Loading...
HomeMy WebLinkAboutNCC232636_ESC Approval Submitted_20230831 s- W Z qpir MECKLENBURG COUNTY Land Use & Environmental Services Agency Storm Water Services 8/25/2023 Email: chris.robusto@dreamfindershomes.com Dream Finders Homes,LLC 301 McCullough Drive Suite 109 Charlotte,NC 28262 Re: Arbor Village Subdivision chg of FRO only(#453025) Approval as noted of plans Denuded acreage 5.46 Dear Sir/Madam: Please be advised that the above referenced plan has been approved by this Office. This approval is required prior to applying for the Construction Stormwater General Permit(NCG010000). Application for this permit can be made at https://deq.nc.gov/NCG01. Please contact Chanell Hatch(980-505-5775),Erosion Control Inspector to set up a pre- construction meeting after obtaining your Certificate of Coverage(COC)from NCDEQ.Refer to the attached Fact Sheet for additional information. Also,this letter gives notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. The Planning Department of the Town of Matthews is being notified of this approval by copy of this letter. Plans that are stamped approved will be held within EPM's"approved package"for printing out as needed. In addition,please always print out an approved set with approval stamps to be kept out at the site. If you have any questions,please give me a call at 980-314-3240. Sincerely, Jonathan Rett,PE Mecklenburg County Project Manager CC: Town of Matthews Planning Depai tcaient—Nadine Bennett Project Manager—Mitchell Latham—Latham-Walters Engineering,Inc. Erosion Control Inspector—Chanell Hatch Mecklenburg County Land Development-Heather Davis EPM Approved project PEOPLE • PRIDE • PROGRESS • PARTNERSHIPS • 2145 Suttle Avenue • Charlotte,North Carolina 28208-5237 • www.mecklenburgcountync.gov