Loading...
HomeMy WebLinkAbout20061804 Ver 11_Site Plan_20150803RIVER DELL EAS I POD FLOWERS PLANTATION - PHASE 0'-.,\-E JOHNSTON COUNTY, NORTH CAROLINA GOVERNING AGENCIES. PLANNING: UTILITY AGENCIES= WATER & SEWER: INDEX JOHNSTON COUNTY AQUA NORTH CAROLINA 202 MacKENAN COURT FLOWERS PLANTATION MAX BUILDING HEIGHT: PLANNING DEPARTMENT. 309 E. MARKET STREET CARY, NORTH CAROLINA 27511 COVER COVER SHEET SMITHFIELD, NC 27577 CONTACT: PEGGY SUE DODGE (OFFICE) CE -01 RIVER DELL EAST PHASE ONE SUBDIVISION CONTACT: MR. BERRY GRAY (919) 989 -5150 919.653.6963 JACKIE JACKSON (FIELD) `'E -02 RIVER DELL TOWNES AVE. PLAN & PROFILE BERRY. GRAY®,JOHNSTONNC.COM 919.624.2348 CE -03 � � RIVER DELL STREET A PLAN & PROFILE JO�,�' ' }�',�' �U; T NATURAL GAS PIEDMONT NATURAL GAS CE -04 EROSION & SEDIMENTATION CONTROL PLAN PUBLIC UTILITIES DUDLEY, NC POINTS 28333 0AD CE -05 EROSION CONTROL NOTES AND DETAILS PO BOX 2263 309 E. MARKET STREET MR. MARCUS THOMPSON CE -06 EROSION CONTROL NOTES AND DETAILS SMITHFIELD, NC 27577 (919) 920 -0257 CE-07 BIORETENTION DETAILS CONTRACT: MRS. CHANDRA COATS (919) 209 -8333 ELECTRIC CE -08 RIVER DELL EAST PHASE ONE - GRADING PLAN CHANDRA. COATSOJOHN STON N C.COM DUKE ENERGY P.O. BOX 1551 D -09 AQUA UTILITY DETAILS 1 EROSION CONTROL: RALEIGH, N.C. 27602 -1551 JOHNSTON COUNTY D -02 AQUA UTILITY DETAILS 2 PUBLIC UTILITIES MR. JOHNNY HOUSE (919) 269 -2548 PO BOX 2263 309 E. MARKET STREET SMITHFIELD, NC 27577 CONTACT: MR. CARLOS BAGLEY, PE (919) 209 -8333 CAR LOS. B AG LEYO.I OH N S TON N C. COM LOCATION: RIVER DELL EAST PHASE I SIDE YARD POD 12 REAR YARD FLOWERS PLANTATION MAX BUILDING HEIGHT: JOHNSTON COUNTY, NC PROPOSED LOT COUNT-. 34 LOTS PHASE ONE COUNTY: JOHNSTON PIN: 169900 -48 -7158 DB /Pr 1247/634 ZONING- FLOWERS PLANTATION PUD ACREAGE- ±21.19 AC. - ENTIRE PARCEL ±13.98 AC. - PHASE ONE PROPOSED USE- RESIDENTIAL SETBACKS: FRONT YARD 20' SIDE YARD 5' REAR YARD 15' MAX BUILDING HEIGHT: N/A EX. IMPERVIOUS AREA 0.00 Ac. PRO. IMPERVIOUS AREA ±3.91 Ac. (18.45 %) LANDSCAPE AREA -1:17.28 Ac. (81.55 %) DISTURBED AREA 12.20 Ac. BEFORE YOU DIG, CALL o�0 NORTH CAROLINA ONE CALL CENTER www.ncocc.org 14 "SITE" VICIN17 Y MAP NOT TO SCALE General Notes: 1. TOPOGRAPHICAL DATA PERFORMED BY TRUE LINE SURVEYING. 2. THE CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OF FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAID FACILITIES. THE OWNER SHALL PAY ALL COSTS IN CONNECTION WITH ALTERATION OF OR RELOCATION OF ANY EXISTING FACILITIES. 3. ALL EXCAVATION IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. 4. ALL STRUCTURAL FILL MATERIAL SHALL BE FREE OF ALL STICKS, ROCKS, AND CLUMPS OF MUD. 5. UNUSABLE EXCAVATED MATERIALS AND ALL WASTE RESULTING FROM CLEARING AND GRUBBING SHALL BE DISPOSED OF OFF -SITE BY THE CONTRACTOR IN AN APPROVED SOLID WASTE LANDFILL. 6. PROPOSED ROADWAY CONSTRUCTION WITH WATER AND SEWER. STREETS TO HAVE STANDARD 30" VALLEY CURB. PRIVATE STREETS. 7. THERE IS EXISTING UNDERGROUND WATER SEWER ELECTRICAL OR FIBER OPTIC ON -SITE OR WITHIN CLOSE PROXIMITY. CONTRACTORS SHALL CALL 811 48 HOURS PRIOR TO DIGGING. CONTRACTORS SHALL DIG WITH EXTREME CAUTION. 8. CONCRETE SUB SHALL BE RESPONSIBLE FOR ALL SCORE JOINTS AND EXPANSION JOINTS. CONTRACTOR TO SUBMIT PROPOSED SCORE JOINT PLAN TO THE ENGINEER PRIOR TO POURING. 9. CONTRACTOR TO FURNISH ALL PAVEMENT MARKINGS AS SHOWN. 10. LOCATION OF UNDERGROUND UTILITIES ARE APPROXIMATE AND MUST BE FIELD VERIFIED. CONTACT THE NC ONE CALL CENTER AT LEAST 72 HOURS PRIOR TO DIGGING ® 811. TRUE LINE SURVEYING HAS ONLY LOCATED THE UTILITIES THAT ARE ABOVE GROUND AT THE TIME OF FIELD SURVEY. UNDERGROUND LINES SHOWN HEREON ARE APPROXIMATE OR AS REPORTED BY VARIOUS RESPONSIBLE PARTIES. THE SURVEYOR DOES NOT GUARANTEE THAT ANY UNDERGROUND STRUCTURES SUCH AS UTILITIES, TANKS AND PIPES ARE LOCATED HEREON. 11. ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES AND ARE APPROXIMATE. 12. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND /OR LOCAL STANDARDS IMPOSED BY LOCAL UTILITY, NCDOT, JOHNSTON COUNTY, AND FLOWERS PLANTATION. 13. ALL CONSTRUCTION AND MATERIALS SHALL MEET JOHNSTON COUNTY, AQUA, AND NCDOT SPECIFICATIONS AND STANDARDS, LATEST EDITION. ALL WORK WITHIN NCDOT RIGHT -OF -WAY SHALL MEET THE SPECIFICATIONS AND STANDARDS OF NCDOT. 14. ALL CONCRETE PIPE IS TO BE ASTM C -76, CLASS III WITH RAM -NEK, UNLESS OTHERWISE NOTED. 15. THIS PROPERTY IS NOT LOCATED IN A FLOOD HAZARD ZONE. 16. WETLANDS AND PONDS ARE DENOTED ON -SITE. NO IMPACTS TO WETLANDS ARE ANTICIPATED. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK ZONE TRAFFIC CONTROL IN OR ADJACENT TO NCDOT RIGHT -OF -WAY. ALL SIGNS, PAVEMENT MARKINGS AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), LATEST EDITION. 18. PRIOR TO PLACING CABC STONE BASE, THE CONTRACTOR SHOULD NOTIFY THE PROJECT ENGINEER TO INSPECT AND PROOF ROLL THE SUBGRADE. ANY STONE PLACED WITHOUT PRIOR APPROVAL WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 19. DESIGN FIELD CONDITIONS QUITE EASILY MAY VARY FROM THAT REPRESENTED IN THE INITIAL SOILS REPORT AND/OR TOPOGRAPHICAL REPORT /ISOLATED AREAS MAY SHOW UP WEAK AND ADVERSE SOILS OR GROUNDWATER CONDITIONS MAY BE DISCOVERED THAT WERE NOT REVEALED DURING THE INITIAL SOILS INVESTIGATION. THEREFORE, THE OWNER /CLIENT IS TO BE AWARE THAT STOCKS ENGINEERING WILL NOT AND CANNOT BE HELD RESPONSIBLE FOR ANY FAILURES TO EITHER A STREET OR PARKING LOT PAVEMENT DESIGN UNLESS WE CAN BE FULLY AND TOTALLY INVOLVED IN THE CONSTRUCTION PROCESS WHICH MAY INCLUDE, BUT MAY NOT NECESSARILY BE LIMITED TO, TESTING SUBGRADE AND BASE DENSITY, ENGAGING THE DESIGN ENGINEER FOR THE EVALUATION OF THE SUBGRADE AND FOR THE OBSERVATION OF PROOF ROLLING SUBGRADE AND BASE AT VARIOUS STEPS OF CONSTRUCTION, OPPORTUNITY FOR THE DESIGN ENGINEER TO CALL IN A SOILS ENGINEER FOR CONSULTATION AND ADVICE ETC. - STEPS WHICH TAKEN ALTOGETHER WITH THE INITIAL DESIGN SHOWN ON THE PLANS, CONSTITUTE THE COMPLETE DESIGN OF THE ROAD, STREET OF PARKING AREA (PRIVATE OR PUBLIC). THE DESIGN ENGINEER MUST BE GIVEN THE FULL LATITUDE AND OPPORTUNITY TO COMPLETE THE DESIGN BY FULLY PARTICIPATING IN THE CONSTRUCTION PROCESS. PLAN DESIGN IS A SMALL PORTION OF THE DESIGN AND CANNOT BE SEPARATED FROM THE CONSTRUCTION PROCESS IF THE OWNER'S /CLIENT'S DESIRE IS TO HAVE THE DESIGN ENGINEER STAND BEHIND THE COMPLETED DESIGNED PROJECT. 20. ALL UTILITY SERVICES, (POWER, TELEPHONE, CABLE, ETC.) ARE PROPOSED TO BE UNDERGROUND. DO NOT SOD, SEED OR MULCH DISTURBED AREAS UNTIL ALL UNDERGROUND UTILITIES HAVE BEEN INSTALLED. 21. SITE LIGHTING IS TO BE INSTALLED BY DUKE ENERGY. 22. PROPERTY IS TO BE SERVED BY AQUA (WATER & SEWER), EXISTING MAINS ARE INSTALL. ALL SERVICES PROPOSED ARE SERVICE TAPS. 23. THE BUILDING SETBACK LINES SHOWN ON THIS PLAT ARE FOR THE ENGINEER'S USE IN ESTABLISHING MINIMUM LOT FRONTAGES AT THE SETBACK LINE AND FOR RESERVING SUFFICIENT BUILDING AREA. BUILDING CONTRACTORS ARE TO VERIFY LOT LINE SETBACKS BEFORE SETTING FORMS OR DIGGING FOOTINGS. THERE ARE NO AGENCY IMPOSED SETBACK LINES AT FLOWERS. 24. REGULATORY SIGNS, STOPS SIGNS AND ADA SIGNS SHALL BE MANUFACTURED FROM HIGH INTENSITY REFLECTIVE MATERIALS. 25. ALL EXCESS TOPSOIL AND UNCLASSIFIED EXCAVATION IS TO BE HAULED OFF -SITE, UNLESS OTHERWISE DIRECTED BY THE OWNER. 26. ALL SITE CONSTRUCTION MUST BE INSPECTED BY THE PROJECT ENGINEER AT THE FOLLOWING STAGES: A. COMPLETION OF GRADING SUBGRADE PRIOR TO PLACING STONE BASE. B. COMPLETION OF STONE PLACEMENT PRIOR TO PAVING. C. FINAL INSPECTION WHEN ALL WORK IS COMPLETE. 27. THE SURVEYOR DID NOT VISIBLY SEE ANY CEMETERIES IN ANY OPEN AREAS UNLESS OTHERWISE NOTED. 28. THIS PROPERTY DOES NOT DEPICT ENCUMBRANCES THAT ARE FOUND DURING A THOROUGH TITLE SEARCH. 29. ALL HVAC UNITS FOR THE PROPOSED BUILDING WILL BE SCREENED FROM PUBLIC RIGHT OF WAY. 30. ALL CURB AND GUTTER TO BE 30" STANDARD VALLEY CURB AND GUTTER. ALL CURB AND GUTTER WITHIN NCDOT R/W SHALL BE 30" STANDARD CURB AND GUTTER. 31. ALL CURB AND GUTTER AND SIDEWALK CONCRETE IS TO BE MINIMUM 3,000 PSI AT 28 DAYS, AIR ENTRAINED. 32. ALL DIMENSIONS ARE TO FACE OF CURB UNLESS INDICATED OTHERWISE. 33. PROVIDE HANDICAP SIGNS, MARKING AND RAMPS AS SHOWN. 34. HANDICAP RAMPS ARE TO MEET "ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES" AS DETAILED IN THE FEDERAL REGISTER, VOLUME 56, NUMBER 144 DATED JULY 26, 1991, RULES AND REGULATIONS ACTIVATED JANUARY 26, 1992. FOR ADDITIONAL INFORMATION, REFER TO THE NC STATE BUILDING CODE VOLUME 1 -C, "MAKING BUILDINGS AND FACILITIES ACCESSIBLE TO THE USEABLE BY THE PHYSICALLY HANDICAPPED ", 1991 EDITION. ALL STREET RETURNS TO HAVE H.C. RAMPS. H.C. RAMPS SHALL MEET CITY OF CLINTON AND NCDOT STANDARDS /SPECIFICATIONS. 35. CONTRACTOR SHALL NOT POUR ANY CONCRETE BEFORE FORMS ARE INSPECTED BY THE PROJECT ENGINEER AND /OR OWNER. ANY CONCRETE THAT HAS NOT BEEN APPROVED BY THE ENGINEER AND /OR OWNER WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. Owner /Develo p er- The Riverdell Company 4880 NC 42 East Clayton, NC 27520 Contact Rebecca Flowers 919.553.3084 (v) Representative= Cary Chandler 919.427 -5466 (c) caryoflo wersplan to tion. com FOR GOD SO LOVED THE WORLD THAT HE GAVE HIS ONLY BEGOTTEN SON, THAT WHOSOEVER BELIEVETH IN HIM SHALL NOT PERISH, BUT HAVE EVERLASTING LIFE. JOHN 3:16 36.ALL AREAS NOT COVERED BY BUILDING OR PARKING SHALL BE COVERED WITH 4" MINIMUM OF TOPSOIL, FREE OF ROOT MATTER AND ROCKS AND GRASSED. 37.CONTRACTOR SHALL SAW -CUT TO PROVIDE SMOOTH TRANSITIONS WHERE EXISTING ASPHALT AND /OR CURB AND GUTTER IS TO BE REMOVED. 38.THE CONTRACTOR SHALL PROVIDE ALL THE MATERIAL AND APPURTENANCES NECESSARY FOR THE COMPLETE INSTALLATION OF THE UTILITIES. ALL PIPE AND FITTINGS SHALL BE INSPECTED PRIOR TO BEING COVERED. 39.ALL HANDICAP SPACES ARE TO RECEIVE A HANDICAP SIGN AND HANDICAP SYMBOL PAINTED ON THE ASPHALT. NOTE STALLS TO RECEIVE `VAN ACCESSIBLE' SIGNAGE. 40.THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PRECISE BUILDING DIMENSIONS AND EXACT UTILITY ENTRANCE POINTS. 41.INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS AND FIELD CONDITIONS WHEN POSSIBLE, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES BY DIGGING TEST PITS BY HAND AT ALL UTILITY CROSSINGS WELL IN ADVANCE OF TRENCHING. IF THE CLEARANCES ARE LESS THAN SPECIFIED ON THE PLANS OR 12 INCHES, WHICH EVER IS LESS, CONTACT THE PROJECT ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 42.THE CONTRACTOR SHALL INCLUDE IN HIS CONTRACT PRICE THE REMOVAL AND DISPOSAL OF ANY EXCESS TOPSOIL /UNCLASSIFIED HE DETERMINES IS NOT REQUIRED TO PERFORM THE FINAL GRADING AND LANDSCAPING OPERATION. 43.THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL REQUIRED /NECESSARY SHEETING, SHORING, AND SPECIAL EXCAVATION MEASURES REQUIRED ON THE PROJECT TO MEET OSHA, FEDERAL, STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THE DRAWINGS. THE OWNER, SAMPSON COUNTY, CITY OF CLINTON & STOCKS ENGINEERING ACCEPT NO RESPONSIBILITY FOR THE DESIGN TO INSTALL SAID ITEMS. 44.THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE DAILY RECORD KEEPING OF THE AS -BUILT CONDITION OF ALL OF THE UNDERGROUND UTILITIES, CONSTRUCTION STAKEOUT ASSOCIATED WITH THE PROJECT. 45.ALL WATER LINE AND SEWER LINE INSTALLATION SHALL CONFORM TO THE STANDARDS AND DETAILS OF THE STATE OF NORTH CAROLINA DEPARTMENT OF HEALTH CONSTRUCTION PERMIT, JOHNSTON COUNTY AND /OR AQUA. 46.ASPHALT PAVEMENT SHALL BE SMOOTH, WITH STRAIGHT OVERLAPPING SEAMS, FREE OF SEGREGATION, STAINS, BIRD BATHS, AND IMPERFECTIONS. ASPHALT PATCHING, SKIN PATCHES, OR RE- HEATING AND ROLLING WILL NOT BE ALLOWED. AREAS THAT ARE NOT ACCEPTABLE TO THE OWNER /ENGINEER WILL BE SAWCUT AND REMOVED. NO PATCH SMALLER THAN 200 SF WILL ALLOWED AND THE SAWCUTS MUST FALL ON A PAINT LINE OR EXISTING SEAM. 47.THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ALL MATERIAL AND LABOR ASSOCIATED WITH THE TESTING OF THE WATER AND SEWER LINES REQUIRED BY THE STATE OF NORTH CAROLINA DEPARTMENT OF HEALTH & AQUA. 48.THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DE- WATERING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PLANS. 49.NATURAL GAS IS AVAILABLE. COORDINATE INSTALLATION WITH PEIDMONT NATURAL GAS. 50.TESTING BY CONTRACTOR: CONTRACTOR SHALL EMPLOY AT HIS EXPENSE AN OUTSIDE INDEPENDENT SOIL TESTING SERVICE (APPROVED BY THE OWNER) TO PERFORM SOIL TESTING AND INSPECTION SERVICE FOR QUALITY CONTROL TESTING DURING EARTHWORK OPERATIONS. COPIES OF RESULTS OF TESTS SHALL BE SUBMITTED BY THE TESTING SERVICE DIRECTLY TO THE CONTRACTOR, THE OWNER, AND THE STRUCTURAL ENGINEER. - -THE TESTING SERVICE WILL CLASSIFY PROPOSED ON -SITE AND BORROW SOILS TO VERIFY THAT SOILS COMPLY WITH SPECIFIED REQUIREMENTS AND TO PERFORM REQUIRED FIELD AND LABORATORY TESTING. (MINIMUM REQUIRED SOIL BEARING CAPACITY IS NOTED ON THE STRUCTURAL DRAWINGS). - -IN PAVED AND BUILDING SLAB AREAS, THE TESTING SERVICE SHALL MAKE AT LEAST ONE FIELD DENSITY TEST FOR EACH 2000 SQUARE FEET OF FILL IN EACH COMPACTED FILL LAYER. IF A TEST SHOULD FAIL TO MEET REQUIRED DENSITY, THE CONTRACTOR SHALL RE- COMPACT THAT LAYER. THE SOIL TESTING SERVICE SHALL PERFORM ADDITIONAL TESTS AT THE CONTRACTOR'S EXPENSE TO SHOW THAT THE FAILED LAYER HAS REACHED THE REQUIRED COMPACTION. - -IN FOUNDATION WALL AREAS, THE TESTING SERVICE SHALL MAKE AT LEAST ONE FIELD DENSITY TEST FOR EACH 100 FEET OR LESS OF WALL LENGTH OF FILL IN EACH COMPACTED FILL LAYER, WITH NO LESS THAN TWO TESTS ALONG A WALL FACE. IF A TEST SHOULD FAIL TO MEET REQUIRED DENSITY, THE CONTRACTOR SHALL RE- COMPACT THAT LAYER. THE SOIL TESTING SERVICE SHALL PERFORM ADDITIONAL TESTS AT THE CONTRACTOR'S EXPENSE TO SHOW THAT THE FAILED LAYER HAS REACHED THE REQUIRED COMPACTION. 51.COMPACTION: COMPACT EACH LIFT OF BACKFILL AND FILL SOIL MATERIALS AND THE TOP 12" OF SUBGRADE IN CUT AREAS TO 98% OF MAXIMUM DENSITY AS DETERMINED BY ASTM D698 FOR STRUCTURES, SLABS, AND PAVEMENTS AND 90% OF MAXIMUM DENSITY FOR LAWNS OR UNPAVED AREAS. FOR WATER AND SEWER LINES INSTALLED IN NON -PAVED AREAS, COMPACT TO A MINIMUM OF 95% OF MAXIMUM DRY DENSITY. 52.THE BUILDING CONTRACTOR AND THE SITE WORK CONTRACTOR ARE TO COORDINATE THE INSTALLATION OF DRAINAGE PIPES AROUND THE BUILDING STRUCTURE. 53.ANY RELOCATION OF EXISTING UTILITIES WILL BE AT THE COST OF THE OWNER. THE WILL NOT ACCEPT RESPONSIBILITY FOR DAMAGES TO CURB AND GUTTER OR STREET IMPROVEMENTS INSTALLED PRIOR TO UNDERGROUND SERVICES, NOR WILL THE CITY ABSORB THE COST FOR BORINGS TO INSTALL UNDERGROUND SERVICE, PAVEMENT PATCHING OR DAMAGE TO LANDSCAPING. THESE WILL BE THE RESPONSIBILITY OF THE DEVELOPER /OWNER. 54.FIRE DEPARTMENT VEHICULAR ACCESS TO ALL STRUCTURES UNDER CONSTRUCTION SHALL BE PROVIDED AT ALL TIMES. IN AREAS WHERE GROUND SURFACES ARE SOFT OR LIKELY TO BECOME SOFT, HARD ALL WEATHER SURFACE ROADS SHALL BE PROVIDED AND MAINTAINED. 55.ADDRESS NUMBERS, BOTH COMMERCIAL AND RESIDENTIAL, MUST BE POSTED ON THE FRONT OF THE STRUCTURE NEAREST TO THE MAIN ENTRANCE IN A POSITION TO BE PLAINLY LEGIBLE, VISIBLE, AND UNOBSTRUCTED FROM THE STREET OR ROAD FRONTING THE PROPERTY. 56.DISTURBED AREA IS OVER 1 ACRE AND A FORMAL SEDIMENTATION & EROSION CONTROL PLAN APPROVAL WAS REQUIRED AS A CONDITION OF CONSTRUCTION PLAN APPROVAL. THE SEDIMENTATION & EROSION CONTROL PLAN PROVIDED SHOULD BE REGARDED AS MINIMUM REQUIREMENTS; ADDITIONAL MEASURES SHALL BE PUT IN PLACE AS NEEDED TO ENSURE THAT NO SEDIMENT IS RELEASED FROM THE SITE. 57.(CONSTRUCTION /SITE PLANS) WATER AND SEWER PERMIT APPLICATIONS HAVE BEEN APPROVED BY THE DENR. PERMIT NUMBERS ARE AS FOLLOWS: WATER PERMIT NUMBER: TO BE DETERMINED SEWER PERMIT NUMBER: TO BE DETERMINED 58.COPIES OF ALL PERMITS AND APPROVED PLANS MUST BE KEPT ON SITE IN A PERMIT BOX THAT IS CONSPICUOUSLY LOCATED AND EASILY ACCESSIBLE DURING CONSTRUCTION. THIS INCLUDES APPROVED CONSTRUCTION PLANS, APPROVED EROSION CONTROL PLANS, ENCROACHMENT AGREEMENTS, DRIVEWAY PERMITS, WATER /SEWER PERMITS, ETC. 59.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL NCDOT, JOHNSTON COUNTY, AQUA AND NCDENR STANDARDS AND SPECIFICATIONS. 60.MAINTAIN MINIMUM 3' COVER FOR ALL WATER PIPE. 61.WHERE WATERLINE CROSSES: A. SANITARY SEWER: WATERLINE SHALL CROSS ABOVE AND MAINTAIN 2' VERTICAL SEPARATION OR 10' OF HORIZONTAL SEPARATION. IF THIS SEPARATION CANNOT MAINTAIN OR IF WATERLINE PASSES BELOW SEWER LINE THEN BOTH WATERLINE AND SEWER LINE SHALL BE CLASS 50 DUCTILE IRON PIPE FOR A MINIMUM OF 10' EACH SIDE OF CROSSING. B. STORM SEWER: WHERE WATERLINE CROSSES ABOVE MAINTAIN 1' VERTICAL SEPARATION, WHERE WATERLINE CROSSES BELOW MAINTAIN 2' VERTICAL SEPARATION. IF THIS SEPARATION CANNOT BE MAINTAINED WATERLINE SHALL BE CLASS 50 DUCTILE IRON PIPE FOR MINIMUM OF 10' EACH SIDE OF CROSSING. 62.WHERE SANITARY SEWER CROSSES STORM MAINTAIN 2' SEPARATION. IF THIS SEPARATION CANNOT BE MAINTAINED SANITARY SEWER SHALL BE CLASS 50 DUCTILE IRON PIPE FOR MINIMUM OF 10' EACH SIDE OF CROSSING. 63.REFERENCE NC 15A, 18C, .0906 FOR ADDITIONAL CROSSING INFORMATION. THIS CRITERIA SHALL BE MET AT ALL CROSSINGS. Civil Engineering= Stocks Engineering, P.A. 1100 Eastern Ave. P.O. Box 1108 Nashville, NO 27856 252.459.8196 (v) 252.903 -6891 (c) Contact: Mike Stocks, PE mstocksestocksengineering.com Sur ve ying= True Line Surveying, P.C. 205 West Main St. Clayton, North Carolina 27520 919.3590427 (v) Contact- Curk Lane, PLS curko truelinesurveying. com 4 � 0) 00 r- 00 000) (0 0) 00 , ' o �0,o) 04 '4- Nh B7 U7 C14 "04 v V) z w w J I" I 3:<0 6L W w z c� z w �Z 00 Z r- j (V i Q U W O Z 0 W W L Q0J I wm= ►A °oOQ �jJ �aZ r / 4 Ilk BLN =C -1874 oz V � O M CC W ~ ao oZ 0 Z � o� y Z CO3 Z W W � PC W LA aC � a Z� C r / a ESSR i =OQ�E O. N -9�y9 SEAL 19843 ��! ••.FNGINEE�.•'��� EL S� ` '/ cJ 5/55 /15 5 COVER SHEET L REVISIONS 6 -10 -15 AQUA COMMENTS FILE NO. 2014 -043 HORZ. SCALE: NONE VERT. SCALE: NONE COVER - - - - - ,93.31 , IRON /1'0.39 FOITN,r ' 285 -IRON ROD FOUND \ \ � W4 - -- -- I 12,6 9ASF V." ,� 37 6,956 SF 11,634 SF / / � 1 � 52 Ac. - \\ 0.27 Ac. 21,911 SF S / V / a/ ♦ �. �\ 0.50 Ac. / % As. B. W _ 18,382 '$F ,\ , ------------ ♦ S 0 \ S W u.e W 7,917 SF \� 's., -- - -- --- �_u -J / e / 55 0.18 Ac. ♦ - -- -- --- I i - _ \ ' S ` ♦ I W 10,761 Os \2g \`, ♦ ♦ �\ 1\ i S \ \ n i O.Z5 -Ac. 51 9,773 SF 91 F I L 0.22 Ac. 7 Act\ ; W i 7,715 SF \j ♦�'b `\\ �O >2 \\ ®.W ♦ %� ��' 1 / \�' / / / \;` \ ; S , 0.18 Ac. ♦ ?> \ S < I 58 11.050 SF `� `, m,` `♦ ♦o° "moo \25 Ac. S ♦ ''� \ 7,511 SF q `� 34 \ S W 40 `♦\ 0.17 Ac. 9,595 SF \ W `� 7,800 SF ♦ �` / \ ° S \ \ \ 0.22 Ac. \\ , ^� `♦ 0.18 Ac. .^\ ♦ �\ s 1 \ 57 \ '/ .'\ \ @� \265 ♦ ` `b• 11,050 SF ''�o�'�\ `♦\ S. erg `�` 'ryood /' `�\ $.♦ `�� ,' i 49 `�\ S \c. \j0 \\ / 0.1 \ ♦ I 7,00 SF 33 7.8Oa SF s I > W� \ \ \ P$ 6. 0.18 Ac. S ` ♦ ♦ I I �^ \ W/ ?y 7,800 SF ♦ ` I I '' �` mU S �� I 58 \ ''�> \ \ ♦ � � , ♦ ♦ o � � 1j,050 SF '>`\ \ m� ° `�\ qr♦ `�\ %%'� \ �♦ 4.25 Ac. 010 \ /' gr � jo3-' \ � •PO. q od ' � 'S. ♦ ' rn 48 � 1 � \� ♦�' � , \\ \ `b. ♦\ ♦�'' \ ?. tip'' \ ♦ '� a 7,800 SF \ ` 32 ` ♦ / �'' I 0.18 Ac. `♦ S I / \ - \ ' S O 7,800 SF `S\ C' 0.18 Ac. W ♦- 42 `♦ �\ / .'` \ W \ `' % \\ ` \ W 7,800 SF / ,. ` ♦ ♦ \`�\ , / '/ ``♦ I m� I� S \ � 59 \0 \ �\ ♦` 0.18 An \ �` I ' \ I 4' \ �� 13,126 SF v� . \ 0.30 Ac. 47 � �\ \ ♦\ � ♦ 7,800 SF 31 `� W \ �� `�\ / ; 0.18 Ac. ,� W W `b•\ \\ \ / / i \ 7,800 SF `. S �c %/ <�\ 0.18 Ac. S - --43 �\ /� �`� �♦ 6 S \ `♦ 7,800 SF 2g0 -/ . % �`� sa Ja `� \ ♦ � 0.18 Ac. `� ♦ `� �' '' `♦\ � / /f �� � ` I � ° --280---- yS. ` \ ' �`, '� ♦ \ ✓/ 9.228 F \ 30 W ♦ <' 0.21 c. \ \ \�d800 SF \`� S \ \ n `/; ♦\`, SEE CE -02fOH ;YFO t.r;,1R#S,S1W'9 AFMIZ \ I I I/ P�e oes� SSW TOP= 261.26' \� �I�\\ - - - - -� 1R1V-IN=249.62' I - - - - - - - - - INV O�T�248.42' - - -I 5' I- 2' 30" 2.01.- II r I I I I 2" SF9.5A ASPHALT SEE DETAIL FOR CURB GEOMETRY 11 i '--8" CABC COMPACTED SUBGRADE - PREPARE IN ACCORDANCE WITH GEOTECHNICAL REPORT. ROLL CURB CROSS SECTION LOCATION RIVER DELL "SITE" SKETCH ELEMENTARY SCHOOL NOT TO SCALE \ T OND \ \ POND F I I GENERAL NOTES: (LOCAL JURISDICTION) \` II r I I I I 1. Any discrepancies in layout should be brought to the Engineer's a attention prior to construction. 100 2. Written dimensions supercede scaled dimension. All dimensions are -d Q V) I DO edge of pavement or face of curb, unless noted otherwise. 3. All materials, installation, testing and inspection of water and sewer _- SS --�� 0.17 Ac. utilities to meet current Johnston County standards. -� 4. All streets noted as "PUBLIC" shall meet NCDOT minimum standards In 1 for subdivision streets. All other shall meet the criteria shown. 12 5. All lots to be served by public water and public sewer. 6. A 10' utility, drainage and road maintenance easement is reserved I I I I along and adjacent to all street right of ways. N 7. Flared end sections are to be used on both inlet and /or outlet ends of /1 I -- I storm sewer unless otherwise noted. 8. Fire hydrants are to be installed as shown on plans. 9. Maintain minimum 3' cover for all water pipe. 10. Waterline pipe shall be C -900 class 200 PVC unless otherwise noted and installed a minimum of 4' off edge of pavement. 11. Corporation stops shall be rated a minimum of 300 PSI. 12. Where Waterline Crosses: A. Sanitary Sewer: Waterline shall cross above and maintain 2' vertical separation or 10' of horizontal separation. If this separation �- cannot maintain or if waterline passes below sewer line then both waterline and sewer line shall be class 50 ductile iron pipe for a minimum of 10' each side of crossing. 6 B. Storm Sewer: Where waterline crosses above maintain V vertical separation. If this separation cannot be maintained or where waterline and /or sanitary sewer crosses below storm sewer, waterline and /or sanitary sewer shall be class 50 ductile iron pipe for minimum of 10' each side of crossing. \ 13. All gravity sewer line is SDR 35 PVC except as follows: All sewer line \\ , �, less than 3' deep or greater than 14' deep shall be minimum class 50 \\ ductile iron. , 14. Each prime contractor performing excavations or underground work \ shall be responsible for the location of any existing utilities in the area of their work. Notify the utility locator service (1- 800 - 632 -4949) at least \ 48 hours prior to commencing construction in order that existing \ utilities in the area may be flagged and staked. Contractor shall use all care necessary when working in areas known or suspected to \\ contain underground utilities, including hand digging. \ 15. The contractor is responsible for relocating any existing utilities that \ conflict with the proposed construction. In addition, the contractor is �$ \\ responsible for repair and replacement of any utilities, curb and gutter, pavement, etc. that may be damaged during construction. Damaged items shall be repaired to at least the quality of the original ( \ \ workmanship. The contractor shall field verify depth of existing utilities / ( \ and relocate if proposed grading causes utility cover to be less than ( \ \ minimum required. ( 16. All temporary erosion control measures shall be inspected after each 1 \ rain event and necessary repairs shall be done as required. , 17. Each lot shall have a 4" sewer service at the center of the lot and a I \\ 3/4" water service. t\ I \\ 1 18. Water services are to be "ganged" where possible. Where "ganged" service crosses under the road, the line must be 1". All service pipe under roads shall be sleeved. ,, / I \ \ ♦ �� \ �'• 19. Waterline to be pressure tested at minimum 175 psi. `\ \� \ �- /�\ �, �' 6 20. Ductile iron pipe sanitary sewer must be interior coated with Sewper Coat or Protecto 401, per Johnston County requirements. 21. Contractor to test sewer & water line according to Aqua North Carolina's 2012 standards. 22. Contractor shall install stub outs for sanitary sewer which shall have a depth of no greater than 6 below the finished grade at the termination of the lateral. The location shall be marked by a 4" PVC turn -up at the end of the lateral. Contractor will mark all sewer services with an S in the face of the curb. 23. Contractor shall install water services which shall have a depth of no greater than 6' below the finished grade at the termination - - / `• / \ of the service. Contractor will mark all water services with an "W" in the face the of curb. 24. Contractor to notify Aqua North Carolina 48 hours prior to beginning construction. 25. Contractor to notify Aqua North Carolina 48 hours prior covering any construction. -_- \\ n 26. House Contractor to install pressure reducing valves at house if required. - - -T 27. Contractor to notify Aqua 1 week prior to connecting to any water mains and his request shall include the following. - Points of connection, fitting to be used, and method of flushing and disinfection. - Estimated construction time. F I I 15' MBSL I I II r I I I I Z I I I I a 0 O0 100 U -d Q V) I DO 7,200 SF Ci SCALE: 1" = 60' 1 _ 0.17 Ac. LO I `� In 1 � OW WATER SERVICE N \ � o 0 r- I I I I I I I I N OS SEWER SERVICE I 1 20' MBSL I -- I TOP�241.89' 65' (TYPICAL) INV IR-33.30' R/W R/W INV OUT 33.10• SSMH \ \ / TOP= 77 INV IN= 230.08' \ \ OUT= 229.88'\ Q / \ 30" ROLL CURB /'�' G� �\ \ f SANITARY f S.S. MANHOLE / SEWER FLOW WATER LINE (1 „) R/W R/W FIRE HYDRANT -- - - - -- 'SSMH \ \\ \ I SCALE: 1 = 60 \ / \ I / \ \ 1OP= 261.18' INV IN= 247.98' - - - - _ - -- / INV 00T= 247.78 �'� _� ��� �'� \ \ \,. \ \ / I / \ \ 0 60 120 150 180 -i ■�__ � ► ► L �► i ► 1 ' - -� / -- / T J' V X! N. REVISED 7 -1 -15 \`,��` , CA IlO o'ESSR Q SEAL 19843 FNG I N C.�� 5 -5 -15 if 1110\ za M44 zo N� �a �z o� �o y Q WS O� ,O Q 00 0) T A 0 L.L V/ W Ii U-) I O 041 "t 04 N V 0 ^11") Z w�J z H =Qo CL LL. M W W Z (H V Z W W (O Z 00 Z r- i Q N U WOZ O LL1 T1_ X a0> M = /n 00< �J �aZ I CE- 0 1 O II r w w J J Q Z Q U U Z 0 O0 N O w -d Q 2 > Y � Ci Q LO N O O I � to N \ � o r- O Z I- LLJ �NM�t J Lf)cO 0 za M44 zo N� �a �z o� �o y Q WS O� ,O Q 00 0) T A 0 L.L V/ W Ii U-) I O 041 "t 04 N V 0 ^11") Z w�J z H =Qo CL LL. M W W Z (H V Z W W (O Z 00 Z r- i Q N U WOZ O LL1 T1_ X a0> M = /n 00< �J �aZ I CE- 0 1 BEFORE YOU DIG, CALL 0 0 NORTH CAROLINA GNE CALL CENTER www.ncocc.org I I - I I 77 0 s8 ° I I I °"800 � o ?s ° s I I I 78 Sc �r I N 9p 50'I: /W J/ 9p I �O 25 LF 18" I \ 50'f :/W RCP ® 2.0% d/ i I ------------- - - - - -- 0 �O I---------------- - 1- --------- j \\ I , � \ 6 I \ ,`�--------------- - - - - -- - - - - -- �zo.00'-- - - - - -" ----------------- 2oWo-- - - - - -� \ I ° I C.B. #15 I _ _ _ I \ TOP 279.28 I \ H _ izo -oo' ---------- / \ INV. IN 274.88 I _ I C.B. #16 ' / I C) = I I 7 S 1 \ I I INV. OUT 272_18 I TOP 279.57 / / `37 9 - - - - -- - I 9 A W �W / I 0 " 2 I _ I INV. OUT 275.38 1 2 6 '\) o o I 30 6 S / • _ 120.40'__ -- 26 I 25' I F I \ I - - - - -- �- - - -- \ 25 STA 25 +17.84 I I / I 27 SP I \ - I i �c / M.H. #7 TC 279.64 R.4 I \ w TOP 279.10\ _I I I � I I I I I I 4 1 INV. IN 26814 TC 279.28 C.B. # 10 � � S I i INV. OUT 267\84 I W- �TC I TOP 279.64 \--------- - - - - -I I \ I I C.B. 12 \2 - `� -- ------- - - - - -- 23.'0' 7�3 / 7\ d \ \ I / / / I \ �'' \ \\ TC 78.57 I 6L � � 279.57 � I / f--- - - - --' ,y9�' � •9,?. %--- - - - - -- \ ES #1 I \\ o \ i # 51<A 22j 4.65 i S `�� INV. OUT 9230, 20 1 L----- - - - - -- s' ` I 145.00' I \ I iELOW V. ±63.00 C.B. #13 \ \ I TOP 278.57 \ I 28 / URY 9 5" TOP 274.k12 \ I INV. IN 270.75 (0\6.13) 20 LF 48" / X. �� INV. IN 2766 \ \PC STA \ INV. IN 272.00 (C. 15) RCP ® 1.15% / $TREAM BED4N, INV. OUT 1.56 $3 +98.00 \ I INV. OUT 270.65 ,Y \ / / ir1 W /6' FES I FIELD �ERIFY) // \ 277 ELEV.- I - /' 386' / 0 C.B. #2 It / I TOP 27 1 g .6 ra .00 E i.3s 9INV. IN 262.70 P 3 INV. OUT 262.68 RC r - -- ------------ - - - -� ---- --- - - -- 1 1 -------- - - - - - --------- ti LF 18° I ® pVC "� / RCP ® 0.50% I I HP STA 25 +72.96 I = o- I STA 25 +05.74 a, 1a' R 114 C�9 �) I TC 279.51 I I HP ELEV. 279.88 IL I 7,0 8 N / / p / / / I 22 �F a, o?, 9• � s - , �_ I I - 0 I ' / e 76 CZ I o / I 1g�6 I' R f.l 25' \ = TC 277.86 4 7 °2 6° - O / °29 S,- 3 I / _ 6 �2 64 I 50' ,'1W S / Rive 11wo# SS P� 214. I I N i TOP 277.86 g -4c SF I I i I \ C �� \ ,62g0 ,,�' STA 24 +25.30 I , 50. W \ I I I INV. IN 270.22 (C.B.11) I I 1 � 23\ LE 18 15% i rp \ TC 278.14 I I I I l'os- 42 LF 24„ I I I �� I INV. O 2 00 (C.6.10) ! I '��� - - - - -- - -- - - - - -- - - - -- // 1 I INV. OUT 270.12 I I S 1 6 RCP ®0.50% � - ------- - - - - -- -- - - - - -� i7o.00' EX I m ------`--------------------------- - - - - -- I - - - - -- / 1 p,ZCN 31 I 28 L�\\ �8" \ TOP 274.72 \ TC 277.06 .,- I �y iro.o0� izo.00' � �� I / M L RCP ®�.15% \ INV. OUT 271.77 \ I - C.B. #11 I - I C�j�k2p W /6.� 23 LF 24" \ - 6 i - i 0� / SjA 2 1 \ \ \ RCP ®0.50% \ _ TOP 277.25 6 _ 1 OS, I _ INV. IN 270.44 8 67 I o I 1 2S Sc 1 1 /C.Bj #3 \ -A - - -- \----------- - - - --\ �S INV. OUT 270.34 I p ROC I - / ° I / / TOPI 274.33 \ �__ 2,�ss7' -- \ o I 79 - - -- INV.�IN 262.42 -- - -- \ - ` -- ----- - - - - -- i o o� INV. WT 262.40 I \ �NV. t262.60 I i \\ In - URY 9.5" \ I \ It I \ ELOW EX. \ \ =REAM BED \ 69 \ I o fELD VERIFY \ ft CONTRACTOR TO REMOVE EX. 2" PLUG & BLOW -OFF AND TIE TO EX. 8" LINE / AT EX. 8" MJ G.V. / Riyer , Pell VPI STA = 22 +00.00 VPI STA = 26 +00.00 PROFILE LEGEND VPI EL = 272.00 o��es venue VPI EL = 283.00 30' OFFSET LEFT g1 = -3.57% 1 = 2.75% g2 = 2 75% 2 = -3 61 % 265 260 255 250 245 240 235 230 225 n = � = O tV \ } d \ IN PRO. GROU /4b \ I II I I 1' I Lo Cn N N i N � �a z z 10 +00 - - - - - - 15 OFFSET LEFT g - EXISTING C/L CURVE LEN = 300.00 CURVE LEN = 400.00 SCALE: 1 " = 50' - - - - - - - 15' OFFSET RIGHT K = 47.47 K = 62.89 0 50 100 125 50 - - - - - - - 30' OFFSET RIGHT E =2.37 E =3.18 O O o co o O O_ O I.�y ° N O O U �- 1 LL J �) V V t U) I- W V UU Lo C> + + r + _ N N + + + 0 N� N �C\O N I� M N Ln 0) O 290 ���111 0\l L�\1 c V) r L��l lhN,l II II II II _ II II N Q II Q II Q II Q II Q II Q II � J � J r J r J J I- J Cn Ld Cn W CIO W CIO Ld CIO W CIO W U U �� U U a_ a_ L_ LZ % _ L_ LZ = = > > > > > > > > W W 285 280 N w CL d �/ i O •I \ \�> _ S> III I IIIm iid I \ FXl �^' � � N m I I 1 cmi II.11" 8" DR -14 275 STl'Vii / m x,11 11( l C -900 WATER 112'MIN.CL. x� 177 wA rfR 1i, , �m y- -,� - 11 11 s 11 / i� h _I L I Z _ -i -- __ _ w w� \ 270 \ / ------ LLLL__ �, " wz Iln JZ \ fnJ zw II //) >u) \ 265 Q I ,'/ L Ld J \ \ \\ LX} 000 p -Do w o X 0011 00 is o Q Ld w u o '0 0 48" RCP BURIED N z Q a 260 '\Z" DELOW ^ , STREAM BED z p ° a 00 z fl�Q -- o °LL Q o I I ?o 255 C) fn 250 r� F__ r-) rr) O 00 Lo c\1 0-) 0 1 oo 00 �q -1- O a-) CO -4- 00 00 ­t L0 N-) r Lc7 L(7 CO 00 0-) 0-) 0-) m 00 r__ U CN c\l c\l c\l c\l c\l c\l c\l c\l c\l Cll c\l C\ C\1 \1 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 m 00 o ° °o W � T� N �} 0 = Q CL = Q CL Q �V) F �U) F- Ld U) W Akf /lle (SEE SHEET CE -3) 1 265 260 255 250 f \, II � 245 w U U U) V) z z O N ftf n O O W �J 1 Q D C3 Q Ln 0 N � Ise I. � I o \ Q N \� I� p z H LLJ �NM J 't Lf)Lo 0 240 •�'� 1111 11� � �� 3`IYA -EN-I vl j OP 3r I I I I ±235.27\ 1 CASING �1 ±234.60 11 II 11 11 235 j � II II 124 LF - d.. JII7 C,, i . �O.6J% IrI JJ lU5 Lf UKY UUKE 6C JAUK W /)8" STFFI FNRACFAAFKlT J W/0.250 INCH WALL THICKNESS AND D" DI �L; ,C! 30 230 CARRIER PIPE. 0 0 M b� c me M MM n O� LO N z NH N F N j z0 <c z�, zz z z � XX aww I 225 11+00 12 +00 13 +00 14 +00 REVISED 7 -1 -15 Q` • o •ESSR. e�SEAL � 19843 4/%C I NE S�C�'` 5- 5 -15 EL e 41,``` I AWPACT TAME 290 / - - CRIRGINAL / MERAM LwT \ PROPOSED PERMIT % \ IEMPMARY STREAM M-AC73 18 LF 20 IF • / _ 2 j PERMANENT STREAM BJPAC75 1.024 SF N/A `�"•r,\/ - , \ ° ZONE 1 BUFFER IMPACTS 5,425 SF 8.876 SF � ZONE 2 BUFFER IMPACTS 2878 SF 4318 SF I 285 TW OF' \ I \ \ LOCA/NMI) v . k ,. 15 �� 280 ZELIP \ \ /BPIA�Cr 275 I �i1�i %,� .�`•:�. /iii % />F` /�: \ PERV 105 IF % %!- \ .\ 270 \ /2 %J / �% >`Yili <i ✓iii /���� 1 L94E CL FLOWERS PLANTATION CROSSING #6 (SCALE. 1 " = 40) I 260 STOCKS ENGINEERING, P.A. FLOWERS CROSSINGS PERMITTING N.C. 1100 EASTERN AVENUE PHONES (252) 459 -8196 CROSSING JOHNSTON COUNTY, #6 - DETAILED SITE PLAN P.O. BOX 1108 FAX, (252) 459 -8197 MAY 14, 2015 rev 7 -24 -15 NASHVILLE, N.C. 27856 MOBILE, (252) 903 -6891 C -06A 255 ,31+00 32+00 33+00 34 +00 250 � a �z a 0 �o y Z; y� a� o�h ZIy e ■ t° rn co 0)co ■ Cn 00 ri Ln l 0 -.4- O O N "tN V 04 ^04 �c04 zZ H =Qo CL LL. M W W z V z W Z) Lo co Z 00 z r- V Q N U w O Z X a_J ° m = ►A °ooQ V1 Paz CE-02 0 II � ww J J Q Q w U U U) V) z z O N ftf n O O W �J 1 Q D C3 Q Ln 0 N � L O � I o \ Q N \� I� p z H LLJ �NM J 't Lf)Lo 0 Ll � a �z a 0 �o y Z; y� a� o�h ZIy e ■ t° rn co 0)co ■ Cn 00 ri Ln l 0 -.4- O O N "tN V 04 ^04 �c04 zZ H =Qo CL LL. M W W z V z W Z) Lo co Z 00 z r- V Q N U w O Z X a_J ° m = ►A °ooQ V1 Paz CE-02 BEFORE YOU DIG, CALL NORTH CAROLINA ONE CALL CENTER www.ncocc.org 411 / 86.73' 17.19' 65.00' 65.00' 65.00' 63.00' 65.00' \ 65.00' 70.33' ' -- - - - - - -- ---- - - - - -, -------- - - - - -1 r- - -1 r-------- - - - - -1 r-------- - - - - -1 r- - - - -r -------- - - - - -1 r---------------- � I I I ! I I I I I I I I I h I C.B. #10 1 O TOP 279.64 1 % \ `\ \ M I I ^� I I I I I I t O 1 INV. OUT 275.38 o C/L CUL -DE -SAC o1 STA 10 +61.24 01 ^ 1 a o, /`Lg o1 a a 1 f T, `� S'6, 1 °I STA 10 +00.00 of TIC 287.99 of 1 0 �ry d / 01 a a TIC 279.64 1 / c, I 'I C/L ELEV. 289.18 y �I I / �i `-` STA 14 +92.38 --- - - -- -- i I TC 279.57 -STA 10 +33.58 I I I I / I I I \ l I I I I I �TIC 288.23 I i I i I i I i I X i C.B/#18 I I I C.B. #16 283.42 60.8• NV. TOP . I 1 OUT 278.29 1 1 1INV. OUT 275.38 �, - - - -- -i L-------- - - - - -- L-- - - - -- 1 ---------- - - - -Ji L L - - - -- .............1 I - - - -- -__ / 29 LF 18" 25', / RCP ® 2.0% 8 .3s. 5�p' rz,A('; �� ��,00' � 6 4p' s5,gp' 8 2&5O' 7�sa' O Rte_ - )A I� I�I I I �� V I I I 'r I I I I f� V I I I r`� I I J/1 I I I I� I (T I I J yft� I I I( f I I I I I( I I J I I I 1 1 I I AIR RELEASE f' / i VALVE MANHOLE �`L°' 242 LF 8" SDR 35 PVC SEWER ® 2.0% / 287 LF 8" DR 35 PVC SEWER 3.0% / Lo 182 LF 18" RCP ® 2.0% -1 N I 11 I I VI III lip 1 II ` I1 f, lit 1 1 IIII 1 11 ^ \\ \ \ M.H. #2 \\ A \ `� \ TOP ±256.e0 I / INV. IN 244 90 I M.H. #1 INV. OUT 2490 TOP ±243.00 INV. IN 236.00 1 I \ I V. OUT 234.04 I I\ + 138 LF \® 5.09,• r \ M.H. # 10 \ ���P j� / �\ `� \ �\ HEE, Ci7-2) _ _ % S s ®o sc sc STA 22 +36.84 `. ��&/ �Q \ "0 �g/ / I `� .\ /, i M.H. # TOP 267.12 � INV IN 25568 (8" STUB) IAL I �`� `L� STA 21+\35.77 \ 105 LF D Y BORE & /ACK INV.OUT 255.48 / L TOP IN 2k `�\ I) W/18" SWEEL ENCASEMENT / • •sue %1�•. / � INV. IN 252.15 ` W/0.2501 INCH WALL /THICKNESS / INV.OUT 2b1.95 I\ I AND 8 "/ DIP CLASS b0 84 LF 8" /\^ % I SDR 35 PVCI / I CARRIEF PIPE. SAME' S.S. ® 0.659dPOE� GP STUB 24" RCP 72 LF 24" I RCP ® 4.0% L C.B. #3 ° TOP 262.02 I cow ° INV. IN 256.50 I INV. OUT 256.40 '\ I M.H. # 4 STA 20 +37.62 N TOP 261.25 ------ t - - - - -- INV. IN 252.90 / I INV.OUT 252.70 86.33' 70.00' 1 70.00' 80.00' 84 LF 30" 1 / I I RCP ® 0.50% I --- - - - - -- ----- - - - - -- - - - - -- C.B. #4 7 H M.. # 1 i i i i � i I I TOP 261.07 I I I STA 15 +37.28 I I I -� o INV. IN 257.44 TOP 279.10 INV. OUT 256.92 INV. IN 268.04 I I/ 1 I OUT 267.84 I I 1 90 LF 8" LP STA 20 +00.11 M --'-INV. I �� I SDR 35 PVC I / I 01 I � I o C/L ELV. 261.05 STA 15 +37.28 1 di 298 LF 8" 1 S.S. ® 0.60%1 G 1 I C/L ELEV. 279.10 SDR 35 PVC I M 1 i i o i ti S.S. ® 4.507. I C.B. #6 1 I 84 LF 24" / 1 1 i 1 C.B. #9 o i l i C.B. 8 i i TOP 263.00 / 1 RCP ® 1.0% 1TC 279.51 b I i I 1 NOV. W 270.22 (C.B.111;-1I TOP 267.94 I I INV. O 25 8 I / INV. OUT 2 .70 J 1 ` STA 15 +68.351 11NV. IN 272.00 (C.B.110, II INV. IN 264.15 �\ TIC 277.86 1 I INV OUT 270.12 I INV. OUT 264.05 I I _ / - - -- -- ------ � ----- ------- - - - - -j - -- - -j L-- - -- y •a I 105 LF 24 "1 s� ^^ I RCP ®5.0 6p 5 / a I N 2 , � 7Q,qp' `J 7o.gpp 1� Si 'IJJ I(I1JJJ Il1T� \ 199 LF 24" RCP ® 3.0�" j In i - 295-`x' STA 9 +57.50 ` 0 6" DR -14 � -900 PVC WATER J I TIC 290.25 `\ \\ \ ti !7 65.U0� (Al 63.0 65.00' (a1U 65.00' (Al 65.00 [Al ✓ 65.OG UQ 25 LF 18" 0£F \ �� ��VJJ ��iVJJ �J ��VJJ ��J Q /> cS• / / RCP ® 2.0% - - - -- --- - - - - -1 r- - - - - -- - - - -1 r--- ------ - - - - -1 r ------- - - - - -1 r - -- 7 / - - - - -1 r-------- - - - - -1 r-- - - - - -- - -- �\ 4z" STA 10 +61.241 1 , 1 I 1 1 M.H. #8 I I C.B. x#17 1 I I I C.B. #15 I I I I I STA 12 +46.36 1 1 T,,,6 I I I I TOP 279.28 \ 1 TIC 287.99 1 1 I I I I y 282.92 I I I I TOP 284.37 1 INV. IN 277.71 I I I IINV. IN 274.88 \ INV. IN 276.85 �'J INV. OUT 277.61 I i i INV. OUT 272.18 ` 5 INV. OUT g76 .65 o I STA 15+07.35 _ - - - - T--_40- - - - STA 10 +33.58 I of '0I o I ° TIC 279.2 / I TIC 288.23 I No I 0 N \ \ NI M.H. #9 3`4 LF 18" `\ STA 10 +00.00 TOP 289.18 i i ^� RCP ®2.0% \\ \\ INV. OUT 281.69 i I I I I I I I I I I TIC 278.57 C.B. #12 '\ \ o 4) I I I I I I I// I I I I ,�0� I TOP 278.57 \ \ / 1 -ol I I I I % I I I '� I I INV. IN 270.75 C.6.13 ` I �I i/ L-------- - - - - -J L---- ----- - - - -J/ L--- - - - - -- - -- _ I 41 �� / - -- L_ -- J L_.___ -� INV. IN 272.00 (C.6.15)� I I I A i / INV. OUT 270.65 \ PROFILE LEGEND �`\ 1 I ; ' ` 015' 9• / �pG� 65.GG• 65.9p• / / .i 65.pG• 65.pG• _ 1p,.4,• \ 30' OFFSET LEFT - - - - - - 15' OFFSET LEFT - EXISTING C/L - • - • - • - 15' OFFSET RIGHT - - - - - 30 OFFSET RIGHT J Lq Z m I- J 280 `w Q Ln U X-7 co XO _ _ - _ T co co 1 rr --- w 290 Q J L ' r _ QV), J z c) 1` 0 1 Ld = ` Lil H N M LO tp 0 W H ¢z J J ° bi AT I Z � - � • 95q _ _I 285 __ o_ O O 265 260 255 250 001 tz��y p O0� } Vl Ln r- - N F¢F o t/l r I I \co C.B. #2 1 I \ \\ NOV. N6 266.20 \ \INV. OUT1256.10 � 20 LF 130" \� RCP 1.0% 1 20 1 1 i LC�1 RCP 2.0% I I 1 I 99 11F 8" I i SDR135 PVC 1 N \\ j S.S.10 0.60% 1 I 1_ _ (D N I \\ N / If C.B. #5 TOP 261//.07 - 1 -- INV. OyT 257.84 / STA 9 +36.214 / TOP 261.62 1 INV. IN 253 69 / INV.OUT 25.49 20 LF 18" / RCP ® 2.0% 9 � / ✓ / TOP 263.00 INV. OUT 259020 I / 4" DR -1,4 C -900 I PVC WATER / g 61.97• � / 65.00' O� 65.23• � � / � ' • STA 15 +84.81 0 / 11 PC STA 17 +93.53 / ,, ��/ M.H. #6 / R TIC 277.06 C L ELEV. 266.86 / - \ _ ------- - - - - -� - / - STA 18 +40.15 C.B. LL - ` i - - -- i i ------- - - - - -r i i -- `\ `\ TOP 264.62 `T(5P 277.25 i i i 1 1 \,\ INV. IN 254.43 / \ INV. IN 270.44 i i I - 1 1 / INV.OUT 254.23/ INV. OUT 270.34 TC 278.14 \ \\ 42 LF 24" \RCP ® 0.50% o(b ` \� ! A 1 N� VPI STA = 19 +75.00 \ I I 1 I VPI EL = 258.00 g1 = -4.88% g2 = 3.48% CURVE LEN = 300.00 K = 35.85 E =3.14 o I NI I oU Ln T + 0 JW� Ln U (D N (r) L\4 CN Q J Lq Z m I- J 280 `w Q Ln U U a_ 11 D 0 II cd rr w cn N L ' r O I � 275 z c) 1` _j W ` Lil H N M LO tp 0 W H 270 ° o_ O O 265 i o' ° 260 255 250 001 tz��y p O0� } Vl Ln r- - N F¢F o t/l r I I \co C.B. #2 1 I \ \\ NOV. N6 266.20 \ \INV. OUT1256.10 � 20 LF 130" \� RCP 1.0% 1 20 1 1 i LC�1 RCP 2.0% I I 1 I 99 11F 8" I i SDR135 PVC 1 N \\ j S.S.10 0.60% 1 I 1_ _ (D N I \\ N / If C.B. #5 TOP 261//.07 - 1 -- INV. OyT 257.84 / STA 9 +36.214 / TOP 261.62 1 INV. IN 253 69 / INV.OUT 25.49 20 LF 18" / RCP ® 2.0% 9 � / ✓ / TOP 263.00 INV. OUT 259020 I / 4" DR -1,4 C -900 I PVC WATER / g 61.97• � / 65.00' O� 65.23• � � / � ' • STA 15 +84.81 0 / 11 PC STA 17 +93.53 / ,, ��/ M.H. #6 / R TIC 277.06 C L ELEV. 266.86 / - \ _ ------- - - - - -� - / - STA 18 +40.15 C.B. LL - ` i - - -- i i ------- - - - - -r i i -- `\ `\ TOP 264.62 `T(5P 277.25 i i i 1 1 \,\ INV. IN 254.43 / \ INV. IN 270.44 i i I - 1 1 / INV.OUT 254.23/ INV. OUT 270.34 TC 278.14 \ \\ 42 LF 24" \RCP ® 0.50% o(b ` \� ! A 1 N� VPI STA = 19 +75.00 \ I I 1 I VPI EL = 258.00 g1 = -4.88% g2 = 3.48% CURVE LEN = 300.00 K = 35.85 E =3.14 o I NI I oU Ln T + 0 JW� Ln U (D N (r) L\4 CN Q 0 II Z J I- J (n W (n W U U a_ 11 O' o c N �-4 + N 1 N II N - F-- J- cn W I- H / / / / / T' /� EX 1 OP= 241.89' If // If EX. INV IN= 233.30' If It EX. INV OUT= 233.10' PRO. INV. IN 233.30 C/L STREAM ELEV. ±235.27 / Ch l TOP OF CASING \\ / CP / ±234.60 I / / II/c / I � SCALE: 1 " = 50' 50 100 125 150 REVISED I'7 -1 -15 jjll \ \A . C ARO �i SEAL 19843 ��v •.FN�INE�� '�.`� �•,���j� ' EL SECT' 5- 5 -15 It u►►���` 290 L':L I I J J LL LL_ > > > > - -- - 285 r 7t ou CN M CNN r -: M11 uj O 06 N +k+ + + Ki + I� •! lv lv 011 di1 -2 09 - ' -' =`� _I �Un� �in"� V) I­__ min �U) a - -____ 280 42 LF- 8•. SDR 5 - I I co l I 210% � � \ ,-= _ � • - • - - - - I I wl � I I� ---- ,� _ N \\ ,\\ I I IU d1I � X11 \•\ ; \ /�i j, j 0 275 - 0 I j/ , ILIL 2g� LF I I z 8' SDR35p c -L __jl Mm a 270 Selma I I I � • �\ � � ' •� o LD - r - co � \��A�� 011 /- / D I I W \ w9R \\ ' -- -- 265 Of 2g ci -- - - - - - \ C /'• - m 00 00 J > J cro 00 ° c^o ma m Of SF1yF \\ \\ \ \/ � till n N N 00 =i L R ®� Z o Z D w w w s m 1 = x,1.,1 1 I M m 1 r 260 _o _o �0� o I - II I �NJ > > > > 00 T 00 io \ o� z x I x \\ -`il r r �I I �' �7� vMW Of o _ \ 11 � cnz 00 00 I� \ „ - _ ��~ awe oLo ° \ - - -_ zoo 3a �a�mQ 255 2'MIN.CL. 90 LF 8- SDR , 315 _ 8 -5b g 5% PVC SEWER (0 0.60% I 99 LF SDR 35 , 9 SEWS PVC SEWER ®0.60% 1- I-I 84 LF 8" SDR 35 P PVC SEWER ® 0.65% w IN N 250 00 CO 00 Ln I\ O N I� N 00 I� Ln N 0) Lo O Ln m O � � m Z N N N N rn rn rn r� I rn 00 0) Ln N 1- � N O N � N 00 Z N N F- � Ln m F- O� 00 I� Ln rn N O O� 00 rn 00 z D N z D z D z 0 00 00 00 00 00 00 00 00 00 00 I� CD CD . o LO Co - o CO CD - o LO Co - o CD CD U) o N N N N N N N N N N N N N N N N N ZZ N N zz N N zz N N zz N N �Z 10 +00 11+00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21+00 22 +00 23 +00 24 +00 v �g 0 Qz W� y0\ 1 Z s oe W ,O ■ 00 0) co ■ 0) 00 ri U-) I O X1)15 4 N It 04 � (n � CNI w z w.. Z J H =Q0 12 LL. M W W uz V z W LL, (o Z 00 Z i Q N Uw O Z LLI X La0 I m > = O 0 Q 0- Z CE-03 0 II Z w J ¢ U N w J ¢ U w o 0 N � 02 N F_: o% U ¢ > D 0 L0 0 T N 1") L ' r O I � o ¢ oN 1` O z ` Lil H N M LO tp 0 J LLJ v �g 0 Qz W� y0\ 1 Z s oe W ,O ■ 00 0) co ■ 0) 00 ri U-) I O X1)15 4 N It 04 � (n � CNI w z w.. Z J H =Q0 12 LL. M W W uz V z W LL, (o Z 00 Z i Q N Uw O Z LLI X La0 I m > = O 0 Q 0- Z CE-03 IROOND \ \\ \ \ \\ �85_�\ —�\ \ \\ �\ Notification of Land Resources Sediment and Erosion Control Self Inspection Proaram: \ �.� \ \ -- \ \ The Sedimentation Pollution Control Act was amended in 2006 to require persons responsible for land disturbing activities \\ \ \\ \\ \\ inspect a project after each phase of the project to make sure that the approved erosion and sedimentation control plan is IRON ROD \ - - -k- \ r \� \ \\ \ \\ \ being followed. Rules detailing the documentation of these inspections took effect October 1, 2010. To simplify FOUND 9� -_- __ _ _ - I 1 \ N��� r /�'\\ \ \ \\ \\ \\ \\ documentation of Self- Inspection Reports and NPDES Self- Monitoring Reports, a combination form is now availible. The new -- go\ \ \ \ form was developed to satisfy the requirements of the Sedimentation Pollution Control Act and the NPDES Stormwater WHO \ Permit for Construction Activities, Mineral \ , ♦ \ \ �\ Od \ NCG 010000. Beginning August 1 2013 the Division of Energy, , and Land ♦ -97 ______ " -- // /' �� `� $� /' v \ \\ \ 6" Resources is responsible for administering both the SPCA and the NPDES Stormwater Permit for Construction Activities, NCG V 37 ♦ _2a�- / / % ` ��\ \`\ / • — 010000. The combined form should make it easier to comply with self- inspection requirements. 3 293 290 / / �\ / 153 29 257 ``\ / - \ /205 / / / `\ \` / I r / / g _ � / , r / The Combined Self-Monitoring form is availible as a PDF and Word document from the Land Qualit y web site, P$ 00 1 http: / /portal.ncdenr.ora /web /Ir /erosion / \ \ �\ �I N / , �\ /64 /1 I \ 1� \ If you have questions, please contact the Land Quality Section at a DENR Regional Office. \` - \ � ��\ \I 1\ /°j� � i / �\ •w'o "�� 200 / i' ) /' �XI04 n \` � \ ry\ ? \ i 1 QN i o� 1 iDa \ �/' / 2 i /�`• S � `y / ' // / / / /m 4�. $0743.8' 38 55 1,i �,� \ \ \\ 1 \ \ \ ?� � 1 :' \ 2e9�\� �'� \\1 NPR• \\ \ \, �\ �' �' U r'/ � \ / /// // // '- �\ \ \�-- � \ ?P\ 3�\HP 1 \\ \\,. g r'' �yy \ 1 90.5 290.\52 i\ \°j \ . L@ <.. 1 39 L0°J cl / \ \ \ \ 1\ \\ S �♦ : 9105 _ y /i `` \ �'' � \ \' \ \�29\\ \ s�sW \ � \\ � \ �``; J ' \\ 50��52• \\ \\ ; \W$ \/ � \ `�\ O 6 » \ , / \ 2g 20 \ � 01 • \ sR \ \, � \ \ � \ \ � 12 52 ^\ \\ 2 \ \ \ $ \\ -7\ .6 \ \ \ \\ \ Sr \ \\ \\ X26 'Od34' \\ ` �\\ �� 2$e W \ e �`�� I �Q y2� I \\ � RS 2e \\ \ \ \ \\ 'T p /' •\ \\ \\ s � 41 2Sl _ PS e• � 02 1 \\ `6 nl \ \�S ` \ \\ 20 `� \W � W ____ Q ,/�'� ` \� I ��' �',QI,�c�2 1 1 ) ` \ 28 \ � \ -�/ \• \ \\ \\ \\ \\ \\ 31 n \ � \ \\ \ \\_- . -� ` \\ � 92 \\ > - ' -�3 ,yam? i. \I I 1 'I \ \•2S \ ' 1\ � x `1-� - � �e 52 .'�� y\ 1 2 J83• �,,1�.- 1a �S. 1 \ \ \ \ }III — — — � \ � � \ \ \ 28 ms a `� $°'• ��\ N / �\\ i I . 1 — � %� < 1 1 \ \ I '280 - - -- \ \ \ Q � \ � � ' \ r� ? ■ I � 1 \ 2 j \\ w l' � \ 44 9 Jroy Q. N \ 1 1 I I \\ \ \` 11 \ \\ \\ \ \ Vt; 60�g2 Iff \``; \ \ b / 61 $ ? I I I 1 I \ 1 21t': \\ \ \\ \ \ \ \\ \ \ >S O\ N2�0�\ % \ - 67 2 152 �Q y� / / \\ \ ;`\ � 'L O 210' / � , \ rol . �'��/ BO 1�•`''4 I I I � I I \ I I J \ \ /. 1 1 FOUNE %'�\ \\ \ \\ \ \ \� \\ \ \ i9� k� / �s� .\ !'s,' �\ o// / 21152/ ftIB \\ \\ \_ `\ I� \ \ I \\ \\ \ \\ ` \ / \ \ 2e0 °% \ \ o /' ! O 'A , \ ; t /11• 269/ N \68\ \ \ \ \ \ \ \ 1 \I 5PR`Fi' \, \\ \ \'��y92 \ \ ' 0 / a 21152 �� y\ �Q g7 // \ - i o ♦ // 00i/// /�_ - - -- - - -J \ '\ \ \ -•� �e h2 / 2 / / 1 - .ti / / / /' \ / LOCAT/ON R. DELL SKETCH ELENENTARY SCHOOL NOT TO SCALE 0 O w w J J a Q U U �, •� 3 z O' ~ j O w 1 w = > G! POND NC � ND � ERCY PLOwERS o ♦2 STORE O O POND In 1 } L0 Q ■ N O z Ld ~ J (V TM't lr7 C0 O O O O O O y 1 O NN 1 O O O O O EROSION LEGEND X-'- % \ \ Q � � 2 �.52/ / �6 .5 / � 'r / / / / / /t, �. j /' � i' � l ■--■ —■ SILT FENCE N \ \ \ \ \ SILT FENCE( \� \\ `� /\ 69 w o \ \ \ \OUTLET %, ss \ \ �� \ \\ \ \ \21 \ \. N ^ s , -'/ / ` X ,/ / — / / / / _ / 25 - - - — T / y - SILT FENCE OUTLET \-`� \ \ �1y�5 \ \\, 6 64/260 \ / // \ / CONSTRUCTION ENTRANCE 2> HARDWARE CLOTH SS ■ T INLET PROTECTION cfl 1 / I SILT FE_ NCE s _ ■ ` � — 00 PERMANENT SEEDING TO) CENTIPEDE SOD a I o TI CONSTRUCTION �+f' 1 \ \ \ \ \'\ �� 71 _ /�� / V / �\/ / / /' ENTRANCE / TEMPORARY PIPE INLET PROTECION — \\A LO Im CV v / / z / / N I / /1— I 1 \ \ \ \ \ \ Q �' _ 9, r- w / / / / •255 1• . f' / / / OUTLET PROTECTION J 1i.1 � li1 Z #`� - f-120' u j< m \ \ / / - /� / / / / / � � ( I I I i I � \ I 1 � � \ ?b, \ � \ \� \ � Ja �• 72 ry`O � / , - -i 2-•0 --''- / / ��' " �/ / / / /i ' /' / / 4 �� / / / 1 �, ■�■ = Q 0 /// 1 I I I \ / l 01 \ \ \ \ \ �/ r ' a h~ // / / t / / / /o�' // / /_ /!°�kv _/ / \ I y a- LL_ M / \ \ 2 / / / / / / _ I / / \ \ �--� NCDOT WATTLE Q�10 / �3 N _ I � 4 ' 1� / � / '/ / � l 1 ���� \ r1•C /" / � -\ // / �/ \ \ \ / `l \ - - - - CONCRETE TRUCK WASH -OUT W LU O -- -- - /^ _ � _ \ PTTD N TEMPORARY DERSION I -!d I / / /--- ' \ 'OUT c�2445 . \ _ _ � / — � / / 1 � l I � \ Iro 224, TOTAL AREA DISTURBED - 9.85 Ac. �N/ N 28,99 r / / N 49`\ i ) \ ' �, /- • -____ ,�� /' _�i r- / 1\ / \` \\ TOP =3 &13. SKIMMER SEDIMENT BASIN / / /i .� - _ - � NV OUT \ .10' / � SSMH / / / / / TOP 37.77' \, , / • _ - /- / // / / ,'� \ - - -_ \ ], -� _I / , 1V QV /= = 88 \y3�08'\ _ \ W // / // •/ / / / / \ \� \ 1 - �� - --\ � // // // // / -- \ \ // ��' / � I -�'I- _ EXCELSIOR MATTING In (ALL SLOPES STEEPER THAN 34) Z 00 SA T YO LESEWER--' /\� \ \ - /' - ' / \ \ / / ' �' ! % I 1 `, v- / ^ AN -Rk = 261)09' l/ (\ J( /'/ // /' \ / /J -�\ / I rit // // I \ �� \\ r- \\_I Rl� 250. 9 ' \ , L 1 1 / I 1 r \ / '0�2 \ It �/ �AtNiA Y sEwrzRl / / MA H / / --RLv1 X273.04' INV T =262.Fi4_ 1 \ \ \ \ \ l I _i �_ -_ -- _ -_- - - -tom \ r 1 I 1 \ \ \ ` SSMH _TOP=yE 1.2�� ---_ � '!_ - -__ \ y ice- � '— .f= _ S _ I- - - - /�, IN 37F998 -� 1 - - - -- 1N�OL 247.78 ?- �\ \ \ \\ -, -- , , i ii I i lam_ �_ �- �_ 1 l� _I _ ■� -- i� 1__ k It SSMH /' G' / \ / / / � /T � / /' � `� -\ , i �\ �� �� � -a i - -_- /T � - - -- \\ \� � \� � i \, I + + / C►\ \ � �` / I I / `L 1 / \`/ / / / �- 1 - 1 \i �i \ \ 1 / 1 -- TOP= 276.78' / / I / \ \ / // /i 1 1 - 1 \ r - -- I \ iL_ -- v j LLJ CV U CARO� o z Q < _ 0 NX J SEAL - Q O J 19843 = wo m = =;�' FN�INE�E� GNkG', V 1 0 o '.,411 EL - :( 5-5-15 r z Mr 04 ■ EROSION AND SEDIMENTATION CONTROL NARRATIVE PROJECT DESCRIPTION The purpose of this project is for construction of streets and utilities for Evergreen at Flowers Plantation. The project is owned by The Riverdell Company. The site is currently undeveloped. Approximately 9.58 acres will be disturbed during construction. The maximum fill will be 6 -8 feet. The project is scheduled to begin construction in May 2015 with project completion and final stabilization by October 2015. The erosion and sediment control program for this project will include the installation of a suitable construction entrance, silt fence, outlet protection, inlet protection, and skimmer basins with temporary seeding of the site. ADJACENT PROPERTY The Riverdell Company owns most land adjacent to the proposed construction area. SOILS The soil at this site is a sandy clay. EROSION AND SEDIMENT CONTROL MEASURES All vegetative and structural erosion and sediment control practices shall be constructed and maintained by the contractor according to these plans and s ecifications and the minimum standards of the Dept. of Environmental Management, Land Qpu0,ity Section and Johnston County. The contractor shall also follow any additional requirements as outlined by the Project Engineer. Structural Practices 1. Vehicle wheels shall be clean when leaving the site to prevent the tracking of mud on paved roads. 2. Construction Road Stabilization: Construction traffic shall be limited to stabilized areas. At a minimum, a temporary gravel construction entrance shall be provided as shown on this drawing. 3. Silt Fence: Silt fences shall be provided where shown and as needed on the site plan. These barriers shall be used to contain sediment. 4. Rip Rap /Gravel Filter Sediment Basins: Construct basin to the shape and dimensions shown in the details. The basin is to be placed below the existing ditch flow line by 2' with the berm built above as dimensioned. Management Strategies 1. Perimeter measures are to be installed prior to grubbing or grading. 2. Tail Ditches shall be stabilized immediately following their construction. As an alternate, rock check dams may be provided at their outlets and /or the terminal downstream end of disturbance until ground cover is implemented. 3. Stockpile and /or waste areas must be maintained within the limits of the areas protected b the proposed measures and otherwise temporarily seeded if to be left stockpiled over 15 calender days. 4. Construction shall be planned so that grading operations can begin and end as quickly as 9 ossible. . Silt Fences shall also be installed prior to or as a first step in construction. 6. The Contractor shall be responsible for the installation and maintenance of all erosion and sediment control practices. Vegetative Ground Cover Immediately following grading, all areas shall receive either permanent or temporary seeding, as applicable, as follows: Site Area Description: Stabilization Time Frame: Stabilization Time Frame Exceptions: Perimeter dikes, swales, 7 Days None ditches & slopes. High Quality Water (HQW) 7 Days None Zones. Slope steeper than 3:1 7 Days If slopes are 10' or less in length & are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter. 14 Days 7 Days for slopes greater than 50 feet in length. All other areas with slopes 14 Days None (Except for perimeters and HQW flatter than 4:1 Zones) PERMANENT SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES RATE (LB /ACRE) TALL FESCUE 200 PREMIUM BERMUDA 60 NURSE PLANTS BETWEEN APR. 15 AND AUG. 15, ADD 10 LB /ACRE GERMAN MILLET OR 15 LB /ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15 ADD 25 LB /ACRE RYE (GRAIN). SEEDING DATES BEST POSSIBLE EARLY SPRING: FEB. 15 -MAR. 20 FEB. 15 -APR. 30 FALL: SEPT. 1 -SEPT. 30 SEPT. 1 -OCT. 31 SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST. IF SOIL TEST IS NOT AVAILIBLE APPLY 2 TONS /ACRE AGRICULTURAL GRADE LIMESTONE AND 1,000 LBS /ACRE OF 10 -10 -10 FERTILIZER, OR APPLY 3,000 -5,000 LB /ACRE SEDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 25 LB /ACRE RYE (GRAIN). MULCH APPLY 4,000 LB /ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE THE SECOND YEAR. ACCORDING TO SOIL TESTS OR TOPDRESS WITH 500 LB /ACRE 10 -10 -10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. Maintenance 1. Reseed and mulch bare spots larger than 9 s uare feet (limited to 5% maximum of site area. ) 2. Maintain all seeded areas until uniform stand qs acceptable. 3. If growth is not established by final project inspection, continue specified attention until the stand is acceptable. 4. Correct and repair all undue settling and erosion within 1 year after final inspection. 5. Remove from the site, all erosion control structures after complete stabilization at end of construction period. 6. Remove silt from sediment pits and from behind check dams when silt is within half depth of the pit or spillway. Dispose of in an area where silt cannot re -enter pit / trap. Calculations The practice utilized for the proposed site did require formal calculations. Calculations have been provided. OWNER RIVERDELL COMPANY 4880 NC 42 EAST Clayton, NC 27520 919.553.3086 (v) CONSTRUCTION SEQUENCE: 1. Obtain erosion control plan approval prior to beginning land disturbance. Retain a copy of the approved erosion control plan and permit on site. Call Johnston County at 919.209.8333 to notify the Inspector of a start date prior to land disturbance. 2. Clear the area needed to construct the proposed construction entrance. 3. Construct the construction entrance as shown on the plans. Maintain the construction entrance daily to ensure that mud and silt will not be tracked onto the paved surface. If mud is tracked onto the road surface, it is to be removed immediately. 4. Construction entrance location may not vary without prior approval from Engineer and NCDENR. 5. Clear the area needed to access and construct sediment basins. 6. Construct sediment basins. Stabilize immediately. 7. Clear the area needed to construct the perimeter erosion control measures including temporary diversion ditches, silt fence. 8. Construct the temporary diversion and silt fence. Tie temporary diversions into sediment basins where applicable diversions & basins shall be seeded, mulched, & anchored upon installation. 9. Begin clearing, grubbing, and topsoil stripping. 10. Rough grade all roadways and lots. Adjust basins and temporary diversions as grades rise. 11. onstruct sanitary sewer system throughout project. 12. Construct the storm sewer system throughout the project. Install inlet protection devices. 13. Construct curb and gutter and CABC on roadway. 14. Seed, straw and tack areas behind the curb and gutter that are graded to their final disposition. 15. Complete the construction of storm sewer pipe. 16. Construct permanent outlet protection devices at pipe outlet. 17. Upon completion of the project, contact Johnston County to inspect prior to removing EC measures. 18. Seed, straw and tack any remaining exposed areas. SAMV5VFJ? SED //IIENTB.4S/N NOT TO SCALE ARM ASSEMBLY "C" ENCLOSURE `�ullWllLll'I WATER ENTRY UNIT PERSPECT /yIE MEN NOT TO SCALE PVC END CAP PVC ELBOW PVC END CAP PVC PIPE PVC TEE 1/2' HOLES IN UNDERSIDE END VIEW NOT TO SCALE INFLOW I STRUCTURE DEWATERING ZONE FILTER FABRIC PVC VENT PIPE SCHEDULE 40 PVC PIPE WATER SURFACE :*PVC I SCHEDULE 40 PVC PIPE ORIFICE PLATE FLEXIBLE HOSE-\ TEE PLAN VIEW NOT TO SCALE a /' BOTTOM SURFACE FRONT VIEW NOT TO SCALE i Z w Y Z a M w I�J1I11J11� I I SKIMMER DEWATERING DEVICE EMERGENCY SPILLWAY 1 BAFFLES INFLOW BAFFLES STRUCTURE SEDIMENT STORAGE ZONE 1' FREEBOARD EMBANKMENT AL 6' M INVERT ELEVATION 0� EMERGENCY E SPILLWAY SPILLWAY _ - CROSS - SECTION VIEW NOT TO SCALE PIPE OUTLET TO FLAT AREA NO WELL- DEFINED CHANNEL AA A A T l� �� -� PLAN VIEW PLAN VIEW l-La� I La 77 FILTER BLANKET OR (MIRAFI 140N) SECTION A -A FILTER BLANKET OR (MIRAFI 140N) SECTION A -A PIPE OUTLET TO FLAT AREA PIPE OUTLET TO NO WELL- DEFINED CHANNEL WELL- DEFINED CHANNEL GENERAL NOTES: 1. La = THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6 ". J. IN A WELL- DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. FLARED END SECTION IS OPTIONAL. SEE PLANS FOR REQUIREMENT. 6. SEE PLAN AND PROFILES FOR ACTUAL DIMENSIONS. CONSTRUC77ON SPECIFICATIONS• 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all obj e ctionable material to the designated disposal area Place temporary sediment control measures below basin as needed. 2 Ensure that fill material for the embankment is free of roots wood vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed y 9 � 9 � l 9 inches and machine compact it. Over fill the embankment 6 inches to allow for settlement. J. ShGpe the basin to the specified dimensions. Prevent the skimming device from settling into the mud by excavating a shallow pit under the skimmer or providing a low support under the skimmer of stone or timber. 4. Place the barrel (typically 4 -inch Schedule 40 PVC pipe) on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backflll around the pipe. Place the fill material around the pipe spillway in 4 -inch layers and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from the firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted bockfill over the pipe spillway before crossing it with construction equipment. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Assemble the skimmer following the manufacturers instructions, or os designed. 6. Loy the assembled skimmer on the bottom of the basin with the flexible joint at the inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach a rope to the skimmer and anchor it to the side of the basin. This will be used to pull the skimmer to the side for maintenance. 7 Earthen spillways - Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spiNwoy should be lined with laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8 -inch staples or pins. The fabric must be long enough to extend down the slope and exit onto stable ground. The width of the fabric must be one piece, not joined or spliced,- otherwise water can get under the fabric. If the length of the fabric is insufficient for the entire length of the spillway, multiple sections, spanning the complete width, may be used. The upper section(s) should overlap the lower section(s) so the water cannot flow under the fabric. Secure the upper edge and sides of the fabric in a trench with staples or pins. 8. Inlets - Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. 9. Erosion control - Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. 10. Install porous baffles as specified. 11. After all the sediment - producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. MAINTENANCE- Inspect skimmer sediment basins at least weekly and after each significant (one -half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one -half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath it can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing in the bottom of the basin does not hold down the skimmer. Repair the baffles if they are damaged. Re- anchor the baffles if water is flowing underneath or around them. If the skimmer is clogged with trash and there is water in the basin usual) jerking on the roe will make the skimmer bob u and down and dislodge the debris 99 � y je 9 P P 9 and restore flow. If this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see if it is clogged; if so, remove the debris. If the skimmer arm or barrel pipe is clogged, the orifice can be removed and the obstruction cleared with a plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the skimmer and pool areas. Freezing weather can result in ice forming in the basin. Some special precautions should be taken in the winter to prevent the skimmer from plugging with ice. Maintenance Notes: PIPE OUTLET PROTECTION SCALE: N.T.S. WOOD OR -METAL POST REINFORCED CONCRETE PIPE SILT FENCE � o 4 a I..... N- N WOOD OR METAL POST .L �sar FENCE �• . ----- - - - - -- - -- M1RAF1 100X OR TREWRA S1115 TEMPORARY PIPE INLET PROTECTION SCALE: N.T.S. STRAW BALES STAKE (TYP) / . 10 MIL PLASTIC � LINING STAPLE (2 PER BALE) SILT FENCE 10 MIL PLASTIC LINING STRAW BALE METAL STAKE (2 PER BALE) PLYWOOD PAINTED WHITE BLACK LETTERS 6" TALL CONCRETE WASHOUT WOOD POST GROUND LEVEL CONSTRUCTION SPECIFICATIONS. 1. CONCRETE WASHOUT SIGN SHALL BE INSTALLED NO FURTHER THAN 25' FROM THE FACILITY AND SHALL BE VISIBLE TO ALL CONSTRUCTION TRAFFIC. 2. POLYETHYLENE SHEETING SHALL BE 10 MILS FREE OF HOLES, TEARS, OR LEAKS. MAINTENANCE.• FACILITY SHALL NOT BE FILLED MORE THAN 12" FROM THE TOP BEFORE DISPOSING OF CONCRETE. CONCRETE SHALL BE DISPOSED OF IN THE SAME MANNER AS OTHER NON- HAZORDOUS MATERIALS FROM THE SITE OR MAY BE BROKEN UP AND USED AS FILL IN NON - STRUCTURAL AREAS. 1. Do not let any area remained exposed for more than 7 or 14 calendar days according to chart without applying temporary seeding. 2. Maintain all erosion control measures daily and reseed disturbed areas as needed. 3. Inspect all erosion control measures weekly and after each rainfall event. Repair as needed. 4. At the end of each day's storm drainage operation, construct a temporary pipe inlet protection device until the next day's operation continues. 40NCRETETRff ff!Y.4SH097 NOT TO SCALE r SUPPORT ROPE TO SUPPORT POST, STAKE TO WIRE TO PREVENT SAGGING 24" INTO BOTTO OR SIDE SUPPORT WIRE �� w J a U w J Q U z O_ [\j L > O w _ w > o! 0 N 0 0 J 0_ a � Lij ~ �NM�L0 CO 0 6 Z J COIR MESH OR SIMILAR, J STAPLED OR TRENCHED INTO BOTTOM OR SIDE SED BASIN BAFFLES SCALE: N.T.S. ia -I I i SEE EROSION CONTROL PLAN CLEAN -OUT MIN. II!III! FOR ACTUAL PIT DIMENSIONS -STAKE 1 5' I = _- IIII 11 111 -III - _ 1 S III SET CLEAN -OUT STAKE AT 112 PIT VOLUME I�I�� III- -iII III�IIII;.I FILTER FABRIC III- III- ill,;h CROSS SECTION EMERGENCY BY -PASS 6" BELOW OVERFILL 6" SETTLED DESIGN SETTLED TOP FOR SETTLEMENT TOP OF DAM - �ti��� =III - SEE EROSION CONTROL PLAN I- - I FOR ACTUAL PIT DIMENSIONS I� r i \ - 4' MIN. \ - - _III- � _III -III -- I I \ \ \ \ I- - - I- I I -III III I III -� _ � � -- 2:1 siDE �� /iv�% /i�.'iV��i� SLOPE MAX'!��ij 1 =1 /\y // 1:1 SIDE... NATURAL \ �l L L TER FABRICS �/\ \ \ III III / SLOPE MA X.i GROUND _----- -- - - -- -III =III- 1= I= I =1 1 =1 I =1 11 =1 11 =1 I = =1 = 1 =1 �._ 3 MIN. - - - I - - - -I - - - - - - - - - = - - - - - - I I- III -I I I_I I I_ I I_I I I -I I I_I I I -I I I_I I I -I I I_I I I_ ' I I III h -I =11 I -1 11 =1 11- -'' 1 -1 11 =1 11 =1 11 =1 11 =1 11 =1 11, - �'' 1 ,III- STONE SECTION GENERAL NOTES: 1. Clear, rub and strip the area under the embankment of all vegetation and root mat. Remove all grub, P 9 surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and the soil. Place the filter fabric between the riprap and soil. Extend the fabric across the spillway foundation and sides to the top of the dam; or Excavate a keyway trench along the centerline of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 ft. deep and 2 ft. wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout. 5. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 ft. and a maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. 8. Material used in the stone section should be a well - graded mixture of stone with a d size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather - resistant. 9. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground and shape the center to confine the outflow stream (References: Outlet Protection). 10. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 11. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap mmediate) after construction References: Surface Stabilization). P Y ( ) 12. Show the distance from the top of the spillway to the sediment cleanout level (one -half the design depth) on the plans and mark it in the field. SEDIMENT BASIN SCALE: N.T.S. CARO F oN,yl 'yy SEAL 19843 = SINE ''�•,���j7 ' EL SECT' 4 -15 -15 It 1111"0% 0 w O Z Q w J a U w J Q U z O_ [\j L > O w _ w > o! 0 N 0 0 J 0_ a � Lij ~ �NM�L0 CO 0 6 Z J r Q Wv �a Qg zz h y �a z 4i O SIN m:4q `II§ O� �s Q� W co 00 rn 00 op 0) co 0) 00 M to 1 0 0) 0) N NO V ^04 u V) Z w..w Z J H OX00 a �M W W Z [H V Z W LO Ul w to 0 Z 04 2 j CV Q U �OZ 0 LJ Q 0 J wm2 / /1 T1- VI rCL Z CE-05 CONSTRUCTION SPECIFICATIONS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE ON THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF THE BLOCK AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2x4 WOOD STUDS THROUGH BLOCK OPENINGS. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE 2. WIRE MESH WITH 1/2-INCH OPENING OVER ALL BLOCK OPENING TO HOLD GRAVEL IN PLACE. 3. USE WASHED STONE PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. 4. INSTALL 1/4 IN. WIRE MESH HARDWARE CLOTH, AND METAL POSTS THAT ARE 5 FT. TALL. PLACE THE WIRE MESH A MINIMUM OF 3 FT. HIGH, AND THE STONE A MINIMUM OF 1 FT. HIGH. 5. BEFORE COMMENCING CLEARING & GRUBBING OPERATIONS, THE CONTRACTOR SHALL FIELD LOCATE ALL EX. INLETS WITHIN THE OPERATIONS AREA AND INSTALL INLET PROTECTION. (REFERENCE: EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 6.52) DEWATERING 00 0 o��o u -6 0 -` ° 00° 0 �o�o TEMPORARY SEDIMENT POOL 1'MIN. 2' MAX. SEDIMENT 1 ) BLOCK AND GRAVEL INLET PROTECTION C -7 SCALE: N.T.S. FILTER = 8' MAX. WITH WIRE = FABRIC -� (6' MAX. WITHOUT WIRE) MIDDLE AND VERTICAL WIRES COMPACTS SHALL BE 12 1/2 GAUGE MIN. FILL _J. } IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIII� 8„ III = III -I I I=I I III III I I I11L.I III I I I I I xannunnni unllllllllllll ll ll 1111111 llllllll ll'llllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII _ _ _ _ „ I STEEL POST -2' DEPTH WIRE U U TOP AND BOTTOM STRAND EXTENSION OF FABRIC AND FILTER FABRIC SHALL BE 10 GAUGE MIN. WIRE INTO TRENCH NOTES 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 18" ABOVE THE GROUND SURFACE. 3. INSTALL THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1 " LONG, OR TIE WIRES. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8' APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY IN TO THE GROUND TO A MINIMUM OF 24 ". 6. EXTRA STRENGTH FILTER FABRIC WITH 6' POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. STAPLE OR WIRE THE FILTER FABRIC DIRECTLY TO THE POSTS. 7. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. BACKFILL THE TRENCH WITH COMPACTED SOIL OR GRAVEL PLACED OVER THE FILTER FABRIC. 9. DO NOT ATTACH THE FILTER FABRIC TO EXISTING TREES. 10. LOCATION OF TEMPORARY SEDIMENT FENCE SHOWN ON THE PLANS IS NOT EXACT. CONTRACTOR SHALL FIELD LOCATE TEMP. SEDIMENT FENCE AS CLOSE TO THE DOWNSLOPE EDGE OF THE LIMITS OF CLEARING & GRUBBING AS SPACE ALLOWS. 5 TEMPORARY SEDIMENT FENCE (SILT FENCE) C -7 SCALE: N.T.S. SEE NOTE 4 I, CONCRETE BLOCK O O- GENERAL NOTES: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING W/2 INCH STONE. 2 CONSTRUCTION ENTRANCE C -7 SCALE: N.T.S. JUM -16 -2006 FRI 09:35 M DEE RRO FAX H0. 19195714718 r. U0 E PUMP W W W W W W W W W 4 W W W W j�' ' W W W W W W W INSERT DISCHARGE HOSE 5' INTO BAG DEWATERING W W a BAG ..� W SUCTION HOSE W - -. W -. y y W \ W W a• / �I- III - III - III -- WyWyW° y yW °W °W�yW °W WWWWWWy - III - III - III - III - III -III -I � -1 11 =1 11 =1 I I I � I � � I 11 . _� -� -I I I -I I -I 11-1 I I -1 I I -1 I I -1 11 -1 11 -1 I W IW� I W I W 6.30 6.30.3 Installation and Use: 1. Place Dewatering Bag on the ground or on a trailer over a relatively level, stabilized area. 2. Insert discharge pipe a minimum of 5ft. inside dewatering bag and secure with a rope wrapped 6 times around the snout over a 6 inch width of the bag. 3. Replace Dewatering Bag when half full of sediment or when the sediment has reduced the flow rate of the pump discharge to an impractical amount. Maintenance and Disposal: 1. Remove and dispose of accumulated sediment away from waterways or environmentally sensitive areas. Slit open Sediment Bag and remove accumulated sediment. Dispose of bag at an appropriate recycling or solid waste facility. OR; as directed by engineer or inspector. 6 DEWATERING BAG C -7 SCALE: N.T.S. Rou out aqua Do rot 4 .,_ TE'MPORA.RY LINER SCALE: N.T.S. COMPACTED SOIL 2' MIN. EXCELSIOR MATTING F\-OW 6' TYP. I I CONSTRUCTION SPECIFICATIONS.- 1 REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MA TERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. J. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. OMI TTED. MAINTENANCE.- INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIA TEL Y STABILIZE IT TEMPORARY DIVERSION WITH EXCELSIOR MATTING NOT TO SCALE 12" OF #57 SILT FENCE WASHED STONE v f 1' -8" MIN. SEE PLAN CLASS B S EROSION CONTROL �010 STONE 2' MIN. FILTER SILT FENCE i., SILT FENCE FABRIC GROUND LINE CROSS SECTION TOP VIEW SILT FENCE le- -f- SEE PLAN FRONT VIEW CONSTRUCTION SPECS: SILT FENCE f 9. CLEAR & GRUB THE AREA AROUND THE SILT FENCE OUTLET AND PROPERLY DISPOSE OF DEBRIS. 2. PLACE GRAVEL TO THE SPECIFIC GRADE AS SHOWN PER THE DETAIL. 3. PROPERLY 0 VERL A P STONE BEYOND EDGES OF SI L T FENCE OPENING. MAIN TENANCE: INSPECT OUTLETS WEEKLY AND AFTER EACH RAIN EVENT IMMEDIA TEL Y REMOVE SEDIMENT FROM THE FL 0 W AREA AND REPAIR AS NEEDED. CAREFULLY CHECK OUTLETS FOR EROSION AND REPAIR IMMEDIA TEL Y. ENSURE THERE IS NO SCOURING APPARENT DOWNSTREAM OF OUTLET IMMEDIA TEL Y STABILIZE ANY AREAS THA T NEED REPAIR. SILT FENCE OUTLET SCALE: N.T.S. Erosion Control Maintenance Plan All erosion and sedimentation control measures shall be inspected weekly and after each runoff - producing rainfall event. Structures that shall be inspected include but are not limited to: Silt Fence and Fabric Inlet Protection Any fabric which collapses, tears, decomposes, or becomes ineffective shall be replaced immediately. Sediment deposits shall be removed when sediment behind the fence reaches 6 ". Seeding, Fertilizing, and Mulching Seeded areas shall be inspected for failure and necessary repairs and re- seeding shall be made within the same season. Block and Gravel Inlet Protection Inspect the barrier after each rain, remove sediment as necessary to provide adequate storage volume for subsequent rains. Upon stabilization of drainage area, remove all materials and any unstable soil, either salvage or dispose of properly. Bring disturbed disturbed area to proper grade, then smooth and compact it. Stabilize all bare areas around the inlet. Temporary Diversion Ditches Sediment shall be removed from the flow area immediately after each rainfall. Temporary Gravel Construction Entrance /Exit Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2 -inch stone. After a rainfall, immediately remove all objectionable materials spilled, washed, or tracked onto roadways. Sediment Basins and Pits Sediment shall be removed from the structure and the structure shall be restored to its original dimensions when 1.0' of sediment has accumulated in the structure. The sediment shall be disposed of off -site and the contaminated part of the gravel shall be replaced. The structure shall be inspected for damage and repaired accordingly. 8 EROSION CONTROL MAINTENANCE PLAN C-7 SCALE: N.T.S. '�,�,�` , CAROL Ess /p' �4, SEAL 19843 = EIS �. C 0 w O Z a w J a U w J Q U U) 0 Z N O_ U) O 5; = w w > 0 N Sri 0 o 0 J Q o H �NM�u7c� 0 0 Z W r O Z O �v �o e W a� W W Q7 W Mr � '' W ^^ 60 n U-) � O 11114 N � (n `j 04 U Z WSW J H =X0 a�M W W Z H Z W V I W c0 Z 00 Z 04 j CV Q U _" 0 LL, WOZ O Q X J W 0° _ T_ . < VI rCL Z CE-06 TOP DAM 256.50 SLOPES TO RECEIVE SLOPES TO RECEIVE �CEN77PEDE SOD CENTIPEDE SOD t? . — CENTIPEDE SOD GROWN— . ON SANDY SOILS W77H AN 12" MAX. INFILTRA77ON RATE OF 2 PONDING INCHAR OR GREATER 4" C.O. I DEPTH TOP OF BIORE7EN77ON 255.00 4" C. 0. 41NED 24" FILL SOIL MEDIA CLASS B RlP RAP L 85 -889' WASHED SAND FOREBAY 12" IN DE 8 -12Z FINES (SILT & CLAY) 3 -5% ORGANIC MATTER PHOSPHOROUS INDEX < 30 2" CHOKING STONE #8 OR #89 I J t PERFORATED PVC SOCK DRAIN BIORETENTION AREA PROFILE Conversion Procedure — Sediment Basin to Bioretention Area 1. After the site is completely stabilized, contact Stocks Engineering ® 252 - 459 -8196 for verification of completion and stabilization. 2. Contact Thad Valentine of NCDENR -Land Quality Section ® 919 - 791 -4200 for approval to remove all temporary erosion control measures. 3. Upon approval from NCDENR -Land Quality Section, begin the conversion of the bioretention area from a temporary sediment trap to a permanent BMP as follows. 4. Construct silt fence around the toe of the interior side slope of the bioretention area (BA) to protect the BA from sediment contamination during the Conversion Procedure. Leave an opening at the downstream end of the BA just wide enough for construction machinery to enter /exit. 5. Bring the side slopes surrounding the BA to proposed grade. 6. Seed /sod the side slopes as per specifications. (Contractor is responsible to maintain and protect seed /sod to promote successful establishment during Conversion Procedure. If damage or death to seed /sod occurs, Contractor must replace affected area immediately.) 7. Once seed /sod has been installed, Contractor shall excavate the bottom of the BA to a depth equal to the greater of the following: a. 1 foot below any evidence of sedimentation upon in situ soils; or, b. 4 feet below the proposed bottom of BA elevation. 8. Excavated material must be disposed of in an approved off -site location. 9. Care must be taken to prevent any sedimentation /re- sedimentation during this process, as contamination of the in situ soils or the designed soil media will compromise the functionality of the BA. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering ® 252 - 459 -8196 to inspect excavated BA before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing BA per details. Establish appropriate permanent vegetation in BA as soon as possible. 12. Upon completion of BA construction, remove sediment from silt fence and dispose of at an approved off -site location. 13. Contact Stocks Engineering ® 252 - 459 -8196 to inspect completed BA before removing silt fence and placing the BA in service. 24" FILL SOIL MEDIA 85 -88% WASHED SAND 8 -12% FINES (SILT & CLAY) 3 -5% ORGANIC MATTER PHOSPHOROUS INDEX < 30 �I 111111l I I —I 4" WASHED SAND- -- - - °� / �h 2" CHOKING STONE I— III -I 1= #8 OR #89 I— -I I I-I I I= ' " 1 =1 I I=I II (- `COMPACTED SUBGRADE BIORETENTION AREA PROFILE NOT TO SCALE Centipede Sod Notes: CENTIPEDE -SOD (TYP.) ELEV 255.00 6" #57 STONE 6" PERFORATED PVC SOCK DRAIN 1. Centipede Sod shall have been grown in sandy soils with an infiltration rate of 2- inches per hour or greater. 2. Do not deliver more sod than can be installed in less than 24 hours. 3. Use a knife or sharp edged shovel to cut the sod to desired lengths. Do not tear sod. 4. Water sod immediatley upon installation to a depth of 1 inch. Water daily for a period of 2 weeks and then periodically until roots have been established. ELEV 251.67 6" #57 STONE 4" WASHED SAND PROPOSED GRADE SCALE: 1 " = 30' 0 30 6�0 75 90 CA ' .Q, SEAL 19843 EL S '. C U) Z O N w o! 0 M II J J 0 Q U U !n U) O w x > M 0 N N � � M H 0 � O U � Q N O w Z F- w N M � to c0 0 L, v Q� W� O AN O� °? a yh Wa o� y QO ■ (2 c r" r co li I O "1 � I O 0) 0) \ NON V LCJ ^Cq Cq Zw�J L;i H =XO CL AM W W Z �01H V Z W LL' c0 O 00 Z � i Q N U _" WOZ 0 LIJ F- LLS X Q O J LLI m= ►/� COQ VI � CL_ Z CE -07 —rte N _7 jj/E \ I 1 FouNq. \ \ \ —\ \ I \ \\ \ 1 ` 1 � v y IN F FER I 19P 262.5/1 HP ♦`� \ \ /�P� \ I I I I I I I I I I �/� \1 11 �/ 1 \ \ \ \ ?�s\ \\ \ ry9' s _ / 2s2.52 25-6--5_ /� I / I I Ij I I I I I / /� -� 1 1 \ / \\\ \ �� �\ \\ \\ Q w___� _ - -y6 T•' wC6 / / / / ,;� = / • \ \ / / _ ice/ / / / l / / ( I I � � I I � — � � \ ?b, \ \ \ \� \ \ ' —72 `� -' / _ � � -- �r -- --- `c- =�- 't � / 26 / � ✓ � /� / /; / / / /� � ' - i � � 24 I I \ I \ \ \ \k �3 UT 25,0 \ — \ N 250.99 I✓/�a�3��9��1 I r \ \ ' r r�� �� _� .�i / / / / / �� 9 / ,'�\ - - -�\ \� — TOP & TN //W 4�\ ) \ \ r ��.i- - -_ v� /i /�� ������r -'L / /r / / �\ >/ / \ — - -;- \INV IN= ANV OU SATARY SEWER _ \ / / \ -Rk - 26109' -SAM iAFiY SEWER INV = 26iZ%4_ - - -t�� STOP 2 f�1.2W, � T _� � �� // \ /' � � �� �\ y�4fi.62 ��— L - - - -- = � - - - - - -' �'r —� f —ter �� \ \ � \ \ � %\ \ \ \I \ \ \ \• // _. I 0 4942_' �SSMH - -- / _ INV IN= 98 T T \ \ \ y ter- 1 -- i I - - - -- r 1NVOL 247.78 M _ / F -- \ ) o \ LOCATION R„E, DELL SKETCH ELEMENT A'" NOT TO SCALE \ 0 ND \ \ POND Eo Y FLOWERS STORE CARP'i s, �O .��FESS /D,v9. •y9 Q SEAL 19843 `"�ciNE S�O�'�c`5 -5 -15 El- O O II w w J J Q Q U U (n N N Z 0 N N O w > 2 > w O N O O I a o N O Z W H W N r7 d' U-) Lfl 0 L,. s V44S Q e °v �z H> W p S� �S WW W Q 0) 0000 0)CIO� Lo I O 14-0) O N d- 04 0 rn � v 04 LN v z W 04 W J H r<00 d W M W W uz 1� V z W W 0 O "D O Z r- j N Q U woz O LLi Q XO J Wm= / O O Q T_ CL Z CE-08 PAVEMENT OR FINISHED GRADE GATE VALVE TO BE SAME \ SEE VALVE BOX DIAMETER AS MAIN LINE ` \I INSTALLATION F,4" MIN. VALVE TAMPED BACKFILL - BOX TAMPED THREADED COUPLING BACKFILL 2" THREADED BRASS PIPE s D.I. PIPE ,,"f ` ? CONCRETE BLOCKING i:! �' •; ,;.•.,; MIN. 1/3 C.Y. AT 3000 P.S.I. 5/8" TYPE 304 STAINLES - CONCRETE THRUST THREADED RODS (MIN. 4 EA) COLLAR _ 2" THREADED BRASS 5' MIN. MJ CAP W/ 2" TAP PIPE (12" IN LENGTH) PAY ITEM INCLUDES ALL ITEMS EXCEPT MAIN LINE VALVE TEMPORARY BLOW —OFF ASSEMBLY NOT TO SCALE COAT HYDRANT BONNET AND NOZZLE CAPS PAVEMENT OR W/ "ALERT" REFLECTIVE FIRE HYDRANT PAINT FINISHED GRADE SILVER MODEL #1440 SEE VALVE BOX 4" MIN. TAMPED BACKFILL INSTALLATION 5/8" TYPE 304 STAINLESS STEEL VALVE PUMPING & HOSE CONNECTIONS EQUAL TO COUNTY STANDARD THREADED RODS (MIN. 4 EA.) BOX,,, , TAMPED THREADED COUPLING BREAK RING TO BE SET WITHIN 2 " -4" BxA,yCKFI 2" BRASS NIPPLE FINISHED GRADE OF FINISHED GRADE '. ;•,•, : VALVE BOX D.I. PIP '•'' s " Y' -1 II 11 =1— 11 =1 11 =1 I I 1 =1 11 =I 11- CONCRETE BLOCKING _ HYDRANT TEE CONCRETE THRUST 2" BRASS NIPPLE MIN. 1/3 C.Y. AT 3000 P.S.I. BURY IAS I I I- I I I I I I I I I I I I I I I 11111; , I I I WATERLINE SIZE VARIES COLLAR (MIN. 6" IN LENGTH) SPECIFIED I — SEE PLANS M.J. CAP W/ „ 2" THREADED TAP CONCRETE THRUST BLOCK 5' MIN. 2" BRASS PIPE (MIN. 12" IN LENGTH) NOTE: ��yL'; 1: 1. MIN. OF 4 CU. FT. CONCRETE THRUST BLOCK PAY ITEM STONE (MORE IF INCLUDES ALL ITEMS I REQ'D). GATE VALVE 2. CONC. THRUST VALVE SHALL BE PLACED ON THE BLOCK TO HAVE M1467 STONE FILL WATER MAIN SIDE OF ROAD DITCH PERMANENT BLOW —OFF ASSEMBLY OF 6 SQ. FT. (4 C.F. MIN.). BEARING ON SOLID 4" TYPE 304 S.S. THREADED RODS BANK (MORE IF HYDRANT LEG TO DIP MIN. 2 EA. PER SEGMENT NOT TO SCALE REQ'D.). OR 3. DRAIN HOLES AND PAY ITEM "Aqua -Grip" RINGS OR ROMAC FLANGES SHALL BE FIRE HYDRANT ASSEMBLY INCLUDES GRIP RINGS MAY BE USED AT CLEAR OF CONC. ALL ITEMS EXCEPT MAIN LINE TEE JOINTS IN LIEU OF THREADED RODS 4. FIRE HYDRANT BARREL SHALL BE PLUMB. FIRE HYDRANT ASSEMBLY NOT TO SCALE CUINCKtlt t! TAPPING VALVE WITH VALVE BOX EXIST. WATER MAIN 4 TAPPING SLEEVE —NEW WATER MAIN TAPPING SLEEVE & VALVE ASSEMBLY NOT TO SCALE NOTE: TAPPING SLEEVE SHALL BE FABRICATED OF TYPE 304 S.S. AND PROVIDE A 360' SEAL AROUND EXISTING PIPE WITH FULL CIRCUMFERENTIAL GASKET. CONCRETE THRUST BLOCK AT 45' BEND. SEE THRUST BLOCK DETAIL FOR DIMENSIONS OF BLOCK. 10' MAX. Z NOTE Name Date I n ALL PIPE SEGMENTS LESS S.S. THREADED RODS rSEE SHALL REQUIRE N of 5; O � w 2 A LTRHHOfAO]�NO� N11((0;' NCRETE WHOST BLOCK CAST IN CONC. & 90' BEND. FINISHED GRADE PAINTED BLACK THRUST BLOCK DETAIL Drawn B : By: _ FOR DIMENSIONS OF BLOCK. PAGE ROD REQUIREMENTS 4. CONTRACTOR SHALL SIZE OF 45' BEND STATIC THRUST IN POUNDS NUMBER OF RODS REQUIRED 6" 4,328 2 8" 7,694 2 12" 17,312 2 16" 30,779 4 20" 48,091 6 24" 69,252 8 1. RODS AND NUTS SHALL BE OF TYPE 304 OR TYPE 316 STAINLESS STEEL 2. CONCRETE SHALL NOT CONTACT BOLTS OR ENDS OF MECHANICAL JOINT BENDS. VERTICAL BEND RODDING AND BLOCKING DETAIL NOT TO SCALE Name Date Z NOTES: 1. VALVE MARKERS SHALL Name Date I n BE PLACED AT R /W. � COLLAR (3,000 P.S.L) Name Date 2. LETTERS "MV" SHALL N of 5; O � w 2 A Name Date CAST IN CONC. & Name Date FINISHED GRADE PAINTED BLACK BRASS OR BRONZE Drawn B : By: _ WATER PAGE Drawn B : y I 4. CONTRACTOR SHALL WATER PAGE Drawn B : y 10 WATER PAGE Drawn B : y WATER Drawn B PAGE y REINFORCING WATER PAGE Checked By: JOHNSTON COUNTY WATER �— WITH BEVELED CORNERS Checked By: I JOHNSTON COUNTY "MV" CAST. Checked By: JOHNSTON COUNTY 9 Approved By: Checked By: JOHNSTON COUNTY 1 O Checked By: JOHNSTON COUNTY STANDARD DETAIL - Approved By: Department of Public Utilities p STANDARD DETAIL 1 Approved By: I Department of Public Utilities p STANDARD DETAIL 2 Approved By: Department of Public Utilities p STANDARD DETAIL 4 Approved ey: Department of Public Utilities p STANDARD DETAIL 5 Approved By: Department of Public Utilities STANDARD DETAIL 7 Scale: I P.O. Box 2263 Temporary Blow Off PLAN Scale: I I P.O. Box 2263 Permanent Blow Off I I I Scale: I P.O. Box 2263 Fire Hydrant SCHEDULE Scale: I P.O. Box 2263 Tapping Sleeve and Scale: I P.O. Box 2263 Critical Bend Rodding C Smithfield, NC 27577 Assembly of 47 I I I I Smithfield, NC 27577 Assembly of 47 I I I Smithfield, NC 27577 Assembly of 47 I I I Smithfield, NC 27577 Valve Assembly of 47 I I I Smithfield, NC 27577 and Blocking Details of 47 Rev. Description Date Init. I 36" V -4" V -4" Rev. Description Date Init. I Rev. Description Date Init. Rev. Description Date Init. Rev. Description Date Init. Rev. Description Date Init. Rev. Description Date Init. NOTES: 1. CONCRETE SHALL BE 3,000 PSI MIN. 2. CONCRETE FOR THRUST BLOCKING SHALL BE KEPT FAIRLY DRY, THUS MAKING THE CONCRETE WEDGE SHAPE MORE EASILY FORMED WITH THE WIDEST PART (BLOCKING AREA) AGAINST UNDISTURBED SOIL. 3. NO CONCRETE SHALL COVER ANY BOLTS OR GLANDS. 4. ALL FITTING AND ACCESSORIES TO BE WRAPPED WITH 10 MIL POLYETHYLENE PRIOR TO POURING BLOCKING. 5. VOLUME OF THRUST BLOCKING SHALL BE AS SHOWN ON THE THRUST BLOCKING SCHEDULE. I N m M SOIL (TYP.) PLAN BENDS PLAN TEES 18" MIN. - 10" 0 & LESS 24" MIN. - 12" 0 & GREATEN • 45- MIN. •,j tU o t y " I SECTION X —X PLAN & ELEV. BENDS & TEES PLUGS PIPE 90' BEND 45- BEND 22 1/2' BEND 11 1/4' BEND TEE PLUG SIZE A B A B A B A B A B D I D 4" a• 12" 8' a' 6" 8" 6" 6" 8' 9" 1o' 18" s• 1o• 12" a• 10' B• s• a• a• t0" 10" 12• is" e' 15' 13" 10' 1o' 8' 8' 8' e" 1o" 12" 12" 24' 10" 16" 14" 10" 12" 6" 10' 6" 1o' 11" 14" 14" 25' 12" 20" 16" 1Y 14" B' 12' a' 12' 14" 16" 16" 30" 14' 22" 18' 14' 16' 10' 14' 10' 14' 18' 18" 18' 34' 16' 26" 20' 16' 18' 12" 16' 12' 16' 18' 20' 20' 36' 20" 38' 26" 24' 18" 18" 13" 12' 9" 19" 1a" 24" 48" 24' 48' 33' 30' 21' 18' 18" 15" 11' 21' 21" 28" 56' THRUST BLOCK DETAIL NOT TO SCALE Name Date Drawn By: Checked By: JOHNSTON COUNTY WATER Approved By: Department of Public Utilities STANDARD DETAIL Scale: I P.O. Box 2263 Thrust Block Rev. I Description I Date Ilnit. Smithfield, NC 27577 VALVE MARKER DETAIL NOT TO SCALE Z NOTES: 1. VALVE MARKERS SHALL - n BE PLACED AT R /W. � COLLAR (3,000 P.S.L) T 2. LETTERS "MV" SHALL N of 5; O � w 2 A FACE TOWARDS VALVE. CAST IN CONC. & 3. MARKER SHALL HAVE FINISHED GRADE PAINTED BLACK BRASS OR BRONZE % 70-41. _ EMBED ON TOP OR SIDE. MAIN Drawn By: 4. CONTRACTOR SHALL 11 4 EA. - #3 REBAR STAMP DISTANCE TO 10 (1 EA. CORNER) CENTER OF VALVE INTO �r EMBED. 1 REINFORCING 5. BLOW -OFF ASSEMBLY PAGE SQUARE MARKER SHALL INCLUDE 1 EA. WATER �— WITH BEVELED CORNERS MARKER W/ "BO" OR - "MV" CAST. 6" TO 16" MAINS = 12 -N0. UNDISTURBED VALVE MARKER DETAIL NOT TO SCALE THRUST COLLAR INSTALLATION NOT TO SCALE RESTRAINED FLANGE ADAPTER "UNIFLANGE" OR EQUAL MJ ACCESSORY KIT "FIELD LOK" GASKET OR EQUAL DIP (BELL DIP (PE) -j" 3/4" THREADED TYPE 304 OR TYPE 316 S.S. RODS MIN. 4 EA. HARNESS RESTRAINT DETAIL NOT TO SCALE FOR USE IN PAVED AREAS FOR USE IN UNPAVED AREAS VALVE BOX COVER FINISHED GRADE rI7X" MIN. IN PAVED AREA 1J¢" 1 1" FINISHED GRADE 11 IN UNPAVED AREA BASE COURSE - _ - 2 -0 6" MIN, _ _- _ - CONCRETE ENCASEMENT ° TAMPED BACKFILL _ _ _ _= AT 3,000 P.S.I. ° .' ' ' ' �° `,A • .,� - -- _ - - VALVE BOX d _ 2' -0" TAMPED O • °•v BACKFILL y WATER MAIN - VALVE ` VALVE BOX • °d P t COVER TAMPED BACKFILL BLOCKING CONCRETE ENCASEMENT SECTION PLAN AT 3,000 P.S.I. NOTES: 1. D.I.P. MAY BE USED FO BOX EXTENSIONS. 2. VALVE BOX SHOULD NOT CONTACT WATER MAIN OR VALVE. 3. CONCRETE PROTECTOR RING MAY BE USED IN LIEU OF ENCASEMENT IN UNPAVED AREAS. VALVE AND VALVE BOX INSTALLATION NOT TO SCALE #3 REBAR 10" 2 EA. I -2" 1 'I I• • j� � 2 4" - 24" - NOTE: PROTECTOR RING SHALL BE 3,000 P.S.I. CONCRETE. CONCRETE PROTECTOR RING NOT TO SCALE Name Date I Z 4'_0^ CONCRETE THRUST - ¢ _J J a U � COLLAR (3,000 P.S.L) Name Date !n N of 5; O � w 2 A Of u7 PAGE Drawn By: I 4' �, WATER ANCHOR A: C�, . ° D.I.P. RING y •• Q O MAIN Drawn By: WATER WATER PAGE Drawn By: WATER PAGE Checked By: I JOHNSTON COUNTY PAGE SECTION REINFORCING WATER PAGE Checked By: JOHNSTON COUNTY WATER Checked By: NOTE: WATER Approved By: I 6" TO 16" MAINS = 12 -N0. UNDISTURBED 9 Approved By: 7 BARS SOIL 1 O Approved By: 20" TO 36" MAINS = 12 -N0. STANDARD DETAIL - CONCRETE THRUST 8 BARS COLLAR (3,000 P.S.I.) BARS PLACED AS SHOWN - - - STANDARD DETAIL ....... :.:::: `• _ D.I ..:....:::. Thrust Collar ANCHOR • RING - • ' I a , " , /:\� TRENCH WALL D.I.P. `/ MAIN TRENCH III. WALL Restraint Harness a• f IG TAMPED BACKFILL P.O. Box 2263 Valve and Valve :...........:::::: .... P.O. Box 2263 Concrete Protector Ring 11 -1 11, -1 I i =1 1 � 1(- i— iii -iii= Installation of 47 PLAN UNDISTURBED Pipe Laying of 47 I I I SOIL Box Installation of 47 I I I SCHEDULE P.O. Box 2263 PIPE DIAMETER CONCRETE THRUST COLLAR ANCHOR COLLAR RINGS REQUIREDI Scale: I P.O. Box 2263 A B C Smithfield, NC 27577 1' -0" 1• -0' 2" ONE I Smithfield, NC 27577 16' V-4- 1.-0. 2" ONE I 20' V -4" 1 -0" 3° ONE I I 24" V -4" 11-0. 3' TWO I I 30' V -4" t•_2° 4" TWO I I 36" V -4" V -4" 4" TWO I THRUST COLLAR INSTALLATION NOT TO SCALE RESTRAINED FLANGE ADAPTER "UNIFLANGE" OR EQUAL MJ ACCESSORY KIT "FIELD LOK" GASKET OR EQUAL DIP (BELL DIP (PE) -j" 3/4" THREADED TYPE 304 OR TYPE 316 S.S. RODS MIN. 4 EA. HARNESS RESTRAINT DETAIL NOT TO SCALE FOR USE IN PAVED AREAS FOR USE IN UNPAVED AREAS VALVE BOX COVER FINISHED GRADE rI7X" MIN. IN PAVED AREA 1J¢" 1 1" FINISHED GRADE 11 IN UNPAVED AREA BASE COURSE - _ - 2 -0 6" MIN, _ _- _ - CONCRETE ENCASEMENT ° TAMPED BACKFILL _ _ _ _= AT 3,000 P.S.I. ° .' ' ' ' �° `,A • .,� - -- _ - - VALVE BOX d _ 2' -0" TAMPED O • °•v BACKFILL y WATER MAIN - VALVE ` VALVE BOX • °d P t COVER TAMPED BACKFILL BLOCKING CONCRETE ENCASEMENT SECTION PLAN AT 3,000 P.S.I. NOTES: 1. D.I.P. MAY BE USED FO BOX EXTENSIONS. 2. VALVE BOX SHOULD NOT CONTACT WATER MAIN OR VALVE. 3. CONCRETE PROTECTOR RING MAY BE USED IN LIEU OF ENCASEMENT IN UNPAVED AREAS. VALVE AND VALVE BOX INSTALLATION NOT TO SCALE #3 REBAR 10" 2 EA. I -2" 1 'I I• • j� � 2 4" - 24" - NOTE: PROTECTOR RING SHALL BE 3,000 P.S.I. CONCRETE. CONCRETE PROTECTOR RING NOT TO SCALE Name Date I Z Name Date I Name Date _J J a U Name Date Name Date !n N of 5; O � w 2 Name Date Of u7 PAGE Drawn By: I 04 WATER PAGE Drawn By: Q O PAGE Drawn By: WATER WATER PAGE Drawn By: WATER PAGE Checked By: I JOHNSTON COUNTY PAGE Checked By: JOHNSTON COUNTY WATER PAGE Checked By: JOHNSTON COUNTY WATER Checked By: JOHNSTON COUNTY WATER Approved By: I Department c STANDARD DETAIL 9 Approved By: Department P STANDARD DETAIL 1 O Approved By: Department p STANDARD DETAIL Approved By: 13 Department � STANDARD DETAIL 14 Scale: I I P.O. Box 2263 Thrust Collar 1 g Scale: I P.O. Box 2263 Restraint Harness 1 7 Scale: I P.O. Box 2263 Valve and Valve Scale: I P.O. Box 2263 Concrete Protector Ring STANDARD DETAIL of 47 I Smithfield, NC 27577 Installation of 47 I I I Smithfield, NC 27577 Pipe Laying of 47 I I I Smithfield, NC 27577 Box Installation of 47 I I I Smithfield, NC 27577 P.O. Box 2263 of 47 Rev. Description Date Init. I Scale: I P.O. Box 2263 3�" and 1" Rev. Description Date Init. Smithfield, NC 27577 Rev. Description Date Init. Smithfield, NC 27577 Condition Rev. Description Date Init. I I I Smithfield, NC 27577 Pavement NOTE: PIPE SHALL BE BEDDED UP TO SPRING LINE AND MINIMUM 4" BELOW BOTTOM OF PIPE WHEN WET AREAS HAND PLACED ARE ENCOUNTERED. DENSELY COMPACTED BACKFILL TO 1 FT. ABOVE TOP OF PIPE - - - - - - _ UNDISTURBED EARTH - - - - - ELECTRONIC MARKER BALLS AT 100' ON ---PIPE- - CENTER & AT BENDS. MARKER BALLS SHALL BEDDED PIPE -O.D.- - BE INSTALLED AT 1 1/2 TO 2' DEEP. NOTE: MARKER BALLS SHALL BE SHAPED SUBGRADE - INSTALLED CONCURRENTLY WITH PIPE. SHALL PROVIDE BEARING _ MARKER BALLS SHALL NOT BE ALONG ENTIRE LENGTH I Ir INSTALLED AFTER TRENCH HAS BEEN OF PIPE BARREL COMPLETELY BACKFILLED. /2 PIPE O.D. 24" + O.D. MAX. 12" + O.D. MIN. NOTE: WATER MAINS 8 "0 AND SMALLER SHALL HAVE MINIMUM OF 3' COVER. WATER MAINS LARGER THAN 8 "O SHALL HAVE A MINIMUM OF 3' -6" COVER. PIPE LAYING CONDITION NOT TO SCALE 2" ASPHALTIC cur TO PLACE C. OR AS IN INEAT EDGE PLACE -8' COMPACTED CRUSHER �/ RUN STABILIZED WITH 5 R PORTLAND CEMENT BURIED - - _ SELECTED PIPE _ BACKFILL TAMPED LINE IN LAYERS SECONDARY HIGHWAYS & CITY STREET 2' PLANT MIX ASPHAL OR CONCRETE MIX SAW TO NEAT EDGE 14 LONGITUDINAL TIE BARS �• : • EXISTING PAVEMENT CONCRETE . -: - .+12" ' 8' HB SELECTED BACKFILL _ _ NOTE: ALL PAVEMENT SHALL TAMPED IN 6' - - BE REPAIRED WITHIN LAYERS _ THE SAME WEEK IT IS CLIT BURIED PIPE LINE PRIMARY HIGHWAYS TRANSVERSE AND LONGITUDINAL CUTS DETAILS FOR CUTTING AND REPLACING PAVEMENT NOT TO SCALE NOTE: ALL TAPS 2" AND SMALLER SHALL BE MADE WITH TAPPING SADDLE. ALL TAPS LARGER THAN 2" SHALL BE MADE WITH TAPPING SLEEVE AND VALVE. NO DIRECT TAPS SHALL BE MADE. - TAPPING SADDLE SHALL BE BRASS OR BRONZE FOR "CC" THREADS WITH DOUBLE STRAPS, FORD S -90, MUELLER BR2B OR APPROVED EQUAL TAPPING SLEEVE SHALL BE BRASS OR BRONZE FOR "CC" THREADS, FORD S -70, MUELLER H -134, JCM 403 OR APPROVED EQUAL FOR SDR -21 PVC. CLASS 20G--' I� POLYETHYLENE CORPORATION STOP SHALL BRONZE WITH "CC" THREADS, MUELLER B- 25000, FORD FB600, JCM 403 OR APPROVED EQUAL DUCTILE IRON PIPE P.V.C. PIPE (CLASS 50 CEMENT LINED) (CLASS 200) NOTE: ALL TAPS TO BE MADE ON TOP QUARTER OF MAIN. STANDARD WATER TAP DETAIL NOT TO SCALE LID SHALL BE LABELED "WATER METER" AND SHALL BE "AMR" TYPE WITH METAL FLIP -UP LID AND 2" HOLI: FINISHED GRADE �I I II I II I II II I I I II I II I II I I METER (US GAL.) I -I %" X �4^ 7" MIN. 11- 13" MIN. � CLEARANCE MIN. 4" WASHED STONE 20" MIN. LOCK TYPE METER ANGLE CL- STOP CHECK BLOCK SUPPORT OR VALVE STONE AS NEEDED 7" OR 1" CLASS 200 L:., :..: J . ' LJ`'•• POLYETHYLEN E WATER SERVICE LINE WIDE BODY OR r DOUBLE STRAP SADDLE METER YOKE SHALL BE COPPERSETTER MUELLER NO. H- 1404 -2, FORD NO. VH -72 -7W OR APPROVED EQUAL FOR METER YOKE COMPLETE WITH -Y4" SERVICE DUAL PURPOSE FITTINGS CORP. STOP WATER MAIN NOTE: 1. CONTRACTOR SHALL PLACE METER BOX IN NON TRAFFIC AREA ONLY. 2. PLASTIC METER BOX SHALL BE CENTURY #1015, NOS D1200, OR APPROVED EQUAL 3. CONTRACTOR SHALL CENTER METER YOKE IN METER BOX. 4. METER YOKE TO MUELLER No. H- 1404 -2, FORD No. VH -72 -7W OR APPROVED EQUAL. 5. METER TO MEET AWWA C- 700 -71 SIDS. AND SPECS. 3/4" & 1" WATER METER SERVICE DETAIL NOT TO SCALE Name Date Z Name Date I (n Q _J J a U Name Date (n 0 Z !n N of 5; O � w 2 Name Date Of u7 Name Date 04 1") Drawn By: Y Q O Drawn B : PAGE Y I O Z J LL WATER PAGE Drawn B : Y WATER PAGE Drawn B : Y PAGE Drawn By., WATER PAGE Checked By: y JOHNSTON COUNTY WATER Checked B : y I JOHNSTON COUNTY Checked B : Y JOHNSTON COUNTY Checked B : y JOHNSTON COUNTY WATER Checked B y JOHNSTON COUNTY Approved By: Department of Public U9lities STANDARD DETAIL 15 Approved By. I Department of Public U9lities STANDARD DETAIL 1 g Approved By: Department of Public U9lities STANDARD DETAIL 1 7 Approved By: Department of Public U9lities STANDARD DETAIL 19 Approved By: Department of Public U9lities STANDARD DETAIL 20 Scale: I P.O. Box 2263 Valve Marker Scale: I I P.O. Box 2263 Pipe Laying Scale: I P.O. Box 2263 Cutting and Replacing Scale: I P.O. Box 2263 Standard Water Tap Scale: I P.O. Box 2263 3�" and 1" Smithfield, NC 27577 of 47 I I I I Smithfield, NC 27577 Condition of 47 I I I Smithfield, NC 27577 Pavement of 47 I I I Smithfield, NC 27577 of 47 I I I Smithfield, NC 27577 Water Meter Service of 47 Rev. Description Date Init. Rev. Description Date Init. I Rev. Description Date Init. Rev. Description Date Init. Rev. Description Date Init. C A 11 p • pal% .•oFESS %.• /•1'''� Q� 1, . 9 SEAL 19843 = '�•,' ��C IEL ; ' ,.,- 4 -15 -15 I I Q D W H O Z (n Q _J J a U LJ J Q U (n 0 Z !n N of 5; O � w 2 1- w > Of u7 04 1") O I Q O Lij ~ �NrM�tn(O 0 O Z J LL o a �v o ti N Z z4- M:4 C§ �+ O Q h W W e co 0) 0) 0) co r DO 0) 0) 00 Ih to � O 0) lit NON N 04 c-4 W z w `/ J H OX0O a- LLM W W uz 1� z W V / LIJ '0 Z 2 DO Z LLJ I- j N Q U Z _ O Z 0 LLI Q J Lj r w0°= / /� TO VI rCL Z D-01 R/W FORD VSH77 -158 X 12 MINIMUM 10 YOKE FOR METER SEPARATION RPZ WATER SERVICE FROM WATER SERVICE WATERMAIN 1 1 /2" and 2" RPZ & BFP Name Date Drawn By: Checked By: JOHNSTON COUNTY Approved By: Department of Public Utilities Scale: I P.O. Bo. 2263 Smithfield, NC 27577 Rev. Description Date Init. WATER SERVICE W/ NOT TO SCALE 23 PLAN r (SEE DETAIL) AND COVER SERIES 170 -BJ. HEAVY RAISED 1-}" LETTERS INSULATED ENCLOSURE "HOT BOX ", DUTY LOAD RATING. COVER WEIGHT FLUSHED WITH TOP OF n HYDRDCOWL ", OR EQUAL ENCLOSURE COVER LABELED f ' rI I I I I I I I I I I I I I I f ,_ 2. ALL OTHER APPLICATIONS - USF SHALL HAVE A HINGED, LOCKABLE UD TERMINAL DEPTH AS RING AND COVER SERIES 170 -J. REQUIRED FOR HOUSE SERVICE (18" MIN, AND MINIMUM 9" CLEARANCE ON EACH HEAVY DUTY LOAD RATING. COVER SEALANT RPZ BACKFLOW PREVENTER 81�- C END &EACH SIDE OF THE RPZ THICKNESS (THICKER "SCARY FEBCO RPZ MODEL 8255'. \ 1SSGAGFY. IF REQUIRED FOR FOR CITY OWNED STRUCTURES STRUCTURAL STRENGTH) \ \ \\ Z- MFLANGED COUPLING ADAPTER ASONARY FINISHED GRADE FORD VBH77 -15B X /roUCH UD WITH HINGED 10 YOKE FOR METER READ' UD WffH DOUBLE CHECK VALVE NATURAL GROUND `,/ SUPPORT (TYP) 1 1/2' PVC I `DRAIN TO / DAYUGHT I I I I I I I I I I I 4. AQUA NORTH CAROLINA MAY , - - k 1�A ANGLE CHECK WUE II�II CONCTETE TYPE II CONCRETE METER BOX, � 34 BROOKS, No. 38 -H WITH 12" EXTENSION TYPICAL BASE REINFORCEMENT SHALL BE: �u NO. 4 BARS ® 12" O,C, FOR DEPTHS UNDER 6' WATER SERVICE FROM NO. 4 BARS ® 9" O,C, FOR GREATER DEPTHS BLOCK S1IPPORf OR WATER SERVICE WATERNAIN SLOPE CONCRETE FLOOR TO / ' - ` C3 ....... 90' BEND J `9 0' BEND 2 CLASS 200 POLYETHELYNE SERVICE LINE LASS 200 POLYETHELYNE SERVICE LINE L DUPLEX OUTLET SHALL BE PROVIDED FOR POWER BYPASS VALVE TO HEAT BOX 057 WASHED STONE 11¢" PVC DRAIN SECTION - 4" CONCRETE SLAB. MIN. 6" WADER THAN BOX TO DAYLIGHT ON ALL SIDES 1 1 /2" and 2" RPZ & BFP Name Date Drawn By: Checked By: JOHNSTON COUNTY Approved By: Department of Public Utilities Scale: I P.O. Bo. 2263 Smithfield, NC 27577 Rev. Description Date Init. WATER SERVICE W/ NOT TO SCALE WATER PAGE STANDARD DETAIL 2 °wKNO N0 23 %" and 2" Meter & Backflow Assembly of 47 M001i DOT 12 US FOUNDRY MODEL 170 -E 23 NOTES: 1. ARTERIAL ROADWAYS - USF RING r (SEE DETAIL) AND COVER SERIES 170 -BJ. HEAVY RAISED 1-}" LETTERS I DUTY LOAD RATING. COVER WEIGHT FLUSHED WITH TOP OF n 217 #, TOTAL WEIGHT 372 #. COVER LABELED f ' rI I I I I I I I I I I I I I I f ,_ 2. ALL OTHER APPLICATIONS - USF SANITARY TERMINAL DEPTH AS RING AND COVER SERIES 170 -J. REQUIRED FOR HOUSE SERVICE (18" MIN, ( HEAVY DUTY LOAD RATING. COVER SEALANT 5" MINIMUM WALL WEIGHT 150 #, TOTAL WEIGHT 305 #. THICKNESS (THICKER "SCARY 3. CITY IDENTIFIER SHALL BE USED 6' -9" (MAX) IF REQUIRED FOR FOR CITY OWNED STRUCTURES STRUCTURAL STRENGTH) LINK SEAL GASKET USE STD. M.H.) ONLY. PRIVATE FACILITIES SHALL BRIG &MORTAR IIII ONLY BE IDENTIFIED AS TO USE. PER ASTM C478 ' \11111111111111111111I% 4. AQUA NORTH CAROLINA MAY , - - k 1�A REQUIRE LOCKING MANHOLES AT CONCTETE TYPE II JI CERTAIN LOCATIONS. WATER PAGE STANDARD DETAIL 2 °wKNO N0 23 %" and 2" Meter & Backflow Assembly of 47 M001i DOT 12 US FOUNDRY MODEL 170 -E 23 C.I. FRAME & COVER r (SEE DETAIL) 2' -6" ADJUST TO I FINISHED GRADE I W/ GRADE RINGS I FINIS E CRADE 1 rf" J_ -�" �INIMUIt. SEE NOTE 11 SLAB THICKNESS (MAX) TERMINAL DEPTH AS STRIP REQUIRED FOR HOUSE SERVICE (18" MIN, JOINT USF 170 MANHOLE RING SEALANT 5" MINIMUM WALL 4' -0° MINIMUM THICKNESS (THICKER INSIDE 11AMETER WALLS SHALL BE USED 6' -9" (MAX) IF REQUIRED FOR A LOK OR (OVER 6' -9" STRUCTURAL STRENGTH) LINK SEAL GASKET USE STD. M.H.) TOTAL) BRIG &MORTAR WALL REINFORCEMENT INVER CHANNEL PER ASTM C478 x FLANGE ADAPTER 6' •,.•.,..,. , - - 4000 PSI ® 28 DAY I CONCTETE TYPE II JI I I J 8" MINIMUM BASE THICKNESS TYPICAL BASE REINFORCEMENT SHALL BE: 8" AASHTO NO. 57 NO. 4 BARS ® 12" O,C, FOR DEPTHS UNDER 6' STONE - COMPACTED NO. 4 BARS ® 9" O,C, FOR GREATER DEPTHS CONCRETE SUPPORT �wM AQUA Aqua North Carolina, Inc. - 23 _ I ^ 1j° MANHOLE COVER TYPE BJ - 23 CONC. ADJUSTING r BY PLUMBER MANHOLE COVER TYPE J I 22j" I 6" PVC RISER J - _ BY LICENSED UNDERGROUND rf" J_ I 244" ELDER VALVE TERMINAL DEPTH AS 301" REQUIRED FOR HOUSE SERVICE (18" MIN, 2% MIN. 45' BEND USF 170 MANHOLE RING f_ 6" MINIMUM MANHOLE FRAME AND COVER DETAILS AQUA Aqua North Carolina, Inc. HEAT SHRINK MANHOLE CAST IRON FRAME AND ENCAPSULATION SYSTEM COVER. SEE NOTE #1 - SEE NOTE #2 CONCRETE ADJUSTING RINGS (AS REQ'D) 4" MIN. JI CONICAL MANHOLE TOP HEAT SHRINK MANHOLE ENCAPSULATION SYSTEM CAST IRON FRAME AND - SEE NOTE #2 COVER. SEE NOTE #1 2' -6" CONCRETE ADJUSTING RINGS (AS REQ'D) 4" MIN ° ft AQUA Aqua North Carolina, Inc. SANITARY GRAVITY, FORCE MAIN, REUSE MAIN, 9. NO WATER PIPE SHALL PASS THROUGH OR FINISHED GRADE STORM SEWER, & POTABLE WATER MAIN COME IN CONTACT WITH ANY PART OF A SEPARATION NOTES & SOLUTIONS SANITARY SEWER MANHOLE OR STORM SEWER 3' MIN c STRUCTURE. 10.00' MIN 1. A MINIMUM HORIZONTAL SEPARATION OF TEN FINISHED GRADE Q (10) FEET OUTSIDE TO OUTSIDE SHALL BE OTABLE WATER MAIN MAINTAINED BETWEEN WATER MAINS AND c SANITARY GRAVITY SEWER OR STORM SEWER SANITARY GRAVITY U LINES. ' I'I � MAIN OR STORM SEWER J1� 2. A MINIMUM HORIZONTAL SEPARATION OF WATER MAIN z THREE (3) FEET OUTSIDE TO OUTSIDE SHALL BE 18" MIN FINISHED GRADE MAINTAINED BETWEEN WATER MAINS AND "REUSE WATER ICI RECLAIMED WATER LINES CARRYING UNRESTRICTED MAIN" SHALL BE 3' MIN PUBLIC ACCESS REUSE WATER. BURIED TO 6' AT ROSSI G HAZARD INTERSECTIONS OR r 18" MIN 3. IN AREAS WHERE IT IS NOT PRACTICAL TO WHERE CROSSING 11 MAINTAIN THE REQUIRED SEPARATION, THE WATER WITH POTABLE MAIN MUST BE LAID IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON WATER LINE AND *SANITARY POTABLE ONE SIDE OF THE SANITARY GRAVITY SEWER, WILL MAINTAIN I WATER STORM SEWER OR RECLAIMED WATER LINE AT EIGHTEEN (18) INCH I MAIN SUCH AN ELEVATION THAT THE BOTTOM OF THE CLEARANCE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE OTHER LINE. GRAVITY MAIN 10. A MINIMUM OF VERTICAL SEPARATION OF OR STORM SEWER 4. IF THE MINIMUM ALLOWABLE TEN (10) FOOT EIGHTEEN (18) INCHES OUTSIDE TO OUTSIDE HORIZONTAL SEPARATION OR EIGHTEEN (18) INCH SHALL BE MAINTAINED BETWEEN WATER MAIN, 16. DEVIATIONS AND OTHER ALTERNATIVES SHALL VERTICAL SEPARATION IN A SEPARATE TRENCH SANITARY GRAVITY SEWER, STORM SEWER OR CANNOT BE MAINTAINED, UPGRADE THE WATER RECLAIMED WATER LINES. BE CONSIDERED ON CASE -BY -CASE BASIS AND MAIN TO DUCTILE IRON, IF THE OTHER LINE IS A MUST RECEIVE SPECIFIC APPROVAL BY NCDENR o STORM SEWER. 11. WHEN THERE IS LESS THAN TWENTY FOUR PRIOR TO IMPLEMENTATION (24) INCHES VERTICAL CLEARANCE BETWEEN THE O 5. IF THE NON- CONFORMING LINE IS A GRAVITY WATER MAIN AND STORM SEWER, THE WATER 17. THERE SHALL BE AN EIGHTEEN (18) INCH F SANITARY SEWER, AND TEN (10) FEET OF MAIN SHALL BE UPGRADED TO DUCTILE IRON. VERTICAL SEPARATION BETWEEN WATER MAINS ONE FULL LENGTH OF PIPE SHALL BE CENTERED AND SANITARY SEWER FORCE MAJNS AT a HORIZONTAL SEPARATION OR EIGHTEEN (18) INCHES VERTICAL SEPARATION IN A SEPARATE AT THE POINT OF CROSSING. CROSSINGS WITHOUT EXCEPTION. CONFLICTS WITH w EXISTING LINES, WHERE IT IS NOT POSSIBLE TO TRENCH CANNOT BE MAINTAINED. UPGRADE THE MAINTAIN THE REQUIRED SEPARATION, IT SHALL 12, IF THE NON- CONFORMING IS A SANITARY GRAVITY SANITARY SEWER (IF BEING NEWLY BE REPORTED TO AQUA NORTH CAROLINA, INSTALLED) TO AWWA C -900, D.R. 18 PVC AND EIGHTEEN SEWER WHERE THERE IS LESS THAN F_ EIGHTEEN (18) INCHES VERTICAL CLEARANCE INC. /ENGINEER. SPECIAL SOLUTIONS MUST BE � HYDROSTATICALLY TEST IT TO 150psi. ACCEPTED BY NCDENR PRIOR To FROM THE WATER MAIN, UPGRADE THE SANITARY IMPLEMENTATION. 6. IF THE OTHER LINE IS A RECLAIMED WATER GRAVITY SEWER TO DIP PVC AND LINE AND THE ABOVE SEPARATION REQUIREMENTS HYDROSTATICALLY TEST IT TO WATER MAIN ARE NOT MET, UPGRADE THE RECLAIMED WATER STANDARDS. PIPES SHALL BE LOCATED SO THAT LINE MATERIAL TO DUCTILE IRON. JOINTS ARE AS FAR AS POSSIBLE FROM EACH OTHER. 7. DEVIATIONS AND OTHER ALTERNATIVES SHALL 13. IF THE OTHER LINE IS A RECLAIMED WATER BE CONSIDERED ON CASE -BY -CASE BASIS AND LINE AND THE ABOVE MINIMUM SEPARATION IS MUST RECEIVE SPECIFIC APPROVAL BY AQUA NOT MET, UPGRADE THE RECLAIMED WATER LINE NORTH CAROLINA, INC. AND NCDENR PRIOR TO IMPLEMENTATION. MATERIAL TO DUCTILE IRON. S. THERE SHALL BE AT LEAST A TEN (10) FOOT 14. SPECIAL STRUCTURAL SUPPORT OR SEPARATION BETWEEN WATER MAINS AND CONCRETE SADDLES MAY BE NECESSARY AT THE a SANITARY SEWER FORCE MAINS WITHOUT CROSSING LOCATION. EXCEPTION. FIELD PROBLEMS SHALL BE 00 N 15. IT IS PREFERABLE TO LAY THE WATER MAIN \ REPORTED TO NCDENR /ENGINEER. SPECIAL ABOVE THE CROSSING HAZARD. 4 o SOLUTIONS MUST BE ACCEPTED BY NCDENR a PRIOR TO IMPLEMENTATION. 4 AS REQUIRED MIN "DOWNSTREAM" LOT LINE CLEANOUT 5' MIN 'Y" FITTING 30' BEND REMOVABLE STOPPER SEWER MAIN SET IN JOINT COMPOUND SIZE VARIES ELDER VALVE ELAN COMBINATION WYE tTE 30' (NP) R MAIN 45' MAX VARIES PROFILE FRAME AND COVER SANITARY" D RUBBER r CHIMNEY SEAL 2 COATS (8 MIL I- EA) COAL TAR EPDXY, INTERIOR \ :p & JOINTS - E A -LOK OR LINK SEAL GASKET CONC. FILL IN BENCHING FINISH GRADE AQUA NORTH CAROLINA CONC. ADJUSTING RESPONSIBILITY BY PLUMBER ADJUST TO GRADE WITH PRECAST CONCRETE GRADE PROVIDE BRASS RING & PLUG w z_ IN TRAFFIC AREAS 6" PVC RISER J - _ BY LICENSED UNDERGROUND (SINGLE PIECE) UTIUTY CONTRACTOR j, r� ELDER VALVE TERMINAL DEPTH AS SEALANT REQUIRED FOR HOUSE SERVICE (18" MIN, 2% MIN. 45' BEND 5' -0" MAX) f_ 6" MINIMUM COMBINATION WYE tTE 30' (NP) R MAIN 45' MAX VARIES PROFILE FRAME AND COVER SANITARY" D RUBBER r CHIMNEY SEAL 2 COATS (8 MIL I- EA) COAL TAR EPDXY, INTERIOR \ :p & JOINTS - E A -LOK OR LINK SEAL GASKET CONC. FILL IN BENCHING FINISH GRADE NON -SKID SURFACE CONC. ADJUSTING r RUNGS (5 MAX) ADJUST TO GRADE WITH PRECAST CONCRETE GRADE ti • DIAMETER RINGS OF PIPE 1 ECCENTRIC .• CONICAL SECTION j, r� STRIP JOINT 3" MIN SEALANT .4 :: PRE -CAST CONC. *arxrti SEE NOTE 4 FOR TOP SLAB TO BE COATED WITH Of Q 9" MI N BITUMINOUS COATING (2 COATS- I #89 CRUSHED STONE MH DEPTH A B C E F UP TO 12 48" 8" 24.5" 15" AS REQ'D 8" 12' TO 18' 60" 8" 24.5" 15" AS REQ'D 10° 18' AND DEEPER 72" 8" 24.5" 15" AS REQ'D 14" MANHOLE SIZE UP TO 24" PIPE: 48" MANHOLE UP TO 36" PIPE: 60° MANHOLE OVER 36" PIPE: 72° MANHOLE NOTES: 1. PRE -CAST CONCRETE SHALL BE TYPE 2 CEMENT (4,000 PSI). 2. LIFT HOLES NOT PERMITTED THROUGH PRE -CAST SECTIONS. 3. ALL OPENINGS SHALL BE SEALED WITH NON- SHRINK GROUT. 4. INSTALL FLOW CHANNEL INSIDE MANHOLES. 5. SERVICE LATERALS SHALL GENERALLY NOT BE PERMITTED DIRECTLY INTO MANHOLES. 6. PLACE TWO HALF -MOON SHAPED PLYWOOD (3/8" TH. MIN.) IN BOTTOM OF MANHOLE AFTER PIPES HAVE BEEN CONNECTED TO KEEP DEBRIS FROM ENTERING SEWER. 7. REINFORCING STEEL PER ASTM C478 -88A. 8. PROVIDE 5' X 5' X 12" CONCRETE COLLAR AROUND COVER FRAME, WITH 4 - #4 REPAR E.W. IN UNPAVED AREAS. 9. PROVIDE PIPE TO MANHOLE SEAL: A -LOK GASKET PER ASTM C -433 SPECIFICATION CAST INTEGRALLY IN MANHOLE WALL AND LOCATED AS DIRECTED. GASKET DESIGNED TO MEET TEST AND PERFORMANCE REQUIREMENT OF ASTM C -425 SPECIFICATION. JOINT SHALL ALLOW 10' OMNIDIRECTIONAL DIRECTION. 10. JOINT SEALANT SHALL BE BUTYL RUBBER OR BITUMINOUS MASTIC GASKET PER ASTM C -990 SPECIFICATION. PROVIDE BUTYL -LOK BY A -LOK PRODUCTS, INC. 11. MANHOLE STEPS SHALL BE } INCH GRADE 60 STEEL ENCAPSULATED IN POLYPROPYLENE CONFORMING TO ASTM C478. 12. MANHOLE FRAME AND GASKETED COVER SHALL BE NEENAH MODEL R -1743 OR AN APPROVED EQUAL. 13. SEAL MANHOLE FRAME AND GRADE RINGS WITH WRAPIDSEAL HEAT SHRINK ENCAPSULATION SYSTEM BY CANUSA -CPS, INC. 14. MANHOLES GREATER THAN 15' SHALL HAVE AN INTERMEDIATE LANDING CONSTRUCTED OF PRECAST CONCRETE. 15. MANHOLE UPSTREAM OF WW PLANT SHALL BE A GRIT TRAP TYPE WITH 2" SUMP. 16 nxsnx oaE STANDARD MANHOLE DETAIL AQUA 05/2012 Aqua North Carolina, Inc. 1 "/FT - MIN. SLOPE / ? PIPE & MANHOLE 2' -0" MIN (TYP) 1 " /FT i-� • MIN. SLOPE BENCH BEN I 4,000 PSI a CONCRETE BENCH & CHANNEL ? PIPE & MANHOLE MANHOLE RADIUS TO BE MAXIMUM POSSIBLE & CHANNEL TO BE TROWEL FINISH JOINT BENCH r- SLOPE 2' -0" MAX d,. 6" MIN SLOPE F •.• JOINT MANHOLE CHUTE IS TO BE USED =MSHTO CRETE WHERE DIFFERENCE IN INVERT ANNEL ELEVATIONS BETWEEN INCOMING PIPE AND OUTGOING PIPE IS LESS THAN 24. COMPACTED STONE IF THE DIFFERENCE IS 24" OR GREATER, THEN DROP CONNECTION SHALL BE USED. orrRn Ka 21 05/2012 60' 1 ROAD ROW MANHOLE CHUTE AQUA Aqua North Carolina, Inc. \ ► L" EA \` a 1 r SLEEVING \ � I I C FOR SINGLE A E S I SERVICES c 1 j' SUELIANG OR FOR f= GREATER FOR DOUBLE SERVICES WATER MAIN 3' FROM EDGE WATER MAIN OF PAVEMENT 10-0 TO-0 I SLEEMNG / 1 r OR GREATER FOR SINGLE SERVICE MANHOLE FRAME AND COVER NON -SKID SURFACE _ FOR PERSONNEL SAFETY H O ADJUST TO GRADE WITH PRECAST CONCRETE GRADE ti • DIAMETER RINGS OF PIPE 1 . SLOPE 1 MANHOLE STEPS LLI J 14" MIN (ROTATED FOR CLARITY) 3" MIN U O LA O CONCRETE BONDING AGENT ENTIRE EXTERIOR SURFACE EXCEPT SEE NOTE 1 "/FT - MIN. SLOPE / ? PIPE & MANHOLE 2' -0" MIN (TYP) 1 " /FT i-� • MIN. SLOPE BENCH BEN I 4,000 PSI a CONCRETE BENCH & CHANNEL ? PIPE & MANHOLE MANHOLE RADIUS TO BE MAXIMUM POSSIBLE & CHANNEL TO BE TROWEL FINISH JOINT BENCH r- SLOPE 2' -0" MAX d,. 6" MIN SLOPE F •.• JOINT MANHOLE CHUTE IS TO BE USED =MSHTO CRETE WHERE DIFFERENCE IN INVERT ANNEL ELEVATIONS BETWEEN INCOMING PIPE AND OUTGOING PIPE IS LESS THAN 24. COMPACTED STONE IF THE DIFFERENCE IS 24" OR GREATER, THEN DROP CONNECTION SHALL BE USED. orrRn Ka 21 05/2012 60' 1 ROAD ROW MANHOLE CHUTE AQUA Aqua North Carolina, Inc. \ ► L" EA \` a 1 r SLEEVING \ � I I C FOR SINGLE A E S I SERVICES c 1 j' SUELIANG OR FOR f= GREATER FOR DOUBLE SERVICES WATER MAIN 3' FROM EDGE WATER MAIN OF PAVEMENT 10-0 TO-0 I SLEEMNG / 1 r OR GREATER FOR SINGLE SERVICE MANHOLE FRAME AND COVER D LLI (ROTATED FOR CLARITY) H O ADJUST TO GRADE WITH PRECAST CONCRETE GRADE Z RINGS mil \ 1// A I ` MANHOLE STEPS LLI J 14" MIN (ROTATED FOR CLARITY) O U U O LA O fV Of ENTIRE EXTERIOR SURFACE EXCEPT w U = O FOR TOP SLAB TO BE COATED WITH Of Q BITUMINOUS COATING (2 COATS- O COAL TAR EPDXY 16 MILS OFT Q CONCRETE BASE TOTAL) // 46" MIN J x FLANGE ADAPTER ENTIRE INTERIOR SURFACE EXCEPT COUPLING FOR TOP SLAB TO BE COATED (2 O r A -LOK SEAL OR LINK SEAL AT WALL OPENING COATS WHITE EPDXY 12 MILS OFT TOTAL) \ DIP DIP F TO d PUMP STATION CONCRETE SUPPORT SUMP WITH GRATE COVER SLOPE CONCRETE FLOOR TO PLAN ~ (V r7 In (0 0 SUMP (MIN 1 X SLOPE) MANHOLE 12" TEE WITH AUTOMATIC AIR / - FLANGE ADAPTER COUPLING RELEASE VALVE / \ DIP FROM PUMP STATION o \ L I SUMP STANDARD 5' MANHOLE / MANHOLE STEP MANHOLE COVER PROFILE NOTES: 1. *FINISHED GRADE WILL VARY. WHEN DISTANCE BETWEEN GRADE AND TOP OF COVER WILL EXCEED 6 INCHES, INSTALL BOLLARD AT EACH CORNER TO PROTECT VAULT. SEE BOLLARD DETAIL. 2. SEE VAL -MATIC VALVE AND MANUFACTURING CORP. CATALOG FOR CONFIGURATION AND MATERIALS OF VALVES. 3. FITTINGS AND PIPE FOR VALVES SHALL BE BRASS 14 AQUA aExsox a.E AIR RELEASE VALVE DETAIL 05/2012 Aqua North Carolina, Inc. � ft AQUA ° ° amanx o� aEY1GK aaE AQUA Aqua North Carolina, Inc. Aqua North Carolina, Inc. NOTE: 1. THE SITE DEVELOPER SHALL LEAVE THE CLEANOUT RISER 3' -4' ABOVE GRADE AND IT c SHALL REMAIN SO UNTIL LOT BUILD OUT. THE - RISER SHALL THEN BE CUT AND CAPPED AT FINISHED GRADE WITH A CONCRETE PAD. 2. ALL CLEANOUTS TO BE FLUSH WITH FINISHo GRADE. 6 a 3. UTILITY CONTRACTOR TO INSTALL & PRESSURE TEST WYE AND INSTALL PLUG. PLUMBER TO t REMOVE PLUG, INSTALL CLEANOUT AND 0 CONCRETE PAD. 4. MARK CURB WITH °S" WHERE LATERAL CROSSES UNDER CURB. ff 5. ALL COMMERCIAL AND RESIDENTIAL SINGLE LATERALS SHALL HAVE 4" CLEANOUTS. 6. MAINTAIN A MINIMUM OF S CLEARANCE FREE OF ALL PLANTINGS & STRUCTURES AROUND CLEANOUT. 7. CLEANOUT CAPS SHALL BE SLOTTED OR HAVE A RECESSED NUT. 8. CLEAN - OUT (SHOWN DASHED) SHALL BE INSTALLED BY THE UTILITY CONTRACTOR TO FINAL CONFIGURATION IN ACCORDANCE WITH STANDARD PLUMBING CODE. 9. DOUBLE LATERALS ARE TO BE AVOIDED WHENEVER POSSIBLE. LOCATE DOUBLE LATERAL AS CLOSE TO LOT LINE AS POSSIBLE, 5' J MAXIMUM. a 10- INVERT OF SERVICE LATERAL SHALL NOT ENTER o SEWER MAIN BELOW PRING LINE. 11. DOUBLE SERVICE LATERAL To BE USED ONLY WHEN WHEN BOTH BUILDING SLABS ARE NOT r GREATER THAN 4 °- INCHES ELEVATION g DIFFERENCE. 12. SERVICE LATERAL, PIPING AND FITTINGS TO BE w U fi° SDR35 PVC UNLESS OTHERWISE NOTED. ( GASKETED ONLY) 13. INSTALL 4"X4" (TOP ONE -FOOT PAINTED GREEN) N AND 3M MAGNETIC MARKER TO IDENTIFY LOCATION OF CLEANOUT(s) AT THE PROPERTY v LINE 0- 14. ALL LATERALS SHALL HAVE C.O. SET 0 2 -FT BACK OF CURB OR 2 -FT BACK OF SIDEWALK. IF SIDEWALK IS IMMEDIATELY ADJACENT To CURB, DO NOT PLACE C.O. IN SIDEWALK. 15. AQUA NORTH CAROLINA, INC. REPAIR /MAINTENANCE RESPONSIBILITY FOR SANITARY LATERALS IS FROM THE MAINLINE TO THE C.O. DESCRIBED IN THE NOT ABOVE. THE PROPERTY OWNER IS RESPONSIBLE UPSTREAM OF C.O. 16. PVC SDR -26 SHALL BE USED FROM THE C.O. TO THE MAINLINE WHERE AQUA NORTH CAROLINA, INC. IS RESPONSIBLE FOR REPAIR / MAINTANCE. N 4� C4 REVISED 7/1/15 Lo CARO 1111111111//// =p'Q.oFESSlp4, SEAL 19843 �� ciNE S��� 4 -15 -15 11 EL ►Ca H Qv oa j� W a zo �o of W o� W h co 0) 00 0) 00 n co 0) 00 LO � O 0) Ilk NON LO V NCN CN z wC,Li J H 0X00 a- LL_ W W uz li z W LtJ (o Ul Z 2 00 jr- N Q U _" Lj WOZ 0 V) X J r w0°= °O_ oQ oQ rCL Z D-02 D LLI H O Z Q ~ LLI J LLI J (n W Z O U U O LA O fV Of w w U = O > Of Q O Q O � O O Q O \ O Lij Z ~ (V r7 In (0 0 J E: H Qv oa j� W a zo �o of W o� W h co 0) 00 0) 00 n co 0) 00 LO � O 0) Ilk NON LO V NCN CN z wC,Li J H 0X00 a- LL_ W W uz li z W LtJ (o Ul Z 2 00 jr- N Q U _" Lj WOZ 0 V) X J r w0°= °O_ oQ oQ rCL Z D-02