Loading...
HomeMy WebLinkAbout820281_Routine Inspection_20230824Type of Visit: ompliance Inspection 7D Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ®'Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: ' 3J ✓I'I Departure Time: County: Region: %` Ace Farm Name: _,&W s, L L C. Owner Email: - Owner Name: e ,(iG i��im G G 6 Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 61 Certified Operator: 4 J6wzyk Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: 9/1" bk b4$0'b@b3 bdA f@#k 14 xa $bt8 k4d N.Ax+4Yi*ga A,K 5K 44a#4?4k#S p39#@E## HI4 'k S.$#49H?S.b Yb M-tHP A3A#%34i}P# 534#k 4k# #944A}�}`k4 Tkhk5 a'h pAp4#ppxtayYb f#y �%{5 jk ¢� §,M1y¢+�• Xg %�fr:Y #A" Y�d994£#5��t5t;;Y1'tt'##9:354�1�RA + bid SSA*G00}�0�000. AtAA Yht bY��Yaa. Alto, 0#N�.,'K;R, Mp$A gff +}RA98t M%IT�XGitlep k&§ 4 4,".1. I.t, kSa'rI}�4*p }�#t#ab &k64WeL 011ldtr�Agp La�ae1L'�,}!'#u i{Y'1#�3fr9#k9'�c'�AC]�fl###*5!>8.x +: 9 $ 5' q�£d333 i"4F# ddA SA'k y#E#K 4R �+7•$Y. 'h6k�4��� gG {Up�r#en $.5Y %'8 v�aylHe� 'ig 96.Q �b RRb obi 3b It fi#w9p ma#d#k 4 # A# fro Hak psrt xa 3.,rlA R aY xo gg #$#$K#4 e #% ttYt ihR+� a iS4d n, Ab@d6x H4id6k#uS;}}�h{ t a £ab46 110 th34148?d .o oP4M#.S,... n 4S#kb t Wean to Finish Layer b Da' Cow; Wean to Feeders Non -Layer Dairy Calf lMR An NY{ 4 V F M#p 'iARIMOM A+##s ,M, e2 k* W1 M Mk4#(d 44#fxi %. ## b * AA hi,A a Feeder to Finish �00"'t. @@ Da' Heifer to ¢� it Farrow to Wean'I &**$;A# AM�R#��"��i���AM u +Seill �A Dr Cow k y$ %b #b YR#4 %a4#kH h4lrkt+Ld#'+4 @#4 aA5484 k+an Farrow to Feeder+4lAs+. # !)',k lltg f; d #%+ $ s d -q11 Non -Dairy p# e{s Farrow to Finish La ers + Bee Stocker .' fit Gilts *4; Non -Layers l4. bA I$ Beef Feeder It Boars 44 Pullets , Beef Brood Cow A jns 15151 k'#k3x4w d*p ww»l alx xre A+zn a+ x st... bp£ y Turkeys +dtH&ia�$tAh P# xa#idN wei na+.a Atr 9 s to t"'b%to ;°+o+•%a':lx�b%{frp&#b'YIffib$a'#d41 xbalx+b#a%d %frap#.:lA bbb'4VA%4v#2 v'bptxx �# aas#A#p48#4dtM#blp A+k4#a YAwM5xm lkp+kk#q�*q AAa£q k'#%ba Y4x MSdx 9l4 f#$d##M%MR #@tiotttllev, nRAMRM^ 1k5 xti##*klp i3'#.34$gl% Turke Poults Fl�gd #S4 %kx+SMMI#udt•m x4aM#%p80Pkt{Sgkq##&AAo+uy Sd +qq YI �xxa Mm##l'1uv4X F44#A*ga#li%k3#k5d0'd#ggn, ti# A*A 44#4§Ya m.!{#aS amgry %q�#M"�# xAP6§s9q% p044 MR �+$,�. Other.. aii# �a�ax:;.a*+�#*� x .d,A.+rka�s Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ,E:rNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes '[J'No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes 2 No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): S� Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ®)No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ,❑'No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes[]'No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes ,®"No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes eNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes _[D�No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 13'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): CVVa J*(,ray� 4C, �! 44e 05 13. Soil Type(s): �� %� leo 14. Do the receiving crops differ from those designated in the CAWMP? [—]Yes E5No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes . / lNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [:]Yes []�o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes E�No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes En'No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Q-1qo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes eNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [—]Yes EE�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ,E�`No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes.D'No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑-Ro the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: Reviewer/Inspector Signature: ❑ NA ❑ NE ❑NA ❑NE ❑ Yes E]No ❑NA ❑ NE ❑ Yes ENo ❑ NA ❑ NE ❑ Yes E]­Ro ❑ NA ❑ NE ❑ Yes E] No ❑ NA ❑ NE ❑ Yes _[ o ❑ NA ❑ NE ❑ Yes ,INo ❑ NA ❑ NE ❑ Yes .--E No ❑ NA ❑ NE ❑ Yes ,-eNo ❑ NA ❑ NE ❑ Yes 12-i�o ❑ NA ❑ NE Phone: 8,35 —F, Idj Date: 511212020 Page 3 of 3 FACILITY* c0>2—?5 FARM NAME: LAGOON PERMIT (Ms) - DUE EVERY 5 YEARS - EXPERIATION DATE NUMBER OF ANIMALS - CURRENT NUMBER OF ANIMAL OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (420) SOIL TYPES CROP TYPES - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (u i) -GOOD FOR 600 DAYS BEFORE OR AFTER 1 �/ DATE �C/ �gb/`NITROGEN LEVEL DATE �< /al "'3 NITROGEN LEVEL �V� DATE �lO/ NITROGEN LEVEL .2 —�"� -- �/l s/fir 1'Sj SOIL REPORT (tr24) - EVERY 3 YEARS: DATE ^f/ Ve - P-1(N.O MORE THEN 400) - PH(N.t U4.,Ie.) - Cu/ZN (NO MORE THEN 8000) CU ZN (IF PEANUTS NO MORE THEN 300) I RR2 (a21) Not over PAN CROP TYPES FLOW Not over PAN CROP TYPES NITROGEN (N) FLOW RATES NITROGE!/ Not over PAN CROP TYPES FLOW RATES NITROGEN (N) _ Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION Iszal EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR DATE OF CALIBRATION �a-1 FLOW RATES RAIN FALL (mot) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED. // LUDGE(�+a25) -DUE EVERY YEAR: DATE Ga `,-�" 0:3:1 P: 3: SI % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE 0: P: %RATIO OF SLUDGE OTHER FORMS (n22AND #21) Y2 RAIN BREAKER FORM CROP YEILDS MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS _ PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE Bermuda grass: Opens March 1-t- Ends September 30th Small Grain Over seed: Opens October 1 n- Ends March 31 st Corn: Opens February 15th - Ends June 30th Cotton: Opens March 15th - Ends August 1st Rye: Opens September IA -Ends March 31st Oats: Opens September 1't- Ends April 15th - Wheat: Opens September 1st- Ends April 30th Soybeans: Opens April 1st- Ends September 15th Fescue: Opens August 1st -Ends July 31st Sorghum Hay: Opens March 15th- Ends August 31st