarily via
vegetated conveyances designed in accordance with the most recent version of
the NC DWQ Stormwater Best Management Practices Manual Alternative
designs may be approved if the applicant can show that the design provides
Water Quality Certification No. 3890 g
Water Quality Certification No. 3890
equal or better water quality protection than the practices specified in the manual.
The project must not include a stormwater collection system (such as piped
conveyances) as defined in 15A NCAC 02B .0202(60).'
It. High Density. Projects that do not meet the Low Density requirements shall meet
the following requirements:
1.. Stormwater runoff from the entire . site must be treated by structural stormwater
controls (BMPs) that are designed to remove . eighty-five percent (85%) of the
average annual amount of Total Suspended Solids (TSS). Stormwater runoff
that drains directly to Nutrient Sensitive Waters (NSW) must also be treated to
remove thirty percent (30 %) of Total Nitrogen' (TN) and Total Phosphorus (TP) a
2. All BIvPs must be designed in accordance with the version of the NC DWQ
Stormwater Best Management Practices Manual that is in place on the date of
stormwater management plan submittal. Alternative designs may be approved if
the applicant can show that the design provides equal or better water quality
protection than the practices specified in the manual.'
3. DWQ may add specific stormwater management . requirements . on a case-by-
case basis in order to ensure that a proposed activity will not violate water quality
standards."
4. DWQ may approve Low Impact Developments (LIDS) that meet the guidance set
forth in the Low Impact Development. A Guidebook for North Carolina."
5, Proposed new development undertaken by a local government solely as a public
road project shall follow the requirements of the NC DOT BMP Toolbox rather
than items (1)-(4) above. 12
B. Submittal Requirements. The submittal requirements listed below apply only to projects
that require written authorization as indicated in the applicable General Certification as well
as projects that require an Isolated Wetlands Permit. Any required documentation shall
be sent to the Wetlands, Buffers and Stormwater Compliance and Permitting Unit at
i. Projects that are Subject to Another DWQ Stormwater Program: If the project is
subject to another DWQ stormwater program, such as the 20 Coastal Counties, HOW,.
ORW or state - implemented Phase II NPDE5, then the applicant shall submit a copy of
the stormwater approval latter before any impacts occur on site."
ii. Projects that are Subject to a Certified. Community's Stormwater Program. If the
project is subject to a certified local: government's stormwater program, then the applicant
shall submit one set of approved stormwater management plan details and calculations
with documentation of the local . government's approval before any impacts occur on site.5
iii. Projects Not Covered Under Items (1) or (ii). If the project is not subject to another
DWQ Stormwater Program or a Certified Community's stormwater program, then it shall
be reviewed and approved by the DWQ through the Water Quality Certification
authorization process.
a. Low Density. For low density projects, the applicant shall submit two copies of the
DWQ Low Density Supplement Form . with all required Items."
Water Quality Certification No. 3890 10
Water Quality Certification No. 3890
b. High Density. For high density projects, the applicant shall submit two copies of a
DWQ BMP Supplement Form and all required items at The specified scales for each
BMP that is proposed."
Iv. Phasing. Stormwater management pians may be phased on a case -by -case basis, with
the submittal of a final stormwater management plan per Items (i) -(iii) above required for
the current phase and a conceptual stormwater management plan for the future phase(s).
The stormwater management plan for each future phase must be approved by the
appropriate entity before construction of that phase is commenced. The approved
stormwater management plan for each future phase must be constructed and operational
before any " permanent building or other structure associated with that phase is
occupied.
v. Stormwater Management Plan Modifications. The stormwater management plan may
not be modified without prior written authorization from the entity that approved the plan.
If the project is within a Certified. Community, then the applicant shall submit one set of
approved stormwater management plan details and calculations with documentation of
the local . government's approval for record - keeping. purposes. If the project is subject to
DWQ review, then the applicant shall submit two copies of the appropriate Supplement
Forms per Item (iii) above for any BMPs that have been modified for DWQ's review and
approval.'5
The stormwater requirement for 401 applications is codified in 15A NCAC 02H .0506(b)(5). and j
(c)(5).
2 Non erosive discharge rates are required in SL 2008-211§2(b)(1). The 10 -year design storm:
standard . is codified in 15A NCAC 02H 1008(f)(2) and .1008(g)(1).
s 30 -foot vegetated setbacks are required in SL 2006-246§9(d), SL 2CQ8. 211 §2(b), 15A NCAC
02H .1006(2)(c) and .1007(1)(a).
- - 4_..Construction and.maintenance.ofthe atormwaterplan is necessary to satisfy 15A NCAC 02H
,0506(b)(5). ......
e Conveys application procedure to streamline the permitting process and reduce any unnecessary _
duplication in the review of stormwater management plans.
e Low density built upon area thresholds are set in SL 2006 - 246 §9(0) and SL 2008.211 §2(b).
' The requirement for low density development to use vegetated conveyances is codified in SL '
2006- 246 §9(c), SL 2008 - 211 §2(b), 15A NCAC 02H 1006(2)(b) and .10071l)(a). The Stormwater
BMP Manual is also referenced in 15A NCAC 026 0265(3)(a) and :0277(4)(e).
e 65% TSB removal is required in SL 2006.248 §9(d) SL 2008.211 §2(b), 15A NCAC 02H
.1006(2)(c), 15A NCAC 02H .1007(1)(a) The 30% TN and TP removal requirements for NSW
Waters are set forth in 15A NCAC 028 0232, 15A NCAC 02B .0267(a)(1), 15A NCAC. 02B
.0265(3)(a) and 15A NCAC 02B.0277(4).
The Stormwater BMP Manual is also referenced in 15A NCAC 02B.0265(3)(a) and .0277(4)(e),
10 The requirement for DWQ to ensure that water quality standards are protected before issuing a
401 certification is codified in 15A. NCAC 02H .0505.
"
The LID Toolbox is also referenced in 15A NCAC 02B 0277(4)(g).
13 The term public road project" Is defined n15A NCAC 02B .0265(3)(a).
t3 Conveys application procedure to streamline the permitting process.
14 Phased development is addressed as a "common plan of development' in 15A NCAC 02H
.1003(3),
15 Procedures for modifying stormwater plans are set forth in 1.5A NCAC 02H.1011.
Water Quality Certification No. 3890 11
MUM
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Donald R. van der Vaart
Secretary
DWR Project No.: .County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North
Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to
DAR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from
all of these.
Applicant's Certykation
I, , hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
Agent's Certy7coulon I J. , hereby state that, to the best of my abilities, due care and diligence was used •�
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
If this project was designed by a Certified Profuslonal
h - , as a duly registered Professional (i.e., Engineer, Landscape
Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time)
the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Registration No.
Date
4018 Buller Permitung Unit
1650 Mail Service Cen @p Reelgh, Noah Carina 27699 ,1650
Phone: 919807- 63001 FAX: 919-807 -6494
An Equal Oppohunily IAnnual Acton Employer