Loading...
HomeMy WebLinkAboutHE-0011_rdy_psh04POND 102'116' STORAGE360' LANE SHIFT 150' TAPER 180' TAPER 25'150' TAPER 360' LANE SHIFT 12 ' 12 ' 1 2 ' 15 " R C P 6 6 " R C P 18 " R C P 15" HDPE 18" RCP 54" RCP US HWY 64 E VAR' BST WOODS WOODS WOODS S 1SBLKD SILO BARN BARN BARN S S S S S S S S S S S S S CONC C O N C CONC 48" WIRE 60" WIRE 60" WIRE 4 8 " WIR E 60" WIR E RIPRAPRI PR A P US HWY 64 W 31' BST US HWY 64 E 31' BST 6 0 " WIR E 60" WIRE GW WOODS WOODS WOODS WOODS WOODS GATE GATE GATE G SS S SILO 15" HDPE 15" HDPE15" HDPE 1SFD S DB 1553 PG 1040 DB 1553 PG 1040 WILLIAM L SMITH ETAL WILLIAM L SMITH ETAL EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/ W E X I STI N G R/ W R/W WIDTH VARIES R/W WIDTH VARIES R/W WIDTH VARIES MTL INV OUT=562.62' 4 8 " W O O D GR D R IVE T T T TT EOI US HWY 64 W VAR' BST MON RW MON RW C H A T H A M C O U N T Y R A N D O L P H C O U N T Y C H A T H A M C O U N T Y R A N D O L P H C O U N T Y DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 8 / 1 7 / 9 9 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 8 /3 0 /2 0 2 3 c : \ p w w o r k i n g \ g f p w 0 1\ b w h i t e \ d 15 5 1 3 3 2 \ H E - 0 0 1 1 _ r d y _ p s h 0 4 . d g n b w h i t e HE-0011 PR OFESS IO N A L E NG INEER N ORTH CARO LINA SEAL 044594 ETIHW .A NI M A JN E B PR OFESS IO N A L E NG INEER N ORTH CARO LINA SEAL . RJ , NAGINREJ . K MAIL L I W 040302 -L- POT Sta. 10+00.00 WW FENCE PROP. 47" + 8 2 . 7 0 + 3 3 . 1 7 + 5 9 . 1 5 SHIFT LANE 360' 81' STORAGE 15 + 0 0 2 0 + 0 0 F F F F F F C A 114.86' RT 98.46' RT +00.00 -L- 114.86' RT +85.00 -L- C A 1 R 2' R 100' R 40' R 20' R 60'-L- STA. 11+16.00 BEGIN EXPRESSWAY GUTTER -L- STA. 13+62.70 END EXPRESSWAY GUTTER TIE TO EXISTING -L- POT STA. 11+00.00 BEGIN PROJECT HE-0011 EXISTING PAVEMENT BEGIN OVERLAY OF EXISTING FENCE REMOVE AND RESET 114.86' RT -L- +85.00 END FENCE EXISTING FENCE REMOVE AND RESET 98.46' RT -L- +00.00 BEGIN FENCE 0404 0405 04060401 0402 0403 04070408 0411 0410 18" RCP-III DI18" RCP-III 2GI RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN GRADE TO DRAIN GRADE TO DRAIN 15" RCP-III 15" RCP-III 0415 0414 0412 2GI 15" RCP-III 15" R C P-III 15" RCP-III TB 2GI 15" RCP-III 15" RCP-III REMOVE 1A OUTLET ANALYSIS RETAIN HW RETAIN HW 100' BUFFER PERENNIAL STREAM 100' BUFFER PERENNIAL STREAM 50' BUFFER INTERMITTENT STREAM 50' BUFFER INTERMITTENT STREAM W/10 SY GEOTEXTILE 3 TONS CL B RIP RAP W/7 SY GEOTEXTILE 2 TONS CL B RIP RAP REMOVE FLOWABLE FILL RETAIN AND TIE 18" RCP-III 0413 TB 2GI TB 2GI 2GI 5 0 ' B U F F E R IN TE R M ITTE N T S TR E A M 18" WELDED STEEL TRENCHLESS INSTALLATION DI DI DI DI N A D 8 3 / 2 0 1 1 - L- S T A 2 1 + 0 0 . 0 0 M A T C H LI N E S H E E T 5 4 FOR -L- PROFILE SEE SHEET 8 PAVEMENT REMOVAL