Loading...
HomeMy WebLinkAboutGrays Creek Elementary SchoolcaM�!�r °Ncem�� FACILITY INFORMATION Facility Nams- r S Permit Name (ff different]: - Facility Address: �1• s�G r_✓, 7 Conte& Person: �? , Well Loratlont Site Name:: SUBMIT FORM ON YELLOW PAPER ONLY Please PrInt Clearly or Type County <<,•-,cs��7o:..,� .. Telephone M (910)6 79'.a7-G 5°k No, of Wells to be Sampled 3 Well-Identificalion Number (from Permit): /, f v J ] For GrounduraterTmat rent Systems W611 Depth: ! ft. Well Dlameten 1n. Cherk Gras Screened Interval• / it, to 0,L fL Depth to Water Level: %ft. below measuring point El ® Influent {98) Measuring Point Is n it. above land surface. Effluent {99) Gallons of water pumpedlbailed before sampling: Fana lysis: alysis: pH� , Spedfic Conductance umhos mp. . Te18:S�°C,Odor n/ani— �. Appearance r"/ 4/ PERMIT If. EXPIRATION DATE: Non -Discharge UIC NPOES TYPE OF PERMITTED OPERATION BEING MONITORED: Lagoon Rernedialim: Infil raflon Gallery Spray Field Rerwdlaflon: Rolary Distrilwto► Land Appiml on of Sludge Other: 5�•6s.,rAr-cc � A 5y s Ae, NM- Values should reflect dissolved and colloidal concentrations. Date sample collected I ' 3 Dale sarnpi/e analyzed: Laboratory Name: Alibc. L�nrt�rJ✓rGS Shy Certification No.. -A I'J/ PARAMEMRS (Samples for metals were collected unfiltered YES NO and field acidified _ YES NOy COD mg/I Nitrite (NO2) as N mg/l Ni - Nickel mgli Conform: MF Fecal L- o 1100ml Nitrate (NO3j as N r 13 s- mgA Pb - Lead mgA Coliform: MFTotal 1100ml Phosphorus: Total as mg/1 Zn - Zinc thivi {Hole: Use MPH nw twd to► hghly turbld aernph»} Orthophosphate mgA Ammonia Nitrogen � d, i � gjfl Dissolved Solids: Total 91 mgll. Al - Aluminum mgll Other (Specify Compounds and Concep. iation _Units) OH (when analyzed) LZ, 3 a- units Ba.- Barium mg;I �� ~ � TOG mgll Ca - Calcium mgfl `- Chloride 16, 6- IR mg/I Cd - Cadmium mgll 4'1 Arsenic mgll Chromium: Total mg/1 =M Grease and Oils_ mg/1 Cu -Copper mgll Phenol mg/1- Fe - Iran mg/l , ORGANICS: (GC,GC1MS,HPLCI Sulfate mgll Hg - Mercury mg/I (Specify lest and method #. Attach lab rep1d Spedfic Corlcfllctance uMhos K - Potasslurn mgll Report Attached? Yes_(I) No (0) Total Ammonia mgA Mg - Magnesium mgll VOC : method # TKN 'as N mgA Mn - Manganese mg/I _ :: method #= method # 3 co CL CD 0 N SUBMIT FORM ON YELLQUV PAPER ONLY Facility Name Permit Name Facility Addre Contact Person: � �'�� /5 ye am lap? Well Locafionl Site Name: ��- Please Priest Cleady or COUnty ��?- -- • b cri c.- Telephone #: ) r No. of Wells to be Sampled: Wei Identification Number [from Permltl: :d W - Wen Depth: .2-3 ft. Well Diameter: --2- In. Screened Interval: 13 #t. to IL Depth to Water Level: -4e /2 // - ft. below meastming point. For Groundwaler Treadnent Systems Check Orem ® Influent (98) 13 Measurkrg Point is �- 5 it, above land surface. L Effluent {gg} Gallons of water pumpedlbailed before sampling: /A 1 Feld analysis: pH "V- 6, . Specific Conductance Temp. Gr °C, Odor Appearance PERMIT #: EXPIRATION Non -Discharge UIC NPDES TYPE OF PE ITT D OPERATION BEING MONITORED Lagoon Reinediallon: lnfillrailon Gallery Spray Field Fbrmdbflen: Rolary Distribritor Land A}olicallan of Sludge Other. .S—GS .,o.,o,4c NOTED Values should reflect dissolved and colloidal concentratlons. Date sample collected: Date sample analyzed: uMhos Laboratory Name: ' i4r, Certification No. PARAMt MRS (Samples for metals were collected unfiltered YES NO and field acidified YES NO) COD mgll Coliform: MF Fecal G / c 1t OOmI Coliform: MF Total !1 oomt JW(si Us*,, MOM rrwOwd for highly turbid ser pW) Dissolved Solids: Total / s 1 mgjl pH (when analyzed) y- 3 units TOG mgil Chloride 9 " ;7-a mgll Arsenic mgji. Grease and Oils mgll Phenol mgfl Stillate mg/I Specific Concbctance uMhos Total Ammonia mgll TKN as N mgA Nitrite (NO2) as N mgA Nitrate (1\10a1 as N / 3 • y4 mgA Phosphorus: Total as P o icy mglt Orthophosphate m9A Al - Aluminum mgfl Ba - Barium mgll Ca - Calcium mgll Cd - Cadmium mgll Chromium: Total mgll Cu - Copper mg11 Pe - Iron mgll Hg - Mercury mgA K - Potassium mgll Mg - Magnesium mgll Mn - Manganese rngll Ni - Nickel mgA Pb - Lead - mgA Zn - Zinc Ammonia Nltrogon _ e_ Y mgll r'11ng Other (Specify Compounds and Concentration It (its) .ORGANICS: (GC,GC/MS,HPLC) (Specify test and method R. Attach lab repok) Report Attached? Yes —(I) No 22 (0) VOC : method # _ method # _ method # _ a m W CD 0 m co n z 0 i N N i CD m N N SUBMIT FORM ON YELLOW PAPER ONLY. FACILITY INif_QRMATIQN FacKlyName- Permit Name (if difierent):r�j� Facifty Address= $i o G Please PrInt Cleady or Type Conrad Person*- pop Telephone #:&01(7b: :ems �G Wei Locallonr Site Name: ^���� Nt i✓ / No. of Wells to be Sampled: Wei Identification Number (from Penfnit): Z-11" I For Groundwater Treatment Sysiems Wei Depth: ,.ZI IL Well Diameter:- in. Cileckprlm Screened Interval: it it.to.2- / fL O Influent (98) Depth to Water Level: // ' IL below measuring point. ❑ Effluent (99) Measuring Point b D it. above land surface. Gallons of water pumpedibailed before sampling: � Fieki analysis: pH '/•..5-.,,,p� , Specific Conductance uMhos Temp. _flLr °C, Odor .Appearance r"i2 PERMIT #: d-17.-2-6 EXPIRATION DATE: Non -Discharge UIC NPDES IYPE OF PERMITTED OPERATION BEING MONITORED Lago6n Remedialian: Inffiratlon Gallery Spray Held Remedlallm c Rolary Distributor Land AppSmIlan of Sludge'r Other. 5' - / -i Via_& chi —, n� N TE: Values should reflect dissolved and Q colloidal concentrations. O Date sample collected: Date sample analyzed: Laboratory Name: Certification No.' PAAAME[ERS (.Samples for metals were collected unfiltered YES NO- and field acidified YES NO) COD mg/1 Nitrite WOO as N mgA Ni - Nickel mgA Coliform: MF Fecal < 1100ml Nitrate (NO3) as N _ mgA Pb - Lead mgll Coliform: IVIF Total 1100ml Phosphorus: Total as P 4?1 jgl�c mgA Zn - Zinc mgll troy: use Mini nwftdwhghlrmrbw-a rftsf Orthophosphate mgA Ammonia Nitrogen G `f mg/l Dissolved Solids: Total 1 on_ mgA At - Aluminum mg/1 Other (Specify Compounds,and Concentration UniW c pH (when analyzed) units 8a -Barium mg/1 0� TOC rngll Ca - Calcium mg/1 Chloride / 7, o mg/1 Cd - Cadmium m 11 Arsenic mg11 Chromium: TotM Grease aril Oils mgA Cu -Copper IILULIVLU Phenol mgJl Fe -Iron flRGANIGS: t�e,tac�Ms,HPLC) � aSulfate MAY mg11 Hg - Merr ury (Specify test and method X. Attach la!L�por,-)Specific Conductance uMhos K - Polasslu Report Attached? Yes(1) WTotal Ammonia mgtl Mg - Magnesia p VOC :method # _ TKN as N ingfl Mn - Manganese mg/1 : method # = method # _ GW 59 Rev. 4MB SUBMIT FORM ON YELLOW PAPER ONLY Facility Name- Peratlt Name (if Fadiiry AcWess Wei Location/ Site Please Print Cleady or Type - County Telephone #: &62 i No. of Wells to be Sampled: Wei Identification Number (from Permlt): /tit Wes-- - For Gra induralm Twatmenc Spslema Wei Depth: • . -3 ft. Well Diameter: In. Check Onc Screened,lntervak 13 it. to .2-3 ft. p Influent (98) Depth to Water Level: A?. s— ft. below measuring poinL ❑Effluent (99) Measuring Point Is •2- S ft. above land surface. Gallons of water pumped/balled before sampling: .2 , -� Field analysis: pH Specific Conductance uMhos: Temp. 7 2' °C, Odor Appearance ,/V PERMIT #: o'-/ 7� EXPIRATION DATE: Non -Discharge UIC NPDES TYPE OF EERMITTEV OPERATION BEING MONITORED Lagoon Remedalion. tnlidlratlon Gallery Spray Field Ftemediallom Adary. Distributor Land Appicalion of Sludge - other: NOTE: Values should reflect dissolved and Q colloidal concentrations. Date sample collected Date sample analyzed: Laboratory Name: Codification No. PARAIJIffffnS (Samples for metals were calleded unfiltered YES - NO and field acidified ° YES NO) COD mg/I Nitrite (NO2) as N r mgA Ni - Nickel mgn Coliform: MF Fecal 1 1100ml Nitrate (NO3) as N 17, 3'a mgA Pb - Lead mg/I Coliform: MF Total 1100mi Phosphorus: Total as P O,yS mgA Zn - Zinc mg/I (Note: Use MPH nVowd for highly aubld smpra) Orthophosphate mgA Ammonia Nitrogen v, 1,t rrig/I Dissolved Solids: Total Too mg4 At - Aluminum mg/I Other (Specify Compounds and-Concentratiortupils) c pH (when analyzed) units Ba - Barium mg/I _ ri TOG mg/I Ca - Calcium mg/I� Chloride -I Fr, S mg/I CA -Cadmium mg/I � h Arsenic mg/I . Chromium: Total Grease and Oils _ frign , Cu - Copper _trig p mg/I Fe -Iron m ORGANICS: {GC,GCIMS,HPLC) -� 0 o Sulfate mg/1 Hg - Mercury mg (specify test and method X. Attach Is�'re Specific Conductance uMhos K - Polasslu mg Report Attached? Yes (1) clo . (0) Total Ammonia mgA Mg - Magnesiu m VOC ; method # TKN as N mgA Mn - Manganes _ — ' A 10 method #= �— _ method # ,'j FACILITY INFORMATIQN F ly! m•oci Na - Grp 6-e e.4 Permit Name (if different): XecZ�nal_ - Fw1ItyAcWess:.. F-162- SUBMIT FORM ON YELLOW PAPER ONLY Please Print Clearly or Type -, " ,- C. 1110'e- Ursa County 44) Telephone #: 1194:9) 6 Contact Person- MV, e­ ex2=4­I, VVelf-Locallonf.Sita Name:, 'No. of Wells to be Sampled. Well identification Number (from Permit): A4 _7[Fo, r Grot nrivrater Twabhent Sysleins Cl Wd Depth: __1 ft. Well Diameter In. ChwlcOne: --&reened Interval:- it. to z;2_1_ - ft. . eft. ft. below measuring point E3 Influent (pa) Depth to Water Level.- Veasuring Point Is -e7 it. above land surface. 13 _ Effluent (99) Gallorisalwater pu!npeftailedbefi;�resampling: Feld 'aiialysk x pH. Specific Conductance —umhos Temp. �92,of-C,Odor Appearance _la:.Wll PERMIT #: ,7-, 7 EXPIRATION DATE: NPDES TYPE OF PERIUII�ER OPERATION BEING MONITORED -- Lagoon lnfillralloh Spray Field Raimcf1aflow Rolary DistribLtair Land AppSmilan 61 SW" V Other NQM- values shoutd'i6flect dissolved and a6flof.dal concentrations. Zle-1 Date sample anedyzi'dii Date sample collected Laboratory Narnw., V&r PARAMENAS (Samples for metals were collected iinfiftered-_LYES. NO and field acidified COD mgll:, Nitrite (NO2) as N mg/l Coliform: MF Fecal /I 00ml. 5�- Nitrate (NO3) as N , X 7 MgA Coliform: MF Total. /100m1., Phosphorus: Total as rngfi ifte: We MPH irAftd for highly turbid swphs) Orthophosphate Mg4 rngA.: Al -Aluminum mg/l. pH'(%yhdd analfted), 7, 15-9 units", Ba--.; barium mgll TOC mg/I Ca - calcium -Chloride 5� "!!!7 M 911 Cd'- Cadmium r gj Arsenic -Grease and .Oils mg/I mg1l'. rj Tota _- Chromium. 5 M1 DEC, I 7,2003 Cu - Copper mg .Phenol. Iragil Fe - Iron rn Sulfate. DWI, Hg -Mercury I UIM FATWLLE REGIONAL OWag Specific.Qcr�ctance uMhos­.. K-Pofasslu 'Total AmrnobI4. Mg4. Mg -Magnesium mg/I TKN as N mgij;-. Mn -Manganese mg/I In,-Iuding 'he pos, YES Ni Nick( Pb. Lea( :-i- 4C - zinc, P brila Nitrogen —1 '(SPecIlY Compounds and —NO) .01110ANICS: (GG,GC/MS,I4PLC) (S146fty test and method 9. Attach Report Attached? 'Yes No Voc method # = method 0 = method SUBMIT FORM ON YELLOW PAPER ONLY Please Print CleFdy or Type Facility Namw_ Permit Name (if 'p­FmMifw Artrimem ; -a County ei­ 6ee-b-,k..� -.­-'Contect Person— &4<e- Op' -Telephone M&A) 67.P-,) Well Location? Site Name: No. of Wells to be Sampled: .021 Number _jFroMff-V7VH1j:_ _/_W(we=� For Groundwater Twabhe . ntSyslain Well Depth: . 'a ft. Well Diameter. A In. Check0ne: Screened Interval: 1 13 it. to X3 ft. 13 Influent (98) Depth to Water Level. lto�, /01 ft. below measuring -point .13 -Effluent t99) Measuring Point Is - 2j, 5- fL above land surface., Gallons ofwa:14pumpeftailed bef{ e sampling: Hel.darialysis: pH Specific Conduclanee umhos Temp. _2_9�OC, Odor - /*dr__ - - , Appearance __eZ.,LdZx PERMrr#- �17�`­. EXPIRATION DATE. = sr Non-DischargeL,, UIr, NPDES TYPE OF PERMITTED: OPERATION nmwz MONITOAEO Lagoon Refuedation: InNhall on Gallery i' Spray Fldd Rotary Distributor Land AppSmIl6n of Sludge ✓ Other: NQM, Values should tei'll ffect dissolved and .0 colloidal codc'e� tratlons. Date sample collectect Dale s'ary -7 Laboratory Narnw. *,�ro Pe analyzed: Cerlification No. qw.// ZVe *377 (S2MOOS for MOWS WOM Callected unfiltered -YES NO and field addifted WD vigil Nitrite_(NO2) as N mg/I Collform: MF Fecal*,. I Nitrate (NO3) as N 1`11g1l, MF Total /100 M": I Phosphorus: Total a-q'P—,- -3� mgA. 'Orthophosphate jike. Um*,- MPH nwftd for highly turbid swphs) MgA Dissolved Solids:, -.Total r6§11 Al - Aluminum mg/I - pH,(when'Malyzed)­­' units Ba -Radum mgfl Toc mg/I Ca - Calcium mg/l, Chloride mg/1 Cd - Cadmium mg/I Arsenic, mol Chromium.- Total mg/I Gtease-and Oils:... mgA Cu.-Copper mg11 Phenol'Fer- mg1l, Iron M19A stillald, mg/I Hg - Mercury mgn Specific Coridictbnce —Umho§ K - Potassium mg/1 Total Ammonia M-0 Mg - Magnesium mg1l TKN as N mgq Mn - Manganese mg11 GW-59 Rev. 4196' Inzed AgerAl Name and THIEP 4palurecUPeEgkiTor—AunwrizedAgerki) Nl-�'-"Nickel F: mg 0 P614",16ad Z6,"ItZinc, .7— mmunla, Nitrogen - Oth" er, PecRY Cbmpounds and -7o ORO ANICS: (dC,6C1M8,H PLC) -7 (SPeCII.Y, test and Method 9. Atticii ReliOrt Attached? Yes VOC.- method # = r+, method # = method #= I I I U I I I Le a F I 11.2 11 to a 11 V 1 %1 (D (Va J / , eC4)-l'i- � r: Subject: (no subject) it Date: Wed, -6 Feb 2002 02:10:46 EST From: Normawitz@aol.com To: stevensj@infi.net CC: Steven.berkowitz@ncmail.net, joe.pearce@ncmail.net Jane: Here is the Draft Gray's Creek OP (finally!). Make sure they fix the timer ("Off" time should be set for 27.minutes, not 270 seconds). Believe the autodialer also needed to be repaired. The ETM and cycle count data looked OK, once things -had stabilized (but I haven't completed reviewing, so if I find they indicate any problems, I'll let you know). They should also be reading water meter at least on a weekly basis through the end of this school year (see permit monitoring conditions). Don't think we've discussed monitoring wells. Are these in? See permit for sampling, requirements. Call if any questions! Steven Name: 98-34GraysCreelcDOP.doc 34GraysCreekDOP.doc Type: Winword File (application/msword) Encoding: base64 Download Status: Not downloaded with message M c,�• d- G i-e c d 7 I of 1 2/7/02 11:08 AM Wastewater Collection, Treatment and Subsurface Disposal System Operation Permit In accordance with the provisions of Article 11 of Chapter 130A, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Tim Kinlaw Cumberland County Schools P.O. Box 2357 Fayetteville, North Carolina 28302 FOR THE operation of a 11,400 GPD wastewater collection and treatment system and 8550 GPD disposal system to serve the new Gray's Creek Elementary .School, located on Alderman Rd., Gray's Creek, North Carolina, with a maximum student population not to exceed 950, with cafeteria and no gymnasium. The system consists of two grease traps (7000 gallons, combined), six-inch gravity sewer, septic tank (12,000 gallons with 2 Zabel effluent filters Model A300-HIP); and recirculating/flow equalization tank (14,000 gallons), duplex pumping system, including pumps and pump removal system, float tree and control panel with timer controls, three recirculating sand filters (3744.square feet, total), flow splitter, final dosing tank (8000 gallons); quadruplex pumping system, including pumps and pump removal system, float tree and control,panel with multiplexing controls, four supply lines, four pressure manifolds, four conventional drainfields (7960 linear feet, total), four designated repair fields, high water alarms with autodialer connections, and two groundwater monitoring wells, with no discharge of wastes to the ground surface or to surface waters, in conformity with the project plans specifications, applications and other supporting data previously filed and approved by the Cumberland County Health Department (Local Health Department) and the Department of Environment and Natural Resources (DENR) and considered a part of this pen -nit. This system is classified as a TYPE Vb system in accordance with 15A NCAC 18A .1961, requiring monthly inspection by the ORC with semi-annual inspection reports submitted to the local health department and at least yearly inspection by your department. This permit shall be effective from the date of issuance until PW and shall be subject to the following specified conditions and limitations: I. PERFORMANCE STANDARDS The owner is subject to all provisions of Article 11 of Chapter 130A of the General Statutes and 15A NCAC 18A .1900 et. seq. The owner is especially referred .to Rules .1935 (31), .1937 (ij), .193 8([), .1945(a,b), .1950(a through i), .1961 (a through m), .1965, .1967 and .1968. 2. The facility is prohibited from disposing of any chemical cleaners or any other potentially inhibitory/interfering substance into the wastewater system, including out-of-date or damaged food goods. The facility is prohibited from operating a garbage disposal or grinder. 4. Condensate water from refrigeration and air conditioning equipment shall not enter the wastewater system. The issuance of this permit shall not relieve the Owner of the responsibility for damages to surface or groundwaters resulting from the operation of this facility. 6. The wastewater treatment and disposal facilities shall be effectively maintained and operated at all times so that there is no discharge to the ground surface or to surface waters. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions or failure of the subsurface disposal area to adequately assimilate the wastewater, the Owner shall take immediate corrective actions including those actions that may be required by the Local Health Department, such as the construction of additional or replacement wastewater treatment and disposal facilities, upon receipt of a repair.permit. Residuals generated from these treatment facilities must be treated and disposed in accordance with the 40 CFR 503 and in a manner approved by the Division of Solid Waste. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited. The Owner shall keep the plumbing. in the facilities served in good repair and eliminate leaks, drips, or excess flows as they occur, and take steps necessary to prevent excessive infiltration/inflow into the wastewater collection system. II. OPERATION AND MAINTENANCE REQUIREMENTS The facilities shall be effectively maintained and operated as a subsurface disposal system to prevent the discharge of any wastewater to the ground surface or surface waters resulting from the operation of this facility. The system shall be properly maintained and operated at all times in accordance with the Laws and Rules, approved system design, plans and specifications, designer's recommended O + M Manual, and with the requirements and schedule of Operation , Maintenance, Monitoring and Reporting of this permit. The system shall be effectively maintained to prevent a failure as defined in the Law and Rules. 2. This system is classified as a Type Vb subsurface system. The Owner shall contract with or employ a certified subsurface. system operator to be 'in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a valid certificate at all times as a Certified Subsurface Systems Operator. The Owner must also contract with/employ a certified back-up operator and comply with the conditions of 15A NCAC 8A .0202. The ORC of must visit the facility/system at least monthly, and must properly manage and document operation and maintenance of the system and must comply with all other conditions of 15A NCAC 8A .0202. The Owner must submit a letter to the Local Health Department, which designates the Operator in Responsible Charge prior to Operation Permit issuance, and within thirty (30) days upon any changes. 3. The daily application rate shall not exceed a long term acceptance rate of 0.36 gallons per day per square foot of drainfield trench bottom area. 4. SCHEDULE OF OPERATION AND MAINTENANCE A. Gravity collection system and effluent supply lines shall be inspected at least bi-monthly by walking the lines and checking for settlement, leakage, or wet areas. The collection system shall be maintained as follows: • Visual inspections of manholes and connecting sewer lines and shall be conducted at least bimonthly, and the septic -tank inlet during every monthly ORC inspection. • If visible accumulation of sewage is evident, it shall be washed thoroughly with fresh water into the sewer lines/septic tank. • If accumulation of solids has not been removed by flushing, them the lines shall be rodded with appropriate sewer line cleaning equipment. • A log of inspections that shows the date of inspection, condition of segment, and maintenance undertaken shall be maintained. • Any additional clogging of these lines shall be remedied on an as -needed maintenance. All emergency maintenance shall be noted in the inspector's log. • Any spills of sewage shall be immediately reported to the Cumberland County Health Department at (910)433-3660. B. .The Septic tank and grease traps shall be inspected monthly for influent/effluent line blockage, tank leakage, structural integrity, condition of the baffles, effluent filters and tees, and solids accumulation. Blockages or leaks shall be repaired. The effluent filters shall be cleaned whenever the tanks are pumped, or as otherwise needed, and repaired or replaced if necessary. The Septic Tank (both chambers) shall be pumped annually, when the solids level exceeds one-third of the liquid capacity of the tank in the inlet chamber, or as otherwise determined necessary by the ORC or the LHD. The Grease Traps shall be pumped out semi-annually, or as otherwise approved by the Cumberland County Health Department. Ground surface around the tanks shall be inspected for areas of settling or ponding of surface water. These areas are to be relandscaped, as needed. C. The recirculating/equalization pump tank and effluent pump tank shall be inspected at least monthly for proper operation, leaks and solids accumulation (daily if remote high water alarm or autodialer system are not installed). Leaks shall be repaired and solids removed whenever the septic tank is pumped or as otherwise found to be necessary. Pumps, controls, floats, and alarms shall be cliecked for proper operation. All components of the pump/control systems shall be kept in compliance with design standards. Pump elapsed time and cycle counter readings shall be recorded and evaluated to ascertain proper pump cycling. Mean daily flows delivered by all pump tanks shall be estimated, based either upon most recent determination of pump flow rates (see below). Autodialer shall be maintained in operable condition per manufacturer's recommendations. D. The Sand Filter shall be in service at all times and shall have media in accordance with approved design specifications or approved modifications. Vegetative growth or surface debris shall be manually removed as needed but at least monthly. The flow splitter weir shall be inspected for levelness, short-circuiting and debris accumulation and made certain flow is being properly split per system design. The low-pressure lines in the sandfilters shall be purged at least two (2) times per year. Pressure on the distribution lines shall be checked and adjusted in accordance with start-up conditions (approx. seven feet) after each purging and at least on a quarterly basis. Pump flow rates for individual.filters shall be tested after each purging following pressure re -adjustment as described below. E. Pump Flow Rates in the filter dosing and final lift stations shall be tested at least two (2) times per year by the following method: • Determine depth of water in pump tanks, by measuring difference in depth from top of riser to bottom of the tank, minus depth to liquid surface. Determine depth of liquid in tank. • Run pumps from three (3) to five(5) minutes. • Re -measure depth of liquid in tanks and similarly determine gallons of water pumped based upon gallons/inch drawdown (125 gallons/inch for both the recirculating pump tank and final dosing tank). Compute pump rate in gallons per minute from drawdown volume divided by pump run time. i • Compare design/startup filter pumping rates to measured pumping rates. If necessary, make adjustments to the timer controls and pump on -off levels to deliver design dose volumes to filters and to drainfields each dosing cycle. F. Drainfields shall be inspected at least monthly for seepage or saturation, surface water ponding or settled ground surface, broken pipes, maintenance of vegetation, protection form traffic, and diversion of surface water. The owner/operator shall be responsible for assuring any broken pipe, manifold tap, cleanouts, etc., are repaired within 48 hours of becoming aware of such a problem. Depth of ponding in trench inspection tubes shall be measured and recorded during each inspection. G. A suitable, year-round vegetative cover shall be maintained on the disposal areas. Clippings and other landscape debris shall be removed from the disposal area as needed to prevent thatch buildup. No traffic or other equipment shall be allowed on the disposal fields, with the exception of mowing equipment, without the permission of the operator and the Cumberland County Health Department. The application of chemicals to the distribution fields is prohibited. Areas shall be relandscaped and vegetation reestablished, as needed. H. Pressure Manifolds head during dosing shall be measured, and flow to each line viewed from opened inspection ports in manifold feeder lines in conjunction with pump dosing at least semi-annually (see above), assuring no lines are blocked, and record any changes made. All divider tee inspection tees shall concurrently be opened to be checked for uniform flow distribution. I. Repair Areas identified for this project and access thereto must be maintained and kept available for future repair. Not construction on or utilization of this area is permitted. III. MONITORING AND REPORTING REQUIREMENTS Any monitoring (including groundwater, surface water, soil or plant tissue analyses) deemed necessary by the Local Health Department to ensure surface and ground water protection will be established and an acceptable sampling reporting schedule shall be followed. 2. The pump elapsed time meters and counters and water meter shall be read and recorded at least weekly, and estimated daily flows from each tank determined (as discussed above). Total daily flow during any week shall not exceed the draiinfield design daily flow rate for this system (8550 gallons per day). Upon the concurrence of the Cumberland County Health Department, readings interval may be extended to monthly after the first full year of system operation. 3. Effluent monitoring requirements: The final sand filter effluent shall be monitored at the specified monitoring points and frequency, and as an indicator of proper operation and maintenance, shall meet the water quality limits detailed in the table below. Parameter Sampling Point Sampling Type of Effluent FrequeneY Sample Limits BOD5 (5-day, 20°C) Septic Tank Effluent Monthly* Grab 200 mg/1 Sand Filter Effluent Monthly* Grab 10 mg/1 TSS Septic Tank Effluent Monthly* Grab 100 mg/1 Sand Filter Effluent Monthly* Grab 10 mg/1 Grease Plus Oil Septic Tank Effluent Monthly* Grab 50 mg/1 Total Nitrogen Septic Tank Effluent Monthly* Grab Sand Filter Effluent- Monthly* Grab 40 o of ST or 50% oeffluent (TKN +NOx-N) Ammonia as Nitrogen Sand Filter Effluent Monthly* Grab 10 mg/1 *After the first year of operation, Owner may request the Health Department concur with reduction in samply frequency to quarterly, with samples collected in September, December, March and May of each school year. All effluent sampling, preservation and analysis must be completed in accordance with the requirements of 40 CFR 136 and at a wastewater lab certified by the State of North Carolina for the specific analysis. 4. Two (2) copies of the operator inspection reports shall be submitted on or before the last day of January, April, July, October, and must include the inspection reports for the previous quarter. This report must include the inspections of all parts of the wastewater collection, treatment and disposal system. An effluent data summary table shall also be included in the report. Environmental Health Division Cumberland County Health Department 227 Fountainhead Lane Fayetteville, NC 28301 An on -site record shall be maintained of all residuals removed from this facility. This record shall include the name of the hauler, permit authorizing the disposal or a letter from a municipality agreeing to accept the residuals, date the residuals were hauled, and volume of residuals removed. A maintenance log shall be maintained at this facility including but not limited to the following items: a. Sampling Results. c. Record of preventative maintenance (cleaning of effluent filters, alarm servicing, cleanings, tank pumping, sand filter servicing, etc.). d. Dates filter distribution laterals are cleared of solids, pressure manifolds are inspected and pressure head checked/adjusted; e. Results of wastewater delivery rate and dosing volume measurements, and any adjustments made to filter or drainfield timer control settings. g. Preventative and repair maintenance completed. h. Date field inspections Noncompliance Notification: The Owner shall report by telephone to the Local Health Department, telephone number (910)433- 3660, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Any occurrence at the wastewater treatment facility which results in the treatment of significant amounts of wastes which are abnormal in quantity or characteristic, such as the dumping -of food waste; the known passage of a slug of hazardous substance through the facility; or any other unusual circumstances. ` b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or. electrical failures of pumps, blowers, etc. c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. d. Any time that self -monitoring information indicates that the facility has gone out of compliance with its permit limitations. Persons reporting such occurrences by telephone shall also file a written report in letter form within five (5) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. When repairs are needed in accordance with NCGS 130A-334(9)(a) and 15A NCAC 18A .1961(c), the permitted must obtain a repair permit from the Local Health Department prior to making the repair. IV. GROUNDWATER REQUIREMENTS Well Construction: Within ninety (90) days of permit issuance], the upgradient and downgradient monitor wells, MW- 1 and MW-2, shall be installed to monitor groundwater quality. The well(s) shall be constructed such that the water level in the well is never above or below the screened (open) portion of the well at any time during the year. Each monitoring well shall be located in accordance with the approved plans, specifications. a. The wells must be constructed by either a North Carolina Certified Well Contractor, the property owner, or the property lessee according to General Statutes 87-94.4(b)(2). If the construction is not performed by a certified well contractor, the property owner or lessee must physically perform the actual well construction activities, and the well(s) must be constructed according to the North Carolina Well Construction Standards (15A NCAC 2C .0108) and the local county rules. b. Within thirty (30) days of completion of all well construction activities, a certification must be received from a professional engineer or a licensed geologist certifying that the monitoring well is located according to this permit. 2. Sampling Criteria: a. Monitor well MW-1 shall be sampled [initially after construction and prior to waste disposal operations, and thereafter every April and November for the following parameters listed below: Water Level pH Nitrate Nitrogen Fecal Coliforms Ammonia Nitrogen Chlorides TDS Prior to sampling the parameters, the measurement of water levels must be taken. The depth to water in each well shall be measured from the surveyed point on the top of the casing. The measuring points (top of well casing) of all monitoring wells shall be surveyed relative to a common datum. b. Any laboratory selected to analyze parameters must be Division of Water Quality (DWQ) certified for those parameters required. 3. Reporting / Documentation: a. All reports and documentation (GW-1, GW-30, GW-59) shall be mailed to the following address: DENR-DEH-OSWS Attn: GW Data 1642 Mail Service Center Raleigh, NC 27699-1642 Updated blank forms (GW-1, GW-30, GW-59) may be downloaded from the Groundwater Section's website at http://gw.ehnr.state.nc.us/ or requested from the address mentioned above. b. For the initial sampling of the well(s), the permittee shall submit a copy of the GW-1 Form (Well Construction Record) with the Compliance Monitoring Form (GW-59) for each well to the address listed in the "Reporting / Documentation" section of the Groundwater Requirements. Initial Compliance Monitoring Forms that do not include copies of the GW-1 form may be returned to the permittee without being processed. Failure to submit these forms as required by this permit may result in the initiation of enforcement activities pursuant to NC General Statutes' 143-215.6A. C. The results of the sampling and analysis must be received on Form GW-59 (Groundwater Quality Monitoring: Compliance Report Form) by the Groundwater Section (address listed in the "Reporting / Documentation" section of the Groundwater Requirements), on or before the last working day of the month following the sampling month. The data of all groundwater sampling analyses required by the permit conditions must be reported using the most recent GW-59 form along with attached copies of the laboratory analyses. d. Within sixty (60) days of completion of [the / all] monitoring well(s), the permittee shall submit two original copies, of a scaled site map (scale no greater than 1 "=100'); however, special provisions may be granted upon prior approval for large properties. The map(s) must include the following information: 1) The location and identity of each monitoring well. 2) The location of major components of the waste disposal system. 3) The location of property boundaries within 500 feet of the disposal area(s). 4) The latitude and longitude of the established horizontal control monument. 5) The elevation of the top of the well casing (which shall be known as the "measuring point") relative to a common datum. 6) The depth of water below the measuring point at the time the measuring point is established. 7) The location of Review and Compliance boundaries. 8) The date the map is prepared and/or revised. e. Control monuments shall be installed in such a manner and made of such materials that the monument will not be destroyed due to activities that may take place on the property. Maps and any supporting documentation shall be sent to the Groundwater Section as addressed in the "Reporting / Documentation" above. The permittee is responsible for the geographic accuracy of any map submitted, however produced. 4. Applicable Boundaries: a. The COMPLIANCE BOUNDARY for the disposal system is specified by regulations in 15A NCAC 2L, Groundwater Classifications and Standards. The Compliance.Boundary for the disposal system is established at the property boundary. An exceedance of Groundwater Quality Standards at or beyond the Compliance Boundary is subject to immediate remediation action according to 15A NCAC 2L .0106(d)(2). b. The REVIEW BOUNDARY is established around the -disposal systems midway between the Compliance Boundary and the perimeter -of the waste disposal area. Any exceedance of standards at the Review Boundary shall require action in accordance with 15A NCAC 2L .0106(d)(1). 5. Additional Requirements: Any [additional] groundwater quality monitoring, as deemed necessary by the Division, shall be provided. V. INSPECTIONS Adequate inspection, maintenance, and cleaning shall be provided, by the Owner to. ensure proper operation of the'.subject facilities. 2. The Owner or his designee shall inspect the wastewater treatment and disposal facilities to prevent malfunctions and deterioration, operator errors and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. The Owner shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Owner._ This log of inspections shall be maintained by the Owner for a period of three years from the date of the inspection and shall be made available upon request to the Division or other permitting authority. The Owner or his designee shall inspect the wastewater treatment and disposal facilities to prevent malfunctions and deterioration, operator errors and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. The Owner shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Owner. This log of inspections shall be maintained by the Owner for a period of three years from the date of the inspection and shall be made available upon request to.the Division or other permitting authority. 3. Any duly authorized officer, employee, or representative of the Local Health Department or DENR may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the disposal site or facility at any reasonable time for the purpose of determining compliance with this pennit; may inspect or copy any records that must be maintained under the terms and conditions of this permit, and may obtain samples of groundwater, surface water, or influent wastewater or effluent wastewater. VI. GENERAL CONDITIONS 1. This permit shall become voidable unless the facilities are constructed in accordance with- the conditions of this permit, the approved plans and specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. An Administering, Inspection and Compliance fee may be established by the Cumberland County Board of Health or DENR. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Owner to an enforcement action by the Local Health Department or 'DENR. Prior to a transfer of this land to a new owner, a notice shall be given to the new owner that provides full details of the materials applied or incorporated at this site. 6. The issuance of this pennit does not preclude the Owner from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 7. The Owner for the life of the project must retain a set of approved plans and specifications for the subject project. The Owner, at least six (6) months prior to the expiration of this permit, shall request its extension. Upon receipt of the request, the Commission will review the adequacy of the facilities described therein, and if warranted, will extend the permit for such period of time and under such conditions and limitations; as it may deem appropriate. 9. The repair areas as designated herein, with setbacks, shall be maintained in an undisturbed state. 10. The Cumberland County Health Department may amend, revise, suspend or revoke this permit including revising. frequencies in the Schedule of Operation and Maintenance and Monitoring Schedule, based on monitoring data, water usage, system performance, or facility use. Permit issued this the MW day of , 200Y A. Cumberland County Health Department , Environmental Health Supervisor Permit Number ;N-28-2002 08:22A FROM:CUMBERLRND COUNTY SC 9106782550 TO-049197153227PP203 P:1/7 CUMBERLAND CO. SCHOOLS • OPERATIONS/MAINTENANCE 810 GILLESPIE STREET FAYETTEVILLE, NC 28302 • Phone: (910.) 678-2561 _x % F• To: ST�yc�U /Je/l�Q(,cJ//-7 From• �%/� � 'V�e/lidi/L��. C.C.S' Fax: 9 l i � 15 1 9- 0 Date: Phone• paw: Pj ., Re: CC, t] Urgent 0 For Review ❑ Please Comment O Please Reply ❑ Please Recycle C"✓Iicrobac Laboratories, l-"e,��.,,s rAYETTEVILLE'DIVISION NC #11 617 CASTLE BAYNE STREET NC #37714 FAYETTEVILLE, NC 28303 USDA #3787 (910) 864-1920 / (910) 864-8774 (FAX) http://www.microbac.com CHEMISTRY • MICROBIOLOGY • FOOD .SAFETY • CONSUMER PRODUCTS WATER • AIR. j- WASTES • FOOD: • PHARlYIACEUTICALS • NUTRACEUTICALS CERTIFICATE. OF ANALYSIS CLIENT: Cumberland Co: School ,ADDRESS: Post Office Box 2357 Fayetteville, NC 28302 rr rONTACT__.PERSON:_ Mr. Mike Oxendine. ACCOUNT NUMBER: #KC012 \SAMPLE ID: 1. Sand filter - ID.#01WE128410 2. Septic tank— ID #01WE128411 DATE REC'D: 12/06/01 SAMPLED: 12/06/01 SAMPLED BY: C. Wade DELIVERED BY: C. Wade SAMPLE CODE Waste water, Grab REFERENCE:�:C,RAYS�CELEM• ` DATA REVIEWED B . DATE REPORTED: 12/20/01 ANALYSIS METHOD 1 2 BOD (mg/L) EPA 405.1 5.20 1.69* NITROGEN, AMMONIA (mg/L) EPA 350.2 17.2.3 z4.05 NITROGEN, TOTAL KJELDAHL (mg/L) EPA 351.2 19.5 37.14 OIL a GREASE (rng/L) EPA 413.1 1.0 0.9 SOLIDS, TOTAL SUSPENDED (mg/L) EPA 160.2 19.4 29.3 COblMNTS: * = Questionabie Data < =Less than > = Greater than - - - 41 ' A PAGE 1 OF 1 The data and other. information containedron_ttiis, and other accompanying documents, represent only the k; M E M B E Fi sample(s) analyzed and is rendered -upon:thecondition that -it is not to be reproduced wholly or in part for advertising or other purposes with writeen approval from the laboratory. \ USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical.and Microbiological Analyses and Research JAN-18-2002 09:10A FROM:CUMBERLANn COUNTY SC 91067e2550 T---"4333669 G l�Iicrob c Laboratories, Inc. FAYETTEVILLE DIVISION 817 CASTLE RAYNE STREET .i FAYETTEVILLE, NC 28303 (910).864-1920 /-(910) 864-8774 (FAX) http://www.microbac.com CLIENT: Cumberland Co. School ADDRESS.` Post Office Box 2357 Fayetteville,. NC 28302 CONTACT PERSON: Mr. Mike"Oxendine ACCOUNT NUMER: #KC012 SAMPLE ID: 1. Sand filter - ID #01WH128410 2. Septic tank - ID #01WE128411 P:3/3 DATE REC T: 12/06/01 SAMPLED: 12/06/01 SAMPLED BY: C. Wade DELIVERER BY: C. Wade SAMPLE CODE: Waste water,, Grab REFERENCE: GRAYS CREEM ELEaL DATA REVIEWED B , DATE REPORTED: 12/20/01 ANALYSIS METHOD 1' 2 BOD (mg/L) EPA 405.1 5.20 1.69* NITROGEN, AMMONIA (mg/L) EPA 350.2 17.Z3 Z4.65 NITROGEN, TOTAL KJELDAHL (mg/L) EPA 351.2 19.5 37.14 OIL a OREABE (mg/L) EPA 413.1 1.0 0.9 SOLIDS, TOTAL SUSPENDED (mg/L) EPA 160.2 19.4 29.3 COMMENTS: * = Questionabie Data < = Less than > = Greater than PAGE 1 OF 1 The data and other. information contained on this, and other. accompanying documents, represent only the MEMBER sample(s) analyzed and is rendered upon the condition that It Is not to be. reproduced' wholly or In part for advertising or other purposes without'written approval from the laboratory. JFA USDA•EPA•NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research JAN-18-2002 09:09A FROM:CUMBERL,ANn COUNTY SC 9106782550 T^'�4333669 P:2/3 G: 41icrobac Laboratories, Inc.' FAYETTEVILLE DIVISION NC #11 817 CASTLE HAYNE STREET NC #37714 Tqicrobac FAYETTEVILLE, NC 28303 USDA #3787 (910),864-1920 / (910) 864-8774 (FAX) http://www.microbac.com CHEMISTRY,, MICROBIOLOGY - FOOD SAFETY - CONSUMER PRODUCTS WATER - AIR - WASTES • FOOD - PHARMACEUTICALS - NUTRACEUTICALS CERTIFICATE OF ANALYSIS CLIENT: Cumberland Co. School ADDRESS; Post Office Box 2357 Fayetteville, NC 28302 CONTACT PERSON: Mr. Mike Oxendine -ACCOUNT NUMBER: #KC012 SAMPLE ID: 1. Sand filter - ID #)01WE107011 2. Septic tank - ID #01WE107012 - N DATE REC'D: 00/02/01 SAMPLED: 10/02/01 SAMPLED BY: C. Wade DELIVERED BY: C. Wade SAMPLE CODE: Waste water, Grab REFERENCE. GAYS CL2EZ:MLt�S DATA REVIEWED BY: DATE REPORTED: 10/12 1 ANALYSIS bOMOD. 1 2 BOD (mg/L) EPA 405.1 50.2 .170 NITROGEN, AMMONIA (mg/L) EPA 350.2 21.85 29.13 NITROGEN, TOTAL KJELDAHL (mg/L) EPA 351.2 24.64 30.24 OIL 6 GREASE (mg/L) EPA 413.1 <0.1 0.41 SOLIDS, TOTAL•SUSPENDED (mg/L) EPA 160.2 10.9 66.1 CONHMS: < = Less than > = Greater than PAGE 1 OF 1 The data and other information contained on this, and other accompanying documents, represent only the MEMBER ' samples) anatyied and is rendered upon the condition that It Is not to be reproduced wholly or in part for advertising or other purposes without written approval from the laboratory. - USDA-EPA-MOSH Testing Food Sanitation Consulting Chemical and Microblological Analyses and Research CLIENT: Cumberland Co. School ADDRRSS: Post Office Box 2387 Fayetteville, NC 28302 CONTACT PERSON: Mr. Mike Oxendine ACCOUNT NUI-SER: #KC012 SAMPLE ID:. 1. Sand filter - ID #01WE96271 2. Septic tank- ID #01WE96272 DATE REC'D: 09/06/01 SAMPLED: 09/06/01 SAMPLED BY: C. Wade DELIVERED BY: C. Wade SAMPLE CODE: Waste water, Grab REURENCS: GRAYS CREM EL,LNi DATA REVIEWED BY: DATE REPORTED: 09/17/O1 **{ridr�yJi*i*J**i*iii*ii************# ***i* 4,***J*************44i****** AMYSIS bw=OD 1 2 i �riitii+iik i�*J*iiJiJJi i1r ►Ji**i**yiiiti�►Jii11r V1`�t1"!<'J iJJii4iiiiiit iiiititit ilrA ii{iJiiJ*JJ*Ji** NITRATE (mff/L) EPA-353.3 53.2 24.2 C5: < = Less than > = Greater than PAGE 1 OF 1 The data and Other information conialned on this, and other accompanying documents, represent only the M B E R sample(s) analyzed and Is rendered upon the condition that it is not to be reproduced wholly or in part for arhrartiatnn nr nthar nurooses without written soprovai from the laboratory, Inc. ®IVYicrobac Laboratories, FAYETTEVILLE DIVXSION NC #11 M' robae 1- 817 CASTLE HAYhfE SxYtEET 23C #37714 le 1 FAYETTEVILLE, NC 28303 USDA #3787 (910) 864-1920 ./ (910) '864-8774 (FAX) http://www.microbac.com CHEMISTRY - MICROBIOLOGY - FOOD SAFETY - CONSUMER PRODUCTS WATT - AIR - WASTES - FOOD PHARMACEUTICALS NFU-'RACEUTICALS CERTIFICATE OF .ANALYSIS CLXENT6. CuMberland Co. School DATE REC'D: 08/23%01 SAMPLED: 08/23/01 ADDRESS: Post Office Box 2357" SAMPLED BY: C. Wade Fayetteville, NG 28302 DELIVERED BY: C.'Wade CONTACT PERSON: Mr. Mike Oxendine SAMPLE CODE: Wastewater, Grab ACCOUNT NI(AME1,11. #XC012 REFERENCE: GR"S .0 Z1-XK SAMPLE 10: 1. Sand filter - ID #01WE85889 2: Septic tank.- ID401WE85890 DATA REVIEWED BY: PATE.REPORTED: 09/10/0"1 --- - ANALYSIS 1�.'TiiOA 1 2 iiiiii*ir':Ifiiit+itt%�Fi+i+i++ik`b++ti+�ir }iiiittW'b'��ti.i+titi.+ttYr �iitA'Yi}.bi+iiii+++iii•YY �YiJrii++iii+i NITRATE (mg/L) EPA 353.3 29.4 <1.0 COiel MMS: < = Less than > = Greater than PAGE 1 OF The data and other Information contained on -thie, and other accompanying documents, represent only the M E M B E R sample(s) analyzed and is rendered upon the condition that it is not to be reproauoed wholly or in -part for advertising or other ourooses without written approval tfom.the laboratory. ,.... C _'Ji�:^ ��r � k' �c'`h :- ;=e.Y�1•, i.'• �.��. �i�a�.°�" �� ,•�a - �-�: ;r.:.;.'�:iif .ftx From: �ilixa. �.ST% nS phone:- (910) 433-3660 Fax: (910) 433-3669 Fair- phaim 227 Fountainhead lane ` Fayetteville, North Carolina 28301 :� Hobbs1 J, Upchurch & Associates,-P A r Consulting Engineers 4917 Waters Edge Drive,, Suite 270 a Raleigh, NC 27606 October 25, 2001 REC � �: Mr. Steven Berkowitz, P.E. Division of Environmental Health, On -Site Wastewater Section NOV O 5 2001 P.O. Box 29594 Raleigh, NC 27626-0594 On -site Wa;_t&jyater Sedan Subj: On -Site Wastewater System to serve the Gray's Creek Elementary School, Cumberland County, -North Carolina HUA Project.Number CU0001 Dear Mr..Berkowitz: 1. On May 31, 2001, Hobbs, Upchurch and Associates conducted a final inspection of the subject wastewater system with yourself, Cumberland County Health Department personnel and Cumberland County Schools (CCS) personnel. The Contractor, The TARA Group was not represented. All the punchlist items have since -been addressed and the system is functioning per design. 2. Attached please find one (1) copy of the As -Built Plans for the subject wastewater system and my Engineer's Certification of the system installation. Please note that the system was installed substantially in accordance with approved plans with the modifications and exceptions noted in the certification and as approved by your office. Please feel free to call us if you have any questions. Very truly yours, HO S C CH AND ASSOCIATES, P.A. R.N. Godshall, P.E. Wastewater Project Manager Raleigh • -Telephone 919-854-0233 • Fax 919-854-7815 e-mail: huaraleigh@mindspring.com Charlotte -• Southern Pines Myrtle Beach 0 Kill Devil Hills Gray's Creek Elementary School October 25, 2001 On -Site wastewater System, Page 2 of 2 ENGINEER'S CERTIFICATION: I, Robin N. Godshall certify that the on -site wastewater system to serve the Gray's Creek Elementary School, Fayetteville, NC, has been installed substantially in accordance with the plans and specifications approved by the North Carolina Division of Environmental Health, On -Site Wastewater Section with the following modifications: a. Per correspondence and with the concurrence of CCS, all parties acknowledged that the sand media was not per the specifications. CCS acknowledges that the system will require additional attention and may require media replacement earlier than planned. b. As shown on plan sheet 7, a redesigned recirculation flow divider weir was reviewed and approved by your office prior to installation. c. The valve vault for the final dosing force mains was separated into two valve vaults. d. The Contractor did not complete final grading in the subsurface drainfield are to provide positive surface drainage. Therefore, CCS accomplished this final grading as shown on Plan Sheets 10 and 11. Additionally, a drainage swale was established up -gradient of the system area to intercept surface stormwater runoff. e. As shown on Plan Sheets 12 and 13 aluminum unistrut bracing was installed in the risers of both pump tanks to provide stabilization for the discharge piping. The installed system includes: a. A 3,000- and a 4,000-gallon grease trap, in series, connected only to the kitchen wastestream. b. Approximately 403 ft of 8-inch SDR 35 PVC gravity collection sewer with cleanouts. c. A 12,000-gallon septic tank, SRTC ST13466, with two Zabel-A300-HIP effluent filters. d. Three force main valve vaults; one for sand filter dosing and two for final dosing. e. Two pump tank control panels with elapsed time meters, event cycle counters, alarms, autodialers, etc. f. A 14,000-gallon sand filter dosing pump tank with three (3) Goulds model 3886 WS 15 submersible pumps and mercury float switches. g. A 3-cell 3,744 ft' recirculating sand filter with sleeved 1'/a -in PVC distribution lines and 4-inch PE underdrain collection lines. h. A recirculation flow divider weir. i. An 8,000-gallon final dosing.tank, Stayright PT-184, with four (4) Goulds model 3887 WS10B submersible pumps and mercury float switches. j. Approximately 1,907 ft of 4-in Sch 40 PVC force mains. k. Four drainfields, with a total area of 23,750 fO and a total of approximately 7,960 ft of 4-in PE drainlines. Four equally -sized repair areas were also dedicated per the plans. Each drainfield is equipped a 120 pressure manifold and two 2-inch Sch 40 PVC (screened) observation ports. 1. Two Type -II groundwater monitoring wells, one up -gradient, one down=gradient of the groundwater flow. This certification is based on my periodic inspections of the construction and the witnessing of key installation events. t%AJnnrr Respectfully Submitted, R.N. Godshall, P.E. Water/Wastewater Project Manager 1 Hobbs U "church` & Associates P.A. p - Consulfina. Engineers 4917'Waters'Edge Drive, Suite 270.9Raleigh, NC 27606 October 25, 2001 Mr. Danny Soles Cumberland County Health Department 227 Fountain Head Lane Fayetteville, North Carolina 28301 Subj: On -Site Wastewater System to serve the Gray's Creek Elementary School, Cumberland County, North Carolina HUA Project Numbers CIJ9802 and CU0001 Dear Mr. Soles: I. Attached please find one -copy of the As -Built Plans for the subject wastewater system. Also attached is a copy of my final -letter and Engineer's Certification to. Mr. Steven Berkowitz, NC DEH, On -Site Wastewater Section. Please feel free -to call us if you have any.questions or if we can be of further service other projects. 'Very truly yours, HOBBS .UPC CH AND ASSOCIATES, P.A. R.N. Godshall, P.E: Wastewater Project Manager - Raleigh • . Telephohe 919-854-0233 Fax 919-854-7815 • e-mail: huaraleigh@mindspring.com Charlotte . Southern Pines • Myrtle Beach -Kill Devil Hills N. , Jun 06 01 11:00p HUR Raleigh 9?n-954-7815 FACSIMILE Hobbs, Upchurch & Associates. P.A. Consulting Engineers 4917 Waters Fdge Drive, Suite 270 Raleigh, North Carolina 27606 (919)854-0233 FAX (919) 854- 7815 TO: Steven Berkowitz DEH Oii-Site Wastewater Section FAX NUMBER: PHONE NUMBER: ' 919 715-3 71� FROM: Doc Godshall, P.E. Hobbs, Upchurch & Assoc., P.A. NO. OF PAGES: (including cover) 5 DATE: June 6, 2001 HUA PROJECT # CU0001 Gray's Creek Elementary School On -Site Wastewater System State In;, tion MESSAGE: Steven, 1 2, 3. I got your fax with the punchlist. While I believe that most if not all of the items can be accomplished fairly quickly, we may have some questions regarding some of the items. I'll be speaking with Jack Chapman tomorrow regarding a proposed cost and schedule. I'll keep you and Danny Soles informed as to our progress. Attached are the surveyed inverts that the surveyor (hired by the TARA Group) gave us last year after the tanks were installed. PIease note that his inverts do not correspond with those on the plans since he used a difference reference point (datum). However, the relative inverts should be correct and I'll be double checking these against changes made in the field prior to submitting the As-Builts and certification. Also attached are the last two months of observed water meter readings from the school. The average daily that CCS calculated is based on a-5-day school week. Mike Oxendine is looking for previous months data. . Thanks, Doc ,n a G1 d:�/ .�57 t a ! G�'. �/,-.u^' �,,, try � �. � �� L� C •,•�^'+ F Page 1 of 1 Jun 06 01 11:00p HUR_ Raleigh } MAY-31-2001 03:55P FROM:C:UMBE _9 COUNTY SC 9106762550 FAX Date 9-/ ;, /O/ Number of pages Including cover sheet To: /' ! t1c) S ,LIJQ ✓�G�—�SSD�_ Phone 20 -$S`/- 791r Fax Phone CC: 3197854-7815 p.2 TO: i .B547815P203 P: V3 301 Maintenance -Cumberland Co Schools Highway 301 South 107 East Mountain Drive Fayetteville, NC 28306 ROM: / ��. .6c/1.�•�ot! Ica. Sc o/s Phone 910-678-2560 Faxlhone 910-678-2560 Jun 06 01 11:00p HUR Raleigh MAY-31-2001 03:56P FROM:i.-UMBE D COUNTY 5C 9106782550 ,' 819-854-7815 T0:1 ----G5,j7815P203 P:3"3 p.3 X C. Deparlttunt of Environment and Nawral Resources Division of Environmental Health Public Water supply section Month: ft Year: - WATER USAGE REPOT T TOIAI Number of Days Water Pumped: PUBLIC WATER SYSTEM FORTotal Number of Wells In Use: 1� (PW51D: 3 Total Number of WATER PURCHASED FROM Wells in System: 1 (PWSID: j COUNTY NAME: Cumberland, _am_�-�� am RM Comm KIM =� J• Clay Wade/Mike Oxendine Signed: ------, _, 0MA 3M iReWsedW2) Certification: Grade C-wellNo. Water Supply (Review9)g7) Telephone Number 910 ) 678-2560 r Jun 06 01 11:01p HUR Raleigh 919-854-7815 p.4 MAY-31-2001 03:55P FROM:CUMBE ) COUNTY SC 9106782550 TO-$ B547815P203 P;2,3 N. C, DcpaM=t of Eavironmcnt and Nat mi Rcsauncxs Division of Envitoameatst Health ftblic Water Supply Section • Month., ^ WATER USAGE REPORT Total Number Year: 01 of Days Water Pumped: -- Gra•✓S Geery Total Number o4 PUE3dJC WATER SYSTEM FOR '4 f��"7e" Wells In Use: 1 (PWSID: Total Number of WATER PURCHASED FROM Wells in System: l (PWSID. . COUNTY NAME: Cumberland DATE TOTAL WATER PURCHASED OR PUMPED CHLORINE USED (Speelty lbs. orgalloms) pN In system Soda Ashe Phosphate FREE CHLORINE RESIDUALS In3ystem (mgm SAMPLE LOCATION tl) , (2) 13) 14) is) P) lei- 2 3 4 , ' 5 6 ' 7 / r .S ! C 4.-✓. s to 12 13 15 19 19 ' 20 21 4,61tJG 7. %. J 22 23 24 25 28 27 28 L� 29 30 31 Tot. e7 Chlorine S ciucations: Product Name CI Or Q X Liquid ' Type Strength 5.25 % Avg. 9 Max. Min. J. Clay Wade/Mike Oxenditle Signed: C-well Certification: Grade � No. DENR 339S (RvAsPA 3/92) Wetersungy(Review3rs7). Telep;hone Number: � 91.0 ) 678-2560 Jun 06 01 11:01p HUR Raleigh 919-854-7815 ' APR 2 0 2000 L---------------- JAMES R. ADAMS AND ASSOCIATES 301 Cumbertand Street Fayetteville, N.C. 2830i 1910) 483-1201 Elevation Verification - Grays Creek Schooi Station Elevatio Floor 105.20 Inlet to 12k tank 95.41 Outlet - 12k tank 95.11 Inlet to 14k tank 95.03 Outlet - l4k tank Pumped Recirculation inlet 94.88 Inlet - sand filter Pumped Outlet - send filter 97.11 Inlet - weir 97.02 Outlet - weir 96.02 Recirculation oullet 96.02 Inlet - dosing tank 93.50 p.5 FILE COS, State of North Carolina Department of Environment and Natural Resources Division of Environmental Health Michael F. Easley, Governor William G. Ross Jr., Secretary Linda C. Sewall, Director Bill Jeter, Chief June 5, 2001 Mr. Danny Soles Environmental Health Supervisor Cumberland County Health Department 2227 Fountainhead Lane Fayetteville, NC 28301 (Courier No. 14-59-32), Fax: (910)433-3669 1•� ±NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RE: Inspection of Installation, Grays Creek Elementary School Wastewater System, Alderman Road, Grays Creek, Cumberland County, NC, Project No. 98-34 Dear Mr. Soles: I appreciated the opportunity to work with you and Adrian Jones of your staff on May 31, 2001, to inspect the installation of the new wastewater system serving the new Grays Creek Elementary School. Also present during this inspection were David McCloy, OSWS Regional Soil Scientist, Doc Godshall, P.E., design engineering firm representative, and Michael Oxendine and Ted Taylor, Cumberland County Schools. Tommy Bell, School Maintenance Supervisor also was present for a brief period of time. Assistance by all parties present during this inspection was 9 greatly appreciated. While much of the work completed to date appeared to be in accordance with approved plans and specifications (or approved modifications), we are concerned that some key issues still need to be addressed, and that this school has operated on Pump and Haul for an entire school year without remaining wastewater system problems being resolved. The following items were identified which must be addressed prior to the installation being considered completed and the Operation Permit for this system issued by the Cumberland County Health Department: 1. Water Conserving Fixtures appeared to have been installed as required. The plumbing contractor should confirm that each fixture (especially the sinks) has been adjusted for ON -SITE WASTEWATER SECTION 1642 Mail Service Center, Raleigh, North Carolina 27699-1642 Telephone 919-733-2895, . FAX 9197715-3227 An Equal opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper June 5, 2001� U Page 2of4 FILE VP proper operation and flow rate. 2. Grease Traps appear to have been installed in the area indicated, although configured differently from how they are shown on the plans. As -built plans and specifications should include. revised tank locations, and engineer.'s certification must be provided that traps were constructed and installed properly. It appeared that excessive grease was being poured down the drain. The food service staff must be instructed not to disposed of grease or waste oils into the wastewater system. This should include posting of signs in key locations within the kitchen. 3. Collection Sewers: Provide confirmation of passage of a leakage test, as specified. The first manhole ring must be reset and resealed to its manhole cone. 4. Septic Tank appears to have been designed/installed with inadequate freeboard, causing the backing up of liquid from the tank into the influent sewer. This will require increased surveillance and maintenance in order to prevent solids accumulation within the influent sewer line (see further discussion, below). Confirm that proper filter model has been utilized (e.g., Model 300-HIP, which should be 26 inches tall. Effluent filters also did not appear to have been installed properly. Stainless steel supporting screws and bolts were either not present or not connected properly. These must be repaired. The filter manufacturer will provide a replacement filter top with improved design enabling a riser extension with handle to be installed to facilitate filter removal for maintenance. These should also be obtained and installed per manufacturer's recommendations. Tankage area,general: Water supply should be provided, protected with minimum of double check valve assembly. This will enable solids to .be kept from accumulating in the lower portion of the collection sewer, allow for proper cleaning of the effluent filters, and provide water for aid in testing pump system performance. Invert elevations must be provided, including inlet/outlet and bottom elevation for all tanks, sand filter underdrain inverts, splitter box inverts (inlet and outlet) and for the return pipes to the dosing tanks (where they enter each tank). It is hoped that a substantial portion of the sand filter dosing tank is below the level which would lead to an overflow/bypass over to the final dosing tank. Further modifications may be advised, depending upon what the actual invert elevations turn out to be. 6. Pump Tanks (both): Float trees must include a larger sleeved pipe over the support pipe set in larger concrete. block (so internal pipe stays in place) to facilitate removal. Pump disconnect and support brackets and float tree must be located within 18-inches of the riser top, so that pumps and floats can be removed without requiring entrance into the tank. c• Level control floats must be confirmed to be set at levels specified in the approved plans. June 5, 2001 Page 3 of 4 FILE COPY Note that the high water alarm activation level must be at or below lag pump activation levels. Leaky check valves must be repaired/replaced. Mechanism must be provided to drain hatch channels (not to the bottom of the vaults). Confirm'autodialer alarm systems are functioning properly. 7. Filter Dosing Tank: No provisions have been made to equalize flow, despite this system being specifically approved based upon the proposed use of a flow equalization system. Method to rectify this problem must be proposed by the design engineer, specifically approved by this office, and retrofitted into the control system for this pump station. Pumping rates measured to the sand filter zones were approximately 220 gpm (at pressure head of about seven feet). 'This rate must be utilized in the equalization dosing system required for this system. 8. Sand Filter: Cleanout end caps should be modified to also provide ventilation to the filter underdrains. It is our understanding that fine filter sand was utilized instead of coarse filter sand, as specified in the approved plans and specifications (effective size .42 - .52 nun, vs .8-1.2 specified; uniformity coefficient 2.6-3.1, vs <2.5 specified, dust content .3-.6, vs <.5 specified). This will increase the likelihood of premature failure of these filters. The School system is apparently aware of this problem and possible consequences, including the possible need to replace the filter sand earlier than otherwise would have been necessary. To reduce the likelihood of problems and extend the filter life as much as possible, it is advised to keep the grease traps and septic tank pumped out at a more frequent basis. If flows will allow, consideration should be given to normally dosing two filter cells at a time, allowing the third to rest (long-term drying out should minimize the development of a clogging zone on the filter surface). 9. Final Dosing Tank: Quadraplex alternator did not appear to be functioning properly, which must be rectified. 10. Nitrification Fields: Final landscaping should include filling in areas over lines which have settled, and after a prescribed period of time, reseeding (and mulching, if needed). The fields/manifolds are to be fenced to protect from unauthorized access. 11. Engineer's Certification and As -Built Drawings must be resubmitted once the above items have been addressed. 12. Operator Contract must be demonstrated to have been executed with a Certified Operator, unless the school system has on staff a subsurface certified operator to be assigned as the a - _ June 5, 2001 FILE Cg[� Page 4 of 4 Operator in Responsible Charge (ORC) for this system. A model Operation Permit for this facility will be separately sent to you, which you may wish to modify/supplement. This must include agreed -upon requirements, including: -Recordation of water use readings, elapsed time and cycle counts for filters and fields during each operator inspection. Water use should be taken'at least on a weekly basis for the first year of operation. -Monthly effluent sampling (which may be discontinued after at least one year. of consistently satisfactory data) from the septic tank and final effluent for BODS,. total suspended solids (TSS), grease plus oil (FOG), ammonia nitrogen (NH-4) and total nitrogen .(TN), with levels to, remain less than 200 and 10 mg/1 for BOD, 100 and 10 for TSS, (septic tank and sand filter effluent, respectively), 50 for FOG (septic tank effluent), 10 for NH-4 (final effluent), and 40% reduction of TN (final effluent -vs -septic tank effluent). We will be glad to provide a copy of the Draft Permit electronically, if that would facilitate.your final editing and issuance. Please feel free to contact us if you have any questions pertaining to this inspection report and recommendations, or if we can be of any further assistance with this project. Sincerely, Steven Berkowitz, P.E. On -Site Wastewater Engineering Cc: David McCloy Doc Godshall Michael Oxedine and Ted Taylor Tim Kinlaw JAN'-28-2002 08:23A"FROM:CUMBERLAND COUNTY"SC 9106782550- T0;919197153227PP203'- P 3/7..'•' GRAYS CREEK ELEMENTRY , SEPTICTANK Date Pumv Run Time -o 1.7. -a) 2. 3. .Pum Counter's o j r, 7 4. 2 Panel B 2 , S _K, d ti 7 3 e 1., Date Run Time P7o. Lf 7—vI S. 1-1 Lf, —0 2- o . 2 z _ 1 v1 1 �, 57. g Y.7 , Pum Counter's . �' '� 1• $ �I I a q - ya' Y-� 1 I 3. 3 fro 1-2 _L- 3 3 drt� k nee•-f � ,. ,. � . WATER, COLUMNS SET -AT 51 :OK COMMENTS: - JAN-28-2002'09:23A FROM CUMbERLAND COUNTY SC 9106782550 TO 919197153227PPz03 P,4�7';,.' t - GRAYS CREED ELEMENTRY SEPTICTANK Panel A _ Date Pum Run Time 3-6 Pum Counter's y-r� -u 1 2. 4 `t57,s-� Panel B Date Pum Run Time e. 47-a i d, l` �Qi .4: J3� �..�� wr r•� Pum Counter's 7 !� �38 4. `rc .W-ATER,,COLUMN 'SET AT Sft. OK coTS: UAV low PNYJ - :1 5---- Q p _ t... ya tcd c-S'S�l� 6S r/t JAN-28=2002 08:24A FROM:CUMBERLAND COUNTY SC 9106782550 M 919197153227PP203' P:5/7 GRAYS CREEK ELEMENTRY SEPTICTANK Panel A Date Pump Run Time °--° 1• �. 2-. ? 7.3 -off 2. 34. o --off 3. ! to .3 a- o f P ouriter's /o_ . a 7 o 167 3. . A ..'?A __ . 4.. ! `f 9 ., s. . . tea• l! S,� 11 �a T // 7/ Panel B Date Pum Run Time /0. / 7. 3 .. l /.S. .2 1b-1-o1 2./-7 5- al,o 2�.g'37 / ,�.3-Z 3. Ott . 3.e � . Cj a 1, n1 io -11e .o 1 1-8 a - P ounter • . � ' $ 2 7 , g - � io-.;-0 rb-1-ox 2. `f75-23 3/3 / z�. ALf3 L a's iX S� WATER COLUMNS SET AT 51 OK ti% COMMENTS: / 0- 3 a- o JAN-28-2002 08;84A FROM:CUMBERLAND COUNTY SC 9106782550 TO:919197153227PP203 P:8/7 GRAYS CREEK ELEMENIRY SEPTICTANK Panel A AJA tj 2 tics Date Pump Run Time'- M�;b co2 -o I3. 3, 4. 55- Lf, Lt Pump Counter's 2. a 3o (p b 1 3 5`7 7 6 — ' 1-3 -7 W-.f-bl � L-z I b- 1 5 m I Lt / D' - - I Panel B Date Pump Run Time 1 0_1 �—O 2. c9 3 , -5 4. .ao,a -3 6 Sr PWm p Counter's Li - 4 �-o l 1. 5- 7 /1 77 1, 3. P`7 sg; 'JAN-28=2002,08:25A'FROM:CUM13ERLAND COUNTY _SC 9106782550 TO:919197153227PP203 P:V7 GRAYS CREEK ELEMEN_ TRY SEPTICTANK Panel A I J Q o Date r I( Pump Run Time", a�-01 2. o.d 1 S g, G �� 3. 6,2,. , 4. . Pump Counter's - L—, I 6 3. g c,o S i 7 4, Panel B Date- Pum Run Time i..��,5 2.a 70p �o. 3-� y e 3s. 3. ,� Sa 0 3(91 if !, 4. Pump Counter's -4 L-5-6 7 30 qs -: I ao 2. s 7 7.1 3 l 6 4. Hobbs, Upchurch and Associates 0 Pumping Drawdown Tests -for �. Gray's Creek'Elementary School On -Site Wastewater System Date: 05/25/2001 Project: Gray's Creek ES OSWS Project No.: C00001 Pump Tank- Sand Filter Dosing Tank Test No.: 1 Pump No:. Design Pumping Rate: Design TDH: 1 (r 178 21.0. gpm ft Time. Increment Elapsed Time Depth -to - Water delta a l 0.00 1 1.00 Crl r! 2 2.00 4 4.00 /Jv 5 5.00 y L,3i 6 6.006.. 7 s 7 7.00 8 8.00 mod- 9 9.00 10Z . 10 10.00 311 11.00 0� . 12 12.00 G5 13 13.00..,: 14 14.00 ' : '.; ,i97 4 •" _ = = 15 15.00 Average/Stabilized x 20 x -. 10 xJ Stabilized Tank Tank delta Length Width (ft/min) (ft) (ft) = Achieved gpm #VALUE! Percent of Design #VALUE! Acceptable Percent 80.0% Acceptable? #VALUE! .p Remarks: 7.481 (gals/ft') Test not run; Pump missing, being replaced May 2001 C00001 Date: 05/25/2001 Project: Gray's Creek 'ES OSWS Project No.: C00001 Pump Tank: Sand Filter Dosing Tank Test No.: Pump No:. Design Pumping Rate: Design TDH: 2 ;"Z=Zr 178 gpm 21.0 ft Time Increment . Elapsed Time Depth to Water delta Z. 0 0.00 97. 1 1.00 2 2.00 3 3.00- ;. 4 4.00 5-` - 5.00..._ -7 6 6.00 C? c ✓". 7. 7.00 3/ 8. 8.00 . 10 r' 14t 9 9.00 10 10.00 ��¢? 11 11.00 ram. 3Aq 12 12.00 A, a.: °' 13 _ 13.00 ` U, _ 14. 14.00 - 15 15.00 Average/Stabilized 0.16 x 20 x 10 . xJ Stabilized Tank Tank delta Length Width (ft/min) (ft) (ft) _ Achieved gpm 239.4 Percent of Design . 134.5% Acceptable Percent 80.0% Acceptable? Yes Remarks:, 7.481 (gals/ft') Needed to tighten check valve. �� Page 3.of4 �� RECEIVED State of North Carolina Department of Environment and Natural Resources Division of Environmental Health James B. Hunt, Jr., Governor Bill Holman, Secretary Linda C. Sewall, Director To: Steven Berkowitz, P.E. JUN 20 9-000 DEHNR.DEH IT T • i Memorandum From: David McCloy, Regional Soils Specialist D v M Re: Grays Creek Elementary School, Cumberland Co. Date: June 16, 2000 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Per your request, I visited -the Grays Creek Elementary School drainfield site to observe -any field - related issues' prior to finalization. I -made -the -visit orr June 12. Accompanying me were Danny Soles, Kenneth Pope; and the Health Director -of the Cumberland County Health Department and Carion Mercer of Cumberland County Schools. My observations for field -related issues were: 1. Soil had settled especially from around several of the -solid- PVC pipes -leading from each of the four distribution manifolds: Soil- had also- settled from-ar-ound the distribution manifolds and within some of the graveled drainlines. 2. Vegetation on the four- initial'subfields; as -well as -on -the four repair subfields, was - predominately of a "weedy" nature, although some grass was seeded. On an additional note, I also observed that: 3. Three -feet and two -inches of -water was measured in -the bottom of the nitrification field -dosing pump tank. It- was -inferred -by those present that -this -water- was due to approximately two and one-half inches -of rain that -fell -on June -10. With the internal -dimensions. of the -pVmp- tank to be 20 feet x 10 feet, this translates to 4737 gallons of water. The source of this4737 gallons is assumed to be -one-half ' (due to the sand filter re -circulation splitter)-of the rainwater- that actually fell (9475-gallons)-over the area of the sandfilter. ON -SITE WASTEWATER SECTION 1642 Mail Service Center, Raleigh, North Carolina 27699-1642 Telephone 919-733-2895 FAX 919-715-3227 I I have the following requirements for the site: 1. Carefizlly fill soil around -components of -the four initial subfields -where the soil had settled. 2. Landscape the entire area -of the initial -and the-r-epair-subfields so that -mowing man -be routinely acconiplish�d. 3. Establish a reasonable grass cover -over -the -entire area of -the initial and -the -repair subfields. I also strongly recommend that: 1. _Uons & et additional barer fence to -encompass all-of-the-initialand=repair-subfields. There is a ready source of children -from -the school, as well as from the neighborhood, I o play in this area. Please contact me if I can be of flurther assistance. cc: Danny Soles Carlon Mercer Cl-tAar- K 0 7 = vt mot- C, I Post -it® Fax Note ° 7671 � 1 i,_A I Co./Dept. re _ Pne # ph O/ 4MMUAM r z F16' G ` r-,�23 ��� FROM : MOBILE WELL DRILLING FAX NO. : 910 483 6701 ( Jun. 29 2003 10:51PM P3 North Carolina - Department of 9nvironment and Natural Resources - Division of Water Ouality • Groundwater Section 1635 Mail.. Ser-emik Center - Raleigh, N.C. 27699-1636-Phone (919) 733.3221 WELL CONSTRUCTION RECORD WELL CONTRACTOR: 2<04" WELL CONTRACTOR CERTIFICATION 4: STATE WELL CONSTRUCTION PERMIT0: 1. WELL USE (Check Applicable Box): Residential ❑ Municipal ❑ Industrial ❑ Agricultural ❑ Monilorirg �/ Aecovery❑ Heat Pump Water Injection [] Other 0 If Other, List Use: 2. WELL LOCATION- (Show sketch of the location below) Nearest Town: _c 0� County: _e� •au"A 46, C,0 s� Q.,g. z c �2e�e_.� .�/err► �9GQ �/���,a.y i� (Ro�adAame and Numbers. Community, or Subdivision and Lot No.) DRILLING LOG DEPTH 3. OWNER 1A "_JA0J oaL... From To' Foera:inn Q—brtp w. Addresste user ar au a o. y.•� cliyd& Town State zip Code 4. ' DATE DRILLED 9-�C-enb c 5, TOTAL DEPTH a02' A� 6. CUTTINGS COLLECTED YES 0 NO[Rr 7. DOES WELL REPLACE EXISTING WELL? YES Q NO[2' 8. STATIC WATER LEVEL Below Top of Casing: 1_ FT. N (Use': It Above Top of Casing) 9. TOP OF CASING IS .O FT, Above Land Surface* -rap of easing terminated at/or below land surface requlros a variance In eeeor. `dance with 15A NCAC 2C .0113 10. YIELD (gpm): .._92 METHOD OF TEST - II �I II N`i1FNR FAYE TR41 r FEGIOntnl n�nrc n 'I 1. WATER ZONES (depth). ._ s 12. CHLORINATION: Type Amount If additional space is needed use baataf !cam 13. CASING: LOCATIO Wall Tfuekne :s N SY_E-Tgs Depth Diameter orWelpht/Ft. Material (Show direction and Qistance from = le=rfro Hate From To Fl. �_ �_ .#ke Roads, or other t-p reference poi== Fiom To Ft. From To Ft. 14. GROUT: Depth Material Method From C2 To . OF12 FI: From To Ft. 15. SCREEN: Depth `jwDiamele? Slot Size Material From 1_ To -2 Ft _ , in. 11 in. Vc From To Ft._ in. in. From To Ft. In. In. 1 S. SANDIGRAVEL PACK: 17 Depth G;" Size Matenal From /O To.. Ft—atsAiAli From To FL � REMARKS: 100 HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH I SA 14CAC 2C, "of/ELL CONSTRUCTION STANDARDS, AND THAT A COPY OlgTHIS REkQRD HAS BEEN PROVIDED TO THE V/ 110i+•rfi/. FOR OFFICE USE ONLY 8• Quad No: sla yuli OF PERSON COrrSTRUCTING Tl­� WELL, C`. T E Submit original to Div s of Water Quality. Groun oeater Sr_.br, -Within 39 c�r_-yS Serial No. *PC -I %GV.1z" FROM : MOBILE WELL DRILLING FAX NO. : 910 483 6701 Jun. 29 2003-10:51PM P2 Nanh Carolina - Department of Environment and Natural Resources • Division at Water Quality - Groundwater Section 1636 Mali tiSerwicMlCenter- Raleigh, N.C. 27699-1636-Phone (919) 733.3221 WELL CONSTRUCTION RECORD WELL CONTRACTOR:N - WELL CONTRACTOR CERTIFICATION fs!: STATE WELL CONSTRUCTION PERMITC 1. WELL USE (Check Applicable Box): Residential ❑ Municipal El Industrial ❑ Agricultural ❑ MonitOecg hecovery ❑ Heat -Pump Water Injection Other ❑ If Other, List Use: 2. WELL LOCATIOfj; (Show sketch of, the location below) Nearest Town: County. 1e . (Road ame and NumberS, Community, or Subdivision and Lot No.) DRILLING LOG DEPTH 3. OWNER n.b2wl14k lot From To C.,Formaton D zcnp;wl Address 0 - 1 trect or ut o. j • • • City or own Slate Zip Code- 4. DATE DRILLED 9 `1s^ 00 S. TOTAL DEPTH -0a"' S. GUTTINGS COLLECTED YES[] NO2--' 7. DOES WELL REPLACE EXISTING WELL? YES NO� S. STATIC WATER LEVEL Below Top of Casing: -i g' -- FT. s�M (Use •+ It Above Top of Casing) 9. TOP OF CASING IS�_ FT. Above Land Surface' -Top of casing terminated allor below land surface requires a varlance In accor- dance with 15A NCAC 2C .0119 10. YIELD (gpm): METHOD OF TEST 11. WATER ZONES (depth): 12. CHLORINATION: Type Amount If additional space is needed rse ba--cat fern 13. CASING: Wall Thickness Depth Diameter- orWelght/FL Material From �'s To .��- Ft. -2 ya From To Ft. From To Ft. — 14. GROUT: Depth Material Method From O To -JAL —FL . From To Ft. 15. SCREEN: Depth 4, Diameter Slot Size tt atedal From 10 - To 3.Q_ Ft �? - 'in. _LAIL�_ in... I& From To FL , in. In. From - To FL In. In..�, 16. SAND/GRAVEL PACK: - LOCATION SKETCH (Show direction and e:smnce front zt leas: bra `Iate ' Roads, or other t-.-.--p relere=* Pain) ?b Depth Size. Material From 12 — TO '9 Ft. Rasa - ('� -� LO f�I� �° FA' � ► I ILLI R-GIONAL OFFICE From To FI. 17. REMARKS: I DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH I SA, INCAC 7C. YlELL CONSTRUCTION STANDARDS, AND THAT A C PY OF ECORD HAS BEEN PROVIDED "TO TFS Y/. • t O+�'rCr FOR OFFICE USE ONLY Quad No: ID ATURE OF PEFtSON MaSTRUCT1NG Tina YELL SubenlL original to ' Islon of Water Quality. Grout'4water S --4,. Ivilhlin 34 G'SYS SoAnl Ne. Grr• J � V. Lr! �FPe-1o� R lt.t;>EME-6 it CAi. (L 2- 7(-3 7L 7 6-5-77-- 3 Z 77, s f -I-7J7 L 7-6 Z, 7 e6 C8 e6tn 0. z Nov 06 00 09:34a HUR Raleigh 919-854-7815 �J P. l FACSIMILE TO: FROM: DATE: RE: MESSAGE: Steven, Steven Berkowitz NC DEH R.N. Godshall, P.E. 0 Hobbs, Upchurch & Assoc., P,A. IqjHobbs, Upchurch. & Associates, P A \l Consulting Engineers 4917 Waters Edge Drive, Suite 270 Raleigh, North Carolina 27606 (919)854-0233 FAX (919)854-7815 FAX NUMBER: I` PHONE NUMBER: . , ., , 919 715-3271 NO. OF PAGES: (including cover) 9 November 6, 2000 . HUA PROJECT # CU0001 Gray's Creek Elementary School On -Site Wastewater System I. Per our recent telephone conversations, attached are the results Of the grain -size analysis co nducted on the samples we sent to S&ME. 2. Also attached are my summary calculations. The average effective grain size is 0.46, the average dust content is 0.5 and the uniformity coefficient is either 2.95 or 2.7 depending on how you interpret the data. In any event, the installed media does not meet the specifications. 3- Cumberland County Schools is looking for input/ recaar mtnendations from the State regding the acceptance of the installed media. Specifically, they want to know if there are any additional maintenance tasks they can perform to help increase the life -span of the media or if performance the maintenance tasks at shorter intervals can reasonably be expected of to increase th For example, if they pump the sepe media'Iife-span. tic tank and grease traps more frequently, could they expect to get a longer life from the fine sand media? 4. I need to contact my client with my final recommendations on this issue before noon today. If convienient Steven, I'd really Iike to discuss this with you as soon as possible after you've had a chance to review the data. Given the circumstances and the criticality of this issue, my client and I would greatly appreciate your opinions regarding the acceptability and maintenance of the installed fine sand media. M Page 1 of 1 El Nov 06.00 09:34a HUH Raleigh 9l 954-7815 p,2 L' October 23, 20000 Hobbs, Upchurch & Associates, P.A. 4917 Waters Edge Drive, Suite 270 Raleigh, North Carolina 27606 Attention: Mr. RN. Godshall, P.E. Reference: Sieve Analysis Gray's Creek Elementary School S&ME Project No. 1053-00-300 Dear. Mr. Godshall: Please find enclosed the results of our grain size analysis performed on three samples of filter sand (Cell 1, Cell 2 and Cell 3) brought to our laboratory on October 3, 2000. The uniformity coefficient of each sample was also calculated based on the gradation curves and were determined to range between 2.6 and 2.8. If you have any questions or continents concerning these test results, please do not hesitate to contact our office. Sincerely, S&ME, INC. Abner F. Riggs, lr:, P.R Chief Geotechnical Engineer AFR/tag Enclosures) $&ME, Inc. Mailing address: (919) 872 2660 3109 Spring Forest Road P.O. Box 58069 (9191 876.3958 fox Raleigh, North Carolina 27616 Raleigh, North Carolina 27658.8069 z NqV 06 00 09:35a HUR Raleigh 9z�, �--�B54-7815 P.3 i� GRAIN SIZE DATA SHEET Project Description: Grays Creek Elementary School Project Number: 1053-00-300 I�1 �11111�■■I�IIII■rrllnN■■�IIIII�■■� IIII IIIIII■►�■IIIIII■■■IIIIIIN■■IIIIII■■ II ■ IIIIII■■IIIIII■■■III11■IIIIII■■� , IIII MINI■ 1�111111■■■Il1�II■■■IIIIII■■■ III IIIIIINlull IIII■■■IIIIII■■�Illlll■■ IIII IIIIIIN■\'NIIIIII■■mIIIIII■■■HIII = IIII HIM N■■1111111■■■IIIIIIN■■III mom III ■ 11111I a1111111■■■11111 ■■■III �■■ Ill �III111■�It11111■■■IIIII�N■IIIIII■■■ III �■III�11■■.u1111I■■■IIIIII■■■IIIIII■■m IIII ■IINII■■1011I HER millIIII■■■IIIIII■■ IIN IINII■ ■IIIIII■ Mill III■■■IIIIIIN■■ III ■ IIIIII■mmI►VI E Mill III■■■IIIIIIN■■ III IINII■ ■II►�IH■■■IIIIII■■IIIIII■■■ IIN � Ii111■■■IIIIII■■■IIIIII■■■IIIIIIN■■ MINI IIMII�■■Illlilommlllilt�■�IIIII�■■m IIII III��■■�II1111N■■IIIIII■■■111NiN■■ I ll III■■■IIIIII■■IIIIII■■■IIIIII■■■ II�1 ■ I�II�N■IIIIII\���UIIIN■IINII■■■ Gr Coars avel < 75 mm and > 4.75 mm Fine Sand < u.qZ!) mm ana e Sand < 4.75 mm and >2.00 mm Silt < 0.075 and > 0.005 mm Sand < 2.00 mm and > OA25 mm Clay > 0.005 mm Boring No.: Bag Sample No.: Cell 1 Depth (ft): NIA Soil Description: SAND (Coefficient of Uniformity=2.6 �.. Ru+s7 ry„2Y' �?°` adz.�����i:E�R•�i:Y..tF..:Si:. �A4.,,,{'l�.i t�t'> � cn.6 •;4., :2•. LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX NATURAL MOISTURE (%) :n:C: SAND (%) 99.4 SILT & CLAY(%) 0.6 i • NQv 06 00 09:35a HUR Raleigh 0 919-t854-7815 p.4 LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX NATURAL MOISTURE (%) S & M E Project Description: 'Grays Creek Elementary School Project Number: 1053-00-300 Sieve # (in) Sieve # (mm) % Passing 3' 75 100 100 2 50 100 100 1 112 37.5 100 100 1 25 100 100 "3/4 19 100 100 "1/2 12.5 100 100 . . "3/8 9.5 100 100 "4 4.75 .100 100 10 2 88:9 100 20 0.85 38.4 100 40 0.425 9.1 100 60 0.25 1.8 100 . 100 0,15 1 100 200 • 0.075 0.6 100 Boring No.: Bag Sample No.: Cell 1- Depth (ft): NIA Soil Description: SAND (Coefficient of Uniformity=2.6)- r>;i,�i <+• ,,.y>+ y�„g �1: i71E. • .: k'.iLa'� �. �';<i^tom ��4 Sc SAND (%) 99.4 SILT & CLAY (%) 0.6. Tested. By: S. Sutton I Checked By: B. Riggs Date Tested: 10/3J00 No.v 06 00 09:35a HV9 Raleigh 9157654-7815 P.5 � *w-vOERE PGRAIN SIZE DATA SHEET Project Description: Gray's Creek Elementary School Project Number: 1053-00-300 Eel ZOW, 1&-JPA'=l *3 INIM 11111woffooluTA 1121, RONNE WOMEN 11011111111111111 0 11111111 1 ism III INN so I I I NINE 111111111101111110 IN 1 011111 NM Iiiim kul M ii� 11 no IN�� I OEM 0 MEN Ili I MIND ill= RI1111ll1E Al llimmillillimm U lii■� 1311111111111111 UNION ■MEMO H I MINIM E ini�= iw0 I iinn Ewillikill i i�ii U lllilloom limmmililiki ,'no 11 111111111011111111i'Ll . iiin� �iu Gravel < 75 mm and > 4,75 mm Coarse Sand < 4.75 mm and >2.00 mm. Medium Sand < 2.00 mm and > 0.425 mm Fine Sand < 0,425 mm and > 0.075 mm Silt < 0.075 and > 0.005 mm Clay > 0.005 mm Boring No.: Bag Sample No.: Cell 2 Depth (ft): NIA Soil Description: SAND (Coefficient of Uniformity=2.7) LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX NATURAL MOISTURE SAND (%) 99.7 SILT & CLAY No-v. 06 00 09:35a H11 Raleigh 91,E 7954-7815 �J P.6 -51 S&ME Project Description: Gray's Creek Elementary School Project Number: 1053-00-300 Sieve #(in) Sieve #(mm) %Passing 3 75 100 100 2 50 100 100 11/2 37.5 100 100 1 25 100 100 "3/4 19 100 100 "1/2 12.5 100 100 "318 9.6 100 100 "4 4.75 99.4 100 10 2 88.4 100 20 0.85 38.2 100 40 0.425 9.5 100 60 0.25 1.6 100 100 0.15 0.7 100. 200 0,075 0.3 100 Boring No.: Bag Sample No.: Cell 2 Depth (ft): NIA Soil Description: SAND (Coefficient of Uniformity=2.7) b.. :::\ :t •p•4:c•Tv: ,.:•nY: ..�.;r..,•,. •i,�`:42�ty ':ii•:�v,::n w•} v .•a•. .. 4 S+I,C.i�i .'2+ti': �ra}�3�,'} C• ' 3 V.iih:}..�: .•:i• j•T,:: 4 n x...: .,.}?isuc�.`il•...�'�l�,rb'K:��'Mnnw.;y. ' ��{L'�� T]C•T\vv' �61.+\ .�y±$.,v'::i {.:. .:.......... — _ .. ).; ri}.l�i+{C}:�y�� ~LIQUID LIMIT SAND (%) 99.7 PLASTIC -LIMIT SILT & CLAY (%) 0.3 PLASTICITY INDEX NATURAL MOISTURE (%) Tested By: S. Sutton Checked By: B. Riggs Date Tested: 1013100 Nov 06 00 09:36a Raleigh 9197854-7815 p,7 SWE w GRAIN SIZE DATA SHEET Project Description: Grays Creek Elementary School . Project Number: 1053-00-300 -. • • " I1■ r IND�IN IIIrr Milli ll■■■IIn1I■■■ Illl llli■\\■IIIIII■■■Illl11■■■IIIIII■■■ gIIII■ IIIIII■■■ IIIII■■■IIIIII■■■ �IIIII■■■IIl11I■■■ I111 Ifl HIS IIIIII■■ III■ �I11111■�11111I■■■IIIIII■■■ II� Milli ■sin111■■■IIIIII■■■IIIIII■■■ III III 1■�Kill 11111■■■II11II■■■IIIl11■■r III llln �1111111■■■IIIIII■■mIIIIII■■ IIII III Im■■.11111I1■■■IIIIII..■II1111■■ - Inl 11�11■ S'1II11i■■rI1111I■■■IIIIII■■ , Ifll IIIIII■■■�11111■■■ 11111■■■illll�■■ IIII ■ IIIIII■■■IIIIII■■■ 11111■■■IIIIII■■ . ' Il� ■ IIIIII■ 1111111-■■IIIIII■■■IIIIII■ ' II ■ IIIIII■■�IIIr1I■■■IIIIII■■rn111I■ III � rIIIII■■■Iil►�11■■■IIIIII■■■IIIIII■■■ III ■IIIIII■ r111111■■■IIIII ■■IIIIII■■■ ' Ifll Ifl111■�■IIIICI■■■IBM Em,lIIIIII■ III IINIi■ ■111111\■■■IIIII/■■■IIIIII■ ' II IIBII�■IIIIII\■■IIIIII■■■IIIIII■■ IIII ■ my■■W11�\��!�111�■■■IIIIII�■� Gravel - < 75 mm and,> 4.75 mm Coarse Sand < 4.75 mm and >2.00 mm Medium Sand < 2.00 mm and > 0,425 mm Fine Sand < 0.425 mm and > 0.075 mm Silt < 0.075 and > 0.005 mm Clay > 0.005 mm Boring No.: Bag Sample No.: Cell 3 Depth (ft): NIA Soil Description: SAND Coefficient of Uniformi =2.8) x{.,:pl.L'{, ny:. 1�t{,,11 x:•Sc:::r♦ :;u/'•:�a1 11 ti'):i.`.'h'{':ai :V'��tA' ..Jw ..`:S- .'R; ih ..yR 2`41J �+>- .•i .�I ?i:fro .c LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX NATURAL MOISTURE (%) }Y;;�;.• ov.Ritt: - pKs:<:::,�:n•:.�.v,xv:::.n.:�•:<.:::::�,,:JC:.X�.X{:. �:.i:.:v:::.i': Y.�'i1 SAND (°/a) 99.4 SILT 8 CLAY(%) o.6 .: Nqv 06 00 09:36a HuS Raleigh 919_-854-7815 P.8 LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX NATURAL MOISTURE (%) S&ME Project'Description: Gray's Creek Elementary School Project Number: 1053-00-300 Sieve #(in) Sieve #(mm) % Passing 3 75 100 100 2 50 100 100 11/2 37.5 100 100 25 100 100 "3/4 19 100 100 "1/2 12.5_ 100 100 113/8 9.5 100 100 "4 4.75 99.4 100 10 2 8&9 100 20 0.85 40.6 100 40 0,425 10.5 -100 60 0.25 2 100 100 0.15 . 1 100 200 0,075 0.6 100 Boring No.: Bag Sample No.: Cell 3 Depth (ft): N/A Soil Description: SAND (Coefficient of Uniformity=2.8) :f�':'kv�E'.4`: 8:Y `,:1 •,.u`+wav n'. ±�, V�, , ' � tih: SAND (%) 99.4 SILT & CLAY {%) 0.6 Tested By: S. Sutton TChecked By: B. Riggs Date Tested: 1013/00 _ ,Nav 06 00 09:.36a Hobbs, Upchurch and Associates HUB_ Raleigh 9�;q `854-7815 Gray's Creek Elementary School On -Site Wastewater System Sand. Filter Calculations Summary of Grain Size Analyses data extrapolation % passin 10 (D 0.52 0.43 0.42 Average Effective Size 0.8mm -1.2mm 0.52 0.43 0.42 0.46 Uniformity Coeff. < 2.5 2.58 3.12 3.14 2.95 Dust Content < 0.5 0.6 0.31 0.6 0.50 at % passing 60 (D6,) 1.35 1.20 1.20 ME % passing 10 D,o 0.51 .0.44 0.42 Effective Size 0.8mm -1.2mm 0.51 0.44 0.42 formity Coeff. < 2.5 2.60 2.70 2.80 Dust Content < 0.5 0.61 0.31 0.6 2. October 2000 p.9 Page 1 of 3 Hobbs, Upchurch & Associates, P.A. - Consulting Engineers 4917 Waters Edge Drive, Suite 270 • Raleigh, NC 27-606-----.-- . RECEIIrcD November 24, 1999 - 1 NOY 24 tags Mr. Ishwar Devkota V DEJjINR; �EH Division of Environmental Health, On -Site Wastewater Section P.O. Box 29594 @ �aSt`�Pseb,, Raleigh, NC 27626-0594 Subj: On -Site Wastewater System to serve the Gray's Creek Elementary School, Cumberland County, North Carolina NC On -Site Wastewater Section Project Number 98-34 HUA Proj. No. CU9802 Dear Ishwar: The subject on -site wastewater system to serve the referenced facility was previously approved by your section via correspondence dated April 1, 1999. However, as I informed you via telephone, the system design has been changed from the approved plans. As shown on the enclosed plan sheet, Sheet 3 of 8, we have revised the location of the drainfields. Enclosed please find two copies of the revised Sheet 3. The revised drainfield locations are still within the areas evaluated by our soil scientist, Mr. Steve Price of Soil & Environmental Consultants, Inc., and approved by Mr. Danny Soles, Cumberland County Health Department and Dr. David McCloy, DEH/OSWS Regional Soils Scientist. I met with Danny and David at the site on November 10`h and they concurred with the proposed shift of the drainfields to those locations shown on the enclosed sheet. I have forwarded one copy of the revised Sheet 3 to David, two copies to Danny and two copies to the Contractor. I have reviewed both the revised drainfield layout and the original mounding analysis with our soil scientist. Given the depth to groundwater at the site and the conservative nature of the original mounding analysis, Steve and I agree. that there is no reason to expect any significant change in the mounding height. We further agree and anticipate that the changed drainfield layout will function as desired without the need for additional mounding analysis. I have also reviewed the pumping design. The drainfield relocations have effected a corresponding change to the lengths of each of the four force mains to the pressure manifolds. These changes are minor and the effects on the total dynamic head for each of the four pumping systems are negligible. Therefore, the selected pumps are still valid and no changes are needed. Our client, Cumberland County Schools, requested this relocation in order to avoid further delay in the project schedule. Unfortunately, the Contractor installing the system failed to fully clear the woods to those limits shown on the plans. We propose to revise the limits of clearing to that area which the Contractor has already cleared. Danny and David have already reevaluated and ,approved these locations. Raleigh • Telephone 919-854-0233 Fax 919-854-7815 • e-mail: huaraleigh@mindspring.com Southern Pines Myrtle Beach • Kill Devil Hills Gray's Creek Elementary School Page 2 of 2 November 24, 1999 Relocating the drainfields as shown on the enclosed sheet will avoid having to delay the drainfield installation by virtue of additional clearing operations. Per our telephone conversation, we assume that since Danny and David have already approved the proposed drainfield revisions and since we have reviewed the associated hydraulic and engineering issues, these changes would essentially be viewed as "as -built" changes to the plans without the need for additional OSWS Engineering Branch review. However, please advise us if any further action is required at this time and we will endeavor to comply in a timely manner. Thank you for your attention in this matter and please feel free to call us if you have any questions. Very truly yours, HOBBS, UPCHURCH AND ASSOCIATES, P.A. R.N. Godshall, P.E. Wastewater Project Manager Cc: David McCloy, DEH/On-Site Wastewater Section, Fayetteville Regional Office Danny Soles, Cumberland County Health Department Tim Kinlaw, Cumberland County Schools Carlon Mercer, Cumberland County Schools Russell Byrd, HUA, Raleigh Division Manager State of North Carolina Department of Environment and Natural Resources Division of Environmental Health James B. Hunt, Jr., Governor Bill Holman, Secretary Linda C. Sewall; Director 2) `7 . 1 •• I Memorandum NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - r . t To:_ Ishwar Devkota RECEIVE® On -Site Wastewater Engineering OCT 6 1999 From: David V. McCloy, Ph.D. W1 DEH On -Site Wastewater Regional Soil Specialist DEHNRI pyWastewetrater Secdon Re: Gray's Creek Elementary School, Fayetteville, Cumberland County Date: October 1, 1999 On September 28, 1999, I -visited the drainfield site for Gray's Creek Elementary School. The reason for my visit was a report from you of possible extreme site disturbance that might alter. the conditions of my previous soil/site approval. Accompanying me on my inspection were Danny • 'Soles and Robert Bennett of the Cumberland County Health Department and Doc Godshall, P.E., of Hobbs, Upchurch, & Associates. My observations on that day were: (1). The previously wooded area of the drainfield site was cut of all trees. The pines appeared to have been sold for timber and the remaining hardwood trees and all slash were placed in windrows. - (2). Tree stumps were bulldozed out of the ground to result in scattered holes, one to three feet deep, to comprise approximately five percent of the ground surface. (3). Due to recent heavy rain, the ground was completely saturated. I recommend the following: (1). At..this time I see ho reason to change the -use of an LTAR of 0.3 by Hobbs, Upchurch, & Associates. • (2). The woody material in the windrows be burned. ' ON -SITE WASTEWATER SECTION 1642 Mail Service Center, Raleigh, North Carolina 27699-1642 Telephone 919-733-2895 FAX 919-715-3227 (3). The use of heavy construction equipment on the drainfield site be halted until the ground is J relatively dry. Otherwise, severe soil compaction will occur. (4). The soil surface be smoothed only to the extent necessary that the holes be filled. Again, the objective is to reduce soil compaction. (5). The location of the drainlines be re -staked. (6). Either the Cumberland County Health Department and/or I inspect the drainfield site before the drainlines are installed. The purpose ofthe'inspection is to confirm that severe soil \ compaction did not occur. cc: Danny Soles, Cumberland County Health Department Doc R.N. Godshall, Hobbs, Upchurch & Associates Charlie D. Andrews, TARA Group State of North Carolina`''Rim Department of Environment and Natural Resources • Division of Environmental Health James B. Hunt, Jr., Governor NCDENR.. Wayne McDevitt, Secretary Linda C. Sewall, Director NORTH CAROLINA DEPARTMENT OF August 10, 1999 EWRONMENT AND NATURAL RESOURCES Mr. Lacy Williams, Jr. Environmental Health Director Cumberland County Health Department 227 Fountainhead Lane Fayetteville, North Carolina - 27954 Courier 14-59-32 Subj: Modification to Plans and Specifications received for: Gray's Creek Elementary School Wastewater Disposal System, Alderman Road, Cumberland County, NC, OSWS Project No. 98-34 Dear Mr. Williams, We have reviewed the proposed modification plans on the approved plans for the subsurface system to serve the above -referenced facility and have following comments: 1. Provisions for access to the septic tank, pump station and sand filter areas must be indicated such as by path- designed to be constructed in a manner that the maintenance/pumping vehicles can reach the tanks and return safely. 2. Please also ensure that there is no Class I and Class H reservoir or any public water supply source utilizing shallow (under 50 feet) groundwater aquifer within 500 feet from the treatment units thus moved and also the drainfields (particularly beyond southern property line) and other wells within 200 feet of all system components. Please feel free to contact us if you have any questions pertaining to this letter or if we may be of further assistance with this project. We may be reached at the address and phone and facsimile numbers listed on this letter or I may be contacted directly by phone at {919) 715-3272 or using electronic mail via the Internet at Ishwar DevkotaOdeh.ehnr.state. nc.us. Sincerely, Ishwar C. Devkota, P.E. On -Site Wastewater Engineering cc: Tim Kinlaw, R. N. Godshall, David McCloy ON -SITE WASTEWATER SECTION P.O. Box 29594, Raleigh, North Carolina 27626-0594 Telephone 919-733-2895 - FAX 919-715-3227 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Hobbs, Upchurch & Associates, P.A. Consulting Engineers 4917 Waters Edge Drive, Suite 270 • Raleigh, NC 27606 July 20, 1999 Mr. Ishwar Devkota, P.E. Division of Environmental Health, On -Site Wastewater Section P.O. Box 29594 Raleigh, NC 27626-0594 RECEIVE® JUL 22 M9 DEHNRIDEH WastewaWr Won Subj: On -Site Wastewater System to serve the Gray's Creek Elementary School, Cumberland County, NC, NC On -Site Wastewater Section Project Number 98-34, HUA Proj. No. CU9802 Dear Mr. Devkota: The on -site wastewater system to serve the reference facility was previously approved by your section via correspondence dated April 1, 1999. However, as I informed you via telephone, the system design has been changed from the approved plans. Per your direction, with respect to submitting changed drawings, the revised system engineering plans and design calculations are submitted for your consideration. Since the system was previously approved and has not changed significantly, it was understood from our conversation that this submittal is intended to convey as -built information and thus not be subjected to a full engineering design review. We believe that the revised plans and calculations provide for an improved wastewater disposal system for the subject facility. Although not all of the drawing sheets contain changes, a complete revised set of plans is provided for your convenience. As I explained on the phone, there are three major changes to the system. First, the fenced -in compound enclosing the system pretreatment components has been moved from its original location near the school -� building to a location next to the drainfields. We have added 405 ft of 6-in gravity collection sewer, slop 0.60. he four force mains have been shortened accordingly and run between the drainfields. This has entailed changing many of the system component invert elevations. Therefore, a set of revised system design calculations reflecting the new invert elevations and total dynamic heads has been included. The TDHs did not change significantly and the pumps selected are the same as in the approved design. Since the daily design flow is unchanged, the sizing and design of the pretreatment components are unchanged. Secondly, the design of the pressure manifolds has been modified to include an upright standpipe to minimize any pressure or water "hammer" problems from pumping downhill. This has been standard practice for many on -site systems serving Cumberland County Schools, particularly those with manifolds at elevations lower than the pump tank. In fact, we are using a design that we have been told has been previously approved by your office. However, it should be noted that we are also requiring that the force mains from the final dosing tank be installed with a continual up -hill slope so as to minimize any gravity dosing of the drainfields. E� 0 Raleigh • Telephone 919-854-0233 Fax 919-854-7815 • e-mail: huaraleigh@mindspring.com Southern Pines Myrtle Beach 9 Kill Devil Hills Gray's Creek Elementary School Page 2 of 2 July 20, 1999 The third change to the approved plans is the location of the proposed water supply well. The previous well location, north of the school between the building and Alderman Road, has been abandoned. The new location, shown on the revised plans, is about 200 ft west of the building. While we anticipate that this will be the final location for the well, this location is not fixed since it is has not yet been approved by the Public Water Supply Section. i � _yLd To r f In the revised submittal, we have also incorporated the pen changes previously made to the approved tS 60 plans. For example, the locations of the two required monitoring wells have added to the revised plans. The new position of the pretreatment compound notwithstanding, we believe that these locations are still appropriate.' We request that you provide concurrence with the proposed system design changes so that we may advise our client and the system installer. Please feel free to call us if you have any questions. Very truly yours, HOBBS, UPCHURCH AND ASSOCIATES, P.A. /.NIG4odshalW1,P. E. Wastewater Project Manager Cc: Danny Soles, Cumberland County Health Department Tim Kinlaw, Cumberland County Schools Archie Gupton, Cumberland County Schools Carlon Mercer, Cumberland County Schools ONE Gray's Creek / On -Site Wastewater System ' Elementary School Design Calculations (Revised 7/2199) 2. Gravity Collection Sewer Invert Elevations 3. System Invert Elevations 4. Sand Filter Dosing Requirements 5. Sand Filter Dosing Tank and Pump System Information 6. Final Dosing Requirements 7. Final Dosing Pump Tank and Pumping System Information 8. Drainfield Requirements 9. Drainfield Dosing Checks 10. Sand Filter Dosing Tank Total Dynamic Head Calculations 11. Final Dosing Tank Total Dynamic Head Calculations 1. Daily Design Flow Per OSWS previous approval of reduced daily design flow based on flow equalization (24-hr and 6-day). Tank sizes remain unchanged. Unreduced (950 students @ 12 gpd) 11,400 gpd Reduced (950 students @ 9 gpd) 8,550 gpd Flow Eq. (DDF x 5/6)(5 days flow over 6 days) 7,125 gpd HUA Proj. No. CU9802 7/20/99 2. Gravity Collection Sewer Invert Elevations Segment Location IE In ft IE Out ft Delta ft Length ft Slope % 1. Plumbing stubout to first elbow 97.50 97.44 0.06 10.00 0.60 2. First elbow to second elbow 97.44 95.14 2.30 383.00 0.60 3. Second elbow to septic tank 95.14 95.07 0.07 12.00 0.60 Pipe diameter = 6.0 in Required Slope Totalsl 0.60 2.431 405.00 Minimum slope in line Required Slope met? 0.60 0.60 Yes 3. System Invert Elevations IE In (ft) IE Out (ft) 1. Septic tank 95.07 94.90 2. Gravity pipe from ST to Sand Filter PT 94.90 94.82 3. Sand filter dosing tank 94.82 94.57 4. Sand filter dosing manifold invert 99.25 99.25 5. Sand filter underdrain collection manifold 96.38 96.38 6. Recirculation weir chamber 96.20 7. Recirculation pipe (back to SF dosing) 92.86 91.84 8. Weir chamber to final dosing tank 92.86 92.80 9. Final dosing tank 92.80 92.55 10. PM 1 (ground elevation approx. = 97.50) 96.17 96.17 11. PM 2 (ground elevation approx. = 98.25) 96.92 96.92 12. PM 3 (ground elevation approx. = 97.50) 96.17 96.17 13. PM 4 (ground elevation approx. = 97.75) 96.42 96.42 4. Sand Filter Dosing Requirements Lateral-1,1/2-in Sch 40 PVC Orifice size (in) 0.16 Number of orifices 306 Minimum flow per orifice 0.58 Required flow/Design pumping rate (gpm) 177.48 TDH (ft) 18.27 See attached spreadsheet for TDH computations. Select Goulds 3888D WS15, 1-1/2 hp pump, see attached pump data. Page I. of 5 Gray's Creek Elementary School On -Site Wastewater System � Design Calculations (Revised 7/2/99) 5. Sand Filter Dosing Tank and Pump System Information Stayright custom-built 14,000 gal pump tank Length (ft) 20.00 Width (ft) 10.00 Volume (ft) 200.00 Invert to tank bottom 86.82 Volume (gals/ft) 1,496 Dose volume (gals) 633 Pumping rate (gpm) 177.48 Ground surface elevation (ft) 99.19 Influent invert elevation (ft) 94.82 Pump tank bottom elevation (ft) 86.82 Discharge piping IE ft 94.82 Pump height (+ 4" block) (ft) 2.58 Pump "Off" elevation (ft) 89.40 Float separation for dosing (ft) 0.42 Pump "On" elevation (ft) 89.83 High-water alarm elevation (ft) 90.33 See previously submitted and approved Sand Filter Design Protocol worksheet for original dosing calculations and checks. 6. Final Dosing Requirements Pressure manifold taps = 1/2-in Sch 40 PVC Nominal Diameter (in) 0.622 Number of taps (per manifold) 10 Minimum pressure head required (ft) 2.00 Design pressure head (ft) 5.00 Minimum required pumping rate (gpm) 112.46 Design pumping rate (gpm) 112.50 Achieved pressure head (ft) 5.00 Minimum pumping rate achieved? Yes Mimumum pressure achieved? Yes Maximum TDH (ft) 17.37 See attached spreadsheet for TDH computations. Select Goulds 3887 WS10B, 1 hp pump, see attached pump curve. 7. Final Dosing Pump Tank and Pumping System Information Stayright PT-184 Length (ft) 10.50 Width (ft) 5.00 Volume (ft3/ft) 52.50 Volume (gals/ft) 392.75 Dose volume (gals) 889 Pumping rate (gpm) 112.50 Pump run time (min) 7.90 Doses per day 8.01 Ground surface elevation (ft) 99.25 Influent invert elevation (ft) 92.80 Pump tank bottom elevation (ft) 88.30 Discharge piping IE (ft) 92.80 Pump height (+ 4" block) (ft) 2.06 Pump "Off" elevation (ft) 90.36 Float separation for dosing (ft) 2.26 Pump "On" elevation (ft) 92.63 High-water alarm elevation (ft) 93.13 HUA Proj. No. CU9802 7/20199 Page 2 of 5 Gray's Creek On -Site Wastewater System 1 Elementary School Design Calculations (Revised 7/2199) 8. Drainfield Requirements LTAR (gpd/fe) 0.30 Required trenchbottom area (fig) 23,750 Trenchbottom width ft 3.00 Require d drainline length (ft) 7,917 minus 25% reduction for LPP (ft) 0 Total required drainline length ft 7,917 Assumed drainline length (ft) 200 Drainline separation ft 9.00 Total number of drainlines 40 Number of drainfields 4 Number of drainlines/drainfield 10 Total drainline length (ft) 8,000 Drainline length met? Yes Drainfield width (ft) 320 Drainfield length (ft) 200 Required drainfield area (fe) 64,000 Setback requirements (ft) 10.0 Total area required ( ) 74,800 9. Drainfield Dosing Checks Drainline volume (gals/100 ft) 66.10 Total drainline or lateral volume (gals) 5,288 Drainline volume per drainfield 1,322 Minimum dose volume 66% df vol. (gal) 881 Maximum dose volume (66% df vol.)(gal) 992 Dose volume (gals) 889 Percent drainfield volume dosed (%) 0.67 % drainfield dosing requirement met? Yes Max. length of FM dosed by gravity (ft) 0.00 Force main volume (gals/100 ft) 67.70 Volume dosed by gravity (gals) 0.00 % of dose volume dosed by gravity (%) 0.00 Maximum dose volume by gravity (%) 10 Gravity dosing below maximum? Yes Note: Force mains will be installed so that a continuous upward slope is maintained from the pump tank discharge invert elevation to the pressure manifolds thus eliminating any dosing by gravity. HUA Proj. No. CU9802 7/20/99 Page 3 of 5 Gray's Creek 0 On -Site Wastewater System � HUA Proj. No. CU9802 Elementary School Design Calculations 7/20/99 (Revised 7/2/99) 10. Sand Filter Dosing Tank Total Dynamic Head Calculations �Fiter�Celt 1 2 �. Desi9n Pressure Head r s300' 77 Achieved Pressure Head a" ,, 4F06 r .F. Eleito►i a ' High point in FM 100.00 100.00 100.00 Pump -off level 89.40 89.40 89.40 L1060 .MAX-1Q60 II _ ' 1U't0 Fncto�i`kl aci, ..,. Pumping Rate t'7'! _h ; i7�748 Discharge Piping: Pipe Material Pipe Size Nominal Diameter Pipe Length No. Check Valves Le No. Gate valves Le No. Ball valves Le No. 90 elbows Le No.45-bends Le Cou ling/Str. Tee Le No.90-tees Le Total Equivelent Le Dishar a Friction Head Sch 80 Sch 80 Sch 80 4" 4" 4" 3.826 3.826 3.826 14.00 14.00 14.00 1 1 1 38.00 38.00 38.00 1 1 1 2.70 2.70 2.70 0 0 0 3.00 3.00 3.00 3 3 3 14.00 14.00 14.00 0 0 0 8.00 8.00 8.00 1 1 1 4.00 4.00 4.00 0 0 0 21.00 21.001 21.00 100.70 100.70 100.70 2.39 2.391 2.39 Supply Piping: Pipe Material Pipe Size Nominal Diameter Length No. Check Valves Le No. Gate valves Le No. Ball valves Le No.90-elbows Le No.45-bends Le Coupling/Str. Tee Le No.90-tees Le Other Le Total Equivelent Le . Force Main Friction Head Sch 40 Sch 40 Sch 40 4" 4" 4" 4.026 4.026 4.026 35.00 7.00 35.00 0 0 0 38.00 38.00 38.00 1 1 1 2.70 2.70 2.70 0 0 0 3.00 3.00 3.00 2 0 2 14.00 14.00 14.00 0 0 0 8.00 8.00 8.00 0 0 0 4.00 4.00 4.00 0 0 0 21.00 21.00 21.00 0 0 0 0.00 0.00 0.00 66 10 66 1.22 0.18 1.22 ' �Tota1 Friction headWIZ "" Totat _,:amicFiead'°° 18.27 ', Page 4 of 5 Gray's Creek O On -Site Wastewater System HUA Proj. No. CU9802 Elementary School Design Calculations 7/20/99 (Revised 7/2/99) 11. Final Dosing Tank Total Dynamic Head Calculations DralnfilelNoJQ :tio_ 1 , . Z Pressure H Design Pressure Head " Achieved Pressure Head K' 5 00 �.... ._ -. ElevtlonLei! High point in FM 96.17 96.92 96.17 96.42 Pump -off level 90.36 90.36 90.36 90.36 Friction Hea_" Pumping Rate IMM50 i 25b Al 50 Discharge Piping: Pipe Material Pipe Size Sch 80 Sch 80 Sch 80 Sch 80. 4" 4" 4" 4" Nominal Diameter 3.826 3.826 3.826 3.826 Pipe Length No. Check Valves Le 14.00 14.00 14.00 14.00 1 1 1 1 38.00 38.00 38.00 38.00 No. Gate valves Le 1 1 1 1 2.70 2.70 2.70 2.70 No. Ball valves 0 0 0 0 Le 3.00 3.00 3.00 3.00 No. 90 elbows 3 3 3 3 Le No.45-bends 14.00 14.00 14.00 14.00 0 0 0 0 Le 8.00 8.00 8.00 8.00 Coupling/Str. Tee 1 1 1 1 Le 4.00 4.00 4.00 4.00 No.90-tees 0 0 0 0 Le 21.00 21.00 21.00 21.00 Total Equivelent Le 100.70 100.70 100.70 100.70 Dishar a Friction Head 1.03 1.03 1.03 1.03 Supply Piping: Pipe Material Sch 40 Sch 40 Sch 40 Sch 40 Pipe Size 4" 4" 4" 4" Nominal Diameter 4.026 4.026 4.026 4.026 Length 326 350 599 632 No. Check Valves 0 0 0 0 Le No. Gate valves Le 38.00 38.00 38.00 38.00 1 1 1 1 2.70 2.70 2.70 2.70 No. Ball valves Le 0 0 0 0 3.00 3.00 3.00 3.00 No.90-elbows 2 0 2 2 Le 14.00 14.00 14.00 14.00 No.45-bends 0 0 0 0 Le 8.00 8.00 8.00 8.00 Cou ling/Str. Tee 0 0 0 0 Le 4.00 4.00 4.00 4.00 No.90-tees 0 0 0 0 Le 21.00 21.00 21.00 21.00 Other 0 0 0 0 Le 0.00 0.00 0.001 0.00 Total Equivelent Le Force Main Friction Head 357 353 630 663 2.84 2.82 5.021 5.29 Mt' _"__, Total Faction - ioiH00 � 14`.58, 5 0 ` �16 86 ,? 1Y 37 Page 5 of 5 APPLICATIONS For Homes Farms Trailer courts Motels Schools Sewage systems Hospitals Industry Dewatering anywhere waste or drainage must be disposed of quickly, quietly and efficiently. SPECIFICATIONS Pump: Solids Handling Capabilities: 2" maximum Capacities: Up to 180 GPM Total Heads: Up to 49 feet TDH Discharge types available: 2" NPT threaded casing. 2" NPT threaded companion flange — "BF" or "BHF" units. Optional 3" NPT threaded companion flange — "BF" or "BHF" units, must order (A1-3) companion flange separately. Mechanical Seal: Carbon rotary/ ceramic stationary, 300 series stainless steel metal parts, BUNA-N elastomers. Temperature: 160' F (71 ° C) maximum. Fasteners: 300 series stainless steel. Capable of running dry without damage to components. L� Motor: Single Phase: 1/3-1/2 HP 115V or 230V, 60 Hz, 1750 RPM; 3/4-1 HP 230V, 60 Hz, 1750 RPM; 1 HP, 230V, 60 Hz, 3500 RPM. Built in overload with automatic reset. Three Phase: 1/2-1 HP 208/230- 460V, 60 Hz, 1750 RPM; 1 HP 208/230-460V, 60 Hz, 3500 RPM. Overload protection must be provided in starter unit. Shaft: Threaded 400 series stainless steel. Bearings: Ball bearings — upper and lower. Power Cord: 15' standard (optional lengths available). Single Phase: 1/3-1/2 HP,16/3 SJTO with three prong plug; 3/4 and 1 HP; 14/3 STO with bare leads. Three Phase: 1/2-1 HP 14/4 STO with bare leads. On CSA listed models: 20' length SJTW or STW are standard.' 2" Companion Flange. have MODEL 3887 FEATURES Impeller: Cast iron — semi -open, non -clog with pump -out vanes for mechanical seal pro- tection. Balanced for smooth operation. Casing: Cast iron volute type for maximum efficiency. 2" NPT discharge adaptable for slide rail systems. Mechanical Seal: Ceramic vs carbon sealing faces, stainless steel metal parts, Buna N elastomers. Shaft: Corrosion resistant stainless steel. Threaded design. Locknut on three phase models to guard against component damage on accidental reverse rotation. Motor: Fully submerged in high grade turbine oil for lubrication and efficient heat transfer. Designed for continous operation. All ratings are within the working limits of the motor. Bearings: Upper and lower heavy duty ball bearings construction. Power Cable: Severe duty rated, oil and water resistant. Epoxy seal on motor -end provides secondary moisture barrier in case of outer jacket damage and to prevent oil wicking. O-Ring: Assures positive sealing against contaminants and oil leakage. ©1985 Goulds Pumps, Inc. Effective January 15, 1985 Ln 2 3 4 FEATURES 1 All Iron Construction 2 All Ball Bearing Heavy Duty Design 3 Stainless Steel Shaft 4 Mechanical Seal MODELS 5 Sewage �i. 6 P, P,m P S r 5 Epoxy Sealed Cable 6 High Grade Turbine Oil 7 Electrocoat Paint Outside & Inside Max. Series HP Volts Phase Amps WS0311B,BF ,/3 115 9.8 WS0312B.BF 230 1 4.9 WS0511B,BF 115 1 13.0 WS0512B.BF 230 6.5 WS0532B,BF �/� 208/230 3 3.3 WS0534B,BF 460 1.65 WS0712B,BF 230 1 6.0 WS0732B.BF 3/4 208/230 3 3.6 WS0734B,BF 460 1.8 WS1012B.BF 230 1 9.0 WS1032B,BF 2081230 3 5.8 WS10346,BF 460 2.9 WS10128H,BHF 1 230 1 11.0 WS1032BH.BHF 208/230 3 7.0 WS1034BH,BHF 460 3.5 SIMPLEX & DUPLEX SYSTEMS Simplex Ejector Systems: are used where drain facilities are below existing sewer lines. Also can be used for septic tank applications where effluent must be pumped away from tank for disposal. I` Duplex Ejector Systems: offer the necessary safety required by institutions which cannot afford an interruption in their sewage disposal systems. SENECA FALLS NEW YORK 13148 7 "BF" and "BHF" r Models — "B" Models PERF 8 Ejector Vanes In Gallop 9 Multi -Vane Non -Clog Cast Iron Impeller Series RPM Solids 1750 2" 3500 No. HP ► RPM ► 5 10 Wt. 3 15 20 63 LLJ 25 30 65 m 35 ~ 40 45 • 1 6_ 3887 DRMANCE RATINGS s Per Minute WS0511B,BF WS0512B;BF S07128,131' WS10128,BF WS0311B,BF WS0532B,BF WS0732B,BF WS1032B,BF WS0312B.BF WS05348.BF WS0734B.BF WS1034B,BF 14 '/A 3/4 1 1750 108 150 170 82 126 150 170 30 94 125 150 56 90 121 17 49 81 14 40 10 85 DIMENSIONS (IN INCHES) �12'/z" Rotation j� 53/4 8'/4" Kick -Back A' — All models are 173/4" except 3/4 HP 10 and 1 HP 10 = 203/4" Dimensions are approximate. Do not use for construction purposes. Available Certifications: SA% Canadian Standards Association. Pennsylvania Bureau of Mines for non -face applications— BOTE 91. SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE. PRINTED IN U.S.A. 1 3500 168 150 128 107 86 64 43 24 BHF BHF y Performance Curve 0 METERS FEET MODEL 3887 16 50 .. .: '_ . - .:... ...:.::... _ .....' . . .:.....::.:. .. SIZE 2" SOLIDS 14 40:. ...:. eNF.. :.:. :_ _ ......._- .; ._.. .......... 12 Ui 10 30 wS1 p W 8- O 6 20 s .. .... .. :..:.. 4 10 - 2 0 L 00 20 40 60 80 100 1120 140 160 180 GPM gPw 0 10 20 30 40 m3/hr CAPACITY �GOULDS MPS, INC. SBJECA FAPULLS NEW YOW 13148 01985 Goulds Pumps, Inc. - Effective .luly 1985 APPLICATIONS Used in a'variety of residential, commercial and industrial applications such as: • Sewage systems • Flood and pollution control • Dewatering • Farms • Hospitals • Trailer courts • Motels SPECIFICATIONS Pump: • Solids Handling Capabilities: 3" Maximum. • Discharge Size: 3" Flanged. • Capacities: up to 440 GPM. • Total Heads: up to 65 ft. TDH • Mechanical Seals: Carbon Rotary/Ceramic Stationary 300 Series Stainless Steel Metal Parts BUNA=N Elastomers. • Temperature: 160°F (71 °C) Maximum. • Fasteners: 300.Series Stainless Steel. • Capable of Running Dry without Damage to Components. Motor: • Single Phase: 11h-2 HP, 230 Volt, 60 Hz, 1750 RPM. Built-in Overload with Automatic Reset. Permanent Split Capacitor Type. ©1985 Goulds Pumps, Inc. • Three Phase: 11/2-5 HP, 208-230, or 460 Volt, 60 Hz, 1750 RPM., Overload Protection must be Provided in Starter Unit. • Class B Insulation: • Shaft: 300 Series Stainless Steel Keyed Design. • Bearings: Ball Bearings Upper and Lower. • Power Cord: 15 Feet Standard. 1 Phase - 14/3 STO 3 Phase - 14/4 STO Optional Lengths Available. • Sensor Cord: 15 Feet Standard. 16/2 SJTO. Optional Lengths Available. On CSA listed Models, 20' length SJTW and STW are standard. FEATURES Impeller: Cast iron, two vane semi - open, non -clog with pump -out vanes for mechanical seal protection. Bal- anced for smooth operation. Bronze impeller available as an option. Casing: Heavy duty cast iron, volute type for maximum efficiency. 3" flanged conforms to 150 PSI ANSI standard. Adaptable for slide rail system. Dual Mechanical Seals: Ceramic vs. carbon sealing faces, stainless steel metal parts, BUNA-N elasto- mers. Upper and lower tandem mounted shaft seals are positioned independently and are separated by an oil -filled chamber. Optional MODEL ,kfT0 4 hq, of Of 0 94,9 0 0 � L77 Tungsten carbide vs. tungsten carbide lower seal available. Seal Sensor Probe: Located in an oil -filled chamber. If water should begin to leak past lower seal, it will be energized and transmit a signal to an optional electronic sensing unit. Shaft: 300 Series stainless steel, keyed design. Motor: Fully Submerged in Oil - Filled Chamber. High grade turbine oil surrounds motor for more efficient heat dissipation, permanent lubrica- tion of bearings and mechanical seal for complete protection against outside environment. . Designed for Continuous Opera- tion: Pump ratings are within the motor manufacturer's recommended working limits and can be operated continuouslywithout damage. Bearings: Upper and lower heavy duty ball bearings construction for precision positioning of parts and to carry thrust loads. Power Cable: Severe duty rated, oil and water resistent. Epoxy seal on motor -end provides secondary moisture barrier in case of outer jacket damage and to prevent oil wicking., O-Ring: Assures positive sealing against contaminants and oil leakage. Effective July, 1985 MA Item No. 2 3 4 5 6 7 8 9 L 2 5 8 7 —2 2 7ERIALS OF CONSTRUCTION Material Part Name Standard Optional Impeller, Non -Clog 1001 1102 Castings 1001 Shaft -Keyed 300 Series S.S. Fasteners 300 Series S.S. Ball Bearings Steel Power Cable STO,15 Feet Additional Lengths 0-Ring Buna-N Seal Sensor SJTO,15 Feet Additional Lengths Mechanical Metal Seals No. Service Rotary Stationary Elaslomers Parts STD. I 1OK21 General Carbon Ceramic Buna-N 30OSeries OPT. I 1OK22 PeavyDutylTungstenj Tungsten I S.S. Material Code Engineering Standard 1001 Cast Iron — ASTM A48 Class 20 1102 Bronze — ASTM B584 MODELS Series HP Volts Phase RPM Solids Max. WL Amp. WS1512D 1112 230 1 11.7 192 WS2012D 2 230 15.0 196 WS1532D 11/2 208/230 10.0 190 WS20320 2 208/230 10.0 194 WS3032D 3 208/230 1750 3" 12.0 200 WS50320 5 208/230 3 17.0 205 WS1534D 1112 460 5.0 190 WS20340 2 460 5.0 194 WS3034D 3 460 6.0 200 WS5034D 5 460 8.5 205 Available Certifications: $i1 Canadian Standards Association. Pennsylvania Bureau of Mines for non -face applications — BOTE 91. PERFORMA Series No. ► HP ► RPM ► 10 15 20 25 30 35 " 40 LL 45 50 55 60 65 r ( i,I�1 Sev age purl_:-�Cps MODEL %NCE RATINGS (Gallons Per Minute) WS1512D WS2012D WS1532D WS2032D WS3032D WS1534D WS2034D WS3034D 1 V2 2 3 1750 290 340 390 255 305 370 210 270 330 160 225 300 100 175 260 40 125 220 60 160 100 40 DIMENSIONS 27" 31/4" Rotation 1' 3" 150 PSI ANSI Flange /811 Kickback WS5032D WS5034D 5 440 425 405 380 355 325 285 240 190 140 80 24 SENECA FALLS NEW YORK 13148 SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE. PRINTED IN U.S.A. �"Submersirl)le Sewage Pump METERS FEET 70 20, 6( 5( 4C 3C 0 L 0 .......... -A - - 4- J. �po sl of J rT i.4 50 100 150 200 250 300 350 MODEL 3888 SIZE 3" SOLIDS 400 450 GPM 0 12.5 25.0 37.5 50.0 62.5 75.0 87.5 100.0 M'/h CAPACITY MGOULDS PUMPS, INC. SENECA FAILS NEW YOPK 13148 _ oL%L ,fit I 1 J)-A - 'A MEMBER - Pre -Cast Concrete Products Since 1937 7/20/99 Mr. Charlie Andrews Tara Group 2042 Buie Phil Road Red Springs, NC 28377 RE: Gray's Creek Elementary School - Fayetteville, NC Dear Mr. Andrews; We submit our data in regards to the above referenced job for your approval. The following items are for your consideration: L. We supply (1) One Precast Concrete 12,000 Gallon -Septic Tank as per our attached shop drawing. Z. We supply (4) Four Precast Concrete 3' x 12' x 3' Deep Manifold Boxes as per our attached shop drawing. 3. We supply (2) Two Precast Concrete 4' x 4' x 4' Valve Vault as per our attached shop drawing. 4. We supply (1) One Precast Concrete 14,000 Gallon Dosing Tank as per our attached shop drawing. 5. We supply (1) One Precast Concrete 8000'Gallon Pump Tank as per our attached shop drawing. We feel that these units. meet'with the spirit of your job'requiremen'ts. Please be aware that these items will not be scheduled for production until we receive approved drawings from you. Thanks for this opportunity to assist you. Sincerely, Stay -Right Tank Co., Inc: RELIVE® r-:d hall Wrenn AUG 6 rector DEHNR, DEH Pik& Waste*b0ection CERTJFIEO,PLANT R O. BOX 58659 RALEIGH, NC 27658-8659-o PHONE (910) 876-8600 8 1 Req'd Imprinted On Tank: 'S RTC STB-166 12,000 -Gall Mfg, Date 8"0 x 4" , Deep 6" 78" Knockout -----�---==--------------------------= ---- ,— i ------ 71 — I N:a I 6"0 Flow Holes LJ I Typ Of 5 r A300. 12" OC j a 48 - 8 10' - +I� I L'•'� A300 I I I I r-� Lifters i tom' 36"• ` I. • I 1 F I II r 8"0:x 4" Deep ' Knockout Zabel A300 HIP Filter Installed By Others, Lifters 8.10 Wt. = 36,350 Lbs (2) 8`0 Wt. = 35,805 . Lbs Knockouts Lifters 108" 1-1/2"0 Butyl Rubber Sealant In Joint .With 6" Band Of Nonshrink Grout Lifters . Wt.' 36,350 Lbs Baffle - Wt.= 6,752 Lbs Se ptic\To ro G_ 12000g st 70111 � 60" x 80" x 6" Tall Riser Shown On Separate Sheet LA a 8' 0 . 10'-0" T • . 2"'f , *, am 98" ® 9'-0" 6 '0 Flow Holes I I 66" Typ Of, . 5 e 1.2" OC I.I . II 47" •� 21 8" Support 'Provided & Installed By Others Tara Group Gray's Creek Elementary ,659 School - Fayatteville,. NC 17658 • 12,000 Gallon Septic Tank 6=8600 it.com Traffic Rated.. 1 Req'd +++++** +++ ***++ ++++ +++ *+ * o Halliday S1 R3648 Access Door Cast In Top Lifters ------------ 6" Riser\TaraG_5x5xC-6 Tara Group REINFORCEMENT: � #4 ® 6" OCEW CONCRETE: 4000 PSI @ 28 DAYS Gray s Creek Elementary School - Fayetteville, NC P.O. Box 58659 Stav"Riaht Raleigh. NC 27658 Y x Y x 0'-6 Tall Riser Phone (919) 876-8600 wwwstayright.com For 12,000 Gal Septic Tank _ LOCKING BAR LA %, ST; .' & ALUM. POSITIVE, LOCKING ,.,,HOLD OPEN. ARM LAN PRIMER REQUIRED, A OPENING SECTION A -A - STAINLESS STEEL HINGES W/ TAMPER PROOF FASTENERS (COVER SHOWN IN OPEN POSITION) CONT. CONCRETE ANCHOR SECTION B-B SSCAT 4/22/93 EZ PAGE . 7 HALLIDAY PRODUCTS SERIES SIR ACCESS DOOR (STANDARD REGULAR) STANDARD FEATURES: • AUTO -LOCK STAINLESS, STEEL HOLD OPEN ARM WITH RELEASE HANDLE • STAINLESS STEEL LIFTING HANDLE, HINGES AND ATTACHING HARDWARE . • NON -CORROSIVE LOCKING BAR • SINGLE . LEAF CONSTRUCTION • 300 LBS. PER SQ. FT. LOAD RATING • 10 YEAR GUARANTEE SPECIFICATIONS THE SIR SERIES (SINGLE LEAF) ACCESS :FRAMES AND COVERS AS MANUFACTURED BY HALLIDAY PRODUCTS. INC. OF ORLANDO. FLORIDA SHALL HAVE A 1/47 THICK ONE-PIECE, MILL FINISH, EXTRUDED ALUMINUM FRAME, INCORPORATING A CONTINUOUS CONCRETE ANCHOR. DOOR PANEL SHALL BE 1/4" ALUMINUM DIAMOND PLATE, REINFORCED TO WITHSTAND A LIVE LOAD OF 300 LBS. PSF. DOOR SHALL OPEN TO 90' AND AUTOMATICALLY LOCK WITH A STAINLESS STEEL HOLD OPEN ARM WITH ALUMINUM RELEASE HANDLE. DOOR SHALL CLOSE FLUSH WITH THE FRAME. LIFTING HANDLE, HINGES AND ALL.FASTENING HARDWARE SHALL BE. _ STAINLESS STEEL. UNIT.SHALL LOCK,WITH A NON -CORROSIVE LOCKING -BAR. UNIT SHALL BE GUARANTEED AGAINST DEFECTS IN MATERIAL AND/OR WORKMANSHIP FOR A PERIOD OF 10 YEARS. 1 /4' M 1/4" THICK EXTRUDED ALUM. FRAME 1/4" X 2" ALUM. PLATE REINF. (AS REQUIRED) SECTION C-C MODEL NO. DIMENSIONS 'UNIT, WT.";'' A B C.- D S1R2424. 24" 30" 24" 30" 50 LBS,' S1R3030 30" 36" 30" 36" 62 LBS. S1R3636 36" 42° 36" 42" 78 LBS. S1R3048 30" 36" 48" 54" 84 LBS, S1R3648 36" 42" 48" 54" 97 LBS. Vulcan j� VULCAN Foundry Corp. I" 3/4 POST OFFICE BOX 905 ; I DENHAM SPRINGS, LA 70727" WATS No..1-800—MANHOLE - 1 R14 7/8 LOCAL No. 1-504-665-6151 FAX No. 1-504-665-4306 4 DRAM 9Y. J.B. DATE: 9-30-88 V-1394 —r APPROVED: O23 1/2 - - .REVISON: REV/UPD 10-20-95 JS - VULCAN (4) 1' DI•A. ANCHOR_ BOLT HOLES 1/9 O LOAD RATING COVER BACK 2 7/6 V-1384 HEAVY-DUTY MATERIAL SPECIFICATION VENTED COVER ❑PTIONAL) SPECIFY 7/9 ASTM A 48 CLASS 30 NUMBER OF VENTHOLES IF REQUIRED. FRAME T ❑ P VIEW (CLASS .35 ON REQUEST) AVAILABLE WITH CLASSIC COVER COVER SECTION OPEN AREA - SQ. IN. SELECTI❑NSt SPECIFY LETTERING, N/A 25 1/4 ESTIMATED WEIGHT — LBS. V MACHINED BEARING SURFACE VULCAN . 1 23 3/4 -{ COVER 180 I FRAME 1 LPN I Tq �� 1/2 TOTAL 315 7 1/2 PATTERN BREAKDOWN . _- V-1384 COVER 1/2 V-1384 FRAME s F .W 3/4 22' 1/4 V-1384 (2) TYPE ONE PICKSLOTS 29.3/4 CATALOG NUMBER PICKSL❑T DETAIL 33 V-1384 DRAWING NUMBER SHEET, COVER FACE FRAME SECTION A822. 01 1 of 1` 02-25-1998.08:57AM -FROM Zabel"_Filtei-s TO 19198765625 P.01 I l c,-;:,m—i: ♦ Y�r�rl.YlY�i�1� . ��Sl�l�l�:�l■ a�t4" A300-HIP U.S.. Paten 4,110,295 1 Req d 8" 20'-0" 8" 8"0 6" Knockout 8„ r---------------------=------------------------=---- 8"0 Knockout i 72" r: . • 24 0 i e•: 8„ x 84" Knockout i o o i L---------------------------- .-------- -----=-------'--� 4" Typ 8"0 Imprinted On Tank: Knockout SRTC PT-184 8000 Gal Date Of Mfg Vulcan V=1384 4'-6" x 8'-5" x 3'-6" ,.Tall -Riser . Ring- & Cover Shown On Separate. Sheet Knockout8" x 84" Lifters - Knockout 6 (2) ' 8,"0 Knockout a 33" _. 5'-6" 52" , 1-1 /2"0 .Butyl Rubber 58" Lifters Sealant In Joint, With .6" 33" Band Of Nonshrink Grout 8„ PumpTank\TaraG-8000gpt Tara Group REINFORCEMENT: H-20 Bridge- Loading CONCRETE: 4000 PSI @ 28 DAYS Grays Creek Elem �entary P.o: Box 58659 - School — Fayetteville, NC Stav ffiaht Raleigh, NC 27658 8000,Gallon Pump Tau* Phone (919) 876-8600 •wwwatayright.com Traffic Rated t- ``- I Req'd 20'-0„ 81.0 Knockout Lifters I n----------------'------==------------------------� I 1 - I 6' I o - I I I:•: I Ili•: I - I I:•: Knockout 8" x 84" Knockout . I I I:•i 72'" I I::• 10'-0„ 1 36" I I I•:: I I I --: I L--------------------------- -� --------- --------- 8„ 8" 0 Knockout - - Imprinted On Tank: SRTC. Vulcan V-1384 14,000 Gal Ring & Cover Date Of Mfg Brought To ,Grade B'y' Contractor .4 —6 x 8 —6. x 3 —6 Tall. Riser Shown 'On Separator Sheet „ „ „ Knockout, Lifters Knockout 12". (2) 8°4i Wt.= 43,000 Lbs 33" Knockout 1-1 /2"0 Butyl Rubber 100 Sealant In Joint With 6" Lifters n Band Of Nonshrink Grout 112" 54 i ;f+orc Wt.= 29,000 Lbs r P u m aTa n k\Ta raG-14000q pt �1 33 ,. Wt.= 43,000 Lbs 8„ Tara Group Gray's Creek Elementary., g School - Fayetteville, NC 58 14,000 Gallon Dosmg Tank Q0m Traffic' Rated om - 2 Req'd 61' 81-61. 61. 6° r--------------=---=-=----- -----� I o o I I I' I I I- I I _ I 1' I .4' _ 6,. I I I I I I 6 4"0 Halliday S2R3684 Lifters Access Door Cast In .Top 6 Tara Group . Riser\45x85x35_S2R3684 ., REINFORCEMENT: #4 :0, 6" OCEW G ay's Creek Elementary CONCRETE:, 4000 PSI @ 28 DAYS School - Fayetteville, NC P.O. Box 58659 4'-6" x 8'-6" x.3'-6" Tall Riser Sta Ri ht Raleigh; NC 27658 Phone (919) 876-860.0 For 8000 Gal & 14,000 Gal pre 4idt, �%. wwwsrayright.com Pump � Tank _ AffO MEMBER P.O. BOX 58659 / RALEIGH, NORTH CAROLINA 27658 / PHONE (919) 876-8600 SETTING & SEALING INSTRUCTIONS FOR: Grease Traps, Oil Interceptors, Septic Tanks and Pump Chambers l . Prepare a hole large enough to accommodate the outside dimensions of the unit. A firm level base should be provided to receive .the unit. It should be capable of with- standing the weight of the unit. Its contents and the load applied onto it. 2. If baffle has not been installed at the factory do so at this time. The baffle fits in the slots provided on each side of the unit.. 3. Apply Butyl Rubber Sealant to a clean joint and then place top on unit.. 4. IMPORTANT: Seal all joints, and around baffles with grout. By sealing these you prevent the liquid contents from escaping the containing unit. _ We recommend that the interior and exterior joints be sealed with a 6" wide band of grout. We also . recommend a non -shrink hydraulic grout. (IE: Dam -it, Waterplug, Speedplug or equal.) 5. -For Grease and Oil Interceptors we recommendinstalling a tee a minimum of 50% of the liquid 'depth of the tank on the inlet and outlet ends. On septic .tanks the tee should extend 25% o of the liquid depth of the unit. On some units the tees may vary depending on the Engineer or Owner. 6. Always prime a grease or oil interceptor with water prior to use. This prevents oil or grease from escaping down the outlet as the unit is being filled for the first time or refilled after cleaning. Enough water should be used to bring -the water level above the bottom of the outlet tee. 7. If you have any questions or problems please contact our office prior to the unit being put into service. Phone: 919-876-8600 or 1-800-768-8265 for assistance. Thanks for. allowing Stay -Right Tank Co., Inc. to be your Precast Concrete Source... 4� 0 4• Req'd 6" 12.'-0" 6" 8" High x 132" Wide Knockout Panel - , f t----------------------------------------------- J 6rr -------- --------- " I - I - I .. I 4".0Drain Hole I F:77'. rr 3'-0„ i -� 6 r 8" High -x 132" Wide Knockout, Panel Halliday S2R3084 Access Door . With Locking Post Hinged On 1 Side Cast In Top f 6.r (2)-132rr Knockouts 3— Lifters ' 0" Y'--------------------------------------- ----i I (2)-8" 'Knockouts I I 10..0 rr 4"0 Drain 2 r Hole Septic\TaraG-3x12x3 Tara Group REINFORCEMENT: #4- ® 6" OCEW Gra 's Creek Elemen-�% CONCRETE:' 4000 PSI @ 28 DAYS —+ School -Fayetteville, NC + P.O.3ox 58659 Stay-R/�►ht Raleigh. NC 27658 Y x .12' x Y-O" Deep) Phone (919) 876 ' 8600 tkW4aatr INC. www.stayright.com Pressure Manifold Vault DDCAT2 4/22/93.. PAGE' 8:: � Cl .LOCKING BAR HALUDAY PRODUCTS c —� SERIES S2R ACCESS DOOR HANDLE (STANDARD REGULAR) Z STANDARD FEATURES: �: w o • AUTO -LOCK STAINLESS STEEL HOLD OPEN ARMS 1/4" THICK DIAMOND o WITH RELEASE HANDLES PAT. ALUM: r U o • STAINLESS STEEL LIFTING HANDLE, HINGES AND , ATTACHING HARDWARE. COVER PLA u u x R • x • NON -CORROSIVE LOCKING BAR • DOUBLE LEAF CONSTRUCTION X. , • K.I. x� • 300 LBS. PER SQ. FT. LOAD RATING x x x x x x x x 0 10'YEAR GUARANTEE M 3" A OPENING 3" B OVERALL r PLAN SPECIFICATIONS _ THE S2R SERIES (DOUBLE LEAF) .ACCESS -FRAMES AND'COVERS AS. MANUFACTURED BY'HALLIDAY PRODUCTS, INC. OF ORLANDO. FLORIDA .SHALL HAVE A 1/4" THICK ONE—PIECE, MILL FINISH, EXTRUDED ALUMINUM FRAME, INCORPORATING A CONTINUOUS CONCRETE. ANCHOR. DOOR PANELS SHALL BE 1/4" ALUMINUM DIAMOND PLATE, REINFORCED TO WITHSTAND A LIVE LOAD OF 300 LBS. PSF." DOORS •° ` SHALL OPEN TO 90' AND.AUTOMATICALLY'LOCK WITH STAINLESS STEEL HOLD `is = PRIMER ASTRAGAL . -OPEN ARMS WITH ALUMINUM RELEASE HANDLES. DOORS SHALL CLOSE FLUSH WITH • ..ILAREQUIRED THE FRAME. LIFTING HANDLES, HINGES AND ALL FASTENING HARDWARE SHALL BE IA OPENING I STAINLESS STEEL., UNIT SHALL LOCK WITH A NON -CORROSIVE LOCKING BAR.' r. UNIT SHALL BE GUARANTEED AGAINST DEFECTS IN MATERIAL AND/OR WORKMANSHIP SECTION AA FOR.A'PERI00'OF 10 YEARS. —. STAINLESS STEEL " ["I�INGEV 00 I sl�E - itrg Lockla(s PosT HINGES W/ TAMPER- S. do ALUM. - PROOF FASTENERS -. MODEL -DIMENSIONS UNIT POSITIVE LOCKING HOLD OPEN ARM (COVER SHOWN 1N 1/4" NO. A B C D WT. OPEN POSITION) S2R4242 42" 48" 42" 48" 106 LBS: 1/4" .THICK. S2R4848 48" 54" 48" 54" 123 LBS. EXTRUDED S2R5448 ' 54" 60" 48" " 54 132 LBS: -' - _ ' • CONT. CONCRETE r ANCHOR ALUM. FRAME » » S2R7248 72" 78 48 54 164 LBS.'. 1/4" X 2" ALUM. PLATE REINF. (AS REQUIRED) S2R6060 60" 66" 60" 66" 171 °LBS. SECTION B=B SECTION C-C S2R3to84 30 42" $4" 90" 52 R3o84 3o" 84" got, l r - 6" 4'-0„ 6" 6". 7" i - --n -----=—R-- — „ I I 7 1 I •sI• f — - 1. F 8 La 11 -Ll I fF _ • 7" I I 7', I o o I . L--------------------- , 6" Halliday W1 R3030 Access Door. Cast In Top Drain To Inside Lift e rs :e 6„ O 1"0 Butyl Rubber Sealant In Joint 0 4'-0„ ' Steps (3)-6"0 (3)-6,, ' Lifters - - 1 y! 6', .r. i Vault\Ta ra G-4x4x4 REINFORCEMENT: #4 ® ,6" OCEW Tara Group 'SI ®28 DAYS : Gray"s Creek Elementary P.o. Box 58659 School - Fayetteville, NC Raleigh, NC 27658 y . Phone (919) 876-8600 4' x 4' x 4' Valve Vault llrG, www.stayright.com I Req'd 6" 6„ 6„ . 6 i 6"0� - 4„ 4 6"0 0 4" 6"0 I Vault\TaraG-4x4x4 i L_ 6 6 0 ►--.. 4 4'-0... r, L_ 4" is 6"0 i 4". 6,3 Halliday W1 R3030 Access Door Cast In Top ' Drain To Inside Lifters 6" o 1 "0 Butyl Rubber Sealant In Joint Steps (4)-6"0 (4)-6"0 Liftef•s . e . Tara Group Ciray's Creek, -Elementary School - Fayetteville, NC 4' Valve'Vault o*-- ' MEMBEfl P.O. BOX 58659 / RALEIGH, NORTH CAROLINA 27658 / PHONE (919) 876-8600 RECOMMENDATIONS'FOR SETTING OF PRECAST MANHOLES AND HANDHOLES -.Tiie'- contractor shall prepare -a hole. -large enough to accommodate the outside dimensions of the unit. The base shall be level and compacted sufficiently to support the weight of the manhole and the load applied. - upon it. The contractor is responsible for access to and from the excavation. Trucks must bey able to travel to and from the excavation under their own power. (No ,pushing or. pulling): Labor to assist in setting is to be supplied by the contractor. Sealant used between joints of the units should be used as directed by the sealant manufacturer. Certain large items require thru-wall lifting devices. After setting the contractor is responsible for,'removing and returning these devices. The'thru=.wall holes should then be grouted watertight with Hydraulic Non -Shrink Grout or Avanti Chemical Grout. For assistance call us @ 1-800-768-8265. F LOCKING BAR L Cl 11 . HFTING ANDLE La �I I 1/4" THICKDIAMOII i'COVER PLATE nn0 �I x Lem��I Bj Aj n 3 3%4" A OPENING 3 3/4" M B OVERALL PLAN S.ST.. do ALUM. POSITIVE LOCKING . HOLD OPEN ARM DRAINPIPE BY OTHERS PRIMER REQUIRED �--- A OPENING ----� SECTION A -A - STAINLESS STEEL HINGES W/ TAMPER PROOF FASTENERS (COVER SHOWN IN OPEN POSITION) CONT. CONCRETE ANCHOR WTSCAT 6/1/93 PAGE 5 HALLIDAY PRODUCTS SERIES W1R ACCESS DOOR -(WATERTIGHT REGULAR) STANDARD FEATURES: • AUTO —LOCK STAINLESS STEEL HOLD OPEN ARM WITH RELEASE HANDLE • STAINLESS STEEL LIFTING HANDLE, HINGES -AND ATTACHING, HARDWARE • NON —CORROSIVE LOCKING BAR • CHANNEL FRAME • SINGLE LEAF CONSTRUCTION 300 LBS. PER SQ. FT. LOAD RATING • 10 YEAR GUARANTEE SPECIFICATIONS THE W1R SERIES (SINGLE LEAF) ACCESS -FRAMES AND COVERS AS MANUFACTURED BY HALLIDAY PRODUCTS, INC. OF ORLANDO, FLORIDA SHALL HAVE A 1/4- THICK ONE-PIECE. MILL FINISH, EXTRUDED ALUMINUM CHANNEL FRAME. INCORPORATING A CONTINUOUS CONCRETE ANCHOR. A 1 1/2" DRAINAGE COUPLING SHALL BE LOCATED IN THE FRONT LEFT CORNER OF THE CHANNEL FRAME. DOOR PANEL SHALL BE 1/4" ALUMINUM DIAMOND PLATE; REINFORCED -TO WITHSTAND A LIVE LOAD OF 300 LBS. PSF. DOOR SHALL OPEN TO 90- AND AUTOMATICALLY LOCK WITH A STAINLESS STEEL HOLD OPEN ARM NTH AN ALUMINUM RELEASE HANDLE. DOOR SHALL CLOSE FLUSH NTH THE FRAME. LIFTING HANDLE, HINGES AND ALL FASTENING HARDWARE SHALL BE STAINLESS, STEEL. UNIT SHALL LOCK WITH A: NON -CORROSIVE LOCKING BAR. UNIT SHALL BE GUARANTEED AGAINST DEFECTS IN MATERIAL AND/OR WORKMANSHIP FOR. A PERIOD OF 10 YEARS. 1/4" THICK EXTRUDED ALUM. FRAME .ALUM. PLATE 1 1 /2" ALUM. REINF. (AS',"REQUIRED) COUPLING -SECTION C-C N 0 1/4" k Y MODEL NO. A DIMENSIONS_ B C . D UNIT' WT. W1R2424 24" 31 1/2" 24" 31 1/2" 60 LBS. W1R3030 30" 37 1/2" 30" 37 1/2" 71 LBS. W1R3636 36" 43 1/2" 36" 43 1/2" 87 LBS. W1R3048 30" 37 1/2" 48" 55 1/2" 94 LBS. WIR3648 36" 43 1/2" 48" 55 1/2" 106 LBS'. _ 7 _ L4 j .o;.... as 44'� 4 SECTIO'N—A g .4 9COO.: • Q:qA p�"4Q,A•d :4.Q94, � . . Q�oQ..o0 ICY.,PSI—PF ::9a p:.�A¢a • �a�;: Manhole Step o~° M.A. Industries Inca kelly & dividend dr.'. • peachtree . city ga. _ 30269 tz. 2-1.84 -Technical Data Flexible Butyl Resin Sealant CONCRETE SEALANTS CS-102 & CS-202 -ER11GAL &*FflP*5IT1an Spec Required CS-102 CS-202 Hydrocarbon plastic content % by weight ,ASTM D4 (mod.) 50-70 50.8 51.2 ,Inert mineral filler % by weight SS-S-210A 30-50' 49.2 48.8 Volatile Matter % by weight ASTM D6 3.0 max. 1.2 1.2 Specific Gravity, 770F ASTM D71 ' 1.20-1.35. _ 1.35 1:34 Duotility,,77°F ASTM- D113 5.0 min. 10 12 Softening point, ring and ball OF ASTM D36 320 min. 390+ 335.+ Penetration, cone 77°F, 150 gm. 5.sec: ASTM D217 50-120 mm 105 mm 114 mm . Flash point, C.O.C., OF- ASTM D92 600 min. 6300 6300 Fire point, C.O.C.,. OF ASTMD92 625 min. -6300 6300 -30-Day Immersion: No visible deterioration when tested for 30 days in 5%- caustic potash, 5% Hydrochloric Acid, 5% Sulphuric Acid, or 5% saturated Hydrogen Sulfide. Laboratory -certified test data available upon request Review the CHEMICAL COMPOSITION and PHYSICAL. PROPERTIES listed above and on the front side of this sheet to determine which sealant, CS-102 or CS-202, is more desirable for the project. Note that the installation ambient temperature .will be the major deciding factor._ Then specify as: follows: The flexible plastic gasket shall be equal to the flexible butyl resin sealant CONSEAL CS-102 or CS-202'as manufactured by Concrete 'Sealants,'[nc. of New Carlisle, Ohio, and shall conform,to. Federal Specification SS-S-210A and AASHTO M-198I3. Clean surface. VERTICAL JOINTS ON ROUND, ELLIPTICAL, OR ARCHED PIPE, OR BOX CULVERTS. ' SPIGOT, BELL ' Apply CONSEAL on upper 1800 of spigot and lower 1800 of bell. Allow sufficient overlap Of CONSEAL to form a joined seal. HORIZONTAL JOINTS Apply CONSEAL all around Butt at -joint, spigot. I LIMITED WARRANTY The following limited warranty applies to our, products and is in lieu of all warranties of merchantability, fitness for purpose, or other warranties, express or implied: namely, that the product will be free of defects in workmanship or material, shall expire one year from the date of 'shipment and our limit of liability shall consist of making available a replacement product. As we have no control of conditions under which this product may be used, -or the methods of application thereof, users should test the Product for their requirements. _ CONCRETE SEALANTS INC. 8917 S. Palmer Road P.O. Box 176 New Carlisle, Ohio 45344 Telephone:: (513) 845.8776, FAX: (513) 845.3587 Arr iate iun Mite IN ipe - ASsoCiation Mr.n— Print—i in I MA State -of North Carolina Department_ of. Environment If �17`A and. Natural Resources" 1 • Division -of Environmental Health, James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Linda C. "Sewall; Director -NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES April 1, 1999 Mr. Lacy Williams, Jr. Environmental Health Director Cumberland County Health Department .1 227 Fountainhead Lane Fayetteville, North. Carolina 27954 Courier 14-59-32 Subj: Approval of Revised Plans, Specifications and System Operation and Maintenance Plan received for: Gray's Creek Elementary School Wastewater Disposal System, Alderman Road, Cumberland County, NC, OSWS Project No: 98-34 Ref.: a.) Ltr dtd March 31,1999 from DWQ/GWS to OSWS re: GWS.review of -the subject facility (attached). Dear Lacy, r We have reviewed the.,revised plans, specifications and other.materials received from March 17 through March 31,.1999 for the subsurface system to sen-e-the'above-referenced facility. We have also" received review comments from our Regional Soil Scientist and the Groundwater Section of the Division of Water Quality which confirm the suitability of the proposed site soils and hydrology. It appears that all of our previous technical comments have been adequately addressed by the proposed'revisions. Enclosed are one copy of the plans and one copy -of the project specifications (including the System Operation and Maintenance Plan), each stamped "Approved.by the On -Site Wastewater Section," Division of Environmental Health, Department'of Environment and Natural Resources." The Improvement Permit and Authorization to Construct to be issued for. this project must include the approved plans, specifications, System Operation and Maintenance Plan, legal -documents andd"any other conditions deemed appropriate by'the health department. The approved plans and specifications are: for the following facilities and system `'components: Facilities: New 950-student elementary school with water conservation (low -flow) plumbing fixtures having a cafeteria but no gymnasium. System: The -proposed system will include two waste streams (domestic -only and kitchen -only) discharging into a common 12,000-gallon septic tank"via gravity sewer. The domestic waste stream will discharge directly into the septic tank while the kitchen wastestream will include two grease traps with a combined liquid capacity of 7,000 gallons. The septic tank flow is discharged into a 14,000=gallon flow- equalization tank_ which will dose a three -celled recirculating sand filter. Sand filter effluent will underdrain and gravity ON -SITE WASTEWATER SECTION P.O. Box 29694, Raleigh, North Carolina 27626-0594 Telephone 919-73.3-2895 FAX 919-715-3227 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper �dray's Creek Elementary School April1, 1999 Page 2 of 6 f, feed to a -flow dividen with an initial recirculation ratio of 3:1. Recirculating flow willbe returned,to the `flow equalization tank and redosed to the sand filter: Disposal flow wastewater will be,sent to a 8;000 gallon final 'dosing pump tank valve vault, four Sch 40 PVC "force mains and hence to four pressure . manifolds... The shortest fo ce.main (approximately 2.73 ft) will be 14n while .the -other three force mains will be 4-in.. Final disposal is through four conventional; drainfields.(4-in:comigatedPE pipe, total length of 8,000 linear ft) with 10 200-ft drainlines per.drainfield. Drainfield sizing is based at an areal loading rate of 0.30 gdlons.per-day per square foot`(gpd/W). Design Flow: 'A flow reduction •was°granted based on the use,of low -flow plumbing fixtures and 247hour per day flow equalization over six days. Based on a. daily student population of950, the unreduced design flow for this system is 11,400 gallons per day, (gpd),for pretreatment component sizing. The reduced flow is 8,550' gpd for sizing of the drainfields. System classification: ,Vb, requiring monthly inspection by the ORC with .'semi=annual inspection reports . submitted to the local health department and yearly inspection by your department If is critical that the Health Department require a preconstruction meeting be held prior to system . installation: This meeting must be attended by representatives -of the-Healtli Department, owner, installer, and the engineer certifying the installation. During this, meeting, the sequencing of project construction, inspection;.and testing activities must be discussed'andclearly understood by all parties. Holding'such a " preconstruction meeting must be listed. as:a condition in the Authorization to Construct, with attendance required by all key parties prior to the onset of the system installation. It is noted that this meeting has been included in the project specifications. As you are aware; there are a number of times during the installation of this system when direct supenlsionbv the' health department must be'proNided to insure that this"system is installed properly. For this project; make certain that: 1. Facilities 'are provided in strict accordance with this approval, the approved plans' and specifications and facility plumbing is correct including the sewage/septic tank lines. All plumbing fixtures must be . cimthe spefi'odels.• HVAC clear water dischargesmay not be plumbed into the sanitary -sewage system. " 2. ..Collection system is pim4ded in strict accordance with the approved plans, specifications and profile drawings; including pipe sizes and materials, as --indicated; invert elevations, minimum depths' of burial, locations of properly=constructed cleanouts. Allsewer lines and-cleanouts.rriust be tested for. watertightness,, as specified. Ensurelhat the, grease traps are plumbed to receive only food service . related wastewater from the kitchen 3 ' Tanka� is provided, installed and leakage tested in strict: accordance with the approved plans and specifications'including properly constructed. state -approved tanks, as indicated; watertightness provisionsincluding •specified pipe penetrations, additional waterproofing, and drainage provisions to divert surface water from the tanks and their access openings._Ensure that access'openings'are' Gray's Creek Elementary School April 1, 1999 Page 3 of 6 provided as shown and that openings are,modified or.provided as shown and determined to be fully accessible and functional from the ground surface without requiring entrance into any basins. Ensure, that all tanks are determined to be fully watertight and infiltration -resistant per the watertightness test specified. Do not accept any tanks that have had holes cast into them below the working liquid level, whether patched or not. t Ensure that the septic tank, recirculation tank and final dosing tank are properly constructed and located in accordance with approved plans, paying strict attention to specified invert elevations. Tanks must include all specified components, including risers and access. manholes located where specified and constructed in a watertight fashion, and effluent filters- installed at the outlet of the septic tank in accordance with manufacturer's specifications. Filters must be demonstrated to be readily accessible from above grade without requiring entrance into the tank. Pump tanks must include allspecified pumps and components, with all hardware of stainless steel or comparable corrosion resistance material. Ensure that all appurtenances, (e.g., floats and float support mechanisms; valves, etc.) are provided as shown and specified, including the use of corrosion -resistant stainless steel and PVC where indicated. Level control floats must be readily accessible from above grade and installed at specified activation elevations. Control panels are to be installed directly adjacent to each pump tank in NEMA 4X enclosures with wires conveyed from pumps and'controls through conduit installed in the. riser with no junctions permitted. Wire conduits must be watertight and gastight, yet still enable floats or pumps to be changed without requiring entrance into the tank. 4. Recirculatins sand filter must be constructed in strict accordance with approved plans and, specification, including location and invertelevations, all materials,'underdrainage and distribution network piping and pipe connections, and all cleanouts and observation ports as indicated on approved plans. Filter must be demonstrated to be watertight by specified leakage test prior to completion. The flow sputter mechanism must be installed in strict accordance with approved plans at the specified relative invert elevation, and demonstrated to give specified 3:1 split in filter return flow between the recirculation tank and the final dosing tank. As part of system startup, all.lateral lines must be flushed out with -fresh water and pressure properly adjusted to each filter. The pump delivery rate to each filter must be measured and determined to be in accordance with design specifications, The final timer setting must "beset to yield specified number of doses and dose volume per approved plans. 5. Dosing s stems tems are provided in strict accordance with the approved plans and specifications, including pumps, controls, float support systems, float settings, valves, controls inside of the NEMA 4X enclosure, and the audible and visible alarm systems., Ensure that no electrical connections are, made inside of the basin and that the system is fully tested prior, to start-up. All dosing system appurtenances must be manually checked and controls must be tested for proper automatic operation. -The dosing ,system must be demonstrated to effectively allow for design dosing number of counts and volume per dose to be delivered to the drainfield. Level'control floats must also Gray's Creek Elementary School April 1, 1999 Page 4 of 6 be set to activate at levels indicated on approved plans. The autodialer system should also be tested and ensured.to be properly functioning. Force mains are provided in strict accordance with approved plans and specifications, including pipe sizes, materials, separation distances/crossing details and installation depths. Ensure that the pressure tests for watertightness are executed in accordance with the approved specifications. Check the pressurized effluent supply line installation and testing for compliance .with the approved plans, including depths of burial, pipe invert elevations, hydrostatic leakage test passage and pipe sizes and materials. 7. Pressure Manifolds must be installed in strict accordance.,with- approved plans and specifications, including: appropriate elevations, materials and components specified, specified method of tapping, manifold and tap sizes and materials, use of true -union ball valves for each tap, inspection port on each supply line, pressure adjustment gate. valves immediately prior to each manifold, connection details, - manifold vault and cover as indicated. It must be demonstrated that the manifolds do not leak when dosed. Testing of the system for proper operation must also include measurement and setting of the pressure head delivered to each of the pressure manifolds, measurement of the pumping rate at the stabilized pressure head and final adjustment of:timer settings, as per design. 8. Conventional ground absorption diainfield laterals are provided in accordance with the approved plans and specifications including: field placement, trenches installed level at specified trench depths and parallel to the natural ground contour without requiring the use of stepdowns, final trench bottom and relative lateral invert elevations, stone size and characteristics, manifold feeder lines -to -lateral connections, orifices of the sizes, spacing,,and orientation indicated; trench width and depth and drairifield layout, as shown. 'The applicant's engineer must ensure that field layout elevations correspond to design elevations (final trench bottom and relative lateral invert elevations). Ensure that surface water diversions are provided in accordance with the plans and that measures for establishing an adequate vegetative cover are implemented, as specified. Ensure that site preparation procedures are conducted with negligible damage to the primaryand repair drainfield areas.. Start-ua procedures are properly conducted including all specified testing and necessary final landscaping provisions. Ensure that all lines have been flushed, e.g., collection sewer and supply lines, LPP in recirculating sand filter, force mains and pressure manifolds: Lift station,, recirculating sand filter and final dosing system testing and adjustment must be completed including setting of design pressure head and measurement of the initial pump delivery rates. Also ensure that flow splitting of the recirculation flow is achieved as designed, i.e.; three parts to recirculation tank and one part to the final dosing tank. Testing of the system for proper operation must also include measurement and setting of the pressure head delivered to each of the pressure manifolds and the measurement of the pumping rate at the stabilized pressure head, as per design. The pump delivery rate to each pressure manifold must be determined to be in accordance with design specifications. The final dosing timer setting must be set to yield the specified number of doses and,dose volumes per approved plans. Gray's Creek Elementary. School April 1, 1999 Page 5 of 6 10. Operation and Maintenance (0&M): The operation permit must include, as conditions, the O&M procedures included in the approved System 0&M Plan: It shall also include the necessary information regarding the proposed management entity and certified operator as well as any additional concerns deemed appropriate by the health department for the 0&M of this system. A certified subsurface system operator shall be contracted to operate the subsurface system. The operator shall inspect the system and report findings to the health department quarterly. The health department shall review/inspect system operation -semiannually. 0&M procedures listed in the operation permit shall include that during each operator visit, flow at the facility must be monitored and recorded, and the pump elapsed time and cycle counter readings shall be recorded. At least semiannually, the ORC must measure and set the pressure head and the pump delivery rate. 11. Pretreatment monitoring requirements: Septic tank and sand filter effluent must be monitored monthly for the first full year -of system operation. If warranted, modifications to the sampling, i.e.',-'reducing monitoring requirements to bimonthly during the school year, may be requested by the applicant, based on the results of the first year's sampling (observed concentration.) Samples must be collected in . accordance with state -approved sampling protocols, analyzed by a state -certified laboratory and results included in the operator's reports. Sampling parameters, sample collection locations and water quality limits requirements are detailed in the table below. Sampling Parameter Septic Tank Effluent Limit Sand Filter Effluent Limit BOD, 200 m f 10 mo/ Total Suspended Solids 100 m f 10 ms/f Oil and Grease 50 mg/2 Ammonia Nitrogen 10 m f as N Total Nitrogen Sample 40% reduction from septic tank effluent 2warranted, modifications to the effluent sampling may be requested by the applicant, based on the results of the first year's sampling (observed concentrations). 12. Groundwater monitoring requirements per the recommendations.of the Division of Water Quality,, Groundwater Section detailed in the attached reference are appropriately addressed in the operation permit.' The locations of the two monitoring wells which must be installed are indicated.per pen changes on the plans made with the concurrence of -the applicant's engineer on March 31, 1999. Groundwater monitoring shall be conducted as detailed in the reference. Groundwater elevations in the monitoring wells shall. also be measured semimonthly. Ensure that a regional representative of the Division of Water Quality, Groundwater Section has inspected and approved .the placement'of the required groundwater monitoring wells prior to the issuance of an operation permit. An initial sampling of these wells must be conducted to establish background levels of the groundwater prior to the commencement of effluent discharge. Gray's Creek Elementary School ; April 1, 1999 Page 6 of 6 ; 13. Repair area: The repair area identified for this project and access thereto must be maintained and kept available for future repair. No construction on or utilization of this area is permitted. Note that a registered professional engineer must certify that the system has been installed in accordance with the'approved plans and specifications. This certification'is based upon periodic observations of construction and a fmal inspection for design compliance by'the certifying engineer or his representative. The installation must be approved by the health department prior to the issuance of an operation permit. Please contact us for assistance with the final inspection after your staff and the installation -certifying engineer are satisfied that the .system has been properly installed and before an operation permit is issued. Also feel free to contact us if you have any questions pertaining to this letter or if we may be of further assistance with this project. We may be reached at the telephone and facsimile numbers or address listed on this letterhead. I can be contacted directly at (919) 715; 3270 or by email at robin_godshall@maiL ehnr.state:nc. us. Sincerely, Aw RN. Godshall Environmental Engineer II On -Site Wastewater Engineering RNG/mg cc:. Tim Kirilaw Mike Koonce David McCloy April 1, 1999 PROJECT CHRONOLOGY Project Name: Gray's Creek Elementary School Review Engineer: RNG Project Number: 98-34 Design Flow: 8,550 gpd (R) County: Cumberland Status: APR Date Action/Activity/Notes 080717 IT80815 Received flow reduction request with water use data and flow calculations from Cumberland ' County Health Department (CCHD). Also received LSS report and initial- site survey maps. Assigned'to Doc Godshall for.review. Date approximate. 980909-26 Started review of received, materials, i e., design flow confirmation (DCF). Had various telephone conversations with Will Buie, Hobbs Upchurch & Assoc., the applicant's engineer," regarding additional information required for DCF. (35) 980928 Letter to CCHD requesting additional information for design flow confirmation. Outlined OSWS . requirements for flow and conditions for OSWS to approve DCF: (12) 981002 Received copy of ltr from Tim Kinlaw to William Buie regarding additional information for design flow confirmation. (4) 981013 Received copy of ltr from Will Buie to CCHD regarding additional infdrmation for design flow 981015 confirmation. (9) Telcon w/ Will Buie. Clarified what information was still needed for design flow confirmation. (2) . 981116 Telcon with Mike Koonce, Hobbs Upchurch & Assoc.. He's the new engineer since Will Buie has left the company. Wanted know exactly what he needs to do and submit for DCF. 981120 Rec'd fax from Mike K. with addition flow/water usage data. Telcon with Mike K.; Discussed OSWS review procedures and data requirements as well as project 98.1209, 10, 18, 21 timing. Also had Teri h " discussions regarding ro osed system design issues and DCF. Telcons with Tim Kinlaw; Discussed OSWS review procedures and data requirements as well as 981215-18 project timing and status. 990126 , Telcon with Mike K.; design questions. 990210-11 Telcons with Tim Kinlaw; Discussed OSWS review procedures and project status. Telcon with Danny Soles, CCHD; project status. 990210 Meeting with Mike K.; - Mike came by originally intending to submit the plans. We instead decided to do a brief pre - design conference. - I explained to Mike that the proposed gravity -dosed sand filter would not work and that the sand " filter should be pressure dosed. revision needed, Mike decided not to submit the."plans. Rather, he took - Given the amount of plan them back to his, office for correction and later submittal. - I gave Mike a copy of our latest Rules, the sand filter design criteria (innovative approval), the sand filter design protocol -and some engineering design calculations sheets. 990211-12 Telcon with Mike K.; desi n. uestions. 990217-9 Telcon with Mike K.; Lengthy discussions regarding sand filter design. Telcon with Mike K.; project status. 990222-23 Telcons with Kelly Derr; proJ ect status. 990302 Telcon with Mike K.; Final questions about design issues. Received full engineering plans; proposed on -site wastewater system plans as well as building, i 990304 plumbing, mechanical and electrical. Mike K. hand delivered. Telcon with Danny Soles, CCHD; project status. 6 Page 1, of 3 April 1; 1999 PROJECT CHRONOLOGY 990305 Telcon w/ Tim Kinlaw; project status. Advised him that Mike K. had hand delivered full engineering plans on 990304. He told me that there was trouble brewing,' - The school board, "based on the original schedule given to them by Will Buie, had given their building contractor the go-ahead to start construction (on or about Feb 1") since they had evidently received a grading permit from the county Building personnel. The contractor has completed all the work he can without actually starting construction. Without approved on -site; plans, they can't get a Building Permit and hence the contractor is in a "hold" mode. - Tim asked there were any way that they could get a permit to start building at their own risk. I informed him that there are no mechanisms to allow for provisional construction starts. - Tim said he fully expects this situation to wind up in court since the contractor has already threatened to sue for damages (lost time). The School Board will in turn probably seek damages from Hobbs, Upchurch & Associates. - Tim said the School system was aware that when they gave the contractor permission to start ave a building construction (grading only), they knew it was at their own risk since they didn't have. permit. However, they decided to go ahead anyway since they really want the school to be open in the fall ofthis year (1999). - Tim also mentioned that he thought political pressure might be brought to bear given that the delays are going to cost someone some money. He didn't at this time have any intention of contacting his representatives, but he wouldn't be surprised if someone on the School Board who was politically connected did. I informed Tim that.while it is the right of every NC citizen to contact their legislator, it actually slows down our review process since we have to respond in writing. - Tim would have to detail the project status at the School Board meeting scheduled for March 9, 1999. 990310 Updated the project chronology in response to legislative inquiry from Senator Rand. Telcon with Mike K.; confirmed project status and key dates. 990311 Telcon w/ Richard Rogers, Legislative Liaison. Briefed him on project status so he could brief Senator Rand. Arranged design conference with Mike K. 990312 Design conference with Mike K.; review results of full engineering review. Detailed several show stoppers. See Review letter. 990315 • Detailed telephone conversation w/ Stephen Price, the applicant's soil scientist; told him what was still required at the site for soils evaluation. He told me he had already done the work and that we should already have the final report., 990317 Ltr to CCHD re: Design conference with Mike K.; Received ievised.en ineerin .. lans, hand delivered b Mike K." 990319 Received fax of final soils'reported; NOTE: Report is dated March 19, 1999. Therefore, Price had not yet apparently delivered this report to Mike, his client, CCHD or OSWS. David McCloy, visited the site. with Danny Soles, CCHD,;to review the soils work and the drainfield staking. 990322 Telcon with Lacy Williams, CCHD; gave him review status report David McCloy, Danny Soles. and Mike K on site to review.soils work and drainheld staking. Reviewed final soils report: while 'report contains assessment of hydraulic conductivities, it is incomplete. We still need mounding and lateral flow analyses. - 990323 Conversation w/ David in Raleigh; he and Soles are satisfied with the site soils and hydrology; McCloy delivered written site comments. Proceeding with, engineering review. 990325 Proceeding with engineering review: Gave Dave Goodrich copy of final soils report. Telcon w/ Stephen Price; told him what we need for mounding and lateral flow analyses. Price said he thought he could get materials to us on Monday or Tuesday of next week (3/29 or 30). page 2 of 3 April 1, 1999 PROJECT CHRONOLOGY 990326 Mtg w/ Mike; gave some additional final comments particularly on pump design and system O&M. Drafting project APPROVAL ltr in preparation for receipt of final plans andspecs. 990329. Mike hand delivered latest edition of plans. Completed engineering review; minor pen changes to plans. Mike sent me corrected pump'spec sheets. Still awaiting submittal from Stephen Price, the'applicant's soils consultant. 990330 Rec'd final hydraulic and modeling report/information from Stephen Price; forwarded two copies to GWS after reviewing. Also forwarded a copy of the latest plans. Conversation with David Goodrich; he's awaiting comments from the GWS Regional Office before sending us the GWS comments. 990331 Coordinated GWS field review of site and pushed for GWS comments. 990401 Rec'd GWS comments; APPROVED plans and specifications; notified concerned parties. page 3 of 3 L \r� April 1,1999, 3:12 PM , INTERNAL MEMORANDUM { TO: Rachel Groff FROM: Robin Godshall, Project Review Engineer SUBJECT: , Project Work Request Please perform the following work tasks with respect to the attached project: y. ® Prepare/Update Tracking Database Entry, including; ® OSWS Project No.: 98-34 — ® Project Name: Gray's Creek Elementar,School — ® County: Cumberland . — ® Date Received: March 4 1998 ® Review Type: NPS — ® Status: ARR — ® Review Eng.: RNG — ® ® Facility -Type: S - 4 System Type: N/GT ST PT PM/C 67 S� — — ® Design,Flow: 11,400 gpd (8,550 gpd reduced) ® Applicant's name, address, phone and fax numbers from the project file ® Engineer'sname , fi; address, phone and fax numbers from the project file, — ® Soil Scientist name, firm, address, phone and fax numbers from the project file — ❑ Prepare file folder / ® Prepare/Update card file (if not already done) — ® Send' cc of plans/specifications/documents with appropriate memo to: . ® Regional Soil Scientist David McCloy — ® Bob Cheek, Groundwater Section: �— ® Blue, yellow and file copies are also required. ) ® Distribution: ® Send original via Courier to: ® . fax to: Local Health Department: Lacy Williams ® Send one copy to: N fax to: Regional Soil Scientist David McCloy ® Send one copy to: ® fax to: Applicant Tim Kinlaw ® Send one, copy to: ® fax to: Applicant's Engineer Mike Koonce ❑ Send one copy to: ® fax to: Applicant's Soil Scientist Steve Price ® Send one copy to: Groundwater Section Review Engineer: Bob Cheek ® One copy to file (Please, two -hole punch at top and place in right side file) ® One copy to Doe/ Ishwar / Steven < Special Instructions/Information: - I've already sent the faxes. - The original of.the Groundwater Section letter stays with us, i.e., attached to our copy in the project file. - Please call Cumberland Co.Schools and make sure Tim Kinlaw got his fax copy. If not, refax until he gets itl I I t If you have any questions, please call me. N.C. Department of Environment and Natural Resources Division of Environmental Health Project No 98-34 PLAN REVIEW LOG Project Name Gray's Creek Elementary School County Cumberland Applicant: Tim Kinlaw, Cumberland County Schools, Post Office Box 2357, Fayetteville, North Carolina 28302, Phone: 910-678-2300, Fax: 910-678-2330 Location: Alderman Road, Cumberland County, NC Erigineer/Designer: , P.E., Hobbs, Upchurch, & Associates, P.A., Post Office Box 1737, Southern Pines, North arolina 28387, Phone: 910-692-5616, Fax: 910-692-4795. Facility(ies) : SCH y��! System: k� iL�v�Ge IV'� � , Design Flow: 14,250 gpd (7,600-gpd reduced) Dates Received(N-New, R=Revision): Dates Reviewed: 9/28/98 7/7/98(N) Reviewed By: RNG } March 26, '1999 a PROJECT CHRONOLOGY Project Name: Gray's Creek Elementary School Review Engineer: RNG Project Number: , 98-34 Design Flow: 7,600 gpd (R) County:.. Cumberland Status: ASN ate Action/Activi � /Notes 717 f80 Received flow reduction request with_water use data and flow calculations from.Cumberland County Health Department (CCHD). Also received LSS report and initial site survey maps. 815 Assigned to Doc Godshall for -review. Date approximate. 980909-26 Started review ofreceived materials, i.e., design flow confirmation (DCF). Had various telephone . conversations with Will Buie,.Hobbs Upchurch & Assoc., the applicant's engineer, regarding additional information required for DCF: (35) 980928 Letter to CCHD requesting additional information for design flow confirmation. Outlined OSWS requirements for flow and conditions for OSWS to. ap rove-DCF. (12) 981002 Received copy of ltr.from Tim Kinlaw to William Buie regarding additional information for design flow confirmation. (4) i 981013 Received,copy of ltr from Will Buie to CCHD regarding additional information for design flow confirmation. (9).. 981015 Telcon w/ Will Buie. Clarified what information was still.needed for design flow confirmation. (2) 981116 Telcon with Mike Koonce,_ Hobbs Upchurch-& Assoc.. He's .the new engineer since Will Buie has left the company. Wanted know exactly what he needs to do and submit for DCF. 981120 Rec'd fax from Mike K. with addition flow/water usage data. 981209, Telcon with Mike K.;. Discussed,OSWS review procedures and data requirements as well as project 10' 18, 21 timing. Also had lengthy discussions regarding proposed system design issues and DCF. 981215-18 Telcon with Tim Kinlaw; Discussed OSWS review procedures, and data requirements as well as ro' ect timing and status. 990126 Telcon with Mike, K.; design questions. 990210-11 Telcon with -Tim Kinlaw; Discussed OSWS review procedures andproject status. Telcon with Danny Soles, CCHD;.project status. 990210 Meeting with Mike K.; - Mike came by originally intending to submit the plans. We instead decided to do a brief pre - design conference. - I explained to Mike that the proposed gravity -dosed sand filter would not work and that the sand filter should be pressure, dosed. - Given the amount of plan revision needed, Mike decided not to submit the plans. Rather, he took them back to his office for correction and later submittal. - i gave Mike a copy of our latest Rules, the sand filter design criteria (innovative approval), the . - sand filter design protocol and some engineering design calculations sheets. 990211-12 Telcon with Mike K.; design questions. % 990217-9 Telcon with Mike K.; Len 'discussions're ardin - sand filter design. Telcon with Mike K.; project status.. 990222-23 Telcon with Kelly Derr; project status. 990302 Telcon with Mike K.;,Final uestions about design issues. 990304 Received full engineering plans; proposed on -site wastewater system plans as well as building, plumbing, mechanical and electrical. Mike K. hand delivered. Telcon with Danny, Soles, CCHD; project status: Page 1 of 3, ' March 26, 1999 PROJECT CHRONOLOGY 990305 Telcon w/ Tim Kinlaw; project. status. Advised him that Mike K. had hand delivered full engineering plans on 990304.- He told me that there was trouble brewing; - The school board, based on the original schedule given to them by Will Buie, had given their building contractor the go-ahead to start construction (on or about Feb 1") since they had evidently received a grading permit- from the county. Building personnel. The contractor has completed all the work he can without, actually starting construction. Without approved on -site plans, they can't get a Building Permit and hence the contractor is in a "hold" mode. - Tim asked there were any way that they could get a permit to start building at their own risk. I informed him that there are no mechanisms to allow for provisional construction starts. - Tim said he fully, expects this situation to wind up in court since the contractor has already threatened to sue'for damages (lost time). The Schoot Board will in turn probably seek damages from Hobbs, Upchurch & Associates. Tim said the 'School system was'aware .that when they gave the contractor permission to start construction (grading only), they knew it was at their own risk since -they didn't have a building permit. However, they decided to go ahead anyway since they really want the school to be open in the fall of this year (1099). - 'Tim also mentioned that he thought political pressure might be brought to bear given that the delays- are going to cost someone some money. ! He didn't at this time have any intention of contacting his, representatives, but he wouldn't be- surprised if someone on the School Board who was politically connected did.. I informed Tim that while it is the right of every NC .citizen to contact their legislator, it actually slows down our review process since we have to respond in writing. - Tim would have to detail the project status at the School Board meeting scheduled for March 9, 1999. 990310 Updated the project- chronology in response to legislative inquiry from Senator Rand. Telcon with Mike K.; confirmed project status and key dates. 990311 Telcon w/ Richard Rogers, Legislative Liaison. Briefed him on'project status so he could brief Senator Rand., Arranged design conference with Mike K. 990312 Design conference with Mike K.; review results of full engineering review. Detailed several show stoppers. See Review letter. 990315 Detailed telephone conversation w/ Stephen Price, the applicant's soil scientist; told him what was still required at the site for soils evaluation. He told me he had already done the work and that.we should already have the finatreport. 990317 Ltr to CCHD re: Design conference with Mike K.; Received revised engineering lans, hand delivered by Mike K. 990319 Received fax of final soils reported; NOTE: Report is dated March 19, 1999,- Therefore, Price had not yet apparently delivered this report to Mike, his client, CCHD or OSWS. David McCloy visited the site with Danny Soles; CCHD, to review the soils work and the drainfield staking. 990322 Telcon with Lacy Williams, CCHD; gave him review,status report David McCloy; Danny Soles and Mike K on site to review soils work and drainfield' staking; Reviewed final soils report: while report contains assessment of hydraulic conductivities, it is incomplete-. We still'need mounding and lateral flow analyses. 990323 Conversation w/ David in Raleigh; he and Soles are satisfied with the site soils and hydrology, McClo delivered written site comments. Proceeding with engineering review. 990325 Proceeding with engineering. review. Gave Dave Goodrich copy of final soil's report. Telcon w/ Stephen Price; told him what we need for mounding and lateral flow analyses. Price said he thought he could get materials to us on Monday. or Tuesday of next week, (3/29 or 30). page 2 of 3 -�March 26, 1999 PROJECT CHRONOLOGY 990326 Mtg w/ Mike; gave some additional final comments particularly on pump design and system O&M. Drafting project APPROVAL ltr in preparation for receipt of final plans andspecs. i page 3 of 3 r S ujUALU W W LU LU xxx inaw 000 O O N pNq fV CIN N C4 C4 20 X iD r- y` x 7. /8 37i�0 63D i %?75 t B 5SD = 117 Project Name: Gray's Creek ES Project Number: 98-34 Total Dynamic Head Calculations t 0 \ Date: 990329 Design Pressure Head :::::.:::.:•.,,..: 97.00 .::.::::::v. 98.50 98.00 •:.:�>.,,,:• High point in FM 97.00 Pump -off level Pumping Rate 94:51 94.51 94.51 94.51 ;«} Sch 80 - Sch 80 <«: Sch 80 Discharge Piping: Pipe Material Pipe Size Nominal Diameter ' Pipe Length No. Check Valves Le No. Gate valves Le No. Ball valves Le No. 90 elbows Le. No.45-bends Le Cou ling/Str. Tee Le No.90-tees Le Total Equivelent Le Disharge Friction Head, . Sch 80 4" 4" 4." 4" 4.026 4.026 4.026 4.026 14.00 14.00 14.00 14.00 1 1 11 1 38.00 38.00 38.00 38.00 3 `' 3 3 3 2.70 2.70 2.70 2.70 0 0 0 0 2.00 2.00 .2.00 2.00 3 3 3 3 14.00 14.00 14.00 14.00 0 0 0 0 8.00 8.00 8.00 8.00 1 1 1 1 4.00 4.00 4.00 4.60 0 0 0 _ 0 15.00 _ 15.00 15.00 15.00 106.10 106.10 106.10 106.10 . 0.84 0.84 0.84 0.84 Supply Piping: Pipe Material 1 Pipe Size Nominal Diameter Length No. Check Valves Le No. Gate valves Le No:, Ball valves Le No.90-elbows Le No.45-bends Le, , Coupling/Str. Tee 'Le No. 90-tees Le Other Le Total Equivelent Le Force Main Friction Head.; Sch 40 Sch 40 Sch 40- Sch 40 3" 4" 4" 4" 3.068 4.026 4.026 4.026 273.00 740.00 673.00 1018.00 ; 0 0 0 0 38.00 38.00 38.00 38.00 3 \ 3 3 3 2.70 2.70 2.70 2.70 0 0 0 0 2.70 2.70 2.70 2.70 1 1 • 1 1 14.00 14.00 14.00 14.00 1 2 2 2 8.00 8.00 8.00 8.00 0 0 0 0 3.00 3.00 3.00 3.00 1 1 1 1 21.00 21.00 21.00 ,. 21.00 0 0 0 0 0.00 0.00 0.00 0.00 324.10 799.10 732.10 1077.10 9:63 6.32 5.79 8.52 191 r Project Name: Gray's Creek ES Date: 99031��I , Project Number: 98-34 Sand Filter Recirculation and Final Pump Tank Required Volume Calculations Filter Dosing TankCumulative rUnSaind reduced Flow Day Inflow ' Discharge Retained 1 11,400 9,500 1,900 ily Design Flow 11,400 Weekly Flow 57,000 2 11,400 9,500 3,800 FE Daily flow 9,500 3 11,400 9,500 5,700 Emergency Stor. 1,900 4 11,400 9,500 7,600 Dose Volume 633 5 11,400 9,500 9,500 Daily SF disch. 9,500 6 9,500, 0 Cumulative Reduced Flow Day Inflow Discharge Retained 1 2 3 4 5 8,550 8,550 8,550 8,550 8,550 7,125, 7,125 7,125 7,125 7,125 1,425 2,850 4,275 5,700 7,125 Daily Design Flow 8,550 Weekly Flow 42,750 FE'Daily flow 7,125 Emergency Stor. 1,425 Dose Volume 633 ump Off Volume 3,741 6 7,125 0 [Required Unreduced Reduced PT Vol. 15,774 12,924 Final Dosing Tank . Flow Eq. Cumulative Reduced Flow Day Inflow Discharge Retained Daily Design Flow 8,550 1 7,125 7,125 0 Weekly Flow 42,750 2 7,125 7,125 0 FE Daily flow 7,125 3 7,125 7,125 0 Emergency Stor. 4,275 4 7,125 7,125 0 Dose Volume 1,781 5 7,125 7,125 0 6 7,125 7,125 0 Required PT Vol. 6.056 Note: Can also subtract piping and free board -volumes as part of required volumes. i 1 elye 114 �/3 W W W ___ IA 0 of coo uf00 ..r cv a aaa ANN IYNN kP.5 c6o� 3 6 " nU:io, n2u: aayw— _7e 1AI �� r.aw SG+ar�r Crag/ 51& ec, Sc G J 'g 'O%Evr A& V� 1,2 x zo ieL =n /h�9G / = 67//iy9� 4.58 G 7-elml /z, �elr�ti I,s f I / -3y 3 1oX71 ty Top / % of 1'� [— GR--6 for 5 o k / �o ye c 11, e-1 ul NNN coo r r N Z »�00 X G G. _ /8//G1��p� X ��✓ = G73 ��/ 7%7,1 77g 3B = z, 013 /, �8,,7f 0,©z) `'"g' so y7J sue. r 1 Project Name: Gray's CreeK ES Project Number: 98-34 Total Dynamic Head Calculations yy� • Date "� 9903�2' ' ' xxxx::•x•.vn :iiiix•.:::::vv: nva1:�� ii•.xx:::vi•:::nv •'.ii•'.:i<>iii<?+',?:} i' .. <ta�' ~: .. 'tt}~ ?S �S iii�i4iiCvi:t • ;iiiixxx:xx:•.:::. %�i� tllM1 .vvvw:::. vxx�•::. .vvvx}w.y:xx::y., �...: ni''v"4i:M1x:hxx:::.:.. t� High point in FM ~ 96.00 96.00 96.00 _ 96.00 " Pump -off level 94,51 94.51 _ 94.51, 94.51 ............ Pumping Rate , Discharge Piping: Pipe Material Pipe Size Nominal Diameter.' . Pipe Length No. Check Valves Le" No. Gate valves Le No. Ball valves' Le No. 90 elbows Le No.45-bends - Le, Coupling/Str. Tee Le No.90-tees -Le Total, Equivelent Le Disliarge..Friction Head Sch 80 Sch 80 Sch 80' , Sch 80 4" 4" 4" " 4" 4.026 4.026 4.026 4.026 14.00 14.00 1.4.00 14.00 1 1 1 1 38:00 38.00 38:00 38.00 3 3 3 3 2.70 2.70 l 2.70 2.10 0 " 0 0 0 2.00 2.00 2.00 2.00 3 3 3 3 14.00 14.00 14.00 14.00 01 0 0 0 8.00 8.00 8.00 8.00 1 1' 1 1 4.00 4.00 4.00 4.00 0 0 0 9 15.00 15.00 15.00 15.00 106.10 106.10 106.10 1; 106.10 0.45 0.45 0.45 0.45 Supply Piping: Pipe Material - Pipe Size Nominal Diameter Length . No. Check Valves Le No. Gate valves Le ' No. Ball valves Le No.. 90-el6ows Le No.45-bends Le Coupling/Str. Tee. Le No. 90-tees Le 'Other Le Total Equivelent Le Force Main Friction Head.: Sch 40 Sch 40 Sch 40 Sch 40 4" 4" 4" 4" 4.026 4.'026 4.026 4.026 273.00 740.00 673.00 1018.00 0 0" 0 0 38.00 38.D0 38.00 38.00 3 3 3 . 3 2.70 2.70 2.70 2:70 0 0 0 0 2.70 2.70 2.70 2.70 1 1 1 1 , 14.00 14.00 14.00 14.00 1 2 2 2 .8.00 8.00 8:00 -8.00 0 0 0 . 0 3.00 3.00 3.00 3.00 1 1 1 1 21.00 21.00 21.00 21.00 0 1 0 0 0 0.00 0.00 0.00 0.00 324.10. 799.10 732.10 1077.1.0 1.38 3.39 3.11 4.57 . ,:»»>::::: • ::..ran:; .•:••>::.:.::;::::.:::.v.;.v:..:.: ;;�.::..•: •:: ••:•:::.. <.�<•: 1� " �LUlu W W W W W W xxx htntn �°noo N ^a^ N N N ���o� 14,E �� le A Vo, rw- ON -SITE SEWAGE PROGRAM LARGE SYSTEM REVIEW SITE PLAN Proiect Nane': 6mO 6ai r4 County: ef. No. Design Flew: J/�/0� — 8�✓� A°W Date: 9903�� Rev iey.er lr Site Evaluation Report: -%ems Application :ate: 10-Year Flood Level : i 00-`'ear Flood Level Descriotion Yes I No N/A Description Yes No N/I Signed P.E. Seal ✓ Locator hiap � J Water Lines Water Sources 0U11d1ng5 ✓ Property Lines `J PA-ve�;,ent ✓ Storm Drains Drainage Ditches !✓ Surface Water Collection Line V ✓ ICollection Line CO/,,�,N VI I I Lift Station I n/ Force Main I "/ Grease Trap I �/ Septic Tank Treatment Plant Effluent Supply Lines ✓ Effluent Dosing Tank Distribution Box Ground Abs. Fields ✓ Repair Area Manifold ✓ Laterals IV/ , Comments/Sumn—nary: RJM/gb 4/ 15/87 ON -SITE SEWAGE PROGRAM LARGE SYSTEM REVIEW COLLECTION SEWERS Project Name: County: Design Flow: 1 Date: 1. Setback Requirements Water Supply Source (1001), Water Line-Horiz. (101) i Storm Sewer-Horiz. (51) Stream Crossing (3') Ground.Abs. Field (51) 2. Grade Chark DAMyu 4/15/87 Ref. 'No. Reviewer: SA Waters (50'-) ✓. Water Line -Vert. (1811) Storm Sewer -Vert. (12") ' Surface Water (10') r k Manhole -Water Line (101) ✓ (Cont.) On -Site Sewage Program Large System Review -- Coll.ection-Sewers'(Copt.) Page 2 3. Specifications/Details Pi p'e Material PSG ;4w Depth of Cover No. of C1eanouts No. of Manholes -At all Junctions? Frequency: Cleanout Detail Provided? Manhole Detail Provided? Manhole Foundation i. Manhole/Sewer Connection Drop Manhole Provided? Lateral Service 'Tap Deta. l.? Watertight Manhole Cover? Connection Type: 4.LInstallation/Testing Trenching Adequate?' Bedding Adequate? V Joining Adequate? ✓ Backfilling Adequate? Ud Pavement Crossing? i ✓ Storm Drain Crossino? Stream/Ditch Crossing? i ✓ Aerial Crossing? v Alignment/Deflection, Check? ✓ In/Exfiltration Check? 5. Coaiments/Summary _ I' Project Name: Design Flow: Capacity Required:' Actual Capacity: 1. Setback Requirements \ UN -SITE .SEWAGE PROGRAM ~� ],LARGE SYSTEM REVIEW GREASE TRAP County:. Ref.No. Date: Reviewer: Water Supply Source (1001) SA Waters (1001) Surface Waters (501) Building (5') Basement (15') -Property Line (10') Steep Embankment (15') Water Line (10') Interceptor Drain (25'„ 10') Drainage Ditch (25') Nitrification Field (20') Other i 2. Design Type of Construction Top Thickness Wall Thickness Top Reinforcement Required" i Wall Reinforcement Required Bottom Reinforcement Required Bottom Thickness Specified Specified Specified Invert in Invert out Difference Rim Elevation Above Ground Manhole Above 10-yr.Flood? Manhole over Each Chamber? Manhole over Each Tee? Manhole Size Watertight Cover? RJM/gb 4/15/87 (CONT. ) ON -SITE SEWAGE PROGRAM LARGE SYSTEM REVIEW --GREASE TRAP (Cont.) Page 2 2. Design (Cont.) No. of Compartments Partition Opening/Tee Opening/Tee Size Open/Tee Depth Partition Vent Size Freeboard Sanitary Tee Material. Tee Depth Length to Width Ratio ! Specified to Receive Kitchen Wastes? Vented? Runoff Diverted? Depth to GWT 3. Buoyancy Check Weight -of Concrete W,eiaht Soil Cover ciah , of Water Displaced Net Weight 4. Insta.ilation/Testinc Installation Adequate? Waterproofing Adequate? 5. Comments/Summary Beddinc Adequate? Leakage Test Adequate? ON -SITE SEWAGE PROGRAM ;LARGE SYSTEM REVIEW SEPTIC TANK Project Name: County:Ref.No._ Design Flow: Date: Reviewer: Capacity Required:. Actual Capacity: R i 1. Setback Requirements Water Supply Source (110') SA Waters (100') Surface Waters (50') Building (5') Basement (15') Property Line (10')_ Steep Embankment (15') Water Line 0 0') i Interceptor Drain (25', 10') Drainage Ditch (25') Nitrification Field (20') Other R 2. Design Type of Construction Top Thickness Wall Thickness Top Reinforcement Required' Wall Reinforcement Required Bottom Reinforcement Required Bottom Thickness Specified Specified Specified RJM/gb 4/15/87 (CONT.) On -Site Sewage Program Large System Review-eptic Tank.(Cont.) Page 2 2. Design (Cont.) Invert in Invert out Manhole over Each Chamber'? Manhole Above 10-Year Flood? Watertight Manhole Cover?' Difference Manhole over Each Tee? Manhole Size Baffle Wall Opening Size Liquid Depth Opening Depth % of Liquid Depth - i 'Baffle Wall Vent Size Freeboard 'First Compartment Length Second Comp. Length Total Length Ratio .of 1st Comp: to Total Width Length -to -Width Ratio Straight Inlet? Vented? Sanitary Tee Material Sanitary Tee Depth of Liquid Depth Surface Area/Depth Ratio Depth to GWT 3. Buoyancy Check Weight of Concrete Weight of Water Displaced i 4. Installation/Testing. Installation Adequate? Waterproofing Adequate? 5. Comments/Summary: Weight Soil Cover Net Weight Bedding Adequate? Leakage Test Adequate? Sand Filter Design Protocol 1. Select type of sand filter ❑Buried single -pass, pressure dosed ❑Free access, single -pass, pressure dosed ❑Free access, recirculating, pressure dosed 2. Select Maximum filter forward Loading Rate, MLR= (GPD/f -). •Compute-Ntnimum filter Surface Area; MSA=DDF/MI.R where DDF= (Design Daily Flow Rate, Gallons) MSA=DDFAER=( A )_ (ft-) 3. Select number of filters: rd 5 6 7 0 Select Filters Dimensions: (length) x (width) -Compute actual filter Surface Area, FSA= (sq. ft.) (FSA must be>_ MSA) -Compute filter design Loading. Rate = FLR = DDF/FSA= ( )/( )_ (GPD/ft-) -Make sure FLR>_ MLR (if not, choose bigger filter or more filters) Lavout,'Desi--n Filter Distribution Network: Select Number ' and length of laterals (in all filters) Total Filter Lateral Leng�*h, FLL= (ft) Filter Lateral Size, FLS (inches) Lateral Orifice Size, LOS = (inches) Lateral Orifice Spacing-; OSP = (feet) -Compute Lateral Volume, FLV= FLL x x_ -Compute Number of Orifices, NO = FLL/OSP _( A gals/ft _ (gallons) -Compute Filter dosing rate, Q= NO x (GPMLos cr DPI where DPH = design pressure head (>_4ft)= (feet) Q= NO x = ( ) x ( )=_ffb-(gPm) Select Dose Volume/Day, DVID = (gallons) -for single pass, DVD= DDF= -for Recirc Filter, DVD = 3; (recirc ratio +1) x DDF h x 11 N0 = �'✓�04� Select Number ofDoses/Day, DPD= Z`f (recommend choosing 4,6,8,12,24, or 48) -Compute Volume/Dose = VD=DVD/DPF = i(-— ! %� (gallons) -Compute Lateral Volume Exchanges/Dose, LVD= VD/FLV ifLVD < 6, select fewer doses/day or smaller laterals -Compute Pump Run Time, PRT = VD/Q (� 33 )_ ,; f(o (minutes) - - Recommend pump run time 3-10 minutes, though smaller may be allowable, if other options limiting. Adjust by changing orifice size, number of laterals, orifice spacing and/or number of doses/day. -Compute Pump Off Time, POT- (24/DPD) x 60 -PRT = 24 x 60 - �D = 3�L , y (minutes) 9. Summary of Filter Design Parameters selected/computed: -Type of Filte-Design Daily Flow, DDF // `X (gallons) -Number of Filters: -57 -Filter Dimensions (. x -Filter Surface Area; FSA (sq. ft.); -Filter Loading Rate,FLR= (GPD/ft-) -Lateral Network Specifications: -Number and length of laterals -Total Lateral Length, FLL (feet) -Lateral Size, FLS: (inches) -Orifice Size, LOS: (inches), and spacing . (feet) -Total Number of Orifices, NO: -Design Pressure Head, DPH (feet) -Filter Dose Rate, Q , (GPW -Recirc Ratio (where applicable) -Number of Doses per day; DPD= -Volume per Dose, VD: (gallons) -Lateral Volume exchanges per Dose, LVD -Pump Run Time, PRT: (minutes) -Pump Off Time, POT: (minutes) Glossary of Abbreviations DDF: Design Daily Flow (gallons) DPD: Number of Doses Per Day DPH: Design Pressure Head (feet) DVD: Dosing Volume Per Day (gallons) FSA: Actual Filter Surface Area (ft-) FLL: Total Filter Lateral Length (fft)j _ FLR: Filter Design Loading Rate (GPD/ft'-) FLS: Filter Lateral Size (inches) FLV: Lateral Volume (gallons) LOS: Lateral Orifice Size (inches) LVD: Lateral Volume Exchanges Per Dose MLR: Maximum Filter Forward Loading Rate (GPD/ft'-) MSA: Minimum.Filter Surface Area (ft-) NO: Number of Orifices OSP: Lateral Orifice Spacing (feet) POT: Pump Off Time (minutes) PRT: Pump Run Time (minutes) Q: Filter'Design Rate (GPM) VD: Volume Per Dose (gallons) S .OSNW\BER ,OWI713ANDFILT.WPD - I a TOTAL DYNAMIC HEAD.COMPUTATION ROJECT NAME _ COUNTY ATE REVIEWER LEVATION HEAD,ft (EH): Field No. 1: i high point pump -off -level feet Field No. 2: Field No. 3: Field' No . 4 : RESSURE HEAD,ft (PH): LOW RATE,gpm: 2ICTION HEAD,ft (FH) DISCHARGE PIPING Size,in Length,ft No. Check Valves Equiv.L: No. Gate Valves Equiv.L: No. Tees Equ;iv. L: No. Elbows Equiv.L: Other Equiv.L: ; Equiv.L: ; Equiv.L: TOTAL EQUIVALENT LENGTH: FRICTION HEAD(discharge piping) SUPPLY LINE Size,in Length,ft No. Gate Valves ; Equiv.L: No. Elbows ; Equiv.L: No. 45-deg.bends ; Equiv.L: Other Equiv.L: Equiv.L: Equiv.L: TOTAL EQUIVALENT LENGTH: FRICTION HEAD(supply line):' TOTAL FRICTION HEAD(FHdp + FHsl): rAL DYNAMIC HEAD(EH+PH+FH): MP SPECIFICATIONS ( gpm/ ft): I, LARGE/ENGINEERED SYSTEM REVIEW -PUMP TANK CHECKLIST Tank Construction: . • Precast concrete ❑ PT- number specified: ❑ Threr feet or less burial depth, (if greater than three feet, additional reinforcing provided?) • . Block/built in place ❑ .1954(d) requirements met? ❑ Reinforcing schedule adequate? • Alternate construction materials ❑ Adequate documentation provided? Watertizhtness: ❑ Additional waterproofing at an joints? El Pipe connections detailed? ❑ Acceptable leak test indicated (vacuum test if within 10-year flood zone)? Buovancv. ❑ Tank empty buoyancy caculations provided? ❑ If nee—ded, a&-zti-floatationprovisions acceptable? PIan View: ❑ Vehicular accessibility provided? ❑ Adequately protected from traffic! Appropriate setback distances maintained? _ ❑ Potable water source provided nearby? Opening(s) provide adequate access to pumps/floats/appurtenances? ❑ Corrosion -resistant access Ed/prote'ction against unauthorized access? Dimensions? L = W = Area = V/ft. = V/ n. Profile View: Location Elevation Difference Volume Acce�t� Criteria Inside floor Off float On/enable float u mp submer ens Alarm float dose volume ES= Lag pumpfloat � < 6 inches ex. FEE Inlet i invert at or above alarm Inside to at or above alarm ' Vol= Riser ope ng capacity > 10-year flood i ❑ Pump removal system? ❑ Float adjustment/replacement system? ❑ Opening(s) provide adequate access to pumps/floats/appurtenances (w/in 18 inches)? ❑ All internal components corrosion resistant, structurally_ sound?. ❑ Schedule 40 PVC or better pipe inside tank? ❑ No electrical junctions inside of basin? ❑ Electrical conduit accessible, sealed water- and gas -tight? Electrical Controls: ❑ NEMA 4X enclosure? ❑ Panel above 100-year flood level?, 0 Panel in vicinity of tanks and fields? ❑ Panel adequately. supported? ❑ Surge (lightning) protection provided?, ❑ Audible/visible alarm on separate electrical circuit and able to alert personnel of alarm? Run Hphts/H-0-A switch for each pump? ❑ Elapsed time meters (and cycle counters .for LPP systems) for each pump? ❑ Timer/PLC specifications/cut sheets and initial settings, if proposed? ❑ Autodialer/stand-by power system specifications/cut sheets, if proposed? ❑ Proper controls for mechanical/electrical field valves, iz proposed? Pumps: ❑ At least duplex, if required? ❑ Manual dosing capabiliry (interconnection/H-connection)? ❑ Check valve? ❑ Anti -siphon hole between pump and check valve, if needed? • Dosing rate = • discharge. piping-H.L. _ • supply piping H.L. _ • F.H. = E.H. _ _ P.H. = T.D.H. _ ❑ Pump correctly specified/curve acceptable? VAD/OSWS January 16, 1996 p:ptrevsht.doc .-1; I' S'lJ102N County -- -si-n Flow: GPD = GPN11 Review Datc: _ LZeviewcr: F'oj.ce main diaiieter: inches; length reet Cover provided over main: feet (three feet imilinauni !'ecornmended) Force main discharge elevation: feet Force main high point elevation: feet .... Pump -off elevation: feet Air relief valve provie;--d'? Yes No If no, need?d? Yes No Force main details: -Adequate mazerials specified: Yes No -Thrust blocks, rig a -of -way, crosslnu, vertical and horizontal separations specified? Yes No If no, explain Pump flow specified: 12.5 x design flow.- minimum) Adequate? Yes "NTo Velocity in force main- FPS V = Pumn flow, GPM (D: inside dia. (2 FPS minimum) 2.45 D'- in inches} Adequate'? Yes No 0. Static head= - = feet (High p_-ini) (Pump-offj 1. Friction head= (0.00113) (ouuno flow.—GPM).'-cs (total couiv. len-Jth. —fti = feet (inside dia. in.)'.17 2. Total dynamic head (TDH) = static + friction = feet Correctly specified? Yes No 3. Dr.awdown: gal. (volume'between pump -on and Pump -off levels) .4. Pump run time = ( gal., drawdown) /( GPM, pump flow - GPiYI, design flow) 1 minutes (3-5 minutes recommended) ,.5. Dosing volume = ( ,-al., drawdown) ( ,al., pump run time X design flow) _ I I;aal. ; dual pumps specified? Yes N0 16. Purnp-off time = ( gal., drawdown)! GPM,ciesign [low) I 11minutes (30 minutes maximum recommended) I % ('ulnpin�l cycle tinle, _____ IllinLiECS (F ininUtes n11111111Ui11 I'CCoill lllendeM 18. Buoyancy test: a.-Nfaxin?tinl WiLNTIC Ot WZ1.1cr dispiaced: :':C:i AV-Cli/tally ft' OU11dation Ft3 total — tr', b. Nfaximum weight of water displaced: (volume 62.4 lb/CO)= Il'os. c. Volume of concrete provided: Ft- d. Weight of concrete provided: (volume x 135 lb/fe) lbs. e. Volume of back -fill on top of tank fo Oil t6p of Foundation outside wet well _ a' total, ft' f. Weight of backfill provided (volume x -110 lb/f0) = lbs. a. Total weight provided: d + f = lbs. h. Compare b and g; is buoyancy test satisfied? Yes No I9. Fillets provided: Yes Io Invert and rim elevations specified? Yes No 20. Plan view, fencing, floor elevation adequate? Yes \ro If no, explain: 21. :adequate valves, pull -rope (corrosion -resistant chain. cruiderails if HP> S), •renting, access manhole provided?' ` Yes No If no, explain: 22. Specified pump and level controls adequate? Yes No If no, explain: 2; 74 25 Electrical controls, high-water aldnn, wiring adequate? Yes No If no, explain: Pump cycle counters provided? Yes Elapsed tuiie counter? Yes High-water alarm: On separate circuit'? Yes Visible? Yes Audible" Yes 26. Standby power or automatic dialer provided? If yes, Plans adequate'? IF no, needed'? _ No. No No No No Yes No Yes No Yes No ?. Construction materials, reinforceiilent detail, and adequate installation procedures st�ecifiecl? Yes 0 T17 rio, explairl: -- ---- Project Name: Design Flow: —Ref No. Reviewer: 1. Setback Requirements Impounded Reservoir, Shallow Aquifer Public Water Supply (500') Deep Aquifer Public W.S.; Shallow Aquifer Private W.S., SA Water (2001) ON -SITE SEWAGE PROGRAM LARGE SYSTEM REVIEW GROUND ABSORPTION FIELDS (Conventional) i County: Date: Deep Aquifer Private W.S.', SB, A -II, B Waters (100') Surface Water (50') Building (5') Basement (151) Property Line (10') Steep Embankment (15') Water Line (101) Interceptor Drain (251, 10') Drainage Ditch (25') Nitrification Field (20'); Other 2. Size and Layout Application Rate Area Required Trench Required Na. of Fields Lateral Length No. of Laterals/Field_ Fields Same Size? 100% Repair Area? Spot Elevations/Contours?, Laterals Along Contours? Lateral Spacing Field Separation Configuration Acceptable? RJM/gb 4/21/87 On -Site Sewage Program Large System Review Ground Absorption Fields (Conventional) Page 2 (Cont.) 3. Distribution System Detail Provided? Accessible to Ground?. Invert. Elevation Above Highest Lateral? Type of Cover Cover Weight Installed Level? Lateral Supply Line Size Pipe Material Pipe Slope Lateral Size Ends Plugged? Volume of Laterals Vol. of Supply Line Draining Min. Dosing Volume. Max. Dosino Volume Dosing.. Volume Sper','d. Actual Dosing Volume Distribution Box No of Outlets On Concrete Pad? Pressure Manifold No. of Taps Tap -Material Flow/Field Manifold Material Manifold Supports?' i Smooth Round Outlets? Baffle Provided? Tap Size Flow/Tap Manifold Size Manifold Cleanout? Manifold/Tap Connection On -Site Sewace Program Large System "ev?ew Ground Absorption Fields (Conventional) Page 3 (font.) 4. Trenches Allowable Width Width Specified Allowable Depth Depth Specified Specified Depth Possible? Level Trenches? Gravel Size Specified Washed? Gravel Above Pipe Gravel Below Pipe Backfill Depth Paper/Filter Cloth? 5. Installation/Comletion Site Preparation Methods? Fill Required? Max. Fill Depth Drainage Swales? Provisions for Pavement Runoff? GW Monitoring Wells Req'd. Monitoring Well Detail Initial Lateral Blowout? Coverup Procedures* Seeding? 6. Comments/Summary Minimize Disturbances? Fill Material Max. Cut Other Drainage? No. Specified — Location Shown? Pressure Adjustment? Landscaping? Mulching? ON-S11E SEWAGE PROGRAM LArtGE SYSTEM REVIEW GROUND ABSORPTION FIELDS (Low Pressure) Project Name: ! County: Design Flow: Date: Ref No. Reviewer 1. Setback Requirements Impounded Reservoir, Shallow ^.quifer Public Water Supply (5001) Deep Aquifer Public W.S., Shallow Aquifer Private W.S., SA Water (200�) Deep Aquifer Private W.S.,-SB, A -II, B Waters (100') Surface plater (50') Building (5') Basement (15') Property Line (10') Steep Embankment (15') Water Line (10') Interceptor Drain (-25', 10') Drainage Ditch (25') Nitrification Field (20') Other 2. Size and Layout Application Rate Trench Required Lateral Length Fields Same Size? Spot Elevations/Contours? Lateral Spacing Configuration -Acceptable? RJM/gb 4/17/87 Area Required No, of Fields No. of Laterals/Field 100% Repair Area? Laterals Along'Contours? Field Separation t On -Site. Sewage Progra:-­_arge System Review Ground Absc Page 2 piion Fields (Low Pressure) (Copt.) 3. Distribution System Lateral Size Orifice Size Max. Allow. Spacing Spacing Specified Orifices Staggered? 3 ft. to First Orifice Max. Allow. Lat. Length .Length Specified Lateral Elevations Spec'd. Max. Elevation Difference Press. Head Highest Lat. Press. Head Lowest Lat. No.* Orifices/Laterals No.-Laterals/Field Flow/Orifice Flow/Field Manifold Size Req'd. Manifold Size Spec'd. Vol. of Laterals/Fuld Vol. of Supply Line Draining Min. Dosing Volume Max. Dosing Volume Dose Volume Spec'd. Actual Dose Volume Manifold Location Manifold Materia l Manifold Cleanout Manifold/Lat. Connection Lateral Material • Lateral Protector Size Threaded Caps? Field Gate Valves? Earthen Dams? 4. Trenches Allowable Width Allowable Depth Specified Depth Possible? Gravel Size Specified Gravel Above Pipe Backf i l l Depth Width Specified Depth Specified Level Trenches? Washed? Gravel Below -Pipe Paper/Filter Cloth? N Project Title: Design Flow: Responsible Agent: '0 h - S 1 .,I E S�Y,A:c 'PROS:;i.T' ` LARGE' S1S-`riREVIE OPERATION A1;D IMLA' i NT Ei{AINC� County: Date: System Operator: Recomended Freauency i. Col Iecti-on System - Sewers 6 mos. - Manho;l es/ . 6 mos'. Cl ean'outs 2. Lift Station - Pumo - Alarm 3 . Grease Trap - Check;i na - Pumping- - San. Tee r • =ti c. Tank - Checki na - Pumoinc� = San. ,Tee .. Dosing Tank - Pump -Alam, - Solics/Pumpin= J Sp p I y Line 7. Nitrif. Fields - Vegetation - Erosion/ Surfacing - 61 0,01ou t/ Press.AdjusL. R. i+;' c 21�87 2 As 2-^ As . -� As . 1-3 mos. 1-3 mos . 6 mos. 1-3 yrs. 6 mos . 2-4 As . 2-4 As . 1-3 mos. 6 mos . 6 mos . 1-3 mos . 1 yr. Ref. No.: Reviewer: Specified Frequency NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY DIVISION OF WATER QUALITY GROUNDWATER SECTION March 31, 1999 MEMORANDUM To: Bill Jeter, Chief On -Site Wastewater Section Division of Environmental Health Through: Bob Cheek 67-- v� e— From: David Goodrich D Subject: Grey's Creek Elementary School Conventional Subsurface -Treatment System Cumberland County DEH 98-34/GW99051 (Robin Godshall: DEM SERG Review Engineer) RECEIVED APR 1 9999 DEHNR!DEH Orasite WaisteWatec Section The Groundwater Section is in receipt of the subject materials to permit a conventional subsurface treatment system to treat.the domestic wastewater generated by the operation of the Grey's Creek. Elementary School in Cumberland County (see Figures 1 and 2) . The proposed treatment system will include sand filtration and four nitrification. fields. The design daily flow onto the nitrification fields, with a 6-day flow equalization, is, 7,125 gallons. The soil scientist?s report for this site indicates that the maximum allowable loading rate is 0.3 gallons per day per square foot of trench bottom. The centers of the parallel trenches are to be nine feet apart, which reduces the effective loading rate to 0.1 gallons per day per square foot of nitrification field. In -order to ,examine the potential for mounding of the water table beneath the nitrification fields, the consultant simulated the operation of :the system using a computer program developed 'by Colorado State University. Site -specific hydraulic conductivity .information 'was taken from slug tests performed- on two (the more conservative data) 'of the three, wells tested: The average saturated horizontal hydraulic conductivity was thus conservatively estimated to be 4.07 feet per day. The saturated aquifer thickness was estimated to be 18 feet, and the hydraulic °loading was taken to be 0.2 gallons per day per square foot of application field (0.027 feet per day), which is twice the amount obtained by dividing 7,125 GPD by 72,000 square feet of application field. After two years of continuous application, the maximum GROUNDWATER SECTION P.0 BOX 29578, RALEIGH, NC 27626-0578 - 2728 CAPITAL BLVD., RALEIGH, NC, 27604 PHONE919-733-3221 FAX919-715-0588 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER m calculated height of the mound beneath a field (representing one quarter of the intended 72,000 square foot effective application area) measuring 90 feet by 200 feet was less than seven feet. Computer modeling of the mounding affect on the water table was also performed by the Groundwater Section using a very similar mounding program, and the results were very similar. It is the understanding of the Groundwater Section that the water table beneath the area of the proposed drainfields is approximately at a depth of 12.5 to 15.5 feet. In view of the field testing information and the conservatively calculated mound height, it would appear that mounding beneath the drainfields .will not be a concern at this ,site. The application package included a blueprint which indicated the location of a proposed water supply well to supply the school (see Figure 2). The proposed location of this well is nearly 500 feet from the.edge of the nearest of the four nitrification fields, and in an upgradient location. If this actually represents the existing well, it would appear that there is minimal danger of water from the nitrification fields being drawn by the water supply well, given the distance of separation between the well and the nitrification fields and the probable direction of shallow ground water flow on this site. An existing house, which is probably supplied with water by a nearby water well, is indicated on the blueprint near the northern corner of the property (see Figure 2). The house is located approximately 500 feet to the north of the proposed drainfields. Assuming that a water supply well exists near this house, there is a potential for water from the drainfields to reach the water supply well. The water supply well for this dwelling, if it is near the dwelling, should be abandoned in accordance with the methods and procedures set forth under 15A NCAC 2C .0113. An alternative to this action would be to install a monitor well approximately half way between the water supply well and the drainfield area and sample it twice a year for nitrates and other potentially harmful substances. A site visit was made by personnel from the Division on March 31, 1999. The visit disclosed the existence of a subdivision with water supply wells located 400 to 500 feet to :the east of Nitrification Field Number 4 (see Figure 2). In view of this situation, the Groundwater Section recommends the installation and monitoring of two monitor wells (MW-1 and MW-2) at respective locations upgradient of the drainfield, and between the Nitrification Field Number 4 and the subdivision (see Figure 2). These wells should be sampled initially and thereafter every April and -November for Ammonia Nitrogen, Nitrate Nitrogen, pH, Fecal Coliform, Total Phosphorous, Water Level, Chlorides, 'and TDS. The Groundwater Section has reviewed the subject permit application and recommends issuance of the permit with the following conditions: *1. Prior to beginning waste disposal operations, one upgradient monitor well (MW-1) and one downgradient monitor well (MW-2) shall be installed to monitor groundwater quality. The well shall be constructed such that the water level in the well is never above or below the screened (open) portion of the well at any time during the year. The general locations and 2 names for these wells are marked on Attachment A. The monitoring well shall be located as indicated, constructed -in accordance with this permit, and approved by the Fayetteville R Regional Office. 2. Monitor wells MW-1 and MW-2 shall be sampled initially after construction (and prior to waste disposal operations) and thereafter every April and November for. the following parameters: Ammonia Nitrogen Nitrate Nitrogen pH Fecal Coliform Total Phosphorous Water Level Chlorides TDS The measurement of water levels must be made prior to sampling for the remaining parameters. The depth to water in each well shall be measured from the surveyed point on the top of the casing. The results of the sampling and analysis must be received on Form GW-59 (Groundwater Quality Monitoring: Compliance Report Form). by the Groundwater Section, Permits and Compliance Unit, P.O. Box 29578 Raleigh, N.C. 27626-0578 on or before the last working day of the month following the sampling month. 3. All wells that are constructed for purposes of groundwater monitoring shall be constructed in accordance with 15A NCAC 2C .0108 (Standards of Construction for Wells Other than Water Supply) and any other state and local laws and regulations pertaining to well construction... 4. The Fayetteville Regional Office, telephone number (910)486-1541 shall be notified at least forty-eight (48) hours prior to the construction of any monitoring well so that an inspection can be made of the monitoring well location. Such notification to the regional groundwater supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding state holidays. *This language differs from that of the shell document. 3 5. Within sixty (60) days of completion of the monitoring wells, the permittee shall submit two original copies of a scaled topographic map (scale no greater than 1":100') signed and sealed by a professional engineer or a state licensed land surveyor, that indicates all of the following information: a. the location and identity of the monitoring wells, b. the location of all components of the waste disposal system, c. the location of all property boundaries, d. the latitude and longitude of the established horizontal control monument, e. the relative, elevation of the top of the well casing (which shall be known as the "measuring point"), and f. the depth of water below the measuring ,point at the time the measuring point is established. This survey shall be conducted using approved practices outlined in North Carolina General Statutes Chapter 89C and. the North Carolina Administrative Code Title 21, Chapter 56. The surveyor shall establish a horizontal control monument on the property of the waste disposal system and determine the latitude and longitude of this horizontal control monument to a . horizontal positional accuracy of .+/-10 feet. All other features listed in a. through e. above shall be surveyed relative to this horizontal control monument. The positional accuracy of features listed in a. through e. above shall have a ratio of precision not to exceed an error of closure of 1 foot per 10,000 feet of perimeter of the survey. Any features located by the radial method will be located from a minimum of two points. Horizontal control monuments shall be installed in such a manner and made of such materials that the monument will not be destroyed due to activities that may take place on the property. The map shall also be surveyed- using the North American Datum of 1983 coordinate system and shall indicate the datum on the map. All bearings or azimuths shall be based on either the true or NAD 83 grid meridian.. If a..Global Positioning System (GPS) is used to determine the latitude and longitude of the horizontal control monument, a GPS receiver that has the capability to perform differential GPS shall be used and all data collected by the GPS receiver will be differentially corrected. The maps and any supporting documentation shall be sent to the Groundwater Section, NC Division of Environmental Management, P.O. Box 29578, Raleigh, NC, 29626-0578. 6. Within thirty (30) days of completion of -all well construction activities, a certification must be received from a professional engineer or a licensed geologist certifying that the monitoring wells are located and constructed in accordance with the Well Construction Standards (15A NCAC 2C) and this permit. This certification should be submitted with copies of the Well Completion Form (GW-1) for each well. Mail this 'certification and the associated GW-1 forms to the Permits and Compliance Unit, Groundwater Section, P.O. Box 29578, Raleigh, NC, 27626-0578. 4 7. For the initial sampling of the wells as specified elsewhere in the permit, the permittee shall submit a copy of the GW-1 Form (Well Completion Form) with the Compliance Monitoring Form (GW-59) for that well. Compliance Monitoring Forms that'do not include copies of the GW-1 form will be returned to the permittee without being processed. Failure to submit these forms as required by this permit may result in the initiation of enforcement activities pursuant to NC General Statutes 143-215.6. 8. Prior to the use of the drainfield, any water supply well associated with, and in the geographic proximity of, the existing house located near the northern corner of the site, shall be abandoned in accordance with the methods and procedures outlined in 15A NCAC 2C .0113. 9. Any additional -groundwater quality monitoring; as deemed necessary by the Division, shall be provided. 10. The COMPLIANCE BOUNDARY for the disposal system is specified by regulations in 15A NCAC 2L, Groundwater Classifications and Standards. The Compliance Boundary is for the disposal system individually permitted after December 31, 1983 is established at either (1) 250 feet from the waste disposal area, or (2) 50 feet within the property boundary, whichever is closest to the waste disposal area. For subsurface treatment systems such as this one, the Compliance Boundary is established at the property line. An exceedance of Groundwater Quality Standards at beyond the Compliance Boundary is subject to immediate remediation action in addition to" the penalty provisions applicable under General Statute 143- 215.6A(a)(1). In accordance with 15A NCAC 2L, a REVIEW BOUNDARY is established around the disposal systems midway between the Compliance Boundary and the perimeter of the waste disposal area. " Any exceedance of standards at the Review Boundary shall require remediation action on the part of the permittee.. If there are any questions please let me know. cc: Art Barnhardt Permit Files --GREYSCRE-- h 2238 a ler ^ O Shewoojdl O 62 o j 3867- • ---38BG rd \ + 224 \ ! o � � • •� 1 I O N - s t160 3865 1 159 r. 162_ r 2244 2233 3664 •o s 2235 O' 759 P ' - o o °o i 76 0 Min' o i-�, ay Cree N232) (2232) I ---- � .-- FIGURE 1 ;3B62 { SCALE IN FEET GREY'S CREEK ELEMENTARY SCHOOL 0 2,000 4,000 CONVENTIONAL SUBSURFACE TREATMENT SYSTEM CUMBERLAND COUNTY DEH 98-34/GW99051 I ` SITE LOCATION MAP 410,000 1 -.mr--�r—N I I --� SriI—IaRca •-1 - - - - PROPOSED 4WATEZ - --. _' MAIN BY OTHERS - - - - •- ALDERMAN ROAD S.R. 2261 ` t w- .------•---•I -•-• •-•------•-•---------•-•-------•--•-•-•---• , E[S TO E P W _ NC HWY 817, -----N.�O$1�6 �_----- -- T I ------- --------- ------------ -;-. 100' RADIUS OF '- - - - - - -. - - - - - - - - - - - - - - - - PROPOSEF� _.VVN111���LL- eP - - - -- - r 3I • ROPPDWX ANDS�ER OTH RS ' ' ..mh .� - i EXISTING HOUSE=- o^ pROPOSED. `GRAY'S- o,IN GRAY'S CR EK LEMENTAN SCH60°'' z, E 5.2 EXISTING MOODS LINE ,(rip io - NITRIFICATION FIELD � - . J _ 25' OFF WOODS j-• . ' , LINE (APPROX.)j.; - - 1-4000 AL{ON AND\` - - 00 30AL'LD GR T }. ' NITRIFICATION' - N ALE IN/SERIES FIELD' #3 - \ �= O �� 1 0 �\ / 4 C SEWER t ..� •t , z 0 SEPTIC TANK UILDI G STUB- . y LER, Jr), 48 9 MP •�-I PATRICIA W. CRUMPLER, - - - \, Vl LOUISE F. CRUMPLER " - \ 1 48 0 - 'PROPOSED ON -SITE - -1 �--� WASTEWATER TREATMENT j y/ cn SYSTEM. SEE DETAILED I•'� I� SITE PLAN -SHEET 3 OF 8.If LEGEND _ v 01) � l+� F^"i - UNK'10ITJ PFENDECHAIN C�' +n - - - _ 25' OFF - . •\, - j.. -"- - - EXISTING CREEK Cy PROPERTY LINE \ .. _ _ ✓� - \, NITRIFICATION, I PROPOSED SEWER FOE - NITRIFICATION \� - FIELD- #4-` FIELD #2 ------------- EXISTING BUILDING PLI r �j r� z �, rro�Ovsed pro po5ed.� :. �ja9b H . y1�,••i I _I - .. jy>r Svn \; o• -,�W Lif -,•.\ - •; "` EXISTING DITCH O Lota tfG M W 4 EXISTING PROPERTY , L_ I _ x gGj-'FENCE- PROPOSED OVERALL SITE I PLAN �"`` —_•_•_ 'EXISTING FENCE I••C y I(--���II SCALE 1 _ ' :0' I - _ lfl EXISTING TREE LINE EXISTING DRAINAGE Pi Q- �O.a EXISTING POWER POLE iOr. - _ - - EXISTING TREE - -• _ -A'� - EXISTING SHRUBS y GRAPHIC SCALE Skb ❑� EXISTING CATCH BASU a%�l5�ah - • - ( IN FEET) I 01/06/1995 19:52 8283226790' - PAGE 01 C� Environmental' Consultants, Inc.. #e N.E. 0 Hickory, -North Carolina 28601 ■ (828) 322.6700; ■ Fax (828) 322-6790 Facsw* u*le Sleet Fax Number (828) 322-6790 Date: 3- -3_z) T 5' Time Sent: To-. - Name: itompany: Fax Dumber: �j (�� 'S`i,-- 78'l57 From: ,p �'� .,._ Subject: Number of pages including transmittal sheet; - For your Comments/approval .Per our conversation Please advise Would like to discuss Hard Copy Sent: US regular mail UPS overnight �. Federal Express Other For your information Per your request Please call Please handle Hand delivery US certified —No - . No hard copy sent Remarks; e, �yzy J1 z Wo:? 1 I;f you have any questions or problems with the transmission, please contact �'� - at (828) 322-6700. Confidentiality Notice This transmission is intended only for the use of the individual- or entity to which it is addressed and may contain information that is .privileged and confidential. If the reader of.this message is nofthe intended recipient, you are hereby notified that any disclosure, distribution or copying of this information is strictly prohibited. If you have re- ceived this transmission in error, please notify us immediately by telephone and return. the faxed documents to us at the above address via the Unified States Postal Service. Wetland ldelineation/Perraittiugfflitigation ' Soil/SiteEvaluation, for On -Site Septic Systems Environmental Assessments llome ice, 244 Went Miilbrook Road lialoigb, North Carolina 27609 PhOne, (919) 346-5960 Fax: (919) 846-9467 01/06/1995 19:52 8283226790 PAGE 02 i Enviro mental Constltant►s, Inc* xe N.E. ■ Hickory, North Carolina 28601 ■ (829) 122-6700 ■ Fax (818) 322-6790 March 30, 1999 Project #; 3575 Dobbs, -Upchurch-& Associates, P.A. Attn: Michael Koonce 4917 Waters Edge Drive Suite 11 Q Raleigh, NC 27606 CHARACTERISTICS Off' THE SOILS AT THE PROPOSED GRAYS CREEK, ELEMENTARY SCHOOL, SUBSURFACE SEPTIC SYSTEM CUMBERLAND COUNTY, NORTH , CAROLINA Soil and Environmental Consultants Inc. (S&EC) evaluated the characteristics of the soils in the proposed system and repair areas. These areas were located by Hobbs, Upchurch & Associates. The purpose of this evaluation was to determine the soil's suitability for on - site wastewater disposal systems so that this data could be used to determine site suitability and the approximate area required for on -site subsurface wastewater treatment system as per county and DER regulations, This evaluation was performed in accordance with DEH regulation (15A NCAC 18,A., 1900). This school will serve approximately 950 students, faculty and staff and according to Hobbs, Upchurch & Associates will have a flow of approximately 10,004 gallons per day (gpd). A soil/site evaluation was performed to determine suitability for an on -site wastewater treatment system. The evaluation was performed by makings hand auger borings to identify the soil to the series level, The proposed system and repair areas were the only areas evaluated. The proposed system area runs approxatraately 450 feet north from the southern property line and 225 feet west from the woods .line shown on the reap, The proposed repair area runs approximately 450 feet north of the southernproperty line and 225 feet east into the woods line shown on the attached map. The soils did not vary significantly over the areas examined. The only area evaluated that was not usable for a conventional septic system was at the northern'rnost portion of the proposed system area, This area was unusable, for a large conventional septic system due to low chroma mottles (indicating seasonal high water table) at a depth of 40 inches. After looking at the well data this. is not the actual water table, This is a more restrictive layer than the lit horizon above, but the Ksats show that this layer does allow water movement, Soils in the evaluated areas are most like the Norfolk (Fine4oamy, kaolinitic, thermic, Typic •Kandiudults) and Wagram (Loamy, kaolinitic, thermic, Arenic Kattdiudults) soil series or_taxadjuncts of these series, Typically these soils had a Et horizon with a texture Wetland Delineatiow'permitting/Mitigatiom SoiySite Evaluation for on -Site Septic Systems Env iromncutal Assessments Mine Office: 244 West Mlibmok Rend Raleigh, Notch Catalina 276o9 Phone: (919) 846.5900 Fax: (919) 846-9467 01/0G/1995 '19:52 828322G790 PAGE 03 of sandy clay loam (shown as "A" on the attached map). Such soils can be permitted for Conventional septic systems by the county with a loading rate of 0.3 to 0.6 gpd/A2 on a trench bottom area basis or for a Low Pressure Pipe system with a loading rate of 0.15 to 0.3 gpd/ftz on an area basis. These loading rates are taken from 15 NCAC 18A..1900 (Laws and Rules for Sanitary Sewage Collection, Treatment and Disposal) and are based on the most hydraulically limiting layer within three feet for Conventional systems and within two feet for LPP (Le. the sandy clay loam Bt horizon in this case). The Norfolk and Wagram soil series are well drained soils, which formed,. in loamy , sediments on uplands. Organic'matter content and natural fertility is low and shrink -swell potential is low. These soils are medium to strongly acid. SOIL/SITE EVALUATION PROPOSED DR6MIEL D AREA The locations of the deep boring, and Ksat measurements are shown on the attached map. Measurements of the hydraulic conductivity of the soils can. -site were performed to determine more precisely what an acceptable loading rate would be. The results of these measurements are shown in 'fable 1.. The Deep Boring descriptions of the soils found, in the system and repair areas are found in Appendix 1. Three wells were installed to record the depth of groundwater on -site. The depth to water ranged from 12.63 to 15.44 feet, with an average depth.of 13.9 feet. Hydraulic Conductivity (Saturated and Unsaturated Zone) Unsaturated Zone: Saturated hydraulic conductivity of the unsaturated parts of the Bit, BC and C horizon was measured using a constant head permeameter. The methods used in these measurements were similar to those described in Methods' of Soil Analysis, Fart L, Chapter 29 - Hydraulic Conductivity of Saturated Soils: Field Methods, 29 - 3,2 Shallow Well Pump In Method, pp. 758-763 and in the Soil Science Society of America Journal, Vol. 53, no. 5, Sept. - Oct. 1989, "A: Constant -head Permeameter for Measuring Saturated Hydraulic Conductivity of the Vadose Zone" a.nd "comparison of the Glover Solution with the Simultaneous - Equations Approach for Measuring Hydraulic Conductivity." The results of these tests are shown in Table 1. The conductivity information was used to predict "mounding" beneath the system. These predictions are discussed later in the report. The conductivity horizon -describes the soil material encountered in the auSer hole where conductivities were measured. Saturated Zone: To assess the Ksat in the saturated zone, S&EC .performed slug tests in the upper 5 feet of the saturated zone at three different observation wells. All three wells (HA1, HA:2, and HA3) were screened below the water table (between 13.3 feet and 17.8 feet below grade) N 01/06/1995 19:52 8283226790 4- PAGE 04 (see Appendix 2). Appendix 2 also presents the slug test field data and Table 2 provides the condensed results. After we had performed slug tests on all three wells_with varying slug volumes and analyzed the data, we concluded that the Bouwer and Rice -Method results from all three wells, provided the best estimate of the formation Ksat. By taking the average of all the runs on these three wells we arrive at a Ksat of 9,13 ft/day. Thus, a Ksat of 9.13 ft/d (Table 2) will be used for modeling purposes throughout the remainder of this report assessment. Transmissivity Transmissivity of the, shallow unconfined aquifer at the site was calculated by using slug- testderived hydraulic conductivity estimates. Transmissivity (T) is equal to the thickness of the'aquifer (b) multiplied by its saturated hydraulic conductivity (Ksat).. So, if one knows two components of the equation the other can be solved,for. Traditionally, transmissivity measurements are per -formed via expensive,. time-consuming aquifer tests involving a drill rig, multiple monitor wells, and long-term data collection (e.g., 24 to 72 hours). Additionally, these tests generally assess a thicker aquifer interval than is needed and produce an average Ksat across that interval. We chose to characterize the upper part of tho aquifer (upper 18 feet) which would be more responsive to additions of wastewater from a disposal field'. - We are being conservative by assuming an impermeable layer at a depth of 18 feet below current land surface. This'would leave an aquifer thickness (b) of 18 feet. Using the equation T = Ksat x b, we calculated transmissivity at the site at 164 ft2/day. Mounding Using the measured values described above and using the inputs shown on Table 3, various approaches were made to predict the mound that would develop under the systenn(s), The systems were assumed to be rectangular for the purposes 'of the model, but total square footage of drainfield is approximately equal to that proposed. Several different scenarios were examined, but only the most realistic will be discussed in this report. In all cases it was assumed that only the'upper 18 feet -of-the aquifer responded and that the water table remained at the measured level year round. The computer model used for predicting mounding beneath.a rectangular basin with a constant recharge rate was version 3.0 of the Colorado State University Program CSUPAW Welland Pit. This,progranr was developed by.D. Moulden, D. Sunada and T. Warner. A, journal article describing the program was published in 9Tgodwater Vol. 22, Number 1, Jan -Feb 1984. The: microcomputer uses Glover's Solution with consideration for Hamtush's better means of evaluating this solution by integrationty parts. We ran two different scenarios to predict the mound beneath the system. For both of the following scenarios our seasonal high water table is the highest elevation observed during 01/0.611995 19:52 e28322.6790 / PAGE 05 our site visit, which was at a relative elevation of 85.37' (12.63' below land surface). Both of the following scenarios utilize the following assumption that makes these scenarios conservative: 1, An impermeable layer was assumed at 18 feet, below the current land surface, when in actuality no such zone was encountered, For both of these scenarios we chose'to use, a draianfiiield that would receive 10,000 gpd at a loading rate of 0.6 gpd/ftZ. This will require an area approximately 50,000 ft' in size. The dimensions for this drainfield .will be 400' x 125' . For scenario 1 we will utilize the average KSat from all the wells (9.13 ft/day). Figure 1. shows the resultant mound developed beneath the drainfield if all the lines are stacked in one .area and at steady state after 2 years of daily application. This graph shows that a mound would develop 3.49' above. the water table we observed while on site. This would provide a separation of 9.14 feet between the top of the mound and the -proposed -land surface. The mounding beneath the drainfield in scenario 2. is shown in Figure 2. Scenario 2 utilizes the average Ksat from wells HA 1 and HA, 3 (4,07 ft/day). This scenario indicates that a mound would, develop to a height of 6.64' above the existing water table. This would allow a separation of 5.99 feet between the top of the mound and the proposed land surface. WASTEWATER FLOW ANALYSIS Design Flow Rate =10,000 gpd Assumed Loading Rate = 0.6 g.pd/fe Conventional Trench Width = 3 ft Needed Total Trench Length 51556 ft Needed Total Trench Bottom Area = 16,667 fe Minimum Space Between Lines 9 ft Minimum Total Drainfield Area - 5,556 x 9 = 5%0.04 W = LI S acres 1 gpd/ftZ is equivalent to 4.06 cm/day, Design Trench bottom Loading Rate = 0.6 gpd/ft2 or 2.436 cm/day ]Maximum Areal Loading Me;-- 0.2 gpd/ftZ or 0.812 cmfday 01/0611995 1 9:52 0283226790 PAGE �06. Assuming the trenches are 1$=24'. deep and based on the.prdfile description presented the bottom of the trenches should b6n the. Bt horizon. and above the BC horizon. The depths of saturated hydraulic conductivity's (Ksats) in the Bt horizon, in the system and repair areas, were between 17. and 33 inches at three sites (HA 1, HA 2; and H.A. 3). These Ksats ranged between 5.95 to 7.3, gpd/f 2, with an average of 6:6.1 gpd/R2. The Ksat values for the BC horizon -at sites HA L H,A, 2; and HA 3 were 0,47 and 6.3 gpd/ft2, with an. average Ksat of 2.45 g A/ft�. The Ksats for the C.horizon measured at HA 1, HA 2, and HA 3 were 1.09 to 93.02 gpd/ft , with -an average Ksat of34,65,gpd/ft. After evaluating the field'data; it is obvious the Bt horizon has a higher Ksat than the BC horizon. With this in mind the most obvious alternative is to try and utilize trenches in the Bt iorizon. We recommend utilizing trenches in the 18 µ 24 inch range, but the soils are deep enough'to allow deeper trenches. The average loading .rate based on 10,000 gpd wastewater and the assumption of uniform distribution is 2.436 cm/d. This value represents 9% (trench bottom basis) of the average Ksat'of the Bt horizons reported in, Table. 1, For the BC layer, 2,436 cm/day. is 8% (areal basis) of the average-Ksat values reported in Table 1. The bottom of the trenches will, in general, be in a zone in the Bt horizon where the Ksat is more than tern times faster than the design loading`rate (assuming all flow is through the trench bottom). Assuming that wastewater distributed by a pressure manifold to move along the trenches, it may also infiltrate through the side walls, which will result in faster infiltration than is anticipated for the -above analysis. Based on the.Ksat values reported in table, it appears that the total volume of wastewater (10,000 gallons) that will be applied daily to the trenches of the proposed system can infiltrate into,,the so' a 24-hour period without a significant amount of ponding in the trenches, This analysis assumes uniform distribution of wastewater over the entire drainfield area. However, because of the use of a pressure -manifold system, wastewater will be applied to the beginning of the trenches. Therefore, more ponding is expected at the beginning of the trenches than at the end of each trench. As wastewater moves along each trench, it infiltrates into the soil through the bottom and sides of the trench. _.Based on the available Ksat values; as long as no clogging that is formed, or conductivity of soil is drastically changed due to wastewater duality or other factors, the system. should function without a serious ponding problem in the trenches. We are assuming that trenches installed on, contour in sandy clay loam textured soils will allow redistribution within the trench.' Once wastewater moves into the soil, it must move away from the trenches either vertically or laterally. Zt was indicated that the maximum areal loading rate for 9 ft minimum' spacing over the entire drainf eld area is 0.2 gpd/ft2 or 0.812 cm/day. The lowest Ksat measured in the Bt horizon was 24.16 cm/day.' So even at the lowest measured Ksat in the Bt horizon, the areal loading Late is only 3 % of the measured Ksat. 01/0611995 19:52 -8283226790 PAGE 07 The lowest Ksat measured in the BC Horizon was 1.91 cm/day, which is more than two times greater than the areal LTAR (42% of the Ksat)_ Based on the type of soil, (relatively deep Bt horizons) found at the site, it does not appear that vertical water movement through the least restrictive.layer is a problem, These analyses are based on the available data and. simplified soil water flow equation. It is also assumed that wastewater will have no effect on the soil hydraulic properties with time. Conclusions The state requires a separation of T between the trench bottom and the predicted mound height for all drainfields.. Assuming a trench depth of 24", _the proposed drainfield in Scenario l will have an extra 5;14 feet of separation between the bottom' of the trench and the top of the mound (for a total of 7.14' of separation). This is demonstrated'by: Relative Elevation - Water table (RA. Elev.) Mound height - Trench bottom = Separation 98 = 85.37 - 3.49 - 2, = 7.14 feet of separation In Scenario 2, the proposed drainflelds will have an extra 1.99 feet of separation between the bottom of the trench and4he top of the mound (for a total of 3.99' of separation). This is achieved by: r" Relative Elevation - Water table (Rel. Elev.) - Mound height - Trench bottom ^ Separation - 98 - 95.37 - 6.64 _ 2 = 3.99 feet of separation The'disposal field,w ill function hydraulically as per DEH requirements under a variety of conditions. This conclusion is.based on groundwater mounding resulting from the proposed system (Figures 1 and 2). It is our recommendation to utilize the maximum loading rate (0.6 gpd/ft2) for a conventional system without -pretreatment. Please call if you have any questions or require further information. Sincerely, Steven. M. Price Licensed Soil Scientist #1153 cc: Doc Godshall 01/06/1995 19:52 8283226790 PAGE 08 { AA3 Nit • Kjll rtAt 1 •9 Q w GRAPHIC SCALE 3oo' 300 0 300, 600 N� 01/06/1995 19:52 8283226790 C E 0 ESTIMATED GROUNDWATER FLOW DIRECTION ENLARGED SCALE i H. = -100, �\ Av-3 PAGE '09 Fr [13M,W KP00'- 1 1 OF 11 Ld - - SAW'LQ SAV 0 � u , ��.N.Y `. V,: .\ua.}yNY\V H.N.F F'..Yx.Y M.Y ��}+•[y��� - �N LO a�(Sy YI/MYt.WaYl.WYVI: �'tl:•n`WY--)--'--'-• 'MY.1Y4 �wFr�[ � .4Cr.Yi7v x�WM�I� � � ] vn � . � � + � Y� �� 3 Wln�%tlYMlpr.•/ry%.yy\�yywyna•� ;jam, �,r �-� _ ira..n:fw•A+ C. I�R cv 04 m 00 CV r OD iw � •�\ +�Waway+.Ywm\n:.w:wrxt.�,�.w.mwww-x+t...avw•-».�n+ww...irta�•aa....+�.w,.r - — _. - -- ` 0.1 w.:�, wY....'r.:+ta...•:+ew+..Y�v vww-�a•�..�.�..+..,ww+.wY�_ xn+�+.w�ar• -�-^^ [ +� - ' :m m LD La cn to Ut N ao 13 �.)LO 2-913 .�.•_»....Y.��J.. _P.._.. . ,.4 ...w� ., ..R 7 _J DAYS ry 1 ��:.F�,y •j g •. 01/06/1995 19:52 82832267,90 PAGE 12 TABLE X 'Gray's Creek Constant Head Permeameter (Ksat)- Horizon n - Death ; HA -Bt ' 25-32" Ksat > 1.12 cm/hr . 10.58 im/day w 6.59 gpd/sq. ft BC 73-80" Ksat >. 0.098 enVbr- 0.93 - in:/day - 0.59 gpd/sq. #t C 115-120" Ksat > 15,8. cm/hr 149.31 io,/day -,- 93.02 gpd/sq. ft HA.2 Bt 17-32" Ksat 1.24- cm/hr. ^- 11.72 in./day - 7.30 gpd/sq. ft BC 63-70" Ksat 0.08 cm/hr - 0.76 in:/day - 0.47 . gpd/sq. ft C 93 , 5-102" Mat ' > 0.185 ' cm/hr - 1.75 in.lday - 1.09 gpd/sq, ft HA3 ' Bt 24,5-33" Ksat > 1.01 cm/hr. 9.54 -in./day - 5.95 gpd/sq. ft Bc 71-8011. Ksat > 1.07 cm/br 10.11 in./day 6.30 gpd/sq, ft - C 100-108" Ksat 1.67 cm/hr w 15.78 in./day 9.93 gpd/sq. ft Bout Soils Area HA4 Bt 27-35" Ksat > 2.11 ctWk w '19.94 in./day - 12.42 gpd/sq, ft BC 53-60" Ksat<° . > 5,45 cmihr - 51.50 in./day - 32.09 gpd/sq. ft .HAS BC 51-58" Ksat > 5.47 cm/hr 51.69 in./day - '32.20 gpd/sq. ft HAI • HA2, HA3 :'oils Area Average value of Ksats of Bt horizon Average value of Ksats of BC horizon Average value of Ksats of C horizon Best Soil" Area (HA4 and HA51 Average value of Ksats,of Bt horizon .Average value of Ksats of. BC horizon . c 6.61 gpd/sq ft- 2.45 gpd/sq ft 34.65 .,gpd/sq ft 12.42 gpd/sq ft 32.1.5 gpd/sq ft Q 01/Q6/1995 19:52 8283226790 PAGE 13 Table 2 Slug test data conversions. Well # Run # HA1 FH2 Ksat > 6.47E-05 ft/sec — 5.59 Way — 41.81 gpd/sq. ft HA1 FH3 Ksat > 6.26E-05 ft/sec — 5.41 ft/day — 40.46 gpd/sq. ft HAl FH4 Ksat > 6.47E-05 ft/sec — 5.59 day ' 41.81 gpd/sq. ft HA2 FH1 Ksat > 2.43E-04 fusee — 21.00 ft/day 157.04 gpd/sq. ft HA2 FH3 Ksat > 2.61E-04 ft/sec — 22.55 'ft/day 168.68 gpd/sq. ft HA2 FH4 Ksat > 2,23E-04 Mee 19.27 May 144.12 gpd/sq. ft .HA3 FH1 Mat > 3.52E-05 ft/sec -- 3.04 ft/day — 22.75 gpd/sq. ft 'HA3 FH2 Ksat > :3.66E-05 ft/sec 3.16 ft/day — 23.65 gpd/sq. ft ` HA3 FH3 Ksat > 3.41 E-05 ft/sec 2.95 ft/day — 22.04 gpd/sq. ft HA3 FH4 Ksat > 3.22E-05 . ft/sec 2.78 . ft/day - 20.81 gpd/sq. ft Average conductivity -of shallow aquifer utilizing HAS $ HA29and HA3: 9.13 ft/day Average conductivity of.shallow aquifer utilizing HA1 and HA3: 4,07 ft/day 01/06/1995 19:52 8283226790 PAGE 14 Table 3 Input Data For Mounding Under Wastewater System ' Predicted by Colorado State University Program Scenario 1 I Scenario 2 Recharge Rate: 0.027 ft/day 0.027 ft/day Transmissivity: * 164 sq ft/day 73.3 sq ft/day Specific Yield:, 0.15 0.15 Beginning Time: 30 days 30 days Final Time: 720 days' 720 days "Time Increment: 30 days 30 days, Time of Cut .Off 720 days 720 days Beginning Distance: 0 0 Final Distance: 200 ft 200 ft Distance Increment: 50 ft 50 ft Depth to Water Table: 12.6 ft 12.6 ft Width of System: 125 ft 125 ft Length of System: 400 ft 400 R Amount of Rise 3.491 1 . 6.64 ft The transmissivity is based on the average Ksat of all three wells (in scenario 1) which is 9.13 ft/da, and a window of 18 feet, In scenario 2 the Ksat for HA2 is not utilized (an average K of 4,07It/day) 01/06/1995 19:52 8283226790 PAGE 15 Table `% TRANSPORT TIME CALCULATION By Darcy's Law: V = K hh where ndl. K. = Hydraulic Conductivity (9.13 fVd) dh/ d1= Gradient (maximum estimated was 0,015) h = l✓£l~ective• porosity (estimated at 0.15) V = velocity V = 9,13 '(0.015) = 0,91. ft/day 0.15 Transport Time = Distance to WrfiLee water. V Distance from front edge of proposed system to stream should be at least 100° aithe nearest paint. Transport Time. j00, = 110 days 091 9 .. 01/06/1-995 19:52 8283226790 Appendix .1 Profile Descriptions PAGE 16 01/Q6/1995 19:52 8283226790 PAGE 17 Profile Description Fayetteville HA-1 •f:.D�f ro6xR• 'as�A x KtP 5YR 4 2 Ap 04" Sand loam Granular B 6-18" 7.5YR 7 3 Sand .loam Granular Bt1 18-48" 5YR 4/6 Sandy clay Subangular loam black Bt2 48-70" 2.5YR 4/8 Sandy. clay Subangular loam blocky BC 70410" 5YR 5/8'. 7.5YR 7/1 Sandy clay Subangular relic loam block C1 110-138" 2.5Y 6. 8 ;Sand Granular C2 '138-145" 2.5Y 6/8 Sand/Clay Granular lenses C3 145-168"+ 2.5Y 6 $ Sand Granular HA-2 ::o: Y'• < •u•>:>: :•fi'. iS<e.f%::a. xn: •x•x• 'eat �caaiaa »:2 a » e:ew» ie:x'�d! e:.e 10 :A:x p •�?% Ap 0-8" 5YR 4 2 Sandy loam Granular E1 8-16" 7.5YR 7 3 Sand loam 'Granular' E2 16-20" 7.5YR 5 6 Sandy loam Granular Bt1 20.56" 5YR 4/6 Relic Sandy clay Subangular loam block Bt2 56-86" 5YR 5/8 5YR 6/2 Sandy clay Subangular 7.5YR 7/1 loam block BC 86-95" 5YR 5/8 5YR 6/2 Sanely clay, Subangular 7.5YR 7/1 loam block C1 95-127" 5YR 4/6 Sand Granular C2 127-130" 5YR 4/6 7.5YR 7/1 Sand/Clay Granular Seasonal lenses High Water Table C3 130-145" 5YR 4/6 Sand, Granular C4 145-152" 5YR 4/6 7.5YR 7/1 Sand/Clay Granular lenses C5 152-160" 2.5Y 7 2 Sand Granular C6 160-192"+ 5Y 8 6 Sand. Granular 01/06/1995 19:52 8283226790 PAGE 18 NA-3 RR:}:.. 'n •ktKt e60.: :A A A 0-7" 5YR-4/2 Sand . loam Granular E 7-23" 7.5YR 7 3 Sandy loam Granular Bt1 23-63" 5YR 4/6 Sandy clay Subangular loans block Bt2 63-78" 2.5YR 4/8 Sandy clay Subangular loans block BC 78-100" 5YR 5/8 .5YR 6/2 Sandy clay Subangular Relic loam block C1 _ 70,0-132" 5YR 4 6 Sand Granular C2 132-148" 5Y 8/6 2.5YR 8/2 Sand Granular Seasonal High Water Table C3 14$-156" 5Y $/6 1017 8/2 Sand/Clay Granular lenses C4 156-181" 5Y 8 6 2.5Y 8/2 Sand. Granular C5 181-193" 5YR 7 2 Sand' Granular C6 193-204"+ , 5Y 816 Sand Granular Seasonal High;Water Table 14A-4 gq Sandy loam Granular A. 0-7" 5YR 4 2 E 7-24" 7.5YR 7 3 San- dy loam Granular Bt 24-48" 5YR 5/6 Sandy loans Subangular black BC 48-72" 5YR 5 8 Sandy loam Granular C = 72-108"+ , 7.5Y 6 6 1 Sand Granular. 11' Seasonal High Water Table 01/06/1995 19:52 8283226790 PAGE 19 Appendix 2 Well Information N W a Grays Creek School Well data. from 6/16198 Neil Total well using ht. Water Level; rater level Screen length (ft} (ft) (ft) fTUC} ft) (TOG) (ft) Screened interval (ft) top of ground fm= to Rod Reading Rod Reading. Relative WMer level (ft) cron (ft) (TOG) Elevation Elevation HAI 15.75' . 1.5. 14.13 12.63 0.5 13.33 13.83 3.55 5.05 98 85.37 HA2 18.17 2.25 15.87 13.62 0.5 15 15.5 3.54 5.79 97:26 83.64 HA3 18.67 0.42 15.86 15.44 1 16.83 17.83 6.02 6.44 96.61 81.17 . o-, Y Lo N N CO ao N 00 N LO Ql rt _ In - M LO a � d m -- Slug Tests Data - Grays Creed 6116/98 - �' Bouwer and Rice Method.for partially -penetrating wells in unconfined aquifers. w RESULTS Slug test type (fh/rh) slug (gal) Rw (ft) Re (ft) I.w (f) Le (ft) B (fl) (ft/sec) Ksat (ft)hr)_ (fild) HA1FH2 fh 2.0 0.167 0.083' 1.62 0.5.0 20 0.0000647 0.233 5.59 . HA1FH3 fh 1.5 0.167 0.083 1.62 0.50 20 0.0000626 0.225' 5.41 HA1FH4. th . 1.0 0.167 0.083 1.62 0.50 20 0.0000647 0.233 5.59 HA2FH1 fh 1.0 0.167 0.083 2.30 0.50 20 0.000243 0.875- 21.00 HA2FH3 f1i 1.5 0.167 0.083 .2.30 0.50 .20 0.000261 _0.940- 22.55 HAMM fh . 1.0 0.167 0.083 2.30 -0.50 -20 0.000223 0.803 19.27 HAMM _ fh 1.0 0.167 0.083 2.81 1.00 20 0.0000352 0.127 3.04 HAMM fh 2.0, 0.167 0,083 2.81, 1.00 , 20 0.0000366 .. 0.132 3.16 HA3FH3 fh 1.5 0.167 0.083 2.81 1:00 20' 0.0000341 '0.123 2.95 HA3FH4 fh 1.0 10.167 0.083 2.81 1.00 1 20 1 0.0000322 0.116. 2.78 - type - type of slug test performed (-falling head/ rh-rising head) slug vol. - volume ofwater used for head displacement (falling -head slug tests only) Rw - radius of boring and/or developed zone Re - radius ofwell casing Lw - length of water column Le - length of well screen (if well is screened below static water table) or length of water column (if well is screened across,* B - estimated aquifer thidmess " Ksat - saturated hydraulic conductivity of host material �o N' N m Go N ao N uO m L m La m ti m: CD 01/06/1995 19:52` 8283226790 PAGE 22 1 83.6'1 9147 1 I4b 1 i i. i .i ESTIMATED GROUNDWATER FLOW 'DIRECTION `WOOV5 c�:ro��ndwe�' .fro E D ar•�inMiw"`�'�'`UtIMIMMU%mulaulomismi owl ENLARGED SCALE 1 " 100, i 8283226790 PAGE 23 01 /.06/ 1995 19: 52 hat fh4 time(sec) d 0.1 0.6 1.2 1.7 2.3 2.9 3.6 4.3 5.1 5.9 7.6 8.5 9.5 10.6 11.7 12.9 14.1 16.6 16.9 18.4 19.9 21.6 23.2 25 26.9 29 31.2 33.5 . 36 38.6 41.4 44.3 47.4 50.7 54.2 67.9 61.8 66 70.4 75.1 80.1 85.4 91 96.9 1012 116.8 124.3 132.2 140.E 149.5 168.9 168.9- 179.5 3.4 3.4 3. 3. 3. 3.1 3.1 3.0 3.0 2.9 2.9 2.7 2. 2. 2.5 2.5 2.4 2.3 2.3 2.2 2.1 2.1 2.0 1.9 1.9 1.8 1.7 1. 1.6 1.6 1.5 1.4 1.4 1.3 1.2 1.2 1.1 1.0 1.0 0.9 0.8 0.7 0.7 0.5 0.4 0.4 0.3 18 18 17 19 77 36 99 hat fh3- ft time(sec) drawdown(ft) 35 0.1 5.065 0.6 4.93 )5 1 4.82 32 1.5 .4.8 A 2.1 4.80 16 2.6 4.76 M 3.2 4,72 18 3.8 4,68 95 4.5 4.63 44 5.2 4,581 89 6 4,62 29 6.8 4.46 71 7.6 4,41 06 8.5 4.35 42 9.4 4.29 84 10.4 4.2 72 11.5 4.16 65 12.6 4,101 $$ 13.8 4.03 23 15 3,96 54 16.4 3.901 92 17.8 3.82 23 19,3 3.75 58 20.8 3,881 94 22.4 3.61 31 24.1 3.53 67 25.9 3.45 93 27.8 3,37 31 29.9, 3.2$ 16 32.1 3.19 97 34.4 .3,10 73 36.9 3.01 85 39.5 2.91 05 42.3 2,81 43 45.2 2.71 74 48.3 2.61 09 51.6 2.51 47 $5.1 2.4 78 58.8 2. 62.7 2,18 51 68.9 2,07 86 71.3 1.96 24 76 1,85 84 81 1,744 .9 86.3 1.82 37 91.9 .1.61 77 97.8 1.4 104.1 1.292 W 110.7 1.181 )9 117.7 1.073 i8 125.2 0,971 133.1 0.877 141.5 0.78 150.4 0.69 159.$ 0.602 hai fh2 4 3 6 9 8 9 3 6 3 $ 7 3 5 3 6 4 5 9 5 2 3 2 5 9 7 6 4 5 3 04 3 4 6 5 2 4 5 time(sec) drawdown(ft) 0.1 4.367 0.7 4.267 ` 1 4.212 1.3 4.166 . 1.7 4.157 2.1 4.115 2.5 4,083 3 4.053 3.4 4.015 3.9 3.942 4.5 3.901 5 3.864 5.8 3.82 6.2 3.774 8.9 3.732 7.0 3.686 8.4 , 3,635 9.2 3,591 10 3,541 T0.9 3.49 11.8 3.435 12.8 3,379 13.9 3,326 15 3.271 18.2 3.215 17.4 3.160 18.8 3.098 20.2 3.033 .21.7. 2,969 23.2 2.906 24.8 2.842 26.5 2.773 28.3 2.703 30.2 2.637 32.3 2,583 34.5 2.489 36.8 2.417 39.3 2.334 41.9 2.266 44.7 2.175 47.6 2.092 .50.7 2,009 54 1,928 57.5 1.846 61.2 1.762 65.1 1.877 69.3 1.589 73.7 1,506 78.4 1.426 83.4 1.338 88.7 1.248 94.3 1.165 100.2 1.077 100.5 0.996 113.1 0,913 t �aVi Q <1✓ 01/06/1995 19:52 8 PAGE' 24 ha2 fh4 time(sec) drawdown(q 0.1 2.89 0.6 • , 2.81 1 2,76 1.5 2.72 2.1 2.62 2.6 2.50 3,2 2.41 3.8 2.32 4.5 2.24 5:2 2.0 6 2.03 6,8 1.94 283226790 t ", 1h82 tb3-' time(sec) drawdown(ft) 9 3 0.1 3,79 9 0.6 3.626 3 1 -3,621 9 1-.5 3.407 7 2.1 3.215 5 2.8 3.001 3 3.2 2.846 3 3.8 2,708 4 4.5 2,581 9 5,2 2.44 4 6 2.288 6,8 2.161 1 7,6 2.021 1 8.5 1,890 1 9.4 1.783 5 10.4 1,665 46 11.5 1.592 9 12.6 1.541 5 13:8 1.423 4 15 1,359 7 . 16.4 1.315 7 `17,8 1.25 $ 19.3 1,142 9$ 22,4 1.028 5 24.1 0.9 9 25.9 0.853 3 27.8 0.796 3 . 29.9 0.74 3 . 32.1 0.69 3 34.4 0,837 $ 39,5 0.591 4 42.3 . 0.535 1 48,3 0.487 8 55.1 0.441 a 62.7 0.397 1 86.9 0.341 7 91.9 0.298 2 97.8 0.235 6 133.1 0.231 5 150.4 9,226 3 % 159.8 0.224 8 191.6 0,219 4 203.5 0.21 9 216.1 0.205 4 229.4 0.1'96 5 243.5 - 0.191 6 258.4' 1 274.2 0.173 2 291 0.168 8 308.8 0.155 8 327,6 .0.15 9 347,5 0.136 7 368.6 0.127 1 391 0.113 3 414,7 0.09 W fhi ime(sec) drawdown(ft) 0.1 3.19 0.5 3.132 -1 3.091 1.4 2.999 1.9 2,863, 2:5 2,793 3 2.775 3.6 2.756- 4.2 2,583 .4.9 2.487 5.6 - -2,387 6.4 -- 2,295 7.2 2.108 8 " 2.071 8.9 1.993 10.8 1.783 11.9 1.685 13 1.631 14.2 1.509 15.4 1.439 18.8 1.338 18.2 1.246, 21.2' 1.176 22.8 1.08$ 24.5 1.024 26.3 0.984 28,2 0.923 . 30.3 0.877, 32.5 0.814 37.3. . 0.768 39.9 zO.717 -45.5 0.669 48.7 0,639 - 52 ' 0.597 55.5' 0.551 59.2 0.498 63.1 0.494 71.7 0,445 78.4 _ 0.429 -M.3 0.404 08.2 0.389 133.5 0;367 141.9 0.33 150.8 0.302 u W fhi ime(sec) drawdown(ft) 0.1 3.19 0.5 3.132 -1 3.091 1.4 2.999 1.9 2,863, 2:5 2,793 3 2.775 3.6 2.756- 4.2 2,583 .4.9 2.487 5.6 - -2,387 6.4 -- 2,295 7.2 2.108 8 " 2.071 8.9 1.993 10.8 1.783 11.9 1.685 13 1.631 14.2 1.509 15.4 1.439 18.8 1.338 18.2 1.246, 21.2' 1.176 22.8 1.08$ 24.5 1.024 26.3 0.984 28,2 0.923 . 30.3 0.877, 32.5 0.814 37.3. . 0.768 39.9 zO.717 -45.5 0.669 48.7 0,639 - 52 ' 0.597 55.5' 0.551 59.2 0.498 63.1 0.494 71.7 0,445 78.4 _ 0.429 -M.3 0.404 08.2 0.389 133.5 0;367 141.9 0.33 150.8 0.302 u u 011.06f 1995 19: 52 PAGE 25 ha3 fh4 time(sec) 0.1 1 1.5 2,1 2.6 3,2 3, 8 ,4.5 5.2 B 6.8 7,8 8.5 9.4 10.4 11.5 12.6 13.8 15 18.4 17.8 19.3 20.8 22.4 24.1 25.9 27.8 29.9 32,1 34.4 36.9 39.5 42.3 45.2 48.3 51.6 55.1 58.8 62.7 86.9 71.3 78 81 88.3 91.9 97.8 104.1 110.7 117.7 125.2 133,1 141.5 150.4 159.8 169.8 8289226790 lha3 fh3 ` Ndown(ftAtime(sec) drawdown(ft) 2.279 0,1 3.365 2.247 0.7 2.876 2,233 1.3 2.634 2,177 2 2.466 2A 27 3.6 2.302 2.08 4.3 2,284 1.968 5.1 2.285 1.887 6 2.231 1.79 6.9 2.21 1,707 7.9 2,187 1,649 9 2,159 1.608 10.1 2A 34 1,575 11,3 2.101 1.552 12,5 2.074 1.534 13.9 2.046 1.515 15.3 2.014 1.497 16.8 ` 1.985 1.474 18.3 1.954 19.9 1.921 1,435 21.8• 1.891 1,421 23.4 1.859 1.398 25.3 1.827 1,379 27.4 1.79 1,356 29.6 1.753 1.338 31.9 1.721 1.315 34.4 1.893� 1.292 37 1.054 1,273 39.8 i .817 1-253 42.7 1,575 1.229 45.8 1,634 1,208 49.1 1,492 1.183. 52.6 1.449 1,156 56.3 1.407 1:133 60.2 1.361 1.105 . 84.4 1.319 1.077 88.8 1.273 1:052 73.5 1.227 1.029 78.5 1.183 1,001 .83.8 1.142 0.973 ' 89.4 1.098 0,937 95.3 •1,054 0.913 101,8 1.013 -0.879 108.2 0.973 0.851 115.2 0.932 0.823 122.7 0.885 0.787 1.30.6 0.849 0.754 139 .. 0.807 0.722 147.9 0:766 .0,692 157.3 0.727 0,664 167,3 0.685 .0.627 177.9 0.644 0.595 189.1 '0,602 0.563 201 0.565 0.533 213.6 0.526 0,496 226,9 0,494 fh2 ie(soc) drawdown(ft) It 0.1 4.021 019 3,801 1.4 : 3.764 1.8 3.377 2.3 3.179 2.9 3.003 3,4 3,07 4 3,019 4.6 2.983 5.3 2.869 6 2.833 .8.8 2.777 7.6 2.736 -'8.4 12.69 9.3 2.648 10.2 2.804 11.2 2.683 12.3 2.517 13.4 2.47 14.6, '2,434 15.8 2.392 2,35 18.6 2.314 20,1 ' 2.277 21.6 2.24 23,2 2.198 24.9 2.15.7 26.7 2.12 28.8 2,076 30.7 2.037 32.9 1.991 35.2 1.945 37.7 1.894 40.3 • . 1.838 43.1 1.792 46 .,1.746 49,1 1,891 52,4 1.64 55,9 1.58 59.6 1,525 63.5 1.469 67.7 1.421 72.1 1.379 78.8 1,333 81.8 _ 1.278 87.1 1.227 92.7 1.172 '98.6 1.123 104.9 ' 1,068 111.5 1.022 118.5 0.986 1.26 • 0,913 133.9 0.867 142.3. 0.821 ,151.2 6,775 ie(sec) . drawdown(ft) 0.1 2.754 0.4 2.855 0.8 2.544 1',2 2.404 1.6 2.284 2,1 2.078 2.5 1,887 3 1.826 3.6 1.555 4,7 1.532 6 1.522 6.7 1.504 T5 1,495 8.3 1,476 9.1 1.458 10 1.439 10.9 1.418 1119 1,402 13 1,384 14.1 1.368 15.3 1,349 16.5 1,336 170 1.317 19.3 1.294 20,8 1.276 22:3 1,267 23.9 1.234 26.8 1.216 •27A 1,193 29.3 1.174 31.4 1,146 33.6 1,123 38.4 1.075 41 1.052 43.8 1.024 46.7, 1.001 49.8 0.978 53.1 0.95 56.6 0,923 60.3 0,9 64.2 0.872 68,4 -0.84 72.8 0,817 77.5 0.784 82.5 6.757 87•.8 0,724 93.4 0.692 99,3 0.884 105,E 0.632 112.2 0.604 119.2 0.572 128.7 0,54 134.6 0.507 143 Q,471 J soil & Environmental' Consultants, Inc. 231.16th Avenue N.E. ■ Hickory, North Carolina 28001 ■ (828) 322-6700 ■ Fax,(828) 3.22-6790 Facsimile Sheet Fax Number (828) 322-6790 Date: 3 - „3 O _ �y Time Sent: To: Name: C. is L-114 cc: Company: ' pis) 7 iS, Fax Number: 7 (_T _ z -7 From: Subject: Number of pages including transmittal sheet: For your comments/approval For your information Per our conversation Per your request Please advise Please call Would like to discuss Please handle Hard Copy Sent: US regular mail Hand delivery UPS overnight US certified Federal Express No hard copy sent Other Remarks: If you have any questions or protgems with the transmission, please contact at (828) 322-6700. Confidentiality Notice This transmission is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged and confidential. If the reader of this message is not the intended recipient, you- are hereby notified that any disclosure, distribution or copying of this information is strictly prohibited. If you have re- ceived this transmission in error-, please notify us immediately by telephone and return the faxed documents to us . at the above address via the United States Postal Service. Wetland Delineation/PetmittingWiitigadon Soil/Site Evaluation for Oa -site septic Syste= En%rironmental Assessments Home Office: 244 Wert M 11bmok Road Raleigh Nogh Carol ha 27609 Phone: (919) 846.5900 Fate. (919) 946-9467 G 1't CJ IJl 1 JJ.J Ll. ... Vv��V f JV RECHARGE .RATE = .-0 7 FT/DAY TRANSMISSIVITY = 164 SQ:FT/DAY SPECIFIC YIELD = .15 BEGINNING •TIME = 3.0 . - DAYS FINAL TIME = 720 •DAYS TIME INCREMENT = 30 DAYS"' TIME OF CUT OFF = 720 DAYS' BEGINNING DISTANCE,= 0 FT FINAL DISTANCE _ 200- FT. DISTANCE INCREMENT.= '50 FT DEPTH = 12.6 - FT WIDTH = 125 FT ' LENGTH = .. 400 FT ANGLE _ ,0. DEGREES TIME DISTANCE HEIGHT (DAYS) (FT) (FT) 30 0 1.480. . 30 50, 1.450 30 100 1.357 30 150' 1.181 30 200 0.'876 60 p 1.899 60 50 1.865 60 100. 1.758 60 150. 1.559 60' 200' 1.226 90 0" 2.153 90 50 2.117 90 100 2:004 90 150 1.797 90 200 _1,452 %-120 0 2..336 %120 50 2.299 %120. 100 2.183 $120 150 1.971 $120 -200 ' . 1.620 %-150 .0 2.478 g150 50 2.441 t150 100 2.323 t150 150 2.109 %150 200 1-.754 %180 0 2.595' -1160 50. 2.557 li180 100 2.439 %-180 150.. .2.222 -200 1.868 %210 -0 0 2.695 %210 50 2.656 !k210 100 2.537 %210 150 " 2.319 %210 200 1.959 $24p. 0-, 2 .7,8.1 _ 1;240 ' 50 2.742 U40 100 2.622 $240 150 2.403 g240 200 2.042 %270 0 2.857 k270 50 2.818 SAAQ %270 100 2.698 %270 150 2.478 %270 200 2,116 %300 0 2,925 %300 50 2.886 1300 100 2.765 W300 150 2.545 g300 200 2.182 %330 0 2.987 %;330 50 2.948 1330 100 2,827 %330 150 2.606 96330 200 2.242 96360 0 3.044 %-360 50 3.005 %360 100 2.883 $360 150 2.661 %-360 200 2.297 %390 0 3.095 U90 50 3.056 %390 104 2.935 1390 150 2.712 %390 200 2.348 %420 0 3.144 %420 50 3.104 %-420 100 2.982 $420 150 2.760 W420 200 2.395 %-450 0 3.188 %-450 50 3.149 1;450 100 3.027 %450 150 2.804 %450 200 2.439 %480 0 3.230 %480 50 3.191 k480 100 3.069 %480 150, 2,846 %480 200 2.480 %510 0 3.270 %510 50 3.231 %510 100 3.108 %510 150 2.885 %510 200 2.519 $540 0 3.307. %540 50 3.268 %540 100 3.145 *540 150 2.922 W540 200 2.555 %570 0 3.342 %570 50 3.303 %570 100 3.180 %570 150 2.957 *570 200 2.590 a600, 0 3.376 50 3.336 %600 100 3.213 %600 150 2.990 %600, 200 2.623 %630 _ 0 3.407 %-630 50 3.368 Ui/ bbI 1 yy5 11 : LL d/-b ZZb f 7JU rout �4 . W630 100 3.245; 163.0 150 3.021 %630 200 2.654 %M 0 3 .438 . %660 50 3.398 %660 100, 3.. 275 $660� 150 3.051 %660 200 2.684 %690. .0 3,467 %690 50 3.427 !k690 100 3.304 %-690 150 3.080 %690 200 2.713 *720 0 3.495 $720 50 3.455 %-720 100 3.332 V20 150 3.108 A720 200 2.740 b11 Ub1 1 7�jO ZLG f 7n rt-K. u� RECHARGE .RATE _ ' , . 027 FT/DAY S TRANSMISSIVITY,= 73.3 SQ.FT/DAY SPECIFIC YIELD ` = .15 - { BEGINNING TIME = 30 :,DAYS FINAL TIME = 720 DAYS, TIME INCREMENT = '30 DAYS TIME OF CUT OFF = 720 DAYS BEGINNING DISTANCE..= 0 FT FINAL DISTANCE, �200 FT, DISTANCE INCREMENT = .50 FT, DEPTH = . 12.6 FT WIDTH = .125 FT LENGTH = 400 ' FT. ANGLE = 0: DEGREES.. TIRE \DISTANCE HEIGHT (DAYS) (FT)- (FT) 30 0- 2.'305 .30. 50 3-0 100 2.111, 30: 150 1.810- 30 200 1.245 60 0 3.163 '60 50 3.100 60 100 2.898 60 150, , 2.516 60 200 1,851 90 o . 3,702. 90 50 3.631 90 100 90 150 2.988 90 200- 2.278 t120 0 4.095 $120 50 4.019 " %-120 100 3.783 ` %120 150 3.345 W120 200 2.608 $150 0 4.404 $150 SO 4.326, %-150 100 4.082 %-150 •150 3.. 631 96150 200 2.878 $180 -0 -4.660 ' P6180 50 4.'580 , *180 100 4.330 1;180 150 3.871 sk1$0 20,0 3.106' W210 0 4.877, W210 50 4.796 $210 100 .4.542 W210, 150 4.077 *210 200 3.303 5,067 76240 50 4.984 ' %240 100 4.728 $240 150 4 •: 257 %240 200.. 3'.477 $270 0 5.234 sk270 50 5.151 G1J G07 177J L1 . LL VLVJLLV f JV - rt� ' %270 100 4.892 U70 150 4.418 *270 200 3.632 %300 0 5.385. %300 50 5.30, %300 100 5.040 96300 .150 4.563 $300 200 3.773, 1330 0 5..521 W330 50 5.437 %330 100 5.174 $330 150 4.694 U30 200 3.901 %360 0 5,646 96360 50 5.561 %-360 100 5.297 %360 150 4,815 %360 200 ." 4:019 �390 0 5.761 sk390 50.• 5.676 W390, 100 5.411 �390" 150 4.927 _ $390 200 4.128 %420 .0 5.867 $420 50 5.782 %420 100 5.516 %-420 150 5.'031 %420 200 4.229 %450 0 5.967 %450 50 5 8'81 %450 100 5.6.15 . *450 150 5.127 g450 200 4.324 %480 0 5.06a %480 50. 5.974 %480 10.0 5.707 %-480 1'50 5.218 %-480 200 4.414. %510 0 6.148 %516 50 6.062' W510 100 5.793 %510 150 5.304 $510 200 4.498 %540 0 6.230 %540 .50 6.144 %540 100 5.875 %540 150 =: 5.385 1540 200 4.577, _ %570 0 6.308 %-570 50 6.222 -�570' loo 5.953 *570 150 5.461 96570 200 4.653 %600, .- - = 0 - 6.:383 $6.00 50 6.296 W600 100 6.026 %600 150 5.534 %600 200 4.724 %630 0 6.453, $630 50._ 6.367 V1f VV+ lJ�r+. ---------- %630 100 %630 150 %630 200 %660 0 %660 50 g660 10.0- %660 150 %-660 200 %690 0 %690 50 !�690 100 %690 150 %690 200.. %720 0 $720 50 %-720 100 $720. 150 %720 200 6.096 5.603 4.793 6.521 6.434 6.163 ,5.670 4.858 6.585 6.498 6,227 5.733 4.921 6.647 6,560 6.288 5.794 4.981 oil -& Environmental' Consultants,,, Inc. 231 l6th Avenue N.E. 'N Hickory.. North Carolina 28601 a (828) 322-6700 M Fax (828) 322-6790 Facsimile Sheet Fax Number (828) 322-6790 Date: 3 - 3 0 - Ff Time Sent: To: Name: Co Js L-4 Company-, Fax Numbet:, -3 2 From: Subject: Number of pages. including transmittal sheet: C.SL, rrs,- I � For your comments/approval For your information Per our conversation Per your request Please advise Please call Would like to discuss Please handle Hard Copy Sent:, US regular mail' UPS overnight — Federal Express — Other Remarks: Hand delivery ---US certified NQ hard copy sent If you hare any quMions.or-,problems with the transmission, please contact at (828) 322-6700. Confidentiality Notice This transmission Is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged and confidential. If the `reader of this message is not the intended recipient, you are hereby notified that ' any disclosure, distributionor copying of this information is strictly prohibited. If you have re- ceived, this trammission:fn-e`r'ror, plegse. notify -us immediately by telephone and return the faxed documehts to us at,the abo ve address via the United. States Postal Service. Welland Delineation/PermittingMtigation' SoiYSite Evalliatio.n for M-Site Septic Systems Emimmnental Assessments Home Offi=. 244 West Milbrook Road Raleigh I North Carolina 27609 Mcne: (919) 846-5900 Fax (919) 946-9467 RECHARGERATE = ,.027 FT/DAY TRANSMISSIVITY = 164. SQ.FT/DAY �O�°�`ci' ��` SPECIFIC YIELD = ..15' BEGINNING TIME = 30. DAYS FINAL TIME = 720 DAYS TIME INCREMENT = 30' DAYS TIME OF CUT OFF = .720 DAYS BEGINNING DISTANCE = '0 FT .FINAL DISTANCE = 200 FT DISTANCE'INCREMENT = 50 FT DEPTH = 12.'6 FT =' WIDTH = 12 5 FT LENGTH = '400 FT ' ANGLE _ 0 DEGREES TIME DISTANCE HEIGHT (DAYS) (FT) (FT) 30 0 1.4'80 30 50 1.450 .30 100 1.357 30 150. 1.181 30 200 0.876 60 0 1.899 60 50, 1.8.65 60 1.00 1.758' 60 150 1.559 60 200 1.226 90 0 2.153 90 50 2.117 90 100 ; . 2.004 90 150. 1.797 90 200.. . 1.452 %-120 0 2.336 %120 . .50 2.29-9 W120 100 2.183 �120 150' 1.971 $120 200 1.620 *150• 0 2.478 k150 50 2.441 �150 100 2.323 ' 1150 ,150 2.109 %150 200 1.7.54 %-180 0 2.595 %180 50 2.557 %;180 100 2.439 *180 150 2.222. . %180 200 1.865 %210 0 2.695 *210 50 2:656` %210 100 2.537 tk210 150 2 .319 �210� 200 1.959 1240 0' 2.781, $240 ;. 50 ., 2 : 742 %240 100 2.622 %240 150_ - 2.403 g240 200 2.042 %270 0 2.857 k270 50 . 2 .818 .. $270 100 2.698. %270 150 2.478 %270 200 2.116 %300 0 2,925 U00 50 2.886 !k300 100 2.765 96300 150. 2.5,45 %-300 200 2•.182 %330 0 2.987 %-330 50 2.9,48 %330 100 2.827 %330 150 2.606' ; -%330 200 2.242 !W360 0. 3.044 ; *360 50 3.005 %360 100' 2.883, %360 150 2.661" %360 -200 2.297 %390 0 3.095 %390 50 3.056 %390 100 2.935 %390 150 2 .7.12 %390 200 2.348 %420 0 3.144 sk420 50 3.104 *420 100 2.982 %420 150 2.760 %420. 200 2.395 g450 0 3.188 %-450 50 3.149 %-450 100 3.027 - %450. .150 2.804" %450 200 2.439 %480 0 3.230 %480- 50' 3.191. g480 100 3.069 %480 150 . 2 .846. _ .... %480 200 2.480 %-510 0 3.270 %510 50 3.231 010 100 -3 .108 %510 150 2.885 %510 200 2.519 %540. 0 3.307 %540 50 3.268 %540 100 3.145 *540 ;150 2.922 %540 200 2.555 %-570 �0 3.342. %570 .50 3'.303 Is570 100 3.180. %570 • 150 2 .9,57 W570 200, 2:590 %�600 .0 3.,376 :• lk600 .5,0 3.336 . %600 100 3.213 *600 150 2.990 %600 200 2.623 6630 0 3.407 %630 50. 3.36.8 • JllUb; 177J L1 : LL aL76LL0 (7CJ .. - nuL �`+ , %630 100 3-245 %630 150 3 .021 '- 1630 200 2.654 ir660 0 3.438 %660 50- 3.398 %660 100 3.275 $660 150 3.051 1-660 200 2.684 %690 0 3.467 %690 50 3.427 A690 100 3.304 %-690 ISO 3.080 %690 20,0 2.713 %720 0 3-.495 $720' 50 3.455 %-720 100 3.332 . t720 150 3.108 %720 200 2.740 U1.1 VOJ 177:J RECHARGE RATE = .027 FT/DAY TRANSMISSIVITY:=, 73.3 SQ.FT/DAY SPECIFIC YIELD = .15 {r.5,, f BEGINNING TIME = 30 DAYS FINAL TIME = 720 DAYS TIME INCREMENT = -30 DAYS TIME OF_'CUT OFF = 720 DAYS BEGINNING DISTANCE = 0 FT FINAL' DISTANCE .= 200 ..FT D I STANCE INCREMENT' = 50" FT DEPTH 12.6. FT WIDTH = 125 FT LENGTH 400 FT ANGLE = 0 DEGREES.. TIME DISTANCE HEIGHT-- (DAYS) (FT) (FT) 30 0 2.305 30 50 2.260 30 100 2.111, 30 150 1.810 30 .200' ,. 1.245 60 0 3.163 60 50 3.100 60 100 2.898 60 150 2.516 60 200 90 0 3.702 90 50 3.631. 90 100 3.406-- 90 150 2.'988 90 200 2.278 $120 0 4.095 96120 •50 4.019 k120 100 3.783 %120 1.50. 3 .345 g120 200 2.608 %150 0 4.404 %150 so. 4.326 1-150 100 4.082 k150 150 3.631 %150 = 200 2.878 $180 0 4.660 %180 50 4.580 %-180 100 4.330 1180 150 3.871. �180 200 .. - . 3.106 %210 0. 4.877 %210 50 4.796 %210' 100 4.542 W210 150 4.67..7 %210 200 3.303 $240 0 5..067 . %240' . . 50 A . 984 %240 100 4.728` $240_ 150 4.257 %240 20.0 3.477 1270 0 5.234 %270 50 5.151 UiI YJbI LL 2SL 7JLL0 (7CJ %270 100 4.892 96270 150 4.418 9&270 200, 3.632 %-300 0 5.385 %300 50 5:301 %-300 100 5.040 %300 150 4.563 *300 200 3.773 %330 0 5.521 %330 50 5.437 9k330 100 5.174 $330 150 4 .694 ' , %330 200 3.901 %360 0 5.646 9s360 50 .5.561 %-360 100 5.297 %360 150- 4.815 %360 200 4.019 %390 0 5.761 %390 50 5.676 $390 100 5.411 %390 150 4.927 %390 200 4.128 %420 0 5.867 %420 50 5.782 %420 i00 5.516 %420 150 5.•031 %4'20 200 4.229 %450 .0 5.967 *450 50 5.881 *450 100 5.615 %-450 150 5.'127- %450 200 4.324 %480 0 6.060 96480 50 5.974 %480 100 5.707 %-480 150 5.218 !k480 200 4.414 96510 0 6.148 .%510 50 6.06.2 $510 100 5.793 %-510 -150 5.304 %510 200 4.4.98 %540' 0 6.230 %540 50 6.144 %540 100 5.875 %540' 150 5.385 °s540 200 4.577 %570. .0 6.308 $570 50 6.222 96570 100 5.953 !k570 150 5.461• %570 2'00 4.653 %600 0 6.383_ %600 -50 6.296 %600 100 6.026 %600 150 5.534 %600 200 4.724 1630 0 6.453 %630 50 6.367 *630 100 6 .096 %630 150 5.603 %630 200 4.793 *660 0 6.521 W660 50 6.434 %-660 100 ' 1660 150 5.670 k660 200 :. A . 858 %-690 0 6.585 %-690 50 6.498 ik690 100 '6.227 _ �690 ,. 15.E . 5.733 $690.:: 200 4.921 %720 0 6,.647 1;720.. 50 :... 6.560 t720` 100 6.288 %720. 150 5-.794 %720 .- 20.0 4.981 COUNTY of CUMBERLAND E. Newton Smith Public Health Center. ENVIRONMENTAL HEALTH 1)"ION Phone (914) 433-3660 Fax (910) 433-3669 . OUR ENVIRONM,EN'T - A WAY OF LIFE f a c s i m e TRANSMITTAL To: L` o�i,� ha 1 Fax #) 7 i 5 = 3a $ From: Imo: GrgMn pyee1C EleYri 6`C10O1 Date:�zGa99 Time: A: 3 10 Pages a- lncluding this Zover sheet COUNTS: 227 Fountainizead Lane • Fayettevifle, North Carolina 28301 • Phone (910) 433 3600 Fax (910) 433 3659 COUNTY of CUMBERLAND E. Newton Smith Public Health Center Memorandum To: R. N. Godshall, On -Site Waste Water Engineers ,r From: ' Danny Soles, & S., Supervisor 'a 5 (pia -Site Waste Water Cumberland County Date: March 26, 1999 RE: Gray, Creek EleMentary School So& ]evievv David McCloy, Robert Bennett, Daniel Ortiz, Carton Mercer and engineer Michael Koonce and I visited the staked proposed drain fill area on Monday, March 22, 1999. Soil borings were made in the middle of the proper pour nitrifica on fields, soft borings were also made in the middle of the four repair areas. Two (2) borings were 126 pnches, one (1) to 102 inches and the other five (5) borings to 60 inches. Measurements of the- four (4) staked nitrification fields concurred with the plans. The LTAR within three feet of the ground surface ranged from 0.45 gpd/W to 0.3 gpolft2 . The rate of 0.3 gpd/R2 used by Hobbs Upchurch and Associates 1s within, this range and should be okay, Sol, profile descriptions we simdar to Steven M, Prices' of Sod, & Environmental Consultants, Ine. presented in his March. 19,1999 report: DS/dm r�'� 7 • 227 Fountainhead Lane • Fayetteville, Nor Mar 29 99 05:45p Thomas K. Goodwin,, P. E P• 1 1qjHobbs, Upchurch & Associates, P.A. Consulting. EnZineers 4917WatersEdge Drive, Suite FACSIMILE',' Raleigh, North Carolina 27606 (919) 854-0233 FAX (919) 854-7815 TO: C �( OG j} 5 N�LI - FAX NUMBER: (Cl I q) FM: �� NO. OF PAGES:, (including cover) RO, iM l l `T Hobbs, Upchurch & Associates, PA - DATE: 317 HUA PROJECT #. C RE: c-v av-- .MESSAGE: rye R3E YJ_-MouE bcx"5 991b 3685 c.im A''� c "r f.•lhua jomuhuasheetVaz-origiw doc Mar 29 99 05:45p Thomas' K•.-Goodwl_n, I' L. aia- dog-.fbIZ) GoJids_ . Sub !Nble. m.ersi Se, W ale �. 2-I P m PS 4 5 .2 7 MATERIALS OF CONSTRUCTION PERFORMANCE RATINGS.(Ganons Per Minute), WS1512D WS20120 wsaoD ws5o32D stsImard optti� wsts3<D WS2034D Na Part flame Series Ro. I. tMS1534D ' WS2034D WS30340 yYS503401 1 Impeller, Non -Clog 1001 11�' HP► 1'k 2 3 5 2' Castings 1001 RPM► 1750 3 Shatt-Keyed 3W Series S.S. 1G 290 340 390 440 4 Fasteners 300 series S.S. 15 eg 305 310 425 5 Ball Bearings, Sfeel 20 , 210 270 330 405 6 Power Cable STI 15 feet Additional.Lengths;, 25 160 • .225 300' 380 .., 7 0-Ring 9una-N. 30 100 175 260 355 ' 8 Seal Sensor Sim, 15 Feet Additional Lengths 125 325 3 220 . . NedlaMal 66 160 9 Saels. k SoNce BatatY Stwonry ElaA*- Parts r 100 2E5'` 45 STD. 10K21. General - Carbon Ceramic Buna-N 300Series 40 1910 S.S.5l1 140 OPT. 101C22` eavy Duty Mgsten Tungsten 55 Makrial Cade Engineering Swdud 60 S. 80 1001 Cast Iron - ASTM A48 Class 20. 2465 . 1102 Bronze — ASTN 8584 MODELS DIMENSIONS , Solids M1x Series aP Voila Phase aPiA Amp = Rot0on WS151?D 1'/: 230 11.7 ig2- . ' WM12B ._ 2 , 230 15.0 196' W51532D 11h 2D81230 10.0 190 - to.o 194 27" 12" ws2o32D z : 2os+2ao W.150 PSI' W83M 3 . M81230 5750 120 200 ANSI Flange 3 17.Q ; 205 W550320 .5 2081230 9'/2" WS15340 1'/e 460 5.0 - , 190 151/2" NfS0340 2. 460- 510 194 61/e" WS20M3 460 60 200 r =++ Kickback wssalaD 5 460 es 2D5 ' 3'/,'. I Avalable Certifications: CP Canadlan Standards Association. Pennsylvania Bureau of Mines for non -face applications — 80TE 91. 'PRINTED IN U.S.A Se4E1=A FALLS NEW ` CpK f3148 SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE Mar 29 99 05: 4Gp Thomas K.-Goodwin, P. E 919-E154-"lE115 p. e Submersnbie Sewage PUMP MODEL 3888. , SIZE 3 SOLIDS METERS FEET 20 15 Q W U_ z 10 �.1 H 0 H 5 "0 50 100 150 _ 200 25u JW 0 12.5 25.0 37.5 50.0 62.5 75.0 87.5 100.0 W/h' . CAPACITY (D GOULDS PUMPS. INC bra FANS nFw YQfK O148 I n'omas r: v000win, r. uiume� Y�*i,. v s I LIE Loll ihree:Phase:'1'1/x 5 HP,-208-23d'+. Tung sten.carbide vs. tungsten APPLICATIONS. or 460 Volt, fi0',Hz,1750 RPM. carbide 'lower seal available. Overload Protection must be Seai Sen'sor Prober Located in an Used in a variety.of residential, Provided In Starter Unit. oil filled chamber. If water should: commercial and industrial • Class B Ensulation:: begin .to leak past lower seal, d will applications such as: • Shaft 300 Series Stainless Steel be 6ptio i Lela tr6n,insen sensing unit., to a. Sewa e s stems ar optional-electronicaensing unit 9 Y Keyed Design. '- Shalt: 300.rlesstainless steel, , e Flood and pollution control, -Bearings. Ball Bearings Upper is Dewatering and'Lower.. keyed design. :Farms ' . Motor: FuUy.Subrnerged in Oil .pow&Cord:15 Feet Standard Filled Chamber. High grade -turbine 4. Hospitals 1' Phase --14/3 STO .'Trailer courts oil su . nos motor for more efficient . 3 Phase - 1.4/4 STO heat dissipation, permanent lubnca 0 Motels Optional Length_ s Availablee. Gon': of bearings and mechanical seal , • Sensor Cord:,15 Feet Standard.. for complete protection against T6l2 SJTO_ outside.environment SPECIFICATIONS - " Optional Lengths Available. Designed for Cnptinuous,Opera nufacturer's recommended Put>rtp. On CSA Ilste Motlels, 20' length Uon: Pimp'ratings are_within the ' Solids Handling Capabilities: SJTW and_STW ace standard: rt�btor ma worki g mits and can be operated. 3��-Maximum. contin' 'sly without damage. • Discharge Size:3"•Flanged._ : I=EATURES Be"rigs: Upper.:and lower heavy a Capacities: up to 440 GPM " duty ball bearings construction for • Total Heads: up to-65 ft. TDH -'Impeller: Cast iron, two vane semi -,..precision positioning,of parts and to e Mechanical Seals: Carbon open; non -clog with pump -out vanes carry thrust loads Rotary/Ceramlc Stationary for rr►echanical,seal,protection, Bal'= power Cable: Severe duty rated, 300 Series'StainlessSteel Metal: "t anced for smooth.operation. Bronze oil and water resistent Epoxy seal , Parts BUNA-N Elastomers. impeller available as.an option:' on mctor-end provides secondary'- s 'Temperature: 160°'F (71-G) Casing Heavy duty cast iron, moisture barrier in of outer, f y acke damage and to prevent oil Maximum. volute type or maximum efficiency:, i 'Fasteners: 300 Series Stainless 3" flanged coritc . to 150 PSI ANSI wicking Steel. standard. Adaptable for slide rail. O-Ring: Assures positive sealing • Capable of Running Pry without : system• contaminants and oil leakag against e• Damage to Components. Dual Mechanical Seals: Ceramic Molar: vs carbon sealing faces: stainless . steel metal pdrts;`BUNA N elasto' •"Single Phase: 11/2-2 HP, 230 Volt, mers: Upper and lower`tandem. . 60 Hz, 1750 RPM. mounted shaft seals,are posltioned ; Built-in Overload with Automatic independently. and are separated by Reset an oil -filled chamber: Optional Permanent. Split Capacitor Type.. eve duty: 1sss ®jags SnA1r Pumos. Ina Mai'- 29 99 04:50p Thomas K. Goodwin, P.E 919-854-.7815 p.1 Hobbs; Upchurch & Asso . ates P.A1qj , ConsultinjZ pnkineeri FACSIMILE 4917 Waters Edge Driv e, Suite 110 Raleigh, North Carolina 27606 P19) 854-0233 FAX (919) 854-7815 TO: JDor GooSll .t. FAX NUMBER: 15-32�3 27 �i~l� - ON S1'� 1Nftb�iNg�� SE�37�} FROM: Hobbs; Upchurch &AssocNO- OF PAGES: 10 (including cover) - iates, P.A. _ DATE: 3 129 9 9 HUA PROJECT # Cu 9 $oZ RE: Gi, M5 A*Vt "11t4Rfjglt'tRt C qEKMr-r MESSAGE: G Vln E h tht.4 (1= yoe., N�e'� X j LNG FL* YIA CC% '7lM {GtNt.l - (ho co. �cHopL f 9{a �78 ' } 233 0 .f.'Vtua form%huasheersyax-originvl.doc .Mar 29 99 04:50p Thomas K. Goodwin, P.E 919-854-7815 p.2 Mar 29 99 09:45a Thomas K. Goodwin, P.E 919-054-7015 p_2 ' GMMs ctua:x �naorm�K i�atook Ptoicct tilt _�w+►6 C " County DEHNF.-OSWS LARGE SUBSURFACE WASTEWATER SYSTEM . REVIEW TRANSMITTAL CHECK -LIST I, SYSTEM WASTEWATER DESIGN FLOW CONFIRMATION'S Not Rate Ap IdW A. Aolica lob infoangfion 16 ❑ Application for Improvement Permit has'been submitted,to LHD (four copies attached) (2a)** L� ❑ . Property has bten shown an plat or boundary survey, and PIN number and' locator.map have been provided M ❑ Name, address, phone, Fax. E-Mai! Numbers for owner, agent, cngix=r, soils consultant are attached d la Project proposed is described, including whether new, repair, expansion, replacement, modification of existing, or combination 0 D Water supplies (existing and proposed) and surface waters have been described and locations shown d ❑ Facilities are described and located (existing and proposed) which are to be served by . proposed system, including occupancy ind projected use patterns Ed, Q List provided of all wastewater sources and water use fixtures (points of wastewater . entry into system) a 13 Projected wastewater characteristics (e.g. including wastewater quality data for any non - domestic sources) and flow patterns are described d a Wastewater system components are described and located (existing and proposed) ❑ U Proposed phasing schedule for facilities and system components is provided. Ef ❑ Documeutation provided to LHD indicating wastewater system and facility are under ownership or control of person owning the facility or that an owners association and tri- party agreemeat shall be provided 13. Design Flow Information (3)** d 0 Proposed design flow attached for siting each system compdnent (e.g. pretreatment units, and drainfelds) and phase of development Cal ❑ Basis, including calculations, for determining design flows provided by Applicant's, engineer 0 O If flow reduction proposed,, the conditions of Rule .1949(c) have been met If reduction proposed is based on flow data: Pf r] Comparable facility has been fnlly.described, including comparative occupancy, hours of operation, location, size, floor plans, water use fixtures and water use practices. For food service facility, documantation on comparable dining area site and use of muld• vs. single -service utensils end plates have been provided. 1-1 Mar 29 99 04:51p Mar 29 99 09:4.Sa p.3 P. ,Dane Na Applira�u _ i 0 flow-meter(s) locadon(s) has been specified and measurement units Jhave been field confirmed, with documentation attached. 16 © Flow -data provided include at least 12 previous consecutive monthly consumption readings and 30 days of consecutive daily now readings from an average or above average month. la Occupancy data has also been collected at least tturing this 30 day period. C O If wastewater includes food service or other non -domestic sources, at least two effluent samples during hours of operation have been -taken from a comparable facility. For food service, samples have been analyzed for BOD or COD, total suspended solids and grease + oil. [� p pretreatment measures have been proposed to off --set any high strength characteristics of the wastewater from the proposed facility, (description attached). If reduction proposed is based-da Using water -conserving fixtures: d 13 Manufacturer's cut.sheets are attacheii' for proposed plumbing fixtures, including water Consumption per use. i ❑ Provisions are described for wastewater minimization &ud for diverting extraneous wafers from the wastewater system (eg: cooling system condensate discharges) O If reduction is based on flow equalization; anticipated flow pattern, basis for sizing dosing tank and drainfields, and method of equalizing�,flows are fully described. Thomas K. Goodwin, P.E Thomas R. Goodwin, P. E 919-8.54-7815. 919-854-?B15' • C. Concurling Aignatu , that the applicant has, M the best of his/her abilities and belief, provided complete and factual representations of the information requested above: Applicant or Applicant's Agent Date _ 1 D. Health _ DepaMe 's Coacurreacs thar Application has been_ submitted, requested information appears complete and State 'review is requested- Local Health Ddpermfent Environmental• Health Specialist Date Note to all interested ':persons. This transmittal check list and necessary accompanying information shall be submitted with a request for design flow coafumadon'to the On -Site. Wastewater' Section, Division of Envi=oamo tal Health, PO Box 29594, Raleigh, NC 27626-0594 (Phone: 919-733- 2895). �« Numbers in parentheses.( ) refer to corresponding item in document entitled "Procedures and Information Required for Apptoval of Loge Subsurface Wastewater Systmaos", which contains complete information on the large system review_ and approval process and may be obtained from the On -Site Wastewater Section 1-2 .Mar 29 99 04:51p Thomas K. Goodwin, P.E 919-854-7815 p.4 Mar 29 99 09:4)3a Thous K. Goodwin, P.E 919-054-7815 P. • 4 G1zAts Ct<FEK ( ftmyt. y sCttowl� Nut Tide CAMA66PA-oo County DEHNR-OSWS LARGE SUBSURFACE WASTEWATER SYSTEM REVIEW TRANSMITTAL CHECK -LIST II. SrM PLAN AND 'LAYOUT APPROVAL Na Lome �pptinals A. ApWication informatio (W needcd if previously provided) ❑ d Application for hnproveme& Permit has been submitted to L ND (4,copies attached)(2a)" ❑ 91 Property has bem shown oa plat ar boundary survey, and• PIN number aid locator map have, been provided ❑ Q Natae, address, phone, Fax, E-Mail Numbers for owner, agent, engineer, soils consultant are attached O C-t Project proposed is described, including whether new, repair. expansion, replacement, modification of existing, or.combination ❑ Gr Water supplies (existing and proposed) and surface waters have been described and locations shown Q ® Facilities are described and located (enuft and proposed) which are ''to be served by proposed system, _ including occupancy and projected use patterns ❑ Cd List provided of all wastewater sources and water use fixtures (pdints of wastewater entry into System) C7 d Projected. wastewater characteristics (e.g. including wastewater quality data, for any Aon- domestic sources) stud now patterns are. described 0 0 'Qastewater system components are described and Iodated (existing and proposed) O d Documentation provided to, LHD indicating wastewater system and facility are under ownership or control of person owning the facility or thar an owners association and tri- party, agre=ent shaft be provided $, �7��n'Flaw Confirmation (�)M� Documentation'provided that: l O Proposed design flow has been confirmed by the L D based on Rifle .1949(a) or Table 1 of Rule .1949(b). Ef l7 OSWS dos previously concurrod with proposed design flow Q ❑ DSWS coarmnation of proposed design flow is being concurrently sought ►. Mar 29 99 04:51p Mar 29 99 09:48a Thomas K. Goodwin, P. E Thomas K. Goodwin, P.E 919-854-1815 p.5 919-854-7815 p-5 C, .his ine_System ComQorignt Evaluation (4)** boa Ayplimbta ❑ d Existing system'compouents initially proposed to remain in use have been.properly 1 identified, inspected by applicant's consultants and UM and innspection repots are attached 17 © Existing component dimensions, capacities, adequacy/suitability for proposed continued use, and coded repairslmodifiLations to be incorporated 'taco system design have been determined and documentation provided D. 5oi11Sttc Evaluation T� O SoMite evaluation report by applicant's soil scientist provided (4 copies) (5b)**: - U Includes soil profile descriptions for pits and borings field located by gridding and . staking-st St? -foot intervals, taken at pre -approved intervals d C] Delineates sites whicb an suitable,.provisiomlly suitable or unsuitable for different types of wastewater systems in maimerwhich enables their field location d O Recommends LIAR for proposed system(s), with justification' Gd O Includes recommendations for drainfield design and site modifications (maximum trench depth, fall depth, drainage needs, etc.). O Includes soil chemical data (pH; CEC, percent base saturation, etc.) when site is,to receive wastewater from nondomestic sources, and background metal and cation levels (sodium, potassium, calcium and magnesium) when the wastewater is expected to contain concentrations greater than domestic -wastewater T� p Includes site -specific documentation in accordance with Rule .I948(d) when site proposed `to be used originally is classified unsuitable 1f O Soil/Site evaluation report by Local Health Department provided (4 copies) (5c)**: 1� 0 Includes verification of consultant's evaluation and compliance with rules D Includes results of itxkependent check borings/pits,, including their locations <� O Topographic map provided prepared by Registered Land Surveyor(4 copies to OSWS- Central office, 2 copies to LHD) (6)"*: d0 Includes site(s) for all proposed drainfields and repair areas, with at least two foot contour intervals or spot elevations at 50 foot grid intervals for level sites. t� O Alternately proposed lateral lines for initial and repair system have been field -located, flagged and surveyed is on site plan. l� D Includes relative elevations along property. Iines and as needed to evaluate hydraulic gradient .betweca field sites and adjacent property lines ❑ U� A,ltemately these relative elevations are shown on site -plan 2( o Site -specific Wbrmation on site loading capacity and assessment of groundwater impact provided (4 copies) (7)"': 2( O Includes field data sufficient to show compliance with performance requirements of Rule .1946(4) Et ❑ Substantiation for proposed LTAR provided l3 © Assessment of projected compliance with groundwater standards and justification provided 11-2 Mar 29 99 04:52p Mer 29 99 O9:40a Thgmas K. G'oodwin, P.E Thomas K. Goddwin, P.E 919-854-7815 9t9-854-?8t5 F'-g Nor �! 0 Revised Site -plan and system layout provided by Engineer and Registered.I.aud Surveyor (4 copies to OSWS-Central Office, x copies to LHD) (S)": C�J ❑ Shows all corners of property and property lines potentially influencing design tf D Sizows all known wells/wafer supply sources (txisting and proposed) within property or within 500 feet of any proposed drainfield(s) and repair area(s) and within 100 fat of all other system components C4 l7 Shows known or proposed water lines within property and within 10 feet, of any projected system component L'� ❑ Shows surface -waters with; their water quality classifications !� 0 Shows locations of any existing and proposed wastewater system, components, d.rainftelds/repair areas 1� El Shows existing and proposed structures, roads, dmimga features, and any known underground utilities ar utility' rights -of -way 0, 0 Delineates designated wetlands and elevations of 10-year and 100-year flood zones in vicinity of any system component d O Shows existing or proposed sediment control and storm water management system components I 17 Shows proposed location and layout field -verified by.LHD of new draWfield(s) and repair field(s),- and proposed alterations to field topography ❑ C� Legal documents for systems to -be under joint or multiple ownership:or control are ,yti6tChed, including easements; association documents, draft tri-party agreements, etc. (2 copies to OSWS-Central 0ffice, 2 copies to LHD) E. Co.,ugItting t� , that the applicant has, to the best of his/her abilides and belief, provided complete and factural representations of the information requested above: Applicant or Applicant's Agent Date r F. approval that Application for improvement permit has been submi , requested information appears •complete and State review is requested: z r s� .ems � - � 4 � Local Health Depirtnidnt, Environmental Health Specialist Date • Note t0 all interested persons. This transmittal check list and accessary accompanying information shall be submitted with a request for site plan and layout approval (prior. to Improvement Permit issuance by the Local Health Deparutent) to the On -Site Wastewater Section, Division of Envirotunental Health, PO Box 29594, Raleigb, NC 27626-0504 (Phone: 919-733-2895). Numbers in parentheses {) refer: to Corresponding item is document entitled "Procedure and Information Required for Approval of Large Subsurface Wastewater Systems", whicb contains complete information osi,the Large System Review and approval process and may be obtained from the On -Site Wastewater Section II-3 p.. G Mar 29 99 04:52p Thomas K. Goodwin, P.E 919-854-7815 p.7 Mar 29 99 09:46a Thomas K. Goodwin P.E 918-854-7815 P.? GWMf �!� �trtt�rt�IM1 Project Title CkM Cauuty. • DEHNlR: 0SWS LARGE SUBSURFACE WASTEWATER SYSTEM REVIEW TRANSMITTAL CHECK -LIST III. SYSTEM ENGINEERING DESIGN REVIEW/APPROVAL* Na Dom AppUftbla A. ApWication infQ mation (= needed if previously .provided) ❑ M Application for ImgroveeoW' Pern[it has•been'subnutted to'LHD (4 copies attached)(2a)** E3 9 Property has been shown on plat or boundary survey, and PIN mimber and locator map have been provided } ❑ m Name; -address, phone, Fax, $-Mail Numbers for owner, agent, eogj =r, soils codsultant are attached ❑ D Project -proposed is described, including whether new; repair, expansion, replacement, modification -of existing. or combination D d Water supplies (existing and purposed) and surface waters have been descnbed and locations shown ❑ m Facilities are described and, located (existing and proposed) which ace to be served -by proposed systcm, including *=pmy. and projected use patterns El d list provided of all wastewater soarems and water use fixtures. (poi is of wastewater entry into system). ❑ 16 Projected'wastewater characteristics (e.g. including wastewater duality, data for any non - domestic sourers) and flow patterns are described © It Wastewater system components am described and located (existing and proposed) 0 I:�J Documentation provided to, LHD indicating wastewater system and , facility are under ownership or control of person owninj the facility or that an owners association and tri- pam agrocment shall be provided B. Site Plan and I aTvout AVgi ► lliJmproveme Permit Issuage Documentation provided that: ❑ 0 Proposed site plan and layout have been previously approved by the OSWS O ❑ An Improvement Permit has been Issued by the LHD (3 copies attached) at ❑ OSWS approval of proposed site plan atul layout is being concurrently sought l( Q C. Prededgn coAmorr was held (11)016 L ❑ ❑ Pr►:design conference was waived by aIt parties FA Mar 29 99- 04:52p Mar 29 99 09:47a Th,c-7s K. Goodwin, P. E 919 854-7815 Thomas K. Goodwin, P.E 919-894-7015 P,8 Ha Due Applicable (' C� ❑ p. Pnginrttinplans and specificallons and supporting cal_ eulatlga, are sLbmiaed herein / (3 copies to OSWS-Central Office, 2 copies to LHD) (12)**: p ❑ The North Carolina Professional Engineer's seal appears on all plan sheets and the first page of specifications and'calculadons ❑ , The design is in accordance with applicable rules, guidelines and recognized principles and practices of engineering and public health 16 ❑ The design incorporates and is found by the UM to -be consistent with approved site plan and layout: and She improvement permit (if issued) G� ❑ Facility description and details (floor plans) are provided to confirm compatibility with previously submitted information (1 copy to OSWS-Ccatral Office, 1 copy to LHD). �. i r �t'gp, g�nGratl„�v inctud�he`foltowinya (13)a*; , R( ❑ Description of all materials and equipment to be used, with attached mamfacturer's cut sheets, pump curves, etc. 1. - lr ❑ Project -specific construction methods, installation, testing and start-up procedures . ❑ Means of assuring quality and integrity.of fWshcd product Li C3 Specific operation and maintenance procedures, including: lr ❑ Requirements for system operation. Er 0 Inspection process and performance monitoring schedules- er 0 Provisions for maintaining mechanical components and dtainfield vegetative cover . Q Q Reporting requirements * ❑ Provisions for residuals management. * L' Abandonment procedures for existing system components that are no longer required. F. Plaits and sMifcatigW ifQr s=ific syste eompone rs inelude.(14)**: Cotlection systems and force mains (14a)*• Q tff*" Plan diaw'tngs showing locations of manholes and cleanouts ❑ G' Frofile drawings provided when the collection system. is a 6-inch, or larger gravity sewer serving two or more buildings or contains two or more manholes, or when it is a pressure sewer system. E3 Pf Pipe invert and ground surface. elevations are shown on plan drawings for all cleanouts/manholes El Force waius are shown in Profile as required when their length exceeds S©D feet, or when their grade is not `continuous. 9( 17 Force main inverts are shown at their beginning and end, and depths of waver ❑ proximity indicated to utilities. wells. water lines, storms drains, surface waters, structures, roads, and other trafficked areas 9( C1 Detail drawings are provided, as appropriate, of service connections, manholes, cleatiouts, valves, other appurtenances, aerial crossings, and crossings of roads, water lines, storm drains. streams or ditches l( ❑ Specifications include alignmem, deflection and inffiltration/extiltration testing procedures and pass/fail criteria M-2 P-$ Mar 29 99 04:52p Thomas K. Goodwin., P.E` 919-854-7815. +"A.9 Mar 29 99 0 9:47n Thomas K. Goodwin, P.E 919-854-7815 Na Does Applit W' [� D Tanks located accessible to pumpers and maintenance vehicles with all setbacks shown inverts, top and ground) . U{ p Flans show tank dimensions and relevant elevations (bottom, floor, inlet and outlet I ❑ Plant"show outer .pertinent elevations in pump Tanks (i.e., float activation levels) or siphon tanks (i.e.; siphoh-trip and alarm elevations) , C� D Access riser, manhole, chamber interconnection and sanitary we details [� p Complete construction'detads are provided for built -in -place tanks, including dimensions, reinforcement details and calculations, and Construction methods. 19 Q State -approval precast tanks arc specified as to manufacturer, nominal capacity, whether or not tite tank is rated .for traffic loading and State approval number (i.e., the PT- riumber for pump tanks, and the STD -number for septic tanks) 1 ri For grease traps, design and construction specifications are provided in accordance with Itule .1955(k) L►1! O Installation (e.g.: bedding, method .of sealing tank and riser, pipe connections, surface water, diversion) and water tightness testing procedures are provided with pass/fail ` criteria ❑ ,Anti -floatation (buoyancy) calculations and provisions have been provided e� ❑ Plans show pumps, discharge piping, and all related appurtenances q( C] Calculations provided for system total dynamic head, pump is -specified, pump curve(s) ;provided, and expected operating eondiCloni specified . t� 17 Plans show accessible pumpjemoval system and accessible float support system, float s*iwhes and float settings O� C3 Plans show control panel over high water alarnn location and electrical cotulectioa details l 0 Control panellhigh water alarm components specified E� D Description of float sequencing, control panel function under naratal and abnormal conditions, and appropriate settings JE( ❑ Emergency storage capacity calculations and provisions for stand-by power have been provided when required , p provisions for lighting, wash -down water -supply with back siphonage protection, and protective fencing,, detailed as needed Ground absorption fields (14d)"" 12( O Final layout, existing and finished ground elevations are shown on the plans Ce ❑ All lines have been re -staked in the ficld.as needed to verify layout, relative elevations and distribution system design t� O Trencb and lateral distribution system plan and profile details and invert clevations for each lateral are shown on the plans B/ ❑ MaWold and. supply line and interconnection details end invert elevations are shown on the plans ' M4 LI 0 -Mar 29 99 04:53p Thomas K. Goodwin, P.E 919-854-7815 Mar 29 99 09:49a Thomas K. Goodwin, •P.E 919-854-7815 p.t0 t+a Lea Arpu— d L3 Flow distribution device design, CDustruction detail, louiion, and invert elevations are shown on the pleas a Drainage system locations, discharge points and design details are shown on the plans Ci Sits preparation proeedwros have been specified ranstruetiou phasing and phased system testing loss been specified d ❑ Final landscaping provisions have been Specified, including compliance with erosion �:ontrol requirements, D L� OSWS- G. Separate Guidelines and traiumittai Checklst aned beeneatrnent systeobtairr mA from st(e. .: sand Central office. and have been followed fa P 8 or .filters, tertiary wastewater treatment plants),.pressure sewersystems{eg: STEPn Grinder Pump Systems), and industrial process wastewater sysmms, . and relevant information is attached (14e**). p d H, other ,requirements or 'guidelines have been, followed as appcopriatG, with references attached (14f)". 1 l"onc SigAB , that the Apglieant'has, to the best of hisfher abilities and belicf, provided complete and factual representations of the information requested above: Applicant or Applicaues Design Engineer Date . . J. that Application for Authorization to Constrict has been submitbA, requested information app= complete and state reviewlapprovaI -is requested: 19 Local viealth epartment Environmental Health Specialist Dane . Note to all iroterested Persons. This traosmiaa! check list and necessary accompanying information shall be submitwith a request for engineering design, review/approval to the On -Site ted Plastewater Section, Division of Environmental Health..Pd Box 29594, Raleigh, NC 27626-0594 (Phone: 919-733-2895). l +rt Numbers in parentheses () refer to corresponding item in document entitled "Procedures and Intofmation iteq eked for Approval of age Subs' f= Wastewater Systa:ms" , wbich contains complete information on the large system review and approval process and may be obtained firom the On -Site Wamwater Section MA nig--e - EFVIRO)DEiii'bI. ►McIILFf 1" �_J 70 .G ;x .0311 CAPE FELR RIM BASIN Classification Name of Stream Description Class Date Index No. Locks Creek (near Vander) From source to Cape Fear River C 9/1/74 18-32 Cedar (reek From source to Cape Fear River C 4/1/59 18-33 Big 111igator Swap From source to Cape Fear River C 9/l/74 18-34 (bl.ligator Creek) 1sw4Y`eek`(Rw{twy) i F;m source toiA C iiwp�8T y B"~s. 4/l/59 18-35-(1) rgooa,•..Rainbov Paid)"• , . Grays Creels From A. C. Hwy. 87 to Cape Fear River C 9/1/74 18-35-(2) *Hairs Kill Creek From source to Cape Fear River C 9/>/74 18-36 Willi C Creek Fran source to Cape Fear River C 9/l/74 18-37 Swans -Creek From source to Willis Creek C 9/l/74 18-37-1 �L'oBrnnc�b (!S b i11 x �;Fies �soace to Sti�s�Creea � �, `,,,G g/1; 7e 1g :�-1-_ Ponca) Kirks Kill Creek From source to Willis Creek C 9/1/74 16-37-2 Unnamed Tributary at Fr® source to dam at HcGougans Lake B 4/l/59 18-37-3-(1) Willis Creek Church (McGaugans Lake) Unnamed Tributary at From dam at Mc augans Lake to Willis C 9/l/74 18-37-3-(2) Willis Creek Church Creek Georgia Branch (Prospect From source to Cape Fear River C 9/1/74 18-38 Hall Creek) Mines Creek (Pages Lake) From source to dam at Pages Lake B 4/l/59 18-38-1-(1) Mines Creek From dam at Pages Lake to Georgia C 9/1/74 18-38-1-(2) Branch Tarheel Creek From source to Cape Fear River C 4/l/59 18-39 Phillips Creek (Bakers From source to Cape Fear River C 4/1/59 18-40 Lake) Black Swamp From source to Cape Fear River C 4/l/59 18-41 Harrisons Creek (Little From source to Cape Fear River C 7/1/73 18-42 Llli.gator Swaup) Indian Creek (Jessups From source to Harrison Creek C 9/l/74 18-42-1 Pond) Bakers Creek Fran source to Cape Fear River C 4/1/59 18-43 B66111 Creek From source to Bakers Creek C 4/l/59 18-43-1 Ellis Creek Fran source to Cape Fear River C 7/1/73 18-44 Suggs !Sill Pand Entire pond and connecting streams to C 4/l/59 18-44-1 Lake Rim (Lake Drain) Ellis Creek From Little Singletary Lake to Ellis C 9/1/74 18-44-2 Creek Little Singletary Lake From source to Lake Run C 4/l/59 18-44-2-1 McCall Smw From source to Ellis Creek C 9/1/74 18-44-3 Salters Lake Entire lake and connecting stream to C 4/l/59 18-44-4 Browns Creek (Cross Pond) Ellis Creek From source to Cape Fear River C 7/1/73 18-45 Baldwin Branch From source to Browns Creek C 9/l/74 18-45-1 Davis Branch From source to Baldwin Branch C 9/l/74 18-45-1-1 TUrnbill Creek From source to Cape Fear River C 4/1/59 18-46 Little Turnbull Creek From source to Turnbull Creek C 4/l/59 18-46-1 Briary Stream From source to Turnbull Creek C RECEIVED Z1 MAR 18 1999 DEHNRIDEH On-sfte WaStew,- .r Snrtinn n i 0 m 0 ,Y a i� it ti � by 41 \\ N 11 234----=--s ' ' s 10 ELEVATION REFERENCE MARKS REFERENCE ELEVATION MARK IFT, NOVDI DESCRIPTION OF LOCATION FIM CUM• 65 83.29 Standard disk atemped "CUM 86. 1'974". From intersection of I:d U U) Q 2 cc 2 U a ZONE C (n o o LL N . m 0) 0) 0) i 0 i m. ZONE A-- .� ELEVATION REFERENCE MARKS REFERENCE ELEVATION MARK IFT. NOVD) DESCRIPTION Of LOCATION RM CUM- 65 83.29 Standard disk stamped "CUM 65. 1974". From intersection of State Road 2212 and State Highway.87, proceed 1.70 mile south on State Highway 87 to a drive loading east, station near first power pole on drive;124.4' seat -northeast of centerline of State I Highway 87. 2.7' south-southeast of power polo No. 491 with I I I tag, 18.8' south-southeast of centerline Dirt Drive. RMCUM. so 78.46 Standard disk mampod "CUM-60,1974". Station isetsouth in- tersection of State Road 2233 and State Road 2224 loop; 32.4' I east of conterline of State Road 2233, 92,6' south of centerline f of State Road 2244, 2.4' west of corner post with aluminum reference tag. I I RM CUM•81 74.56 Standard disk stamped "CUM 81, 1974". Station is on State Road 2233, 3.35 mile north from State Highway 87; 1.10,mile i south of Stats Rosd 2224. 28.6'southeast of canterline of State 1 S.R, 2233 j Road 2233, 14.6' northeast of centerline of dirt rood, 1.9' north- well of fence. RM CUM-82 00.88 Standard disk stamped "CUM-82. 1974" From intersection of State Road 2233 endStato Highway 87. proceed oast2.2 miles tP on State Road 2233 to Cape Fear Baptist Church. Station at .� southwest corner of walkway in iron of brick annex. ' RM CUM-83 76.00 Standard disk stamped "CUM-83, 1974". From intersection of State Road 2233 and State Highway 97, proceed east to inter- section of State Road 2233 and State Road 223.2. 3.7' eouthesst of telephone podes%l, 19' northeast of 36" pine with tag. u u unI r a )NE C . 00 (V m N N rn cn m m \ 0, 0 a LL ' = ZONE B ON RM-•cum -80:• ON ZONE C ZONE C ZONE C .+• ZONE C Z"0'111 ZONE C ZONE C Z-O,NE 0111E'b23 .I :ZbhiE:6:.i : ZONE .6r=`•::- '' •-�� ,' ...• � :ter; :`'° 1t Z Q .;� -, NEC 3=18-1999 10:32AM FROM HOBBS.UPCHURCH/ASSOC 910 692 2028 P.8 REFERENCE ELEVATION MARK (FT. NOVD! RM CUM•65 93.29 r 3-18-1999 10:28AM FROM HOBBS.UPCHURCH,/ASSOC 910 692 2028 I'•2 KEY TO MAP 500-Year Flood Boundary 100-Year Flood Boundary — Zone Designations" 100-Year Flood Boundary 500-Year Flood Boundary Base Flood Elevation Line 5�3 - ••••-•� With Elevation In Feet** Base Flood Elevation in Feet (EL 987) Where Uniform Within Zone*" Elevation Reference Mark RM7X Zone D Boundary River Mlle eM1.5 •*Referenced to the National Geodetic Vertical Datum of 1929 *EXPLANATION OF ZONE DESIGNATIONS ZONE EXPLANATION A Areas of 100-year flood; base flood elevations and flood hazard factors not determined. AO Areas of 100-year shallow flooding where depths are between one (1) and three (3) feet; average depths of inundation are shown, but no flood hazard factors are determined. AH Areas of 100-year shallow flooding where depths are between one (1) and three (3') feet; base flood elevations ate shown, but no flood hazard factors are determined. Al-A30 Areas of 100-year flood; base flood elevations and flood hazard factors determined. A" Areas of 100-year flood to be protected by flood protection system under construction; base -flood elevations and flood hazard factors not determined. B Areas between limits of the 100-year flood and SOO- year flood; or certain areas subject to 100-year flood- ing with average depths less than one (1) foot or where the contributing drainage area Is less than one sQuare mile; or areas protected by levees from the base flood. (Medium shading) C Areas of minimal flooding. (No shading) D Areas of undetermined, but possible, flood hazards. V Areas of 100-year coastal flood with velocity (wave action); base flood elevations and flood hazard factors not determined. V1.V30 Areas of 100-year coastal flood with velocity (wave action); base flood elevations and flood hazard factors determined. NOTES TO USER Certain areas not in the special flood hazard areas (zones A and V) rrsay be protected by flood control structures. This map Is for flood Insurance purposes only; it does not neces- sarily show all areas subject to flooding in the community or all planlmetric features outside special flood hazard areas. For adjoining map panels, see separately printed Index To Map Panels. INITIAL IDENTIFICATION: DECEMBER 13. 197a FLOOD HAZARD BOUNDARY MAP REVISIONS: JULY 28. 1973 RM CUA- -- < CREEK 3�18-1999 10:32AM i FROM HOBBS.UPCHURCH/ASSOC 910 692 2028 W. 9. •1. Y f•;fi 'ti...l .. •\A i i 1t S.R. 2234 L---J L 2245 s y ZONE C eta sc,"Got- St, SR% ELEVAT REFERENCE ELEVATION MARK (FT. (FT. NOVD T°pCUINe� �✓ 9 COUNTY of CUMBERLAND E. Newton Smith Public Health Center Memorandum To: R. N. Godshall, On -Site Waste Water Engineers From Danny Soles, R. S., Supervisor 0 P 5 On -Site Waste Water Cumberland County Date: March 26, 1999 RE: Grays Creek Elementary School Soils Review David McCloy, Robert Bennett, Daniel Ortiz, Carlon Mercer and engineer Michael Koonce and I visited the staked proposed drain fill area on Monday, March 22, 1999. Soil borings were made in the middle of the proper pour nitrification fields, soil borings were also made in the middle of the four repair areas. Two (2) borings were 126 inches, one (1) to 102 inches and the other five (5) borings to 60, inches. Measurements of the four (4) staked nitrification fields concurred with the plans. The LTAR within three feet of the ground surface ranged from 0.45 gpd/ft2 to 0.3 gpd/ft2 . The rate of 0.3 gpd/ft2 used by Hobbs Upchurch and Associates is within this range and should be okay. Soil profile descriptions are similar to Steven M. Prices' of Soil & Environmental Consultants, Inc. presented in his March 19,1999 report. DS/dm RECEIVED MAR q 1. 1999 DEHNR!DEH On-s to Wastewater Section r 227 Fountainhead Lane o Fayetteville, North Carolina 28301 • Phone (910) 433-3600 Fax (910) 433-3659 0 State of North Carolina Department of Environment and Natural Resources Division of Environmental Health James B: Hunt, Jr., Governor Wayne McDevitt, Secretary Linda C. Sewall, Director Memorandum To: R.N. Godshall, OSWW Engineer MIA NCDENR. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES From: David V. McCloy, OSWW Regional Soil Specialist (� Date: March 22, 1999 Re: Gray's Creek Elementary School (Fayetteville, NC) soils review Danny Soles, Robert Bennett, and Daniel Ortiz of the:Cumberland County Health Department, two Cumberland County school officials,. and I visited the staked, proposed drainfield area on Friday, March 19. There was a follow-up visit on Monday, March 22, by the same individuals as well as by Michael Koonce of Hobbs, Upchurch, & Assoc., I made one soil boring in the middle of 'each of the four nitrification fields as well as one soil boring' in the middle of each of the four repair areas. Two of the borings were to 126 inches, one boring to 102 inches, and the'remaining five -borings to 60' inches. Field measurements, of the' dimensions of the four staked nitrification fields concurred with the plans. My assignment of the LTARs within three feet of the ground surface ranged from 0.3 to 0.45. I concur with the use of a LTAR of 0.3 by Hobbs, Upchurch, & Assoc. I had simifiar soil profile descriptions to what Steven M. Price, Licensed Soil Scientist for Soil & Environmental Consultants, Inc-., presented in his March 19, 1999 report. My assigned LTARs (within three feet of the ground .surface) were approximately five percent of the y'sat readings -of the Bt horizons (both expressed as gpd/ft2). ON -SITE" WASTEWATER SECTION P.O. Box 29594, Raleigh, North Carolina 2762&0594 Telephone 919-733-2895 FAX 919-715-3227 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper March 18,1999, 9:28 AM INTERNAL MEMORANDUM TO: Rachel Groff FROM: Robin Godshall, Project Review Engineer SUBJECT: Project Work Request Please perform the following work tasks with respect to the attached project: 19 Prepare/Update Tracking Database Entry, including; - ® OSWS Project No.: 98-34 ® Project Name: Gray's Creek Elementary School ® County: Cumberland ® Date Received: March 4, 1998 ® Review Type: NPS ® Status: REV ® Review Eng.: RNG ® Facility Type: S ® System Type: N/GT ST PT, PM/C ® Design Flow: 11,400 gpd (8,550 gpd reduced) ® Applicant's name, address, phone and fax numbers from the project file ® Engineer's name, firm, address, phone and fax numbers from the project file ® Soil Scientist name,'firm, address, phone and fax numbers from the proj ect file ❑ Prepare file folder. ® Prepare/Update card file (if not already done) ® Send cc of.plans/specifications/documents with appropriate memo to: ® Regional Soil Scientist David McCloy ® Bob Cheek, Groundwater Section ® Blue, yellow and file copies are also required. ® Distribution: N Send original via Courier to: ® fax to: ' Local Health Department: Lacy Williams ® Send one copy to: ® fax to: Regional Soil Scientist David McCloy ® Send one copy to: ® fax to: Applicant Tim Kinlaw ® Send one copy to: ® fax to: Applicant's Engineer Mike Koonce ❑ Send one copy to: ❑ fax to: Applicant's Soil Scientist ® S nd one copy to: Groundwater Section Review Engineer: Bob Cheek ® One copy to file (Please two -hole punch at top and place iri right side file) ® One copy to Doc/ Ishwar / Steven Special Instructions/Information: - Please handle the faxes manually and then please give me the fax numbers. If you have any questions, please call me. : ,March,18, 1999 "i :INTERNAL MEMORANDUM TO: �Dr Dav dMcC,o FROM _ :R.N. Godshall-� _ -...- '5 SUBJECT: Region Soil Scientisi Review - OSWS Project No.: 98-34 County: Cumberland Facility Name: Gray's Creek Elementary School Facility Type: School System Type: Conventional Design Flow: 11,400 gpd unreduced, 8,550 reduced Attachedyou will find plans, specifications, and supporting information for the on -site wastewater system to . serve the above referenced facility. ' Please review the adequacy of the soil/site evaluation work prepared by the local health department and applicant's consultants in accordance with Rules. 1939 through .1948, and our "New Procedures Review and Approval of Large Subsurface Wastewater System". The Regional Groundwater Hydrologist will also most likely be asked to review this project for projected compliance with State groundwater standards by the Groundwater Section. Please review plans/ specifications/supporting data with this person, and, to the extent practical, coordinate any field investigations deemed appropriate. PROJECT/SPECIFIC INSTRUCTIONS/COMMENTS: David, as Danny Soles has probably already told you, this is one is somewhat hot. I know it's not our fault but they've got a contractor in hold mode because they're awaiting approved plans. The county and the applicant's soils consultant (Stephen Price,-S&EC) are anxious to get out to the site and. complete the . evaluation requirements. There is also some pressure from the Cumberland Co. Schools and their legislator, Senator Rand.. A rapid -turnaround on this project would help immensely. • I'm still waiting for a copy of the final soils report from the applicant's consultant I will forward this to you as soon as I get.a copy. .:' Please let me know about your site.visit. Stephen Price has told me that the depth to groundwater ranges -from -12.510 15:0 ft in the area of the drainfields: He also ran some Ksattests which�he said give a relatively°:high K value. He assessed a range for the LIAR of 0.30 to 0.60. Additionally, the engineer used as LTAR of 0.30'for the drainfield design requirements. •Therefore, if you and Danny confirm Stephen's work and the field -staking, I'm.inclined,to waive the.requirements.for lateral flow and mounding analyses.- Some minor-engmeering"issues but generally things look pretty good Please advise in writing ASAP if you have arty site layout concerns from an engineering or lr �*aulk perspective:_ I've got to.keep-our legislative liaison person informed RNG/nng cc: Project File r Sail :& Environmental Colisultants, Inc. 231 16th Avenue N.E. A hickory', North Carolina 28601 ° p (828) 322-6700 ' 11, Fax (828) 322-6790 Facsimile Sheet Fax Number (828) 322-6790 Date: Time Sent: To:, Name: % cc: o Go L.r 515 Company: of yl/P Fax Number: •(. �6 79117' 'd 7 From `� I r Subject:r .S. Number of pages including transmittal sheet: 1 For your cornments/approval. For your information's Per our conversation Per your request _ Please advise Please -call Would like to discuss '.• . Please handle Hard .Copy Sent: - US regular mail Hand delivery UPS overnight US certified Federal, Express No.hard copy sent, Other Remarks: If you have any questions or pmbleiiis with the transmission, please contact at (828) 322-6700. Confidentiality Notice This transmission is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged and confidential. If the reader of this message is not the intended recipient, you are hereby notified that any disclosure, distribution or Copying of this information is strictly prohibited: If you have re- ceived this transmission in error, please notify us immediately by telephone and return the faxed documents to us at the above address via the United States Postal.Servicd., Wetland Nlineation/PermittinwMitigation Soil/Site Evaluation for On -Site Septic Systems Environmental Assessments` Home 01gce: 244 West Millbrook Road Raleigbt. North Carolina 27609 Phone; (919) W-5900 Fax: (919)`W.9467 M�r'19 99 11:29a Thomas K. Goodwin,..P.E 911=854-7815 p.1 Hobbs, Upchurch & Associates, P.A.. I Vj Consulting Engineers YA'csiMILE 4917Waters EDrive, Suite 110 Raleigh, North rth Carolina 2760606 (919)854-0233 FAX (919)854-7815 �c•<.c:o�3ft�ttt,la5��) �cti5�'i/�y-32Z'j . TO: '01NN1 SAS iLuM1S tM� �a. li C, , ,l�l �o) Q 3- 3bt Gj FAX NUMBER: 'JIM il.1NL W GRM1tJNMEntprcCCu+nSEx4 Cv•scin+-I-d FROM: (kiclfJ7fj-'55ONO.OFPAGES• 13(includingcover) = Hobbs, .Upchurch & Associates, P.A. DATE: 3I 1 qq HUA PROJECT # RE: 6tm(.rLWc �N►tin�t 1 5cita>: Sv9l. Lli�lrti;L'{'F7�ii{1C-� MESSAGE: �J�IV ALL"iAIL- i vVE'ICNGS :bVLNt '111-e r►ft� SV,V).9c•1;"i f.•\hua forms\huasheei44x-originaLdoc GJ/ 17! 1777 11. Jo oco J.:I-W r Ju Envirronmenta.1 Consultants, ■ Hickory, North Carolina 286010 (828) 322=6700 r Fz..c (828) 322-6790 March 19. 1999 Project 4: 3575 Hobbs, Upchurch & .Associates, P.A. Attn: Mike Coonce P.O. Box 1737 290 S.W. Broad St. Southern Pines, NC 28388 CHARACTERISTICS OF THE SOILS AT THE PROPOSED GRAYS CREEK ELEMENTARY SCHOOL, SUBSURFACE SEPTIC SYSTEM CUMBERLAND COUNTY, NORTH ,CAROLINA Soil and Environmental Consultants Inc. (S&EC) evaluated the characteristics of the soils .pair areas. These areas were located by Hobbs, Upchurch & his evaluation was 'to determine the soil's suitability for on- ;ms so that this data could be used to determine site e area required for on -site subsurface wastewater treatment R regulations:- This evaluation was performed in accordance' CAC 18A. 1900). This school will serve approximately 950 1 according to Hobbs, Upchurch & ,Associates will have a gallons per day (gpd). formed to determine suitability for an on -site wastewater �tion was performed by making hand auger borings to zvel.. The proposed system and repair areas were the only ed system area runs approximately 450 feet north from the 15 feet west from the'woods line shown on the map. The proximately 450 feet north of the southern property line -and line shown on the attached map. The soils did not vary, camined. The only area evaluated that was not usable for a gas at the northern most portion of the proposed system area. large conventional septic system due to low chroma mottles :er table) at a depth of 40 inches. After looking at the well ter table. This isa' more restrictive layer than the Bt horizon kat this layer does allow water movement. Soils in the evaluated areas are most like the Norfolk (Fine -loamy, kaalinitic, thermic, Ty pic Kandiudults) and Wagrami (Loamy, kaolinitic, thermic, Arenic Kaztdiudults) soil Wetland Dclinead=/P=nittiaVMti0cn Scil/Site Evalzzdm .for Qn-Site Segue Systems Environmental Asst ==rz -9467 Home Ica: 244 West MWbrook Road Ralmgh, North Carolina .27609 Phony (919) 84&5900 .Fmc: (91M) 846 UJ1 1 7f 1 J J, 11 • JLI VLUJi.LV f JV - "�'- - - series or'taxadjuncts of these series. Typically these soils had a Bt horizon with a texture,, of sandy, clay loam (shown as "A" on the attached map). Such soils can be permitted fo;r . Conventional septic systems by the county with, a,loading rate of 0.3 to 0.6 gpd/ft2 on a trench bottom area basis or for a Low Pressure Pipe system with a'loading rate of 0;15 .to 0.3 gpd/ 2 on an area basis. These loading rates are taken from 15 NCAC 1-8A.1900 :` (Laws,and.Rules for Sanitary Sewage Collection, Treatment and Disposal) and are based on -the most hydraulically limiting aye within three feet, for Conventional systems and, within two feet for UP (i. e. the sandy clay loam Bt horizon in this case). The Norfolk and Wagram soTseries are well drained soils, which, formed, in loamy , sediments on uplands. Organic _matter content and natural fertility' is low and shrink -swell potential is low., These soils are medium to strongly acid. W aJSTTE EVALUATION OF PROPOSED DRAINFIELD AREA .The locations of the deep boring; and Ksat measurements are shown on the attached inap. Measurements of the hydraulic conductivity of the soils on -site were performed to determine more precisely..what an,.acceptable loading rate_would be.- The results of these measurements are shown in Table 1. The Deep Boring descriptions of the soils found in the system and'repair. areas are found in Table 2. Three wells were installed to record. the depth' of groundwater on -site. The depth to water ranged from 12.63 to 15.44 feet, with an.average depth of 13.9 feet. Ry(Iralllic Conductivity Unsaturated Zone: Saturated hydraulic. conductivity of the unsaturated, parts of the Bt, DC and C horizon was measured using a constant head permeameter`..: The methods used in these measurements were similar to those described. in Methods of -Soil Analysis,, Part L, Chapter 29 - Hydraulic Connductivity of Saturated Soils: Field Methods;'29 - 3.2 Shallow Well Pump 1n Method, pp. 758-763and in the Soil Science. Society of America Journal, Vol. 53,'no: 5, Sept: Oct.' 1989, "A Constant -head Pe'rmeameter for Measuring Saturated Hydraulic. Conductivity of the Vadose'Zone' and "comparison of the -Glover Solution with,the' Simultaneous - Equations Approach for MeasuringHydraulic Conductivity:" The results of the'se tests are shown.in Table 1. The conductivity information was used to predict "mounding" beneath the system; 'These predictions are discussed later in. the report. The conductivity horizon describes'the sail material encountered in the auger hole where conductivities were measured. WASTEWATER FLOW ANALYSIS Design Flow Rate=10',000 9 ' ,Assumed Loading Rate = 0.6 gpd/fta'. Conventional Trench Width = 3 ft Needed "Total Trench Length = 5,556 ft Needed Total trench Bottom Area = : 16A67. ft Minimum -Space Between. Lines = 9 ft . , Miriimunt Total Drainfeld Area = 5,556 ,' .= 50,004'ft'" .1.15 acres 1 gpd/ft2 is equivalent to 4.06 cm/day Design Trench bottom Loading Rate = 0,6 gpd/ft2'or 2.436 crn/day Maximum, Areal Loading Rate = 0.2 gpdV or 0'812 cm/day Assuming the trenches are 18-24" deep and based. on the profile description presented the bottom of the trenches should be 'in the Bt horizon and above the BC horizon: The depths of saturated, hydraulic conductivity's, (Ksats) in the Bt horizon,, in the system and repair areas, were between 17 and 33.inches at three sites (HA 1,.HA 2, and HA, 3). These Ksats ranged between 5.95`to 7.3 gpd/fiZ, with an average of 6.61 gpd/ft2..' The Ksat values for the BChorizon at, sites RA 1, .HA 2; and HA 3 were `0,47 and 6.3 gpd/ft2, " with an average Ksat of 2:45 gpd/f32: The Ksats for the. C horizon measured at HA1, HA 2, and HA 3 were 1.09 to,93.02,gpd/ft ; with.aO average"Ksat of34,65 gpd/fe. , After evaluating the field data, it is obvious the Bt horizon has a higher Ksat than the BC horizon. With this in -mind the most obvious alternative,is to.try and utilize trenches in the Bt horizon. We recommend utilizing trenches. in the .18 — 24 inch range, buf the soils are. deep enough to allow deeper trenches. 'The average loading rate based, on,10,000 gpd,wastewater aiid the assumption of uniform distribution is 2.436 cm/d. 'This value reptesents 9% (trench bottom basis).of the average _ Ksat of the Bt horizons reported in Table' 1., For the BC layer, 2.436 cm/day is 8%, (areal 'basis) of'the average Ksat values. reported in Table ::' The bottom of:.the.trenches M11,1n. ' general, be ina zone in the Bt horizon where, the Ksat is more than ten.times faster than - the design loading'rate (assuming all flow is through the trench, bottom). Assuming that wastewater distributed by a ,pressure manifold to move along the trenches, it may also, infiltrate,through the side walls, which -will result in Taster infiltration than is anticipated for the above analysis. Based on the Ksat values reported.in.table, it appears that the total volumeof wastewater (10,000 ,gallons) that will be applied, daily to the ". trenches. of the proposed system can infiltrate into the sot do a 24-hour period 'Without,.a C1.3i 17: 1777 ' •11 .:JO OLOJ LGO f 7c.� '�'— -- significant amount of ponding'in-the trenches: This analysis assumes uniform distribution of wastewater over the entire drainfield- area. -,However, because of the use of a pressure manifold system, wastewater will be applied to the beginning of the trenches.' Therefore, more pohdiz�g is -expected at the beginning of the. trenches than at'the end of each trench. As wastewater moves along each trench, it iztfiltrates `into the soil through the bottom and, sides of the trench. Based on the available Ksat values; as long as no clogging mat is formed, or conductivity of soil isdfastically-changed due to wastewater quality or other factors, the system -should function without a serious ponding problem in the trenches,. We are as that trenches installed on contour in sandy clay loam textured soils will allow redistribution within the _treiich. Once wastewater moves into the soil, it must move away from the trenches either .vertically or laterally. A was indicated that'the�maximum.areal loading rate'£or.9 ft minimum spacing over the entire drainfield area is 0.2 gpd/ft2 or 0.812 cm/day. The lowest Ksat measured in the Bt.horizon was 24,t 6 cm/day., So even at the lowest measured Ksat in the' Bt horizon, the areal -loading rate is only 3 % of the measured Ksat. The lowest Ksat measured in the, BC Horizon.was 1.91 'cm/day, which. is more than.•two times greater than the areal LIAR (42% of the Ksat).. Based on the type of soil (relatively deep Bt'horizons) found at the",site, it does not appear that vertical water movement through the.least rest, ctive layer is a problem., These analyses are based on the available data and,, simplified soil water flow: equation, It is, also assumed that. wastewater will have no effect on the soil hydraulic properties with. time. Please call if you have, airy questions or require further information. _ Sincerely, so Steven` M:,., Price Licensed Soil Scientist *1153 ' TABLE 1 Gray's,Creek Constant Head Permeameter(Ksat) Horizon D.enth HA Bt 25-32" Ksat > .1.12 "cm/hr ' 10:58, in./day 6.59 gpd/sq. ft BC 73-80" Ksat'- > 0,098 cm/hr 0.93, in./day 0A gpd/sq" ft C 115.120" Ksat, > ' 15,8 cm/hr 149.31 - in./day 93.02 gpd/sq. ft HA Bt 17=32" Ksat > 1,24 cm/hr 11.72 indday, � 7.30 gpc Aq. ft BC. 63-70" Ksat > ` 0.08 cm/hr 0.76 ' inJday . 0.47 gpd/sq, ft C 93.5-102" Ksat > ' 10.185 cnUhr 1.75 " .- in,/day , . 1.09 gpd/sq. ft HA3 Bt 24.5-337. Ksat > 1.01 `` crn/li 9.54 in./day 5.95 gpd/sq. ft BC 71-8011" Ksat 1.07 cwAr 10.11 in 6.30 gpd/sq. ft C 100-108" Ksat > 1.67 bm/ht 1518 .'in./day 9.93 gpd/sq. ft Best Soils Area HA Bt- 27-35" Ksat > 2.11 cm/hr 19.94.. in,/day. 11.42 gpd/sq. ft BC _ 53-60" Ksat 5.45 cnOu ' 51.50 in./day 32.09 gpd/sq.. ft HAS BC 51-58" MO. > 5.47 :, cm/hr.. 5.1,69' inJday 32.20 gpd/sq. ft HA1,,HA2. HA3 Soils Area Average,yalue-of Ksats, of Bt horizon . 6.61, gpd/sq ft". . 'Average value of Ksats of BC'horizon - 2.45 ' gpd/sq ft Average value of Ksats of C horizon ,-34.65 gpd/sq ft. Best Soils Area fHA4 an HAS) Average value of Ksats of Bt horizon 12.42 ' gpd/sq ftft Average value of Ksats of BC horizon 32.15 .. ;gad/sq ft `; ' L.J! 1J1 1JJJ. L.L JW U-U1j .LV ( JV ' ^`-•� 'fable 2 Slug test data conversions Well # Run HA1 FH2 Ksat > 6.47E=05 ft/sec 5.59 ft/day 41.91 gpd/sq. ft . HAl FH3 Ksat > 6.26E-05 ft/sec 5.41 ftlday 40.46 gpd/1 ,ft HA1 FH4 Ksat > 6.47E-05 ftlsec �. 5.59 ft/day 41.81. gpd/sq. ft- HA2 FHl Mat > 2.43E-04 ft/sec 21.00 ft/day, 157.04 gpd/sq. ft HA2 FH3 Mat . > 2.61E-04. ft/sec 22.55 ft/day 168.68 gpd/sq. ft ' 'HA2 FH4 Ksat. > 2.23E-04 ft/sec 19,27 ft/day 1:44.12 gpd/sq. ft, HA3 FH1 Ksat >' 3.52E-05 ft/sec 3.04 May 22.75 gpd/sq: ft, HA3 FH2 `Ksat . > 3.66E-05 ft/sec 3.16 ft/day . 23.65 gpd/sq. ft HA3 FH3 Ksat. > 3AE-05 ft/sec 2.95 ft/day 22.04 gpd/sq. ft HA3. FH4. Ksat > 3.22E-OS ft/sec 2.78 ft/day 20.81 gpd/sq. ft Average Conductivity of shallow aquifer utilizing "HA1, HA21 and HA3: 9.13 ft/day Average conductivity of shallow aquifer utilizing HA1 and.HA3: ' 4.07- ft/day, 0311 J lyyy 11 : Ob Profile Description Fayetteville us_h xo n: R x 0 ,. ...w� •: A:?:: x0.. : — — rx •w x�w � .a a 9<xP•xx p:Q;Q: w 02• dxr.4 �� .r x x : •o iFP: wN)S v.. x' ::6i' w:, xa: 5YR 4. 2 Sandy loam A .v.v..i„d.• 0-6" Granular E 6-18" 7.5YR 7 3 Sa-.ndy 16Am . Granular Bt1 18-4$" • 5YR 4/6 Sandy clay Subangular loam I blocky Bt2 48-70" 2.5YR 4/8 Sandy clay. Subangular loam block, BC 70-110" 5YR 5/8 7.5YR 7/1 Sandy clay Subangular relic loans blocky . C1 110-138" 2.5Y 6 8 Sand.. Granular C2 138-145". 2.5Y 6/8 Sand/Clay Granular lenses , C3 145-168"+.1 2.5Y 6/8 Sand Granular ;max x <•:.q:: R••x:.x;w rx.K'x :.:6 •:e7 fR: 0-8" 9bYR4kM R .M:k.x kota»:by`.m°. exk. 5YR 4 2 P.x:'i. akk +0'0$«'ad,...... ':!. d :• :<'<« :,a.2P` ;J::e2 •.3.e Ap Sanav loam Granular E1 .8-16" 7.5YR 7 3 Sandv loam 'Granular . E2 16-20" 7.5YR 5 6 Sandy loam Granular Btl 20-56"' 5YR 4/.6' Relic Sandy clav Subangular loam block Bt2 56-86" 5YR 5/8 5YR 6/2 Sandy clay Subangular 7.5YR 7/1 loam blocky BC 86-95" 5YR 5/8 5YR-6/2 Sandy clay Subangular 7.5YR- 7/1 loam black T C1 '95-127' 5YR 4.0 Sand Granular C2 127-130" 5YR 4/6 7.5YR 7/1 Sand/Clay. Granular Seasonal lenses High Water Table C3 1. 0-145" 5YR 6 Sand Granular C4 145-152" 5YR 4/6`' 7.5YR 7/`1 Saud/Clay Granular lenses' C5 152-160" 2.5Y 7 -2 Saud Granular C6 1,60-.192"+ 5Y 8 6 Sand Granular C1JF I 1JJJ LJ- JV u wJLL V/I�+J.Q C e .xh�. 'x�� <vo7:iS X fw: `K�'Q:n y 'R 9.Gx ~• xxete.p .5YR 4 2-:: ntib9R wy:< Sri' 'n Sand lioam a. 'w;o: :4 Grariular A 0-71 E .. 7L23:' 7 5YR 7 3 Sandy 14am Gxanular " Bti 23-63'. 5YR 4/6. Sandy day . Subangular loam block Bt2 .;: 63-7W' 2.5YR 4/8 Sandy clay Subangular loam. �biock BC 78-10e 5YR 5/8 ., . 5Y.F 6/2 Sandy clay Subangular .. Relic. loam block C1 100.432" . 5YR 4 6 - Sand Granular C2. 132-748" 5Y 5/6 2.5YR•8%2' ` Sand -Granular Seasonal ; High Water Table C3 148-156" 5Y 8/6 10R-8/2, Sand/Clav Granular 'lenses . C4 156-181" 5Y 8 6 23Y 82 'Sand Granular C5 ' 181-193' 5YR, 7/ 2 Sand' :` Granular C6, 193-204"+ ' 5Y S 6 t Sand .: Granular sxn:,jGUz ' .xx :¢x: °Ml .. n. ..... ..... III .«•e¢� '�'� i/x :ewwxR xQ.ofe '5.#:h cx•�i.,g,; wxaMR w i '•x¢:. 6� A 0-7' 5YR54.2 Sand loam Granular E 7-24" 7.5YR .7 , 3 Sand 'loam Granular. Bt 24:-4.8" 5YR 5/6. Sandy loain Subangular- bloc BC 48-72" 5YR 5 8 ' Sandy loam Granular C 72=10$"+' 7.5Y 6 '6 Sand Granular.:: - Screened interval MY. Well Total well Casing hL water level water level Screen.length from top of ground to Rod Reading (ft) (TOC) Rod wading (ft) (TOG) Relati��e . Movation Water level Elevation depth (ft) 01) . 00-{TOC) (ft) ) (TOG) (ft) m fra" " . 3.55 5.05 98 " 85.37 HA1 15.75 1.5 14.13 12.63 0.5 13.33 13.83 \ HA2 18.17 2.25 15.97 13.62 0.5 15 15.5 3.54 5.79 97.26 " 83.64 HA3 18.67 0.42 15.86 -15.44 1 16.83 '17:83 6.02 6.44 96.61 81.17 - Slug Tesits Data - GnlyR Creek 6/1.6/98 Bouwer and Rice Method for partiaily-penetrating swells in unconfined aquifers._ -RESULTS Slug test type slug- Rw Rc Lw Le D. Ksat - . (gat) :. (ft) =(fl} (ft) (ft) (R) (ft/sec) . : (fVhr) (ft/d) HAiFFI2 fh 2,0 0.167 _ 0.083 1.62 0.50" 20 OA000647 0.233. .- 5:59_ HA1FH3 fh, -1.5 0:167 __ 0.083- 1.62 0.50 20 '_ O.0000626 0.225 5.41_ ' HA1FH4 . -lb 1.0 0.167 . 0:083 1.62 0.54 20 0.0000647 0.233 5.59 HA2EH1 . `Ri 1.0 ' 0.167 0.083 ' 2.30 0.50 ' 20 0.000243 0..875. 21.00 ' HA2FH3 di 1.5 0: i 67 . 0.093 2.30 0.50 20 0.000261 0.940. 22.55 HA2FH4 _ fh 1.0. 0.167- : 0.083 , 2:30 _0.50 '_ 20 0.000223 , 0.803 -- 19.27 3.64 HA3FH1 fh 1.0 0.167. 0..083 2.81 1.00 20 .0.0000352 0.127 HA3FH2 _. th 2.0.: 0.167 0.08.3 2.81 1.00 20 0.0000366 '0.132. 6 3.16 HA3FH3 t 1.5 0.167 0.083 231..' -1.00 . 20 0.000034 f 0.123': 2.95. HA3FH4 fli 1.0 --0.167 .0.083 2.81 - 1'.00- 20 -0.0000322 _ 0:116 238. type:- type, of slug test performed (ih-falling head/ rh-rising head) . slug vol.-- volume of water used'for head displacement (falling -head slug tests only) Rw =_radius ofbbring and/or developed zone ; Rc -radius of well casing.: = - Lw - length of water column Le -length of well screen (if well -is screened below static water table) -or length of Water column (if well is screened across e. B estimated aquifer thickness Ksat - saturated'hytimulic.conductivity of host -material J n ri . 0311137 1` 3J 11: `Jti �.s. 49 z N GRAPHIC SCALE E 300 0 300 600, CJJf l if 1777 L L JV UL V.JLL IJ f JCJ JOB No, 1249 , S(m • ou . MIW MCRK SP, RD SCJui '— FILE � h 1 � i n, E i, V V OOP5 O 1 ESTiMATEJ GROUNDWATER 'n:_OW v DIRECTION z� Y ® W z d � 7C , C v cNLARGED SCALE . w 1" — 100' .. SHEET CF March 18, 1999 MEMORANDUM.. :f TO:`-. _-Bob'Cheek, Supervisor Permits.and Compliance Unit. GroundwaierSection; DWQ . FROM: Robin Godshall, Project Engineer On -Site Wastewater Engineering Branch, OSWS, DEH Phone: 715-3270 SUBJECT: Groundwater Section Review OSWS Project No.: County: Facility Name: Facility Type: System Type: Design Flow: Regional Soil Specialist: Phone: 98-34 Cumberland Gray's Creek Elementary School School Conventional 11,400 gpd unreduced, 8,550 reduced David McCloy, Fayetteville RO 910 692-4118 Per our Memorandum of Agreement, attached you will find plans, specifications, and supporting information for the above project for the Groundwater Section's review. If we can provide any additional information, please don't hesitate to contact us. Your assistance is greatly appreciated. PROJECT/SPECIFIC INSTRUCTIONS/COMMENTS: This is another school. There may be some hydraulic issues although they've told me that the depth to groundwater is between_ 12.5 and 15.0 ft in the, area of the drainfields and the Kv_alues look consistent_ with the design loading rate. It generally looks pretty good but request that you make recommendations as to whether or not hydraulic modeling (i.e., lateral flow analysis) and or mounding analysis should be performed _ by the applicant's consultants. I'm still waiting for a copy of the final soils report from the applicant's consultant. I will forward this to you as soon as I get a copy. RNG/mg cc: Project File „. a State of North Caro fin Department jof,Eh*onrhent and Natural Resources • Division of Environmental Health .1� 4 _ James B Hunt, "J'r ;, Governor Wayne McQevitt, secretary Linda .C.:Sewa11, birector _ NORTH CAROUNA DEPARTMENT OF 'AND NATURAL SOU TU L RESOURCES. _ -ENVIRONMENT March 17,1999 Mr. Lacy Williams. Jr. Environmental Health -Director Cumberland County Health Department 227 Fountainhead Lane Fayetteville; North Carolina 27954 Courier 14-59-32 Subj: "Project Status of: Gray's Creek Elementary School. Alderman Road. Cumberland County, NC. OSWS Project No. 98-34 Dear .Mr., Williams, We have reviewed the plans: design calculations, projection, specifications and soils evaluations received on March 4, 1999. In recognition of the urgency of the proposed project. «-e conducted a full engineering review of the submitted materials. At the request of the applicant's engineer, an engineering design conference was conducted at the OSWS Raleigh office on 1Vlarch 12,-1999 to discuss the outstanding issues and items of concern currently remaining on the proposed project.' The following items were discussed in detail ��ith the . applicant's engineer; o Daily design flow - :11.: Sand filter design... , 2.. Wastewater characterization 12. Final dosing pump tank 3. Pretreatment requirements 13:.Drainfield design and location s. 4. ' Soils evaluation 14. Pressure manifolds 5. • Site layout 15 Force mains, 6: Collection sewer 16. System classification = 7. General -tankage issues. = 17. Pretreatment-momtoring requirements 8 ° Grease=traps = '' 18: Groundwater- considerations = 19: System 0 eration and lvlaintenance 9. 'Septic tank y p - '10. Sand -filter' dosuigtank 20. Mounding and lateral flow, analyses We'had a very good meeting and now believe that the applicant's erigineer.has been provided -with a clear 'understanding of the remaining -site -and ,engineering issues,: Today; we received the.revised_plans and project _ specifications which the applicant's engineer hand=delivered-to our offic .-; We understand the time criticality of the plans to your applicant an will endeavor to•review. the -revised plans. as soon- as -possible = ON SITE WASTEWATER SECTION: , P.O. Box 29594,' Raleigh,`North' Catolina 27.:626-0594 Telephone 919-733-2895 FAX 919=7.15-3227 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post;eonsumer paper a. - Gray_'s CreekElementaryS6hool: y March 17. 1999 _ Page 2 of 2 Please contact us.ifyou haze any questions pertainirigto this letter orif«e may be:of further'assistance >.. ; this -project. We may be reached at the telephone and facsimile numbers -or address listed on this letterhead. I can be contacted directly at (919) 715-3270 or by email at robin_godshallCmail.ehnr.state.nc.us. Sincerely, . I'tGodsh Environmental Engineer H On -Site Wastewater Engineering RNG/mg cc: Tim Kinlaw Mike Koonce Dmid McClov Project Name: Gray's Creek ES ` Date: • 99031.5 Project Number: 98-34 Sand Filter Recirculation and Final Pump Tank Required Volume Calculations Dosing Tank Cumulative Flow r Day Inflow Discharge Retained 1 11,400 9,500, 1,900 Flow 11,400 57,000 2 11,400 9,500 3,800 FE Daily flow 9,500 3 11 i400 9,500 5,700 Emergency Stor. Dose Volume 5,700 633 4 -5 11,400 11,400 9,500 9,500 7,600 9,500 Daily SF disch. 9,500 6 - - 9,500 0 Cumulative Reduced Flow Day Inflow. Discharge ' Retained 1 8,550 -7,125 1,425 Daily Design Flow 8,550 Weekly Flow FE Daily flow 42,750 7,125 2 3 8,550 8,550 7,125 7,125 2,850 4,275 Emergency'Stor. Dose Volume 4,275 633 4 5 8,550 8,550 7,125. 7,125 5,700 7,125 6 7,125 0 Unreduced Red Required PT Vol. 1033 12,033 Final Dosing Tank Flow Eq. Cumulative Reduced Flow - Day Inflow Discharge Retained Daily Design Flow 8,550 1 8;550 7,125 1,425 Weekly Flow 42;750 2 8,550 7,125 2,850 FE Daily flow 7,125 3 8,550 7,125 4,275 Emergency Stor`. 4,275 4 8,550 7,125 5,700 Dose Volume - 1,781 5 8,550 7,125 7,125 6 7,125- 0 Required PT Vol. 13,181 Note: Can also subtract piping -and free board volumes as part of required volumes. /r L/FG 465 %903/5' ZZ.'f</ 'f /"O�00 , yz 7S j M M Ln h I— I.- LU LU 1!d W LU ui mmm V1 Vf Uf O O O tm2a CV �CVa aaa N CI N CV C`!N ivy -�'/7/ Z aWa W W W W W W .Z =_ 0 of 0 coo v1 0 0 N N It N N N W 1-wXX - n/ Aer V- W W W xxx YI Vf Yl goo r M aqo AI C C4 C44 l-a a // 4 / J/�Pi! /C27'f Gj /�/ QJGr j f?7/ �✓ � '" •!ti/.PG, GlE'.�'� G'�'.C�7 e�� �-�'-,G�� ,�Se,I��/^�-�' �ir�.� `' JLP� �6e'�C !///% fit✓ `�. ,2��^- e�'��+.� /�"`5u/�%/o� `' �— �1i[17 eG /ram-v�. �� ✓%��'- � _ � G r/s�".6c,a,. fie, ,� i 0`'�F�G � ��'!, �� e.` ,G�.e✓�!'? �`i'f"..a�"' ,�y1� � �7 ,�CS°'�2.r' �.' c. �il.'�--,Y^r //`t!l/�' �Jotcc // Q� Z/��y�Gf� d i LUUALU W W W Vf Uf Uf tmoo -N N N N 7/ ZS/, 3 �3 = 79/7 = 7 Gcsco �/ �22s//'c /� rc•/ /y��f` . a-,q o� /�o ,,y�,{ f/ f/ ORI V A�/ le f 1-/ 4�W 17 � �� r �,et Y �- v® 4 ' 'r�r im 16 e of% �. ,fie- a a�• � � `vs✓� ..:� � � e- � � �. I lA IA to F b-F W W W W W W '=S' x 0 N N 000 rl1 � o N N N N N k VVII =e4'tfWr' Sand Filter Design Protocol 1. Select type of sand filter 2 OBuried single -pass, pressure dosed �� �tjv 1 ❑Free access, single -pass, pressure dosed 2I'ree access, recirculating, pressure dosed �l 2. Select Maximum filter forward Loading Rate, MLR= (GPDMO). -.Compute: Minimum filter'Surface Area; MSA=DDF/MLR where DDF= (Design Daily Flow Rate, Gallons) MSA=DDF/NER=(// `Io0 )/(3 )= 3840 (f�) 3. Select number of filters: Z 4. Select Filters Dimensions: Z (length) x 31 (width) -Compute actual filter Surface Area, FSA= 19 zZ (sq. ft.) (FSA must be>_ MSA) -Compute filter design Loading Rate = FLR = DDF/FSA= (11'4"0 )/( I17 L. )_ (GPD/ft2) -Make sure FLR>_ MLR (if not, choose bigger filter or more filters) 5. Layout/Design Filter Distribution Network: 6. Select Number / -/ and length VO of laterals (in all -filters) ' Total Filter Lateral —Length, FLL= S q0 (ft) ! Filter Lateral Size, FLS = 1, IN (inches) I Lateral Orifice Size, LOS = S/3z (inches) Lateral Orifice Spacing, OSP = Z (feet) -Compute Lateral Volume, FLV= FLL x /,B ib0 gals/ft Sya x D,a rg (gallons) Compute Number of Orifices, NO = FLL/OSP _ - _ ( fill A Z )_ if Z0- ' 5 0 - IZZ -Compute Filter dosing rate, Q= NO x / 6'6 (GPMLos cr DPH) where DPH = design pressure head (>Aft)= � (feet) Q=NOx =( yZ!7 )x( 7. Select Dose Volume/Day, DVD = (gallons) -for single pass, DVD= DDF= — - PT -for Recirc Filter, DVD = (recirc ratio +1) x DDF x 1/ yob = 000 8. Select Number ofDoses/Day, DPD= -g .(recommend choosing 4,6,8,12,24, or 48) z7 Zq Per a -Compute Volume/Dose = VD=DVD/DPF _ � = 960 (gallons) *Compute Lateral Volume Exchanges/Dose, LVD_�) V -if LVD < 6, select fewer doses/day or. smaller laterals -Compute Pump Run Time, PRT = VD/Q (minutes) Recommend pump run time 3-10 minutes, though smaller maybe allowable, if other options limiting. Adjust by changing orifice size, number of laterals, orifice spacing and/or number of doses/day. -Compute Pump Off Time, POT= (24/DPD) x 60 -PRT = -24 x 60 - . �„ �' _ Z I (minutes) (IIII-) G .9 9. Summary of Filter Design Parameters selected/computed: -Type of Filter -Design Daily Flow, DDF (gallons) Number of Filters: -Filter Dimensions ( x ft. -Filter Loading Rate,FLR= (GPD/ft') -Filter Surface Area, FSA: (sq• )� t -Lateral Network Specifications: Number and length of laterals -Total Lateral Length, FLL (feet) -Lateral Size, FLS: (inches) -Orifice Size, LOS: (inches), and spacing (feet) -Total Number of Orifices, NO: - - -Design Pressure Head; DPH (feet) -Filter Dose Rate, Q (GPK -Recirc Ratio (where applicable) -Number of Doses per day; DPD= -Volume per Dose, VD: (gallons) -Lateral Volume exchanges per Dose, LVD -Pump Run Time, PRT: (minutes) -Pump Off Time, POT: (minutes) Glossary of Abbreviations DDF: Design Daily Flow (gallons) DPD: Number, of Doses Per Day DPH: Design Pressure Head (feet) DVD: Dosing Volume Per Day (gallons) FSA: Actual Filter Surface Area (ft2) FLL: :-Total Filter Lateral Length (ft)- FLR: Filter Design Loading Rate (GPD/ft2) = - FLS: Filter Lateral Size (inches) FLV: Lateral Volume (gallons) LOS: Lateral Orifice Size (inches) LVD: Lateral Volume Exchanges Per Dose MLR: Maximum Filter Forward Loading Rate (GPD/ft2) MSA: Minimum Filter Surface Area (ft) NO: Number of Orifices OSP: Lateral Orifice Spacing (feet) POT: Pump Off Time (minutes) PRT: Pump Run Time (minutes) Q: Filter Design Rate (GPM) VD: Volume Per Dose (gallons) I S:\OSW W\BERKOWrI1SANDFILT. WPD FACSIMILE N.t �1�-a54-�aia in 1. H ''Hobbs, Upchurch, _ P Associates, P.A. Consicltinx Engineers 4917 Walers Edge Drive Suite I l0 ' "Raleigh, North Carolina 27606 (919) 854-OZ13 FAX (919) 81 4-7815 TO: Doe Godshall FAXNUMBFR: 715-3227 DEH On -Site Wastewater Section NO. OF PAGES: 2 (i,u(uding cover) FROM: Michael S. Koonce, P.E. HUA PRO,II:CT # CU9802 Hobbs, Upchurch & Associates, P.A. HUA FILF: NO. # 605 DATE: November 20, I998 TIME: 3:59 PM RE: Gray's Creek Elementary School On -Site Wasteivatee Treatment System Design,Flow Reduction Request MESSAGE: As, requested in your September 28,1998 letter:to Mr. Lacy'Williams of the Cumberland County Health Department, please find altach-cd the following infurmation concerning the above referenced project: - 1. 12 months of water, usage records for the existing C;ra.,�'s Creek School (similar size, low -flow plumbing fixtures, etc,) 2. Wastewater Characterization Results from existi tit, Cir:,y's Creek School I hope this provides you with the necessary information to complete your preliminary review and concur with out Design Flow Reduction-12equest.. If you need additional information please give me a call at your`earliest convt nience. , Also, I would. like to schedule a "Pie -design Conference' with you to review our design concept prior to,the official permit application. Hopefully, it will expedite the approval process by getting your input up front. I will give you.a call early next week to confirm a time. Thank you for your assistance. P. L Mike -.Cc: Mr. Tito Kinlaw r Mr. Lacy WiMatlls, Jr. Associate Superintendent ". Environinental Healili Director Cumberland County'Schools Cumberland County, Health Department Via Fax (910) 678 2339 Via Fax (910) 3. 3669 43 3- � .. . (,'�q c _ _ Yn. t Existing Grav's Creek Elementary School Water Usage Da The data shown below is taken from water usage data provided by Cumberland County School personnel for the existing Gray's Creek Elementary School. This school obtains its water from an on -site well and all usage is based on actual meter readings. The total gallons of water used each nfonth, the number of school - days open per month, and the average number students and faculty are showed on the following pages. Total Gallons of Water Used (Nov. 1997-Oct. 1998) 967,000.0 Total Open School Days .242.0 Average Daily Water Usage 3,995.9 Total Number of Students and Faculty (Avg.) - 788.0 Average Daily Usage Per Student • g,l x 4 x nov CU• -Ja U4: e'_lp I nomas K. u000win, r. m zIU-bb4--lala P...j S/- 9106782116 34 I NTC PAGE 03 R-1— LIMBMANDCOUNi'Y SCHOOLS PCs 2 AYSRAGE WAT�R USAGE .,,,;YEAR_1�I9 S� BASED ON OPEN « • • DAYS OF: TOTAL GALLONS OF E• 1 iLtiLilia� � i WRTMA \mow R"��,itfl S °u✓5' }� t{ } (LYE * t srK + 4 mvn Yam{ �._- _C.1 5 T ! t ' t, ., .. ... t- ... 1•':i ,. .. o Nov, 20 98 04:21p Thomas K. Goodwin, P.E 819-854-7815 11/18/1998 ,16; 34 9166782' ^ CUMB CTY SChf Ki lr�' i PAGE 02 p.4 R-1-3-97 CUkMERLAND COUNTY S(:IiooLs'- �PG 2 AVERAGE 'WATER USAGE SCHOOL MONTH YEAR BASEDON OPEN SCHOOL DAYS OF r AVERAGt:. DAILY WATER USAGE /�YlIWW - YEARLY WATER USAGE GRAYS CREEK JANUARY 099 X X_A! 1 FEBRUARY MARCH APRIL 1 i- 1j a0 p' — G � i , •s !s, JUAY 5 ' 1 j t� JULY !' . A Js N I 0 1 / �AppUCKIpS�T����++pp 14 91 NOVEMM DECEMBER / PM FOREST MIDDLE JANUARY FEBRUARY 11 It 0 - MARCX 11 /. 1r h APRIL 9 h ►� 1� , MAY _ 9All/ o-✓� ' UNE / IMY JJVa AUGUST /21P, SEFTStMMOcTcm t'1 1 L ei 'Cr 9-7 NOVENMER, DECMAM RALEIGH ROAD .J ARY FEBR Y !t A1 9 J rj14Ij 1 /s MARCH 4 �. AMM MAY JUKE 11• J 0. JULY g a / At OCTDBER ca A% • NOVPIrIDER DECEMBER 97 7 Jy. y ' r Nov 20 98 04:21p 10/23/1998 14:38 p.5 Thomas K. Goodwin, P.E 819-854-7815 9106784�. CUMB CTY ETCH PAGE 01 Microbac, Laboratories, Inc, FAYSTTSVILLB DIVISION 817 CASTLE RAYNE STREET NC #11 FAYSTTEVILU, NC 20303 NC R37711 (910) 164-1920 / (910) 864-8774 (FAX) USDA #3787 AAA FUEL WATER • FOOD " WASTES CERTIFICATE OF ANALYSIS CLISHT: CL:aDarland Co. School ems: Pont Office Boot 2357 FaYettaville, NC 28302 CONTACT PERSON, Mr. Carlo= Mercer ACOPUNT NUMBER: •KC012 SAMPLE ID: 1. Grays Creek - ID l98PX105574 2. 3. 4. CERT #24361 DAYH RFC'D: 10/12/98, SAWLED: 10/12/90 SAMPLED BY: Client DBLIVSAS BY: Client SAMPLE CDT: Waste Water Grab R EP"CB: 14CN-OOMPLIANCR DATA REVIMED. BY: DATE REPOR78D: 10/20/58 taaaa��+taaaaiaaiiaiiii.iaaaaaa•ataaaaa�*a•saaa}iiasa+aaa,a..aaaay•+aaaaaaa•aaa�aaaaaaaa•aaaa •..aa+♦aaa•aaa•***��**s***.*:***,::��*s..+a..+*..+++.aat�a+:a+aaaa2t*+aaaaa3 l en= BCD (mg/L) }aaaaaa♦+s.,, EPA 405.1 206- COLIFOM PRCAL (per 100 ml) SMIS 9222D HIVE (mg/L) 390 d NITROGEN, A�g6tyYIA (�/y� SPA 353.3 <1.0 SPA 350.2 83.42 OIL i C4USA,3B (atq/L) �H EPA 413.1 0.314 SOLIDS, TOTAL SUSpMMIM SPA 150.1 7.05 TRH?2pATURB (•C) SPA 160.2 51 E. SPA 170.1 21.0 �122;. < - Lena than "Greatir than PAGE 1 OF 1 Hobbs, Up'churi hA Associates; PA. Eonsilting Engineers, 290.8 *Br'oag1 Street -Post, Office Box 1737 Southern Pines, NC 283881qj _ October '7 ' 1998 \Mr. Lacy -,Williams Jr. ; t, Environmental Health Director ;l Cumberland County Health D,epart�ment 227 Fountainhead Lane; ' A Fayetteville, North Carolina 27954 RE: Gray's Creek Elementary ,',. Additional Information HUA No. CU9802.p ,. ` Dear Mr. Williams: I am in receipt of the letter', from Mr. R':N.,,,Godshall •of the On -site Wastewater Group. The purpose of my letter is to address IA9`questions,and. concerns on the above referenced project. =} 1. First, the proposed Gray'si Creek School will be constructed -without' a xJ gymnasium or showers. ` I' "was- -mistaken when. sending you this information earlier. ,Based on this; we 'will be sending you additional water usage information from comparable facilities. 2. Cumberland County is, specifying jthe•,use -of extreme water -conserving i fixtures at this school. We, will ; forward the plumbing plans and cut; sheets to your office. 3,. At least one grease. Trap' Mlll be 1provided-for the "kitchen' waste from the cafeteria. This will be shown on the plumbing plans. •i RECEIVED OCT 1 S 1996 DEHNR!DEH Omits Wastewater Section huamain@pinbhurst.net j I Ili It I - - ,�..'f �t �l, �..i..� IIi. +, I I r r �I I�1 111 ' � `' �,'I�I'r��',11°9k�i •I�J+11 (Ir F i `I ,j, 1 + ��l�y.�l + I ,1 il;; C Ir t � 1 •I,�°>, s, :��° ,� i . I i� .'� I' ''I' f I}6";il 1� I ;1 � I i ,t I� i� t li�h 1, l I ✓ •1 r i� Ito I I III I I a r 11 1 ;I 1VIr. Lacy Wilhams;IJr -, 'J i,,� Cumberland County.IHealth Department; Pa e 2 g ; ,�i J. gp 1 { l 1 {' • 'FT": 4. The pro' osedl s ° stem ' clude. flow p Y} e q ualization.: The-wlet`;well I , ; I r,;ll, holding tank oversized'to provide uniform flow'over`s<c perk,°4 willibe week (days i 5. We will) provide:,effluent sampleresults_as soon as these are available ''ll ,>,� 1 :• L., , 1 II YI 1 IIIti We will sample the,dlseharged from the existing`{Gray'' Creek chooll YI it , � T , jA If you have any about this information. or, the information i'to be'I pioaided, do not .: , :questions hesitate to contact our office., t �• i+l I7 I,i� 11 l ,� h II Il, i I I. - f� , ! Sincerely i° ,. I �; f!. I1 1I aE; III I I1 i �I� I II I' HOBBS UPCHURCH-`&�WS MATES �:P.A'. t 7 r7 - .. 51 I:� i J 1 1 I .1 •,i ��� , I William R. ;Buie, P.E. 4 , cc: Tim Kinlaw. I R.N. Godshall !; , .• �1 I IF Al I f 1 1 1 II^ , 1 I r t k I RICHARD B. GLAZIER, CHAIRMAN HENRY MOLDEN, JR., VICE CHAIRMAN MICHAEL C. BOOSE KENNETH EDGE MACKY HALL Cumberland County Schools P.O. Box 2357 Fayetteville, North Carolina 28302 910-678-2300 WILLIAM C. HARRISON, Ed. D. SUPERNREMENT September 30, 1998 Mr. William Buie Hobbs, Upchurch & Associates, P.A. Consulting Engineers P. O. Box 1737 Southern Pines, North Carolina 28387 Dear Mr. Buie: LARRY LANCASTER MARY EMILY ROYAL DIANE WHEATLEY MILTON J. YARBORO Re: September 28, 1998 NCDENR letter to Mr. Lacy Williams; Jr. reference' On -Site Wastewater for Gray' § Creek Elementary School I have reviewed the memo from Mr. R.N. Godshall, Environmental Engineer, to Mr. Lacy Williams Jr., Director to the Cumberland County Health Department. Please provide the correct information as needed. The proposed Gray- s Creek Elementary School does not contain any showers or gymnasium. The multipurpose. room. does not require any additional water facilities. Please provide all requested information to Mr. Godshall's attention immediately. This project is scheduled for bid in November of 1998 _ to relieve overcrowding in existing elementary schools. It is critical the wastewater permit be approved as soon as possible. If you have any questions or comments, please contact me immediately. Sincerely, <777-\� Tim Kinlaw l Associate Superintendent Operations THK:pbp RECEIVED c: R. N. Godshall OCT 2 1998 DEHNR!DEH ti,te WastewaLern Equity and Excellence in Education ,1 / September 28,1998, 2:31 PM INTERNAL MEMORANDUM TO: Rachel Groff FROM: Robin Godshall, Project Review Engineer SUBJECT: Project Work Request Please perform the following work tasks With respect to the attached project: ® Prepare/iTpdate Tracking Database Entry, including; ®' OSWS Project No.: 98-34 ® Project Name: Grays Creek Elementary School ® County: Cumberland, ® Date Received: Wl 7, 1998 ® Review Type: NPS , ® Status: REV ® Review Eng.: RNG ® Facility Type: S" ® System Type: N/GT, ST, PT, PM/C ® Design Flow: 14,250 gpd (7,600 gpd reduced) ® Applicant's name, address, phone and fax numbers from the project file ® Engineer's name, firm, address, phone and fax numbers from the project file ® Soil Scientist name, firm, address, phone and fax numbers from the project file ❑ Prepare file folder ® Prepare/Update card file (if not already done) ❑ Send cc of plans/specifications/documents with appropriate memo to: ❑ Regional Soil Scientist _ CJ Bob Cheek, Groundwater Section �j Blue, yellow and file copies are also required. ® Distribution: ✓ \ / ® Send original via Courier to: ® fax to: Local Health Department: Lacy Williams V . ® Send one copy to: ® fax to: Regional Soil Scientist David McCloy ® Send one copy to: ® fax to: Applicant Tim Kinlaw ® Send one copy to: ®,. fax to: Applicant's Engineer William Buie ❑ Send one copy to: ❑ fax to: Applicant's Soil Scientist Groundwater Section Review Engineer: Bob Cheek ® Send one copy to:. ® One copy to file (Please two -hole punch at top and place in right side file) / ® One copy to Doc/ Ishwar Steven Special Instructions/Information: See letter in project file with list of contacts If you have any questions; please call me. __J1 State of North Carolina Department of Environment and Natural Resources Division of Environmental Health James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Linda Q. Sewall, Director September 28,1998 Mr: Lacy Williams, Jr. Environmental Health Director Cumberland County Health Department 227 Fountainhead Lane Fayetteville, North Carolina 27954 Courier 14-59-32 D E R NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subj: Review of Design Flow Confirmation Request Received for: Gray's Creek Elementary School, Alderman Road, Cumberland County, NC, OSWS Project No. 98-34 Ref. a.) Ltr dtd April 25, 1996, from On -Site Wastewater Section to Environmental Health Specialists, Consulting Engineers, Soil Specialists and Geologists, re: Design Flow Rate Reduction Requests Dear Mr. Williams, We have reviewed the design flow confirmation request and soils report received from July 7, 1998 for the above -referenced facility. Review of this project has been assigned to R.N. Godshall and to whom all further correspondence should be addressed. It is our understanding that at this time and from the submitted materials, the applicant's engineer is only seeking design flow confirmation. Therefore, a full engineering review was not conducted and the comments contained herein concern only the proposed design flow. These comments must be addressed and revisions resubmitted for further review prior to design flow concurrence. It is our understanding that the proposed on -site subsurface wastewater disposal system will serve a new elementary school with a daily student population of 950 students with cafeteria (to include kitchen) and gymnasium (to include shower) facilities. Design Flow: The submitted calculations indicate a daily design flow of 14;250 gallons per day (gpd) based on 15 gpd per day per student. The correct unreduced daily design flow could be based on 12 gpd per student for a total of 11,400 gpd. It is understood that the requested design flow reduction request is based on a daily student water usage of 8 gpd per student or a total of 7,600 gpd. It should be noted that the flow reduction request is applicable only towards sizing of the drainfields and that the pretreatment component sizing must be based on the unreduced flow of at least 11,400 gpd. ON -SITE WASTEWATER SECTION P.O. Box 29594, Raleigh, North Carolina 27626-0594 . Telephone 919-733-2895 FAX 919-715-3227 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper I Gray's Creek Elementary School September 28, 1998 Page 2 of 3 Prior to our concurrence with the proposed daily design flow of 7,600 gpd for the drainfields, the following issues must be resolved: In order for OSWS to concur with the proposed flow reduction to 8 gpd/student, sufficient data as required by Rule .1949(c) must be received Additionally, the system design must include 24-hour flow equalization over a six-dayperiod. (In the absence of this supporting data, the minimum flow OSWS will concur with is 9 gpd/student or a total of 8,550 gpd for drainfield sizing, to include 24-hour;flow equalization.) Tlhe applicant's engineer should clarify the source of the handwritten monthly water usage readings for the three Cumberland County schools listed, i.e., the Cumberland County Schools. If the water supply for these schools is municipal, the flow request should include water reports from the responsible water authority. If these schools are supplied by wells, the submittal should indicate that these figures are compiled from water meter readings. The notes only indicate the student population of one of the three listed schools. It is therefore not possible to evaluate whether the proposed daily student usage is applicable to the rest of the County schools in general and to the proposed school in particular. Specifically, the existing Gray's Creek School listed is an elementary school without gymnasium or showers while the proposed project is a school with gymnasium and showers. Additionally, our design flow concurrence will also be based on the proposed facilities to be connected to the subject system, the use of extreme water conserving fixtures and the management of the wastewater characteristics. Therefore, our concurrence with the proposed design flow is contingent on the following conditions: The use of extreme water -conserving plumbing fixtures must be specified at the subject facility. In the restrooms, lockerrooms and kitchen, the facility should have: — toilets which use no more than 1.6 gallons per flush (gpf), — urinals which use no more than 1.0 gpf and — showers which use no more than 2.5 gpm and — spring -loaded faucets which use no more than 1.0 gpm The applicant's engineer should submit cut sheets for these fixtures to confirm their use in the facility, the plumbing schedule and the plumbing plans with his full engineering submittal. Clear water discharges such as from the HVAC system or stormwater runoff shall not be discharged into the sanitary sewage system, as shall be indicated on the plumbing plans. This office must be provided the stormwater management and plumbing plans which demonstrate that there is no discharge to the subsurface disposal system from these sources. Since the proposed facility includes a kitchen, the wastewater system will require at least one grease trap, documentation, i.e., the plumbing plans, must be provided clearly demonstrating that the grease trap(s) shall receive kitchen waste only and no toilet wastewaters. The system design must include flow equalization over at least a 24-hour period. OSWS will concur with the proposed daily design flow of 7,600 gpd for drainfield sizing if the flow equalization is also designed to spread the five-day flow uniformly over six days per week F Gray's Creek Elementary School September 28, 1998 Page 3 of 3 2. Wastewater Characteristics: The proposed wastewater discharge must be characterized, particularly with respect to BOID,, COD, TSS, O&G, nitrate nitrogen and ammonia nitrogen concentrations. The wastewater pH and temperature (field measurements) must also be characterized. This characterization may be accomplished by effluent sampling of the existing similar facilities in the Cumberland County School system. With respect to effluent sampling, we offer the following recommendations. The sampling should be conducted by personnel familiar with acceptable sampling and sample handling protocols since the use of improper sampling protocols may result in an invalid sampling or inaccurate results. The analysis mast be conducted by a state-certified,laboratory. The sampling location should be as far downstream in the wastestream prior to distribution as is feasible to collect the samples. Typically, we recommend sampling from either the existing distribution box or the septic tank outlet. This office is available to work closely with you and the applicant's engineer in establishing an appropriate sampling and analysis regimen. Depending on the sampling analytical results, additional pretreatment may be needed. The ultimate design flow required for the drainfields and the required level of pretreatment may also be influence by site -specific field limitations. Please contact us if you have any questions pertaining to this letter or if we may be of further assistance «ith this project. We may be reached at the telephone and facsimile numbers or address listed on this letterhead. I can be contacted directly at (919) 715-3270 or by email at robin_godshall@mail.ehnr.state.nc.us. RNG/mg cc: William Buie Tim Kinlaw David McCloy Sii4W rl RN. Godshall Environmental Engineer II On -Site Wastewater Engineering i -3 IN-Fh W W W xxx Vf Vf Ln En00 N •-Na ava N N M N N N Pe- 9 s < rrl J �Z�CC( ��� •�'�'i r itf- ' e.,,y .Gel{! � rF i� Project: Gray's Creek Middle School Project No.: 98-34 t Date: 980909 A review of the submitted flow data from 3 Cumberland Co. ES. School Month Days Open Gallons Used Average Daily NW: Students Use per Student Gray's Creek ES Jan 22 135,500 6,159 777 7.93 Feb 20 .77,800 3,890 ' : 777 5.01 Mar 22 79,200 3,600 -777-163 Apr 18 62,000 3,444 777 May 19 72,500 3,816 -777 Pine Forest MS Jan .22 116,200 5,282 .. �i Feb 20, 115,200 5,760, ' .. Mar 22 135,800 6,173' Apr 18 97,100 5,394 May 1:9 104,900 5,521. , Seabrook. - Jan 22 115,670 5,258 yL�,W,4 Feb 20 . 103,060 . 5,153 Mar 22 117,130 5,324 Apr 18 150,790 8,377 May 19 161,620 8,506 4� CARC� COUNTY of CUMBERLAND E. Newton Smith Public Health Center July 1, 1998 Steve Berkowitz NCDEH&NR Division of Environmental Health On -Site. Wastewater Section PO Box 29594 Raleigh, NC 27626-0594 Dear Steve: Re: Gray's Creek Elementary School Subsurface Sewer System. HUA No. CU9802.P The Cumberland County Board of Education is proposing to install a large conventional or LPP system for a proposed new school in the Gray's Creek area. The projected wastewater flow is 14,250 gpd. The consulting engineers (Hobbs, Upchurch & Associates, P.A.) are requesting a flow reduction through the use of low flow fixtures and other water conservation methods. The supporting data for a flow_ reduction is included with their proposal. In addition, a site plan and preliminary soil suitability report is submitted for your review. If our office can assist in any way, please do no hesitate to contact us. Respectfiilly yours, . aiA. Heshaam R.S., Soil Scientist RECEIVE® JUL 7 1995 DEHNR!DEH Ore Wastewater Section �V - - 227 Fountainhead Lane - Fayetteville, North Carolina 28301 • Phone (910) 433-3600 Fax (910) 433-3659 Hobbs, Upchurch & Associates, P.A. Consulting Engineers ST� 290 S.W. Broad Street - Post Office Box 1737 - Southern Pines, NC 28388 June 11, 1998 Mr. Danny Soles Cumberland County Health Department 227 Fountainhead Lane Fayetteville, NC 28301 RE: Gray's Creek Elementary School Subsurface Sewer System HUA No. CU9802.P Dear Mr. Soles: As you are aware, the Cumberland County Board of Education is planning to construct a new elementary school in the Gray's Creek area. As no public sewer is available, the school system is planning to construct a large subsurface sewer system. Following is information about the proj ect: Project Title Gray's Creek Elementary Sewer System Property Location See enclosed map Project Contract List Owner Cumberland County Schools Mr. Tim Kinlaw, Assistant Superintendent of Operations P O Box 2357 Fayetteville, NC 28302 (910) 678-2300 Phone (910) 678-2330 Fax En ineer Hobbs, Upchurch & Associates, P.A. Mr. William R. Buie, P.E. P O Box 1737 Southern Pines, NC 28387 (910)692-5616 Phone (910)692-4795 Fax Soils Consultant Soil & Environmental Consultants, Inc. Mr. Steven Price 244 W. Mill Brook .Road Raleigh, NC 27609 (919) 846-5900 Phone (919) 846-9467 Fax Southern Pines, NC • Telephone 910-692-5616 • Fax 910-692-7342 • e-mail: huamain@pinehurst.net Myrtle Beach • Kill Devil Hills • Raleigh Mr. Danny Soles Cumberland County Health Department June 11, 1998 Page 2 Proposed System New System to serve new school Area Description As this is a new school, there are no existing facilities (see map for proposed site -plan). The school will serve approximately 950 students and staff. The school will have a gym and cafeteria and will be used approximately 9 months a year. Wastewater Sources & Wastewater generated by this project will come from the Flow Patterns following: Bathrooms Cafeteria Showers All wastewater is expected to be of domestic strength. Flow would be generated between 7:00 a.m. and 3:30 p.m. when the school is operated. Wastewater System Conventional or LLP system is proposed depending on soil Components suitability Projected Wastewater From NCAC 2H.0219-Minimum design requirements day Flows schools with cafeteria, gym and showers 15 gal/student x 950 = 14,250 gpd Through the use of low flow fixtures and other water conservation methods, typical water usage in Cumberland County Schools with these fixtures is approximately 8 gal/student x 950 = 7,600 gpd. Supporting data is included with this package. Ownership Cumberland County Schools will own the proposed site and operate the proposed subsurface system. We have also enclosed a site plan of the proposed property for the school site. The site contains approximately 65 acres. If you have any questions about this information, do not hesitate to contact our office. Sincerely, HOBBS, UPCHURCH & ASSOCIATES, P.A., William R. Buie, P.E. Enclosures '06/09/1998 09:30 9106782550 CUMB CTY SCH MAINT PAGE 02 '% R•1-14.98 CUMBERLAND COUNTY SCHOOLS AVERAGE WATER USAGE YEAR__fr _ PG 2 SCHOOL MONTH BASED ON OPEN SCHOOL DAYS OF TOTAL GALLONS OF WATER USAGE AVERAGE DAILY WATER USAGE NOTES 7�7 5�odw� a5 GRAYS CREEK JANUARY lry jr41s FEBRUARY &Of l4b 3 !e • ' MARCH 7 a s 'r3f. Igne APRIL 6.2VW 04.: 3 /J U - 3 7. MAY oOFA Vi .a , NNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER PINE FOREST MID. JANUARY f!6 or Pr4Is .Z 6413 FEBRUARY Al Is MARCH X 4,16 APRIL b 1 Wr MAY % OI 0- 6 NNE JULY AUGUST SEPTEMBER OCT0BEit NOVEMBER DECEMBER J. W. SEABROOK JANUARY 11.V6 v (rah . .f 81 13 FEBRUARY t $ O a die shX, I-rj A411 MARCH '' 117.13I 4.4h 3a 1 APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER Environmental Consultants, ■ Hickory, North Carolina 23601 ■ (704) 322-6700 ■ Fax (704) 327-9164 May 14, 1998 Project 4: 3575 Hobbs, Upchurch & Associates, P.A. Attn: Will Buie P.O. Box 1737 290 S.W. Broad St. SouthernPines, NC 28388 PRELIMINARY SOIL SUITABILITY OF THE SOILS AT THE PROPOSED GRAY'S CREEK ELEMENTARY SCHOOL SUBSURFACE' SEPTIC SYSTEM CUMBERLAND COUNTY, NORTH CAROLINA Soil and Environmental Consultants Inc. (S&EC) evaluated the characteristics of the soils in the.proposed system and repair areas at the above mentioned site. These areas were located by Hobbs, Upchurch & Associates. The purpose of this evaluation was to determine the soil's suitability for on -site wastewater disposal systems so that this data could be used to determine site suitability and the approximate area required for on -site subsurface wastewater treatment system as per county and DEH regulations. This evaluation was performed in accordance with DEH regulation (15A NCAC 18A. , 1900). This school will serve approximately 950 students, faculty and staff and according to Hobbs, Upchurch & Associates will have a flow of approximately 10,000-gallons per day (gpd). SoiUSite Evaluation A soil/site evaluation was performed to determine suitability for an on -site wastewater treatment system. The evaluation was performed by making hand auger borings to identify the soil to the series. level. The proposed system and repair areas were the only areas evaluated. The proposed system area runs approximately 450 feet north from the southern property line and 225 feet west from the woods line shown on the map. The proposed repair area runs approximately 450 feet north of the southern property line and 225 feet east into the woods line shown on the attached map. The soils did not vary significantly over the areas examined. The only area evaluated that was not usable for a conventional septic system was at the northern most portion of the proposed system area. This area was unusable for a large conventional septic system due to low chroma mottles (indicating seasonal high water table) at a depth of 40'inches. However, this area does meet the ;requirements for a LPP septic system. This area is shown as "C" on the attached map. Wetland Delineation/PennittingTvfitigadon Soil/Site Evaluation for On -Site. Septic Systems Environmental Assessments Home Office: 244 West Millbrook Road Raleigh, North Carolina 27609 Phone: (919) 846-5900 Fax: (919) 846-9467 Soils in the evaluated areas are most like the Norfolk (Fine -loamy, kaolinitic, thermic, Typic Kandiudults) and Wagram (Loamy, kaolinitic, thermic, A.renic Kandiudults) soil series or taxadjuncts of these series. Typically these soils had a Bt horizon with a texture of sandy clay loam (shown as "A" on the attached map). Such soils can be permitted for Conventional septic systems by the county with a loading rate of 0.3 to 0.6 gpd/ft2 on a trench bottom area basis or for a Low Pressure Pipe system with a loading rate of 0.15 to 0.3 gpd/ft2 on an area basis. These loading rates are taken from 15 NCAC 18A.1900 (Laws and Rules for Sanitary Sewage Collection, Treatment and Disposal) and are based_ on the most hydraulically limiting layer within three feet for Conventional systems and within two feet for LPP (i.e. the sandy clay loam Bt horizon in -this case). However, there was an area east of the proposed repair area where the texture of the Bt horizon was a sandy loam, which could allow a higher loading rate if it can be proven in the additional site testing. This area is shown as `B" on the attached map. For any system over 3,000 gpd, more detailed on -site testing and lateral conveyance calculations will be required to determine the final permittable loading rate. The Norfolk and Wagram soil series are well drained soils that formed in loamy sediments on uplands. Organic matter content and natural fertility is low and shrink -swell potential is low. These soils are medium to strongly acid. Recommendations Since all of the best area is of similarly textured soils and there is little difference in physical or chemical properties, the recommended loading rates vary based on the type of distribution system utilized. _ Based on our experience with large systems, we believe that a 0.3 gpd/ft2 loading rate on a trench bottom basis for a Conventional type trench and distribution system, and a 0.10 gpd/ft2 loading rate on an area basis if LPP distribution is employed are the maximum possible. We should also note that in the "Conventional System" area trench depths should be 18" to 24" in most areas, with 18" depth preferred at the edge of the useable soil, limits. Prior to applying for a permit, more detailed soil investigations will be necessary. A description of the work required was contained in the information we previously sent to you with our proposal. Once potentially useable areas are located, the next consideration is the horizontal extent of those areas. The size and configuration of the useable soil area dictate the utility of that area. The size of a subsurface.disposal field is determined by: 1) design flow from the source (in this case, we are assuming approximately 10,000 gpd), and 2) the long-term acceptance (LTA.R) of the soil (based on the hydraulic conductivity of the soil, a function of the soil's texture, mineralogy, structure, porosity, etc.). The configuration must be such that an efficient layout of disposal lines (on contour) is possible. An. additional consideration is the required setbacks for the system from various elements such as wells (100% streams and ponds (50% property lines (25% top of embankment (15% etc. Therefore, in order to determine the area needed for a system, the daily wastewater flow must be known. The site plan for this tract must ensure that adequate soil area for system and repair is unaffected by site elements (building placement, driveway, wells, athletic fields, parking, etc.). The area designated on the site plan for the septic system and repair must remain undisturbed (no mechanical clearing, excavation, heavy traffic or other significant site disturbing activities) until authorized -by the appropriate permitting agency. A tract with adequate useable soil area may be rendered unusable as a result of improper site planning and/or disturbance. This is a preliminary report, which discusses the general location of potentially useable soils for on -site subsurface wastewater disposal, and, of course, does not constitute or imply any approval or permit as needed by the client from the local heath department. An individual septic system permit will be required for this tract prior to obtaining a building permit. This will involve a detailed evaluation by the local and state health departments and a private consultant to determine system size and layout. Only after developing this information can a final determination be made concerning specifics of system design and site suitability. Soil boundaries are shown as approximations on the attached map. The soil boundary is not marked in the field. However, the -soil borings performed by S&EC are marked in the field with flagging. Red flagging marks holes that are potentially usable for a conventional system. Pink and black striped flagging marks holes that are potentially usable for a LPP system. Based on our experience with large systems, we believe .that as a guideline 30 ft?/gal of wastewater produced will be needed for system and repair. This number takes into account topographic irregularities that. are present on most sites. This number may increase or decrease depending on the findings of the mounding analysis. The mounding analysis is where the hydraulic conductivity of the various soil horizons is determined. Using the 30 ft'/gal as a rule of thumb, for this proposed 10,000 gpd system, approximately 6.9 acres would be needed for system and repair. As you know, the utility of a potential useable soil area for subsurface systems is most accurately determined by an on -ground layout of the proposed system. Of course, a repair area equal in size to the initial disposal area is required as a back-up site. The total area needed for system and repair will depend upon the system type, the layout of that system and the total design flow (factors mentioned above). The system should be designed so that it is as long and narrow parallel to slope as possible. Repair areas can be configured less stringently but must still be useable realistically. Soil & Environmental Consultants, Inc. is pleased to be of service in this matter. Once the land planner has reviewed our work and determined if a plan can be designed so that the required soil area is reserved, we would like to review and comment. Then, if the county desires, it would be timely to begin the more detailed studies. S&EC is required to notify the county and state 2 weeks prior to our site visit for the mounding analysis. So once we receive word from you to proceed .it will be at least 2 weeks before we can proceed with the mounding analysis. Please call if you have any questions or require further information. Sincerely, Steven M. Price Licensed Soil Scientist #1153 Note: I Since your proposed flow exceeds 3,000 gpd, the state will have to rev�a system plans and will require a-moundinganalysis prior to issuing a permit. It often takes the state 3 months to 1 year to process a permit application. '1 0 m 0 \ Ln \ \ / \ i ,-� 0-0 — $L ' —0.0.00 — — z > &KAY'5 CREEK ELEMENTARY 56HOOL REVISIONS FOR THE Hobbs, Upchurch & Associates, P.A.tN, �• DESCRIPnON' DATE BY CUMDEKLAND COUNTY 5CHOOL5 Consulting Engineers ;'t�j"Ess �S > GUMBERLAND COUNTY, NORTH CAROLINA N SOUTHERN PINES, NC — MYRTLE BEACH, SC SEALlqi _ KILL DEVIL HILLS, NC — RALEIGH, NC 22189 1 PROPOSED 51TE PLAN �,�FN�INE �� f 290 S.W. Broad Street, Soathem Fines, North Carolina 28387 k,pgy R O Phone: (910) 692-5616 — I = (910) 692-4795 CI— R OI1d01 3115 O3SOd0?Jd IN 53217V f0'09 s 3115I "1V101 39V3w 31VWIX0s wv S3'nV OS£'S s 03SV317 39V3nV 31VWIXONJJY i 31,1II SQOOM 3NI-1 NAJO .1 J.VM-zlO-1H91N 9NI-LGDG - — — — - aN393� IZ0 r_ ;o 1 g 1 ' i � g i M9 GRAY-5 CREEK FOREMFEE TARY 5CHOOL CUMDERLAND COUNTY 5CHOOL5 CUMDERLAND COUNTY, NORTH GAKOLINA MOP05ED SITE PLAN Hobbs, Upchurch & Associates, P.A. lqj Consulting Engineers SOUTHERN 'PINES, NO UYRME BEACH, SC KILL DEVIL HILLS, NO — RALEIGH, NC 290 S.W. Broad Street, Southern Pine, North Carolina 28387 Phone: (910) 692-5616 — Fax (910) 692-4795 SEAL T 22989 �'CINE �� R )I.LJO) 3115 O3SO.Joij 5330V £O'09 s 3115 -IV1O1 39V320V 31VVIIXOSJJY 532ov OS'£S s Q3sv-ql7 39v330V 31VWIXObddV 3NI-I SOOOM 3Nll UW? IJMW - I — I — I .IVM-=10-1H'DIS 9NI1SIX3 — — — — — aN3�3-1 DTD9-Z9D (are) LDs9a y n S H r A"dM=_Os aim Us ayow N S 069 7V AzrvAN-JT 7 JFYMTA NOLM ALUM -MMMNOS a• JMONa75N NaY IAMYERrrnb" .LSaraLNS 77Y su" G—r Fi ST NOLLTOLUJ M sm Mz" at iY7d NO dYir aL L-I -amw ASWOO d0 LWLiO L97 " 7 c d0 AJM OO YM70M NINON do SSYJS i ti J � w � o m 9Od06ad b OTL 9d porf as w aNOdaYS mom YNONYI '2ITr Pm m wodaM NOS= AMMS at Od up ad o9T x Less ea NS7dW22 J it SSM07 'DITA Pl - NSIdx= d xamoN MMMD A YDRLWd '211- Ptw .� - aN7dJYR7D N MOM i _ - •Nr =dM20 II 77rRS2nA dLY 090 09 a .041 570NY 0 / dET \\ \ , ., � � \ , �\'.. �'•.. 1'�. soon / N .42,99.91 M ,9079 9T7 S .00,00.19 N ,tl''09 - iT7 8 .LS,Or.09 N IC9701 sT7 S .LZ,OO.OD N ,IA-CUI ZT7 �: � dt j S .oser.as N ,9s•sor rJ7 s .1S,ss.99 N ,LL'Par Or7 (Ja I;S S .90,6i.99 x ,99•S98 67 $\ /, 9.er,Th09 N ,09199r 07 '$S S .r9,9i.89 N ,69.00T L7 m.fit. / /S9g2 xg S .61.90.as N ,se•ee s7 / p9 S .JI,f0.B9 N ,BO'SOT i? / �, • _ S ,L0,2i.89 N ,OL•Tbr 67 i> s .9s,11.09 N ,GT'sor z7 owu NI YSNY 7Yda9 iLnmoo0 da MY OLLYJYNOdw MY 6E9999E10 - M=Yd MUD aSN7 OO 'D MODH9 7YdM07rdaH SNY MOXYISYa 77Y •9 •aSLON SSL07L77LL0 SSr= SZMWO9 77Y IV ISO MOM Nobs Y ,owi am M aSIYJ07 S9HMU00 aNY d7LLS705N ,LLMOOJ aNY7N=W NJ ago-W do SLY7d aNY ®a Mr a mar NaLLYRNaw Ao" 9T ARAMS SfSL T ,MM SLYmWg IYSL S90NWWO dN MUVMDW ST JVIU ALLMaa7 aL d0 NOLLNOd Y N7 a UVWZ S7 MEW MM '9 .zr7d SISL d0 YLYa Mu a NaNd ago W do SL%OMM T9Y a" SAYA- M-MO N SLNS)DT M 77V aNY ANY aL IJSrUJ2S S7 .L=d"d SML 'T �\60 � pN \ a OTA27ON u 'E CONVEYED = e0.07 AC \ CAY7ER/.DVE DVTEILSELTlON If".. B7 & S.R. 2295 / 2235 SITE / / EK Cam• / V10EUTY AL1P nrs .7777.E RRFHRENCBS '0/ \ DE"6I! ROM45A7 PIGS 59e RL PK Nd1L �,'/ / \ 160' . ¢ ROAD HILTION $ WALTM?S WALTERS a 1Sg DBd0w , A7R7CLA & 227 i HOUSE m ro �SL % 4 IffIlAY C YebIAfA; JR, CER2TFY 17lAT 7>IIS MAY WAS DRAWN UNDER MY SOPMUMON FROM AN ACTUAL SURVEY MADE ONDSR SOF //USED )SSCRIPrION SURVEY AD J DO ). THAT THE B00T'DARAS NOr AS SHOWN): SURVS'YED ARE CLEARLY RVDIG2ED AS D%ON FROM JNFORAG710N FOUND (PJ73OMVCR4 A9 SHOWN); 7Hdr THE RA27GN OF PRKCWaff AS r..c.- =A7E0 S 1: IO,000+; FAYE W. FAIRCLOTH J AND nur 28LS Pur WAS. PREPARED 1N ACCOROANCE W17H P DO 96B2 PG e75 PB 4B PG 27 G.S. 47-30 AS AMENDED. W17TO:SS YY ORIGDYAL SIGNATDRE, JUMS A770N NUl®HR AND SEAL TON —DAY of r- BARA'-J A.D., 19 - 1- RArMTABEO LAD SURVEYOR o QI�I� S Qv L-2421 EA- R6CLS7RA770N NUMBER L-2421 -rDODC$- ARCHS ERUCT FAIRCLOTH .. DB 2710' PG 74 E7CLS17NG N m NORTH CAROLINA I IOP C'UA03ERIAND COUNTY ` N=41e,e99.4945 E=2,049.ee7.2514 REGISTERED AND RECORDED DV THIS OFFICR PLAT BOOK PAGE T7LS TAR DAY OF In I ) REGL= OF DJ= \ LOT 14 I LOT 19 / 1 \ PH 901PG 179 / \ ol" LEGEND O EW EXM77NG MON PIPS 0 MR IX07MM MON ROD O ECU ZOSENG CONCRETE YONOhmYP 0 COMPUTED POD1T BOUIMURY IBM - - - - - - - UNSURVEYED BOUNDARY LLNE - — — - RIGHT-OF-WAY FAIRCLOTH (NAD 89) SURVEY FOR CUMERLAND COUNTY BOARD OF EDUCATION GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY NORTH CAROLINA MARCH 1998 SCALE 1" = 200' GRAPHIC SCALE (IN 7X7 ) 11-h - 200 R. �D e, srt tee, � UTdTTON- E CONVEYED = 80.07 AC. \�.�\, CENTERI.OVE DVTERSECTTON / HWY. 57 & S.R. 2235 223E SITE VICUUTY MAP N.T.S. i025 % 777ZE REFEMENCES n BOOB 4593 PAGE 50d EX PX � ROAD /4tg HD:7DN E. HALTERS and wife, PA27UCZA S. WALTMU DR 941 PG 227 I y / �EK ROME / L vmu" C. Mcamim. aL. CERTTFY TRAr rme PLAT yq HAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVDDON DE® DESCRD'TTON RSF®481I=S AS SROWNJ: SEAT TER BO NOT / SURVEYED dR6 CLEARLY INDICATED AS DRAWN FROM OVFORMdTTox FOUND (RaFERSIvcEs AS sHOWN1; rRAr / / FAYE W. FAIRCZOTH 77i8 RATTON OF PRECISION d5 cALcrHwraO LS 1: 10,000+; AND THAT 77HS PLAT WAS PREPARED RV ACCORDANCE WITS DB 3682 PG 675 E8 G.S. 47-50 AS AMENDED• W17NEiS MY ORIGIMAL SIGNATURE, - I: BAD PB 48 PG 27 RWMEA770N NUMBER AND SEAL 71b4_ DAY OF �e A.D., ID A CreA. ,g •2"SH15T REGL57MUM LAND SURVEYOR 'HOODS' M � � � - yljoAcrs YYY���' C SEAL L-7A21 � ! L-2421 REGIb7RATTON NUMBER ac1L'�'� \a ARCEW BRUCE FADNCLOTH ; DB 2710 PG 74 �CREEK11G \ �m eq NORTH CdROLRNA RIP CUA03ERLum COUNTY N=416,603.4015 E=2,043,667.2514 REGL922MM AND RECORDED IN TMS OFE7CE I PLAT BOOS- PAGE THIS THE nAY OF 1�. 1 I ! REGISTER OF DEEDS LOT 14 LOT 13 j PH DOIPG 179 11 11 moo• 1 LEGEND O RIP ZUSTDVG MON PIPE O m Ed7STING IRON ROD O ECM EY1597NG CONCRETE YONUAG<iMP O COMPUTED PODVT BOUNDARY LDVE ------- UNSURVEYED BOUNDARY LOVE — — — — RIGHT-OF-WAY NCGS FAZRCLO77I (NAD 83) SURVEY FOR CUMBERLAND COUNTY BOARD OF EDUCATION GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY NORTH CAROLINA MARCH 1998 SCALE 1" = 200' GRAPHIC SCALE m m m IN rm) 1 1.ch - 2N M 1. TMN PROPRBTY lS SUBJECT TO A RIGHT -OF -MAYS, AND AGPJMM ]ME DATE OF TRIS PLAT. 2. THIS SURVEY LS LOCATED DV A P IS REGULATED BY ORDINANCES I 3. 7HL4 SURVEY IS FROM DVFORIIAM OF RECORD DV CW[BERI.AND COL LOCATED IN THE FLMO. 4. IRON RODS SST AT AIL CORNERS 5. AIL MSTANC S ARE HORIZONTAL 8. COYBDVED GRID FACTOR - 0.0001 AND ALL EASfMMTS, OF RECORD PRIOR- TO TON OF THE COUNTY THAT 'REGULATE 1AMU. FOUND IN DEED AND PLATS !REGISTRY AND CORNERS LESS OTHER = NOTED. AREA 1NFORMATIO. AREA BY COORDINATE TOTAL ARRA IN TRAC 104.70' N 50'42'07' E 10 1 105.09' N 60.04 41' E Q g'' / 98.83, N 6LY05'18' E 6 / 100.89' N 58'4B'51' E ��61/ 159.80' N 58.41 10' N 303.55' N 68'40'08' E 104.778 N 68'34'31' E �� /yq AX BUD 103.66' N 68'18'30' E g' 103.71' N 80'00 27' E 101.33' N 60'18 37' E BB.44' N 61'00'00' E 91.08' N 13'5E 2T 1I Lg r ✓ -- - ~ \\ E& Hi Mp /. Of RE BARN 'HOODS' AUR ULL W. cau"Lam, JR THOMAS H. CRUMPLHR and wife, PATRFCIA W. CRLWLER RORERT P. CRUYPLER and wife, LOULSE F. CHUYPLER DB 3307 PG 100 PB 48 PG 48 STEPSE111 NELSON RADFtlRD end wife, LINORA MOCK RADFORD BB 4164 PGI710 PH 00 PG 5 STATE OF NORTH CAROLM COUNTY OF I, AffvM► OFFIm OF COUNTY, CRRTD'Y THAT THE YAP OR PLAT TO WATCH IRIS CBRPIFICdTION L4 AM= JLESDi ALL STATOTORY REQUlREAMM FOR RECORDING. SURVEYOR: MU" C Yc2VAK JIL RKY" OFFICER 200 S.W. BROAD Sr. SOUTHERN PDIm'S, N.C. 28387 DATE (D1o) OB2—E