HomeMy WebLinkAboutSAW-2013000210 NWP3 Verification 29August2023U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW- 2013-00210 County Haywood GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Town of Maggie Valley/ Attn: Mike Mehaffey Address: 3987 Soco Road Maggie Valley, NC 28715 Telephone/Email: (828)400-9494 /mmehaffey(a)maggievalleync.gov Size (acres): 5 ac. Nearest Town: Maggie Valley Nearest Waterway: Jonathans Creek Coordinates: 35.598509,-83.006175 River Basin/HUC: Richland Creek-Piaeon River/ 0601010602 Location description: The proiect site is located on a tract of land (PIN 8609-96-4882) known as Town of Maggie Valley Wastewater Treatment Plant at 5320 Jonathan Creek Road in Maggie Valley, Haywood County, North Carolina. Description of projects area and activity: This permit verification authorizes 197 linear feet (0.039 ac) of permanent stream impacts to Jonathan Creek associated with maintance to existing bank stabilization. 29.59 Linear feet (0.017 acre) of temporary stream impacts for the installation of coffer dams and construction access, and 167.70 linear feet (0.097 ac) of temporary stream impact for dewatering. Instream work shall not be concudcted during Trout Moritorium (October 15 — April 15). Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 3 SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions, above noted special conditions, and your submitted application and attached information dated July 21, 2023. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide/regional authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide/regional permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide/regional permit. If the nationwide/regional permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide/regional permit, activities which have commenced (i.e_, are under construction) or are under contract to commence in reliance upon the nationwide/regional permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide/regional permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management at (252) 808-2808_ This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Mitchell Anderson at 828-271-7980, ext. 4231 or Mitchell.l.anderson@ usace. army.mil. Corps Regulatory Official: Date: August 29, 2023 Mitchell Anderson Expiration Date of Verification: March 14, 2026 CF: WithersRavenel, Rick Trone, rtrone@withersravenel.com Action ID Number: 2013-00210 County: Haywood Permittee: Town of Maggie Valley/ Attn: Mike Mehaffey Project Name: Town of Maggie Valley WWTP Levee Repair Date Verification Issued: August 29, 2023 Project Manager: Mitchell Anderson Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: Mitchell Anderson 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at https://regulator .00ps.usace.gM.miVcustomer-service-survey/ • 1 - t, � 6�7skrRd �jr xa r r � l 11'I'� r • �� ' .t'. as ICP 1 L -k i • 1 I• ! _ '' rf• r o ,vlo.nanti,�`' ntairvAti lw� IMPACT LEGEND- >III�III _ - TEMPORARY STREAM IMPACT a— v PERMANENT STREAM IMPACT ! — 0 IMPACTS5 o PERMANENT STREAM IMPACT BANK STABILIZATION I 0.024 AC (1059.59 SF); 102 LF IMPACTS2 II "0 I I / TEMPORARY STREAM IMPACT �1 TEMPORARY CONSTRUCTION NORTHERN COFFERDAM I I1 I LOD 0.008 AC (364.46 SF); 12.16 LF • I r I M PACT S6 w I PERMANENT STREAM IMPACT RIP RAP FILL IMPACT S1 I Z 0.015 AC (671.32 SF); 95 LF TEMPORARY STREAM IMPACT O o / TEMPORARY CONSTRUCTION ACCESS Q 0.087 AC (3781.70 SF); 167.70 LF I ' I � Z REGULATORY I I FL PER tX FIRMM 37008 3700860900J I 0 I o .I U p Z I IMPACT S4 / I• TEMPORARY STREAM IMPACT / I I TEMPORARY CONSTRUCTION ACCESS RAMP IMPACTS30.003 AC (133.37 SF); 8.64 LF • . I I' �`I TEMPORARY STREAM IMPACT I III TEMPORARY CONSTRUCTION SOUTHERN COFFERDAM O�L�� 0.006 AC (247.96 SF); 8.79 LF 7 • HANK AARON ROSS REBECCA DUNCAN ROSS ' xx OVERALL STREAM IMPACT SUMMARY < DB 1006, PG 166 CAB D, PG 883 IMPACT SPECIFICATION TEMPORARYSTREAMIMPACT PERMANENT STREAM IMPACT ` ( i�� PIN: 8609-95-0540 g (NO FUNCTIONAL LOSS) I EXISTING 54" CMP (LF) (SF) (AC) (LF) (SF) (AC) INV:2489.32' TEMPORARY CONSTRUCTION ` TOP:2493.09' S1 ACCESS 167.70 3781.70 0.087 'o ! TEMPORARY CONSTRUCTION S2 12.16 364.46 0.008 N NORTHERN COFFERDAM Iooy =� TEMPORARY CONSTRUCTION w $79 24796 0.006 EXISTING S3 SOUTHERN COFFERDAM � / ` 7 INV: 2489.59' P TEMPORARY CONSTRUCTION �L / s S4 ACCESS RAMP 8.64 133.37 0.003 - - - Q> �' / � zoos o 15 30 S5 BANK STABILIZATION - - - 102.00 1059.59 0.024 % S6 RIP RAP FILL - - 95.00 671.32 0.015 / v i %' SCALE: 1 inch = 30 ft. Total 197.29 4527.49 0.104 1 197.00 1730.91 0.040 No. Revision Date B Designer Scale KFw AINOTFD MAGGIE VALLEY WWTP 1/ Wlt ersRavene Sh-N� Drawn By Date STREAM IMPACT MAP 1� KFw 7!z1!zoz3 Engineers I Planners I Surveyors L "f • O Checked By Job No. LEVEE REPAIR 115 MacKenan Drive I Cary. NC 27511 SJM 08221122.0 Town of Maggie Valley Haywood County North Carolina t. 919.469.33401 license#: F-1479 I www.withersravenel.com D—Sign EnwiDpe ID, 42E3ADC&F2FDA433�E454-F5028aCA57D CONSTRUCTION PLANS MAGGIE VALLEY WWTP LEVEE REPAIR 5320 JONATHAN CREEK ROADI, WAYNESVILLE, NC I HAYWOOD June 02, 2023 SITE GRAPHIC SCALE LOCATION MAP p ` CONTACT LIST: ENGINEER OF RECORD TOWN OF MAGGIE Stephen J. Marks, PE, CFM VALLEY WithersRavenel Mike Mehaffey 919 535-S200 Director of Public Works smarks@withersravenel.com 828-926-0866, ext. 102 mmehaffey@maggievalleync.gov • e P,�HeCARp� o,° 1 0 SEAL r a ➢ / 039751 ^ F i `mfT""mQ OrF aNG IN r.�wwn.n belax Pall L.rore roaag. .°° pH • „ . �p°ove, 1 I 1276 � TE � 4 i I f f e GRAPHIC SCALE VICINITY MAP P PREPARED BY: WithersRavenel Oil115 M.Kenan Drive I Cary, NC 27511 License #: F-1479 It 919.469.33401 www.withersravenelcom OWNER: TOWN OF MAGGIE VALLEY 3987 SOCO ROAD, MAGGIE VALLEY. NC 28751 PHONE #: 828-926-0866, E T- 102 ATTENTION: MIKE MEHAFFEY INDEX OF SHEETS NUMBER TITLE C0.0 COVER C0.1 NOTES C1.0 EXISTING CONDITIONS C2.0 PROPOSED WORK AREA C2.1 PLAN and PROFILE C3.0 DFTAI LS C4.0 LANDSCAPE PLAN C5.0 E&SC PLAN C5.1 E&SC DETAILS C5.2 E&SC DETAILS X-1 CROSS SECTIONS SURVEY BENCHMARK BENCHMARK IS LOCAL TO SITE. SEE SHEET C1.0 FOR BENCHMARK INFORMATION. VERTICAL DATUM BASED ON NAVD 88. CONSTRUCTION PLANS AGGI MIE VALLEY LEVEE REPAIR M NO.08MUM Town of M_. Valley: PROJECT# 06/02/2023 DESCRIPTION MINOR CONTOUR INTERVAL MAJOR CONTOUR INTERVAL SPOT ELEVATION PROPERTY LINE RIGHT-OF-WAY EASEMENT CENTERLINE EDGE OF PAVEMENT TRAIL DIRT OR GRAVEL DRIVE DIRT OR GRAVEL ROAD STORM DRAINAGE UNDERGROUND ELECTRIC OVERHEAD ELECTRIC UNDERGROUND TELEPHONE TELEPHONE PEDESTAL OVERHEAD TELEPHONE OVERHEAD UTILITY CABLE TELEVISION (CATV) CATV PEDESTAL UTILITY POLE LIGHT POLE WATER LINE 12" WATER LINE 18" RAW WATER WATER VALVE FIRE HYDRANT WATER SERVICE GRAVITY SANITARY SEWER SEWER SERVICE MANHOLE FORCE MAIN SWALE BUILDING OR STRUCTURE FENCING STRUCTURE SIGN WOODSLINE WATERWAYS/BODIES OF WATER DIRECTION OF FLOW LIMIT OF DISTURBANCE TREE PROTECTION FENCE SILT FENCE REINFORCED SILT FENCE OUTLET TEMPORARY INLET PROTECTION TEMPORARY PIPE INLET PROTECTION WETLANDS GRAVEL RIP -RAP CONCRETE LEGEND EXISTING PROPOSED ----too---- 100 +121A ---- NIA R/W N/A N/A o --------- N/A --------- N/A _---- N/A - - - E - -E N/A - -ORE- N/A - -T N/A m N/A - - -BHT- N/A N/A ---c N/A ® N/A N/A 0 N/A W N/A % N/A eBx N/A ® N/A HYD N/A N/A - N/A N/A - p-ss- N/A M - -FM- G C C C N/A �Ar ❑ N/A ./WYWYI. N/A N/A N/A Loo WA TP N/A SF N/A gIIIN N/A IFNI N/A NiA JI . GENERAL NOTES: 1. EXISTING 8ITE CONDITIONS: THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES AS TO THE EXISTING SITE CONDITIONS PRIOR TO BIDDING THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A WORKABLE SITE CONDITION DURING THE EXECUTION OF THIS CONTRACT, THE CONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS UTILIZING PHOTOGRAPHIC AND/OR VIDEOGRAPHIC MEANS, AND SHALL FURNISH THE OWNER WITH SUCH DOCUMENTATION ON SUITABLE MEDIA (DVD, USB DRIVE, ETOI, AND SHALL BE RESPONSIBLE FOR RESTORING ALL DISTURBED AREAS TO ORIGINAL DR SATISFACTORY CONDITIONS AS APPROVED BY THE OWNER REASONABLE CARE SHALL BETAKEN DURING CONSTRUCTION TO AVOID DAMAGE TO VEGETATION. ORNAMENTAL SHRUBBERY AND TREE BRANCHES SHALL BE TEMPORARILY TIED BACK, WHERE APPROPRIATE, TO MINIMIZE DAMAGE. TREES THAT RECEIVE DAMAGE TO TREE BRANCHES SHALL BE TRIMMED OF THOSE BRANCHES TO IMPROVETHE APPEARANCE OF THE TREE. TREETRUNKS RECEIVING DAMAGE FROM EQUIPMENT SHALL BE TREATED WITH A TREE DRESSING. TAKE PROPER PRECAUTIONS NOT TO DISTURB EXISTING PROPERTY CORNERS. IF NECESSARY, CONTRACTOR TO BE RESPONSIBLE FOR HIRINGA REGISTERED LAND SURVEYOR TO COMPLETE THIS WORK, TO REMOVE AND RESET PROPERTY IRONS. 2. PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATIONS WILL BE MAINTAINED: 18 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER (INCLUDING FORCE MAIN) AND WATER MAIN, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAIN) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FEET OR 13 INCHES VERTICAL SEPARATION FROM WATER MAINS. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT THE DUCTILE IRON PRICES. 3. SEDIMENTATION AND EROSION CONTROL: THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE SEDIMENTATION POLLUTION CONTROL ACT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INCORPORATING CONSERVATION PROCEDURES NECESSARY TO COMPLY WITH THIS ACT IN MINIMIZING EROSION AND SEDIMENT POLLUTION ASSOCIATED WITH THE CONSTRUCTION OF THIS PROJECT AS SHOWN AND AS DIRECTED BY THE ENGINEER. 4. MATERIALS, TOOLS, TESTING: THE CONTRACTOR SHALL FURNISH ALL THE NECESSARY MATERIALS, APPARATUS, TOOLS, MACHINERY, AND LABOR. MATERIALS AND APPARATUS SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KINDS, AND SHALL BE SUBJECT TO SUCH STANDARD TESTS AS THE OWNER MAY SELECT IN DETERMINING THE FITNESS AND DURABILITY OF THE MATERIALS AND APPARATUS TO BE FURNISHED. THE TOOLS AND MACHINERY SHALL BE SUITABLE FOR THE PURPOSE INTENDED, AND IN GOOD WORKING ORDER WITH NO OIL, COOLANT OR HYDRAULIC FLUID LEAKS. ALL LABOR SHALL BE PERFORMED IN AN EXPEDITIOUS, THOROUGH, WORKMANLIKE MANNER: ALL IN ACCORDANCE WITH THESE SPECIFICATIONS, THE ACCOMPANYING DRAWINGS, AND SUBJECT TO THE APPROVAL OF THE OWNER. 5. DEFECTIVE MATERIALS: SHOULD ANY OF THE MATERIALS, WHEN DELIVERED UPON THE LOCATIONS OF THE WORK,13E FOUND DEFECTIVE OR NOT IN ACCORDANCE WITH THESE SPECIFICATIONS OR ACCOMPANYING DRAWINGS, THEY SHALL BE IMMEDIATELY REPLACED BY THE CONTRACTOR, OTHERWISE THE OWNER OR ENGINEER MAY CAUSE THE SAME TO BE REMOVED AT THE CONTRACTOR'S EXPENSE. 6. CHANGESTO ACCOMMODATE MATERIALS AND EQUIPMENT TO BE PROVIDED: THE CONTRACTOR SHALL PROVIDE MATERIALS AND EQUIPMENTTO FIT AND. BE CAPABLE OF USE AND/OR OPERATION WITHIN THE STRUCTURE DIMENSIONS SHOWN. IF MATERIALS AND EQUIPMENT PROVIDED BY THE CONTRACTOR REQUIRE CHANGES IN HIS WORK, THE CONTRACTOR SHALL MAKE THE REQUIRED CHANGES AT HIS EXPENSE AND SHALL BE RESPONSIBLE FOR ALL ADDITIONAL EXPENSE OF THE ENGINEER INCURRED BY THE OWNER AT ACCOMMODATE THE CHANGES. 7. SUBSURFACE INVESTIGATION AND GEOTECHNICAL REPORT: THE CONTRACTOR SHALL FAMILIARIZE HIMSELF AS TO THE EXISTING SITE CONDITIONS PRIOR TO BIDDING THE PROJECT, NO SUBSURFACE INVESTIGATION OR GEOTECHNICAL REPORT IS PROVIDED. 8, OSHA: CONTRACTOR SHALL COMPLY WITH CURRENT OSHA REGULATIONS. 9. INSTALLATION: THE CONTRACTOR SHALL PROVIDE TEMPORARY ACCESSTOTHE CONSTRUCTION SITE DURING INSTALLATION. ALL WORK ASSOCIATED WITH PROVIDING ACCESS SHALL ALSO INCLUDE ANY ASSOCIATED ELECTRICAL COSTS, FENCE INSTALLATION, NECESSARY FILL MATERIAL, DRIVEWAY CULVERTS, NECESSARY SILT FENCING, AND ALL FINAL GRADING AND SEEDING ON THE SITE UNLESS OTHERWISE NOTED. 10. TEMPORARY UTILITIES: CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL TEMPORARY UTILITIES NECESSARY TO PERFORM THE CONSTRUCTION. NOTES: • THE CONTRACTOR SHALL TEMPORARILY MOVE UNDERGROUND UTILITIES WHEN THE UTILITY CAN BE MOVED OUT OF THE WAY OF ACTIVE CONSTRUCTION ACTIVITY WITHOUT DAMAGING THE UTILITY. WHERE THIS CANNOT BE ACCOMPLISHED, THE CONTRACTOR SHALL NOTIFY THE TOWN ENGINEER IMMEDIATELY AND SHALL WORK WITH THE OWNER AND THE AFFECTED UTILITY COMPANY TO DEVELOP A PLAN OF ACTION. WHERE ADDITIONAL WORK IS REQUIRED BY THE CONTRACTOR, THE CONTRACTOR SHALL SUBMIT A CHANGE ORDER FOR APPROVAL BY THE OWNER PRIOR TO COMMENCING CORRECTIVE ACTIONS. • THIS DOES NOT RELIEVE THE CONTRACTOR FROM LIABILITY RELATED TO DAMAGED UTILITIES OR INTERRUPTION OF SERVICE AS WRITTEN IN BELOW, AND IN THE CONTRACT DOCUMENTS. 11, COMPACTION OF TRENCHES: ALL TRENCHES SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM DENSITY IN TOWN AND NCDOT RIGHTS OF WAY TO WITHIN 12' OF FINISHED GRADE. DENSITY TESTS SHALL BE PAID FOR BY THE CONTRACTOR. ALL TRENCHES FOR ROAD CUTS WILL BE COMPACTED BY MECHANICAL MEANS, 12. SEEDING AND MULCHING: PAYMENT FOR SEEDING AND MULCHING THE AREAS DISTURBED WRING CONSTRUCTION SHALL BE INCLUDED IN THE PRICE ESTABLISHED IN THE BID. 13. DRIVEWAY REPLACEMENT: THE CONTRACTOR WILL BE REQUIRED TO REPLACE ANY EXISTING GRAVEL, CONCRETE, ASPHALT OR PAVERS THAT HAVE TO BE REMOVED AND REPAIR THESE SECTIONS TO ORIGINAL OR BETTER CONDITION. 14. SUBMITTALS: THE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ALL SHOP DRAWINGS AND SUBMITTALS FROM THE ENGINEER PRIOR TO BEGINNING ANY INSTALLATION WORK. 15. SHOPDRAWINGS: SHOP DRAWINGS SHALLBE SUBMITTED FOR ALL PRECAST STRUCTURES, METAL CASTINGS INCLUDING HATCHES, MANHOLE RINGS AND COVERS, VALVE BOXES, AND CATCH BASIN FRAMES AND GRATES; ROLLED EROSION CONTROL PRODUCTS, AND GEOTEXTILES. MANUFACTURERS CERTIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER CERTIFYING THATALL PUMPS AND PIPE MEETS THE PROJECT SPECIFICATIONS. CONCRETE MIX DESIGNS, THE DETAIL SPECIFICATIONS AND BITUMINOUS CONCRETE PLANT MIX DESIGNS OF THE DETAIL SPECIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. NONE OF THE ABOVE LISTED MATERIALS SHALL BE USED ON THE PROJECTS UNLESS THE ENGINEER HAS GIVEN THE NECESSARY APPROVAL FOR THAT PARTICULAR MATERIAL. THE CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS,CERTIFICATIONS, AND MIX DESIGNS REQUIRED WITHIN THIS CONTRACT. 16, AS -BUILT DRAWINGS AND SPECIFICATIONS AT THE JOB SITE: THE CONTRACTOR SHALL MAINTAIN, IN READABLE CONDITION AT THE JOB SITE, ONE COMPLETE SET OF WORKING DRAWINGS AND SPECIFICATION FOR THE WORK, INCLUDING ALL SHOP DRAWINGS. SUCH DRAWINGS AND SPECIFICATIONS SHALL BE AVAILABLE FOR USE BY THE OWNER OR ITS REPRESENTATIVE ATALL TIMES. THIS SET SHALL BE MARKED, OR NCTES ACCEPTABLE TO THE ENGINEER PROVIDED, IN ORDER TO REFLECT AS -BUILT CONDITIONS. THE CHANGES INDICATING SUCH CONDITIONS SHALL BE KEPT CURRENTAT ALL TIMES. UPON COMPLETION OF THE PROJECT, THIS CCNPLETE SET OF DRAWINGS AND SPECIFICATIONS, SHOWING AB -BUILT CONDITIONS, SHALL BE RETURNED TO THE OWNER DR HIS REPRESENTATIVE, 17. SELECTBACKFILL EXCAVATED ROCK DRAW OTHER UNSUITABLE MATERIAL SHALL NOT BE USED AS BACKFILL MATERIAL EXCEPT AS APPROVED IN WRITING BY ENGNEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SUITABLE MATERIAL FOR BACKFILLING IN AREAS WHERE ROCK OR OTHER UNSUITABLE MATERIAL IS REMOVED FROM THE PROJECT AND SHALL BE PAID AT THE UNIT PRICE ESTABLISHED IN THE BIDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL ROCK AND OTHER MATERIAL DEEMED UNSUITABLE FOR BACKFILL FROM THE PROJECT SITE AND PROPERLY DISPOSED OF. OVER EXCAVATION TO REMOVE UNSUITABLE MATERIAL SHALL BE CONSIDERED IN THE PRICE OF THE WORK AS BID AND INCLUDED IN THE LUMP SUM BID PRICE. 18. LOCATION OF UTILITIES: SUCH INFORMATION AS IS INCLUDED IN THE DRAWINGS AND SPECIFICATIONS RELATIVE TO THE IDENTIFY AND LOCATION OF EXISTING UNDERGROUND UTILITY FACILITIES IS THE BEST INFORMATION PRESENTLY AVAILABLE. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THEIR LOCATION OR THAT ALL UTILITIES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION OF THE EXISTING UTILITIES IN THE WORK AREA. EXISTING UTILITIES AND OBSTRUCTIONS THAT WILL BE ENCOUNTERED DURING CONSTRUCTION SHALL BE LOCATED AND THEIR ELEVATIONS DETERMINED IN ADVANCE OF CONSTRUCTION. THE CONTRACTOR SHALL CONTACT NC 811, THE POWER COMPANY, GAS COMPANY, AND TELECOMMUNICATION COMPANIES FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES, OR LINES BEFORE CONSTRUCTION BEGINS. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE RELOCATION OF ANY POWER POLES OR OTHER EXISTING UTILITIES WITH THE ELECTRICAL AND/OR TELEPHONE COMPANY PRIOR TO THE BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATINGAJND PROTECTING ALL EXISTING WATER MAINS AND SERVICE CONNECTIONS DURING CONSTRUCTION. ANY DAMAGE, WHICH OCCURS AS A RESULT OF THE CONSTRUCTION, SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER. IN THE EVENT OF A TEMPORARY SERVICE INTERRUPTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND BEGIN REPAIRS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE OWNER TO ACCURATELY DETERMINE THE LOCATION OF EXISTING WATER MAINS AND SEWER LINES WITHIN THE PROJECT AREA. TFE CONTRACTOR SHALL TAKE ADDITIONAL CAUTION IN EXCAVATING AROUND THE SERVICE LINES AND MAINS WHILE WORKING WITHIN THIS PROJECT. ANY DAMAGE TO THE MAINS OR SERVICE LINES SHALL BE THE RESPONSIBILITY TO THE CONTRACTOR. SUPPLEMENTAL NOTES: 1. CONTRACTOR TO HAVE A COMPLETE SET OF CONTRACT DOCUMENTS AS WELL AS ALL PERMIT APPROVALS AND EASEMENTS ON JOB SITE AT ALL TIMES (SEE GENERAL NOTE 17). 2. ALL SHOP DRAWINGS MUST BE REVIEWED AND APPROVED BY ENGINEER BEFORE EQUIPMENT OR MATERIAL IS ORDERED. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR ANY COSTS INCURRED DUE TO THE ORDERING OR MANUFACTURING OF UNAPPROVED MATERIALS OR PRODUCTS. 3. ALL KNOWN EXISTING UTILITIES HAVE BEEN LOCATED BASED ON BEST AVAILABLE INFORMATION. THE CONTRACTOR IS RESPONSIBLE TO ACCURATELY LOCATE, BOTH HORIZONTALLY AND VERTICALLY, ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION. ALL COSTS ASSOCIATED WITH ANY DAMAGE TO KNOWN OR UNKNOWN EXISTING UTWTIES RESULTING FROM CONTRACTOR'S FAILURE TO ADEQUATELY PROTECT EXISTING UTILITIES DURING CONSTRUCTION TO BE BORNE SOLELY BY CONTRACTOR. 4. THE CONTRACTOR SHALL CONTACT NC811(811 OR 1-800-6324949)AND THE FOLLOWING PRIOR TO MOBILIZATION FOR LOCATION OF THE FOLLOWING KNOWN UNDERGROUND UTILITIES IN THE PROJECT AREA: • POWER • TELECOMMUNICATION (TELEPHONE/CABLE WRIER OPTIC) GAS • WATER • SEWER • OTHER/UNKNOWN 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AND SHALL ADHERE TO THE PROVISIONS OF THE MUTCD (MOST CURRENT EDITION). 6. CONTRACTOR TO SAVE PROPERTY IRONS,MONUMENTS, OTHER PERMANENT POINTS AND LINES OF REFERENCE AND CONSTRUCTION STAKES. A REGISTERED LAND SURVEYOR AT CONTRACTOR'S EXPENSE TO REPLACE PROPERTY IRONS, MONUMENTS, AND OTHER PERMANENT POINTS OF REFERENCE DESTROYED BY CONTRACTOR. 7. CONTRACTOR TO FURNISH, INSTALL, AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES WHETHER OR NOT SHOWN ON PLANS TO PROTECT ADJACENT DITCHES, CANALS, ROADWAYS, ETC. FROM SILT AND EROSION. B. CONTRACTOR TO RELOCATE EXISTING UTILITIES AS REQUIRED FOR INSTALLATION OF NEW WORK. THERE WILL BE NO ADDITIONAL OR SEPARATE PA`" ITEM FOR THIS WORK UNLESS SPECIFICALLY CALLED OUT IN BID FORM. RELOCATIONS OF EXISTING UTILITIES MUST BE COORDINATED WITH AFFECTED UTILITY COMPANY. 9. CONTRACTOR SHALL PROTECT EXISTING UTILITIES IN CLOSE PROXIMITY TO THE NEW WORK WHICH ARE NOT REQUIRED TO BE RELOCATED. THERE WILL BE NO ADDITIONAL OR SEPARATE PAY ITEM FOR THIS WORK UNLESS SPECIFICALLY CALLED OUT ON THE BID FORM. THE CONTRACTOR SHALL COORDINATE SUCH WORK WITH THE OWNER(S) OF THE AFFECTED UTILITIES. 10. CONTRACTOR TO RESTOREIREPLACE ALL SIGNS, MAILBOXES, ETC, ENCOUNTERED DURING CONSTRUCTION TO ORIGINAL CONDITION. 11. CONTRACTOR SHALL MAINTAIN ACCESS TO PROPERTY AT ALL TIMES. 12. CONTRACTOR TO RESTORE ALL DISTURBED AREAS TO EXISTING GRADE UNLESS OTHERWISE NOTED ON DRAWINGS. 13. ROADWAY DITCHES DISTURBED DURING CONSTRUCTION TO BE RESTORED TO PRE -CONSTRUCTION CONDITION OR BETTER. 14. ALL DISTURBED AREAS SHALL BE PREPPED AND RESEEDED IN ACCORDANCE THE SPECIFICATIONS. 15. EXCAVATED MATERIAL TO BE PLACED WITHIN LIMITS OF DISTURBANCE DURING UTILITY INSTALLATION. CONTRACTOR TO PROVIDE NECESSARY SEDIMENT AND EROSION CONTROL MEASURES TO CONTROL RUN-OFF. EXCESS EXCAVATED MATERIAL TO BE REMOVED FROM CONSTRUCTION SITE AND DISPOSED OF LEGALLY, 16, EASEMENTS ACROSS SLOPED AREAS TO BE GRADED UNIFORMLY ACROSS SLOPE AT NO STEEPER THAN 5:I HORIZONTAL TO VERTICAL RATIO EXCEPT WHERE INDICATED IN THE DRAWINGS, 17. POSITIVE DRAINAGE TO BE PROVIDED FOR ALL AREAS THROUGHOUT CONSTRUCTION. EROSION CONTROL NOTES: 1. SEE SHEETS C5.0 FOR EROSION CONTROL PLAN AND AREA SPECIFIC NOTES. 2. ALL DISTURBED AREAS SHALL BE PREPARED AND SEEDED IN ACCORDANCE WITH SPECIFICATIONS AND SEEDING SCHEDULED ON SHEET 4 0. 3. SEE SHEETS 5,1 AND 5.2 FOR EROSION CONTROL DETAILS. 4. LIMITS OF CONSTRUCTIONLIMRS OF DISTURBANCE= 31639 SF 0.73 ACRES 5. ANY AREA DISTURBANCES BY CONTRACTOR NOT SHOWN ON THE CONSTRUCTION DRAWINGS ARE TO BE PERMITTED THROUGH THE APPROPRIATE PERMITTING AGENCY. 6. PURSUANT TO G.S.113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICE OR STRUCTURE. 7. PROVIDE A ROLLED EROSION CONTROL PRODUCT(RECP) TO STABILIZE DISTURBED DITCHES IF ANY SIGNS OF SCOURING ARE EVIDENT EVEN IF NO RECP HAS BEEN SHOWN ON THE CONSTRUCTION DRAWINGS. 8. NO STOCK OR WASTE PILES ARE ALLOWED WITHIN 500F STREAMS OR DRAINAGE STRUCTURES, UNLESS INDICATED AND PROTECTED ON THE APPROVED EROSION CONTROL PLAN (SEE SHEET C5.0). 9. WHERE DEWATERING OF TRENCHES, PITS, AND OTHER EXCAVATIONS BECOMES NECESSARY THE DISCHARGE MUST BE DIVERTED TO A SEDIMENT FILTER BAG BEFORE BEING DISCHARGED TO THE GROUND. 10. ADEQUATE EROSION CONTROL MEASURES MUST BE INSTALLED, MAINTAINED, AND ADJUSTED AS NEEDED DURING THE DEMOLITION OR CLEARING AND GRUBBING PHASES AS WELL AS THROUGHOUT THE LIFE OF THE PROJECT AND UNTIL PERMANENT VEGETATION IS ESTABLISHED. 11. NO FUELING OR FUEL STORAGE SHALL BE CONDUCTED'MTHIN 50 FEET OF THE STREAM BANK. SPILL CLEAN-UP BOOMS SHALL BE READILYAVAILABLE ON SITE FOR EMERGENCY USE IN THE EVENT OF A SPILL. SELF INSPECTION: NOTIFICATION OF THE DIVISION OF ENERGY, MINING AND LAND RESOURCES (DEMUR) SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THEAPPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES- THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN, THE INSPECTIONS MUST BE CONDUCTED AFTEREACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131. THE SELF -INSPECTION REPORT FORM IS AVAILABLE FROM: https:fk xw.deq.nc.gov/abmVdivisions/energy-minemland-land-resaurceslemsion-and-s diment-mntrol/emion nd-sediments ntfol-forms IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE ASHEVILLE REGIONAL OFFICE OF DEMLR AT (828)296-4500. GROUND STABILIZATION CHART SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER(HQW) ZONES 7DAYS NONE SLOPES STEEPER THAN 1-1 7DAYS IF SLOPES ARE 10 OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN NOUN LENGTH, ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES. •, LLI In. z J I= LLJ oo > Lu W W l7 J o Q � REVISIONS. niC�o/u[/N4f -JOB NUMBER 0832ITm- DRNiUGN:KEWIBGB CKD:SJM NOTES I I / I / I / / I / I / I / I / I / I / ;- ' 1 DEBRIS PILES B IDLE Looms _ � � I i WRCONTROL NAIL it4 N: 696.030.90 It E: B09,162.33 I 15.00' NAVD88 ELEV:2,497.29' FEL I I I / 8 / /,1 g TOWN OF MAGGIE VALLEY DB 379. PG 55 PIN: 8609-96-4881 fHAIN-LINK FENCF —_�-- — CH � I ANNUAL / CHANCE FLOOD PER FIRM / 1 3]00860900J / `REGULATOR, FLOODWAV PER FIRM 370086 (XU I G4 / I / STREAM CENTERLINE // r REGULATORVJ 3— 6V PER RM 37OJ3 . FlRM 609001 / 30'ACCESSS UTILITY EASEMENT / DB 379 PG 55/ 15.07 o �4 /tl / { / r WR CONTROL REBAR#1 LO ALIZED M 696,207.82 E:809.30.62 NAVD88 ELEV:2,496.35' �158/SCL — 30' ACCESS & UTILITYEASEMENT �G E7 DB 379 PG 55 \WRCONTROLNAIL#5 I \ M 696,596.96 1 A,414.84 NVDAVDELEV:2,501.41' I / - I I WR CO ROL NAIL#3 LOCALIZED N: 696,50].28 E: 809,410.37 NAVD88 ELEV:2,495.88' I I /rg 'aaN IH $s I I l I i HANK AARON ROSS REBECCA DUNCAN ROSS DB 1006, PG 166 CAB D, PG 883 '..� PIN: 8609-95-0540 54. CMP INV,2493.09': 2489.32To INVy1\ 54"CMP INV: 2489.59' WR CONTROL REBAR#2 NAD63(2011) GRID GROUND POINT N: 696.375.23 E 809,358.31 NAVD88 ELEV.2,495.87' CGF:0.999775911 CHA REBAR/CAP / \ �ZH CARo o �FEBS/O 9 MMKe� 4 �14IVES SEAL � �,,.a� 039751 NT NGINEE �h ep N MPS IN. LPWV DATE'. 06/02/2023 REVISIONS. I. [1 GEC 09�2`L2200 I OHJ U(. M1: rceev e(. L' � D: S1M EXISTING CONDITIONS 61.0 1 TOWN 01 MAGGIE VALLEY /^\ D8 379, PG 55 PIN: 8609-98-4881 u's ,, Z4 •4iy� O �ZH CA RO Q oFESS/p� 9 SEAL S \I 6/S 039751 c F INITIAL PI -AN DAM 06/02/202B REVISIONS. WRJOBNDMER 082211220D DRN/DGN: KEW/BG8 CKD: SIM PROPOSED WORK AREA C2.0 O—S,, E—bp, TOWN OF DB 3' PIN: 86 �M1Od�'��i0ovrt— mvl���:oov MAGGIE VALLEY WWTP LEVEE REPAIR PLAN VIEW STREAM PROFILE �8r^` PROFILE VIEW GRAPHICSCALE 1" - 20' HOR2. V=2' VERT. 0 20 40 ��oFEss/O� S �1 VES SEAL 61 a. ricm.a= 039751 c F INITIAL PWN DATE:06/02/2023 REVISIONS. —JOBNUMBER 0822112200 DRNiDGN: KE-BGB CKD: SJM PLAN AND PROFILE C2.1 D—S,, Evebr � 1:10R FLATTER HEADERBOULDER, 2'x 3'x 4'(TYP.) 12" VEGETATED SOIL LIFTS SET HEADER BOULDER BACK A \ MINIMUM OF 6" BANKFULL BENCH STREAM CROSS-SECTION AA /. i DIRECTION OF FLOW CLASS B RIP RAP CHANNEL INVERT FOOTER BOULDER, B'(miD) 2'x Tx 4'(TYP.) ram ---I FILTER FABRIC, TYP. SECTION B-B HEADER BOULDER, 2' x Tx 4' (TYP.) 7 B STAGGER BOULDERS / 2'(±)OFFSET (TYP.) j FLOW FOOTER BOULDER, 2' x Tx 4' (TYP.) J, FILTER FABRIC, TYP. ELEVATION A BACKFILL MATERIAL BOULDERTOE MOTTO RULE lilly FLOW PLAN VIEW TRENCH IN MATTING AND ANCHOR SLOUGH BOTTOM NOTE: N AREAS TO BE MATTED, ALL SEEDNG, SOL AMENDMENTS. AND SOIL PREPARATION MUST BE COMPLETED NACCORDANCE WITH THE PROJECT SPECFFATIO%,AND PL,WTING NOTES PROEM PLACEMENT. B MIN POOL RIFFLE `_ L•\ ANCHORBON / S'CENTERB RIFFLE P00L COIR FIBER MATTING INSTALLED PER MANUFACTURERS RF=.E -� SPECffICATONS WTH BARE ROOT PLANTINGS. PERMANENT AND TEMPORARY SEEDING PER PLANS AND SPECIFICATIONS. RIFFLE (TYPICALBOTHSIDES) PLAN ONE COIR FIE R MATTING ROLL WIDTH OENTEREDAT TIDE OF `SLOPE MINIMUM ROLL WIDTH=120' BARE ROOT. TYP. WOODEN ANCINBR9 @ON3CFNM 1,,.w., TYP) COIR HBHi MATTING 1S' P) BACNPLL r G OODPIAINffXISTING / GAWNO COIR FIBER MATING E%ISTING GRACE WOODEN ANCHORS ON TCENTERS(e.w., WE) SLOUGH SIDE SLOPE PROPOSED GRADE ®WOODEN ANCHOR \ TRENCH IN MATING T MIN. EXTENDMATTNGTO NORMALWATER PLACED AT TOE OF SLOPE SURFACE ELEVATION S' MIN ANCHORS ON I' \ CENTERS IN TRENCH MATTING SHALL BE _ PLACED IN TRBJCF AND DACKFILLEO TYPICAL SLOUGH CROSS SECTION COIR FIBER MATTING r6*\ NOT TD SCALE SECTIONA_A RENCHINTOP UYEROF MIR MARING TAKE FACING—.RMATTING SEMI.OYERIAPMATTINGB'MINSEMI.OYERLAPAMTTINGCMIN FB CDR FIBER MATTI a.]5'o.c: MAN. I SS'u.o,(MAKI uFr mPJ DFrNYPI 'tip l 'yi I '�i 11 '� 1 '� 1 i LLELFVATIOX ROFILEONPLAN� I ' sIeETR II 1' I"') I � � 1�(I 't2" ' 24' NOTE: NO METAL STAKES PERMITTED, WOODEN ANCHOR DETAI NOTTOSCALE aTRBW FLy PLANVIEW Try r�r���_j�j_rr_r�r_j�j_�rr rjlrlrr VEGETATED SOIL LIFT NOT TO —LE 3. DETAIL NOTES 1. BARE ROOT SEEDLING SPECIES SHALL BE LIMITED TO RED MAPLE, SYCAMORE, EASTERN COTTONWOOD, RIVER BIRCH,TULIP POPLAR, AND COMMON ALDERWRHN THE VEGETATED SOIL LIFT. SEE PLANTING PLAN FOR ADDITIONAL INFORMATION. 2. COIR FIBER MATTING SHALL NOT BE PUNCTURED OR TORN TO PLANT BARE ROOT SEEDLINGS. B BARE ROOTBEEDUNGSSHALL ONLYBE PLANTED IN VEGETATED BOIL LIFT ABOVE THE BANKFULLELEVATIONINDICATED WRHINTHEPLANAWPROFNESHEETS. 4. TOPSOLSHALLBEPIACEDAROUND THE ROOTS TO THE SAFE ROOT SEEDLING PRIOR TO PLACEMENTOF THE TOP SOIL LIFT S BARE ROOTSEEDLINGSHALLBE PIANTEDATAN ANGLETOPREWNT LEAF CONTACT WIIHTHEGROUND. BARE ROOT SEEDLING PLANTING IN SOIL LIFT NOT TO SCALE •, ILLI n. z J IZ o LLI W W l7 J o Q � usMMKa' Q OFESS/O� T IN rE�S SEAL l 39751 c F DUNG SOIL LIFT UPWARD. INITIAL PLAIN DATE: CS/G2/2023 REVISIONS. WRJOB NUM BER 06221122W DRNi O—EW/BGB CKD: S)M DETAILS C3.0 UN 419, PI; bb PIN: 0609-96-4881 DacuSign Evelape ID. 42E3ADC6-F2FOA4336454-FS02848CA57D SEEDING i TEMPORARY SEEDING --SIR— TEMPORARY SEEDING (ALL AREAS) DATES SEED MIXTURE SPECIES APPLICATION RATE(LB/ACRE) URN 1-DEC31 RYEGRAIN 1. 2. SOIL AMENDMENTS e. FOLLOW RECOMMENDATIONS OF SOIL TESTRORAPPLY 2,6W LB/ACRE GROUNG AGRICL.LTLAUL UMEGTDNE AND M WACRE 1634T FERTILIZER. 3. MULCH a. APRY4,WDLPJAGREST M,ANCHDRSTRAWWWKINGWITHASP T.NEFPNG,DRAMUIGHMCR INGTGOL.ADISKWII HP ESSETNEARIYSMlA T CAN BE LASED AE A MULCHANCHOF NGTOOL OR b. INSTALLATEMPORARY BIODEGRADABLE, PIOTWEGRADMLE ROLLED EROSION CONTROL PRODUCT(RECPI ITENSAR ERONET DEN 0 OR EQUAL], ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS. 4 MAINTENANCE a. WINTER, DRY SPRING,.. SUMMER 1) REFERTILIZEWGROWTH IS NOT RILLYADECRATE. RESEED, REEERTN2E,AND MULCH IMMEDIATELY FALLOWING EROSION OROTHER DAMAGE b. FALL 1) REPAIR AND REFEWILIZE DAMAGED AREAS IMMEDIATELY. TOFDRESSWTH50LBIACREOFNITROGENINMMCH. IF IT N NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15 OVER3EED WITH 50 L&ACRE BROWNTOP MILLET IN LATE FEBRUARY OR EARLY MARCH, 5, TEMPORARY SEEDING MIST BE FOLLOWED UP WITH PERMANENT SEEDING AS SCION A PRACTICAL. PERMANENTSEEOIRG 2 SEEDALL DISTURBED AREAS OF CONSTRUCTION WITHIN ZONES I AND 2. 3, NOS SIDING SHOULD BE UNDERTAKEN INWINDYORUNFAVORABIE WEATHER, WHEN THE GROUND 19 TOO WETTO RARE EASILY, WHEN IT IS IN A FROZEN CONDITION,OR TOO DRY. 4 THE SUBGRPDE OF ALL AREAS TO BE SEEDED SHALL BE RAKED All ALL 1111I8H,STIC11, LOOSE ROOTS, AND STONER LARGER THAN 2 I1GHES""LL1111I 5, EXCEPT FORAREAS WTTHINTHE CRITICAL ROOTZONE OF EXISTING TREESTO REMAIN, THE SUBGRAOE SHALL BE SCARIFIED OR OTHERWISE LDDSENED TO A MINIMUM DEPTH OF 4INCHES. S FOLLOW RECOMMENDATIONS OF SOIL TESTS OR SPECIFICATIONS. FERTILIZER SHALL BE UNIFORMLY SPREAD AND INCORPORATED BY DISKING OR TILLING TO A DEPTH OF ATLWT41NCHES. ]. PERMANENT SEEDING a IMMEDIATELY FOLLOWING THIS PREPARATION, PERMANEW SEED, AS SCNEDUEDBELOW, SHALL REUNFORNLY APPLIED AND LIGHTLY RAKED INTO THE SURFACE, LIGHTLYROLLTHESURFACEAN WATERWITHFINESPRAY. PERMANENTSEEDSH BEMN®ATTHEFOLLOWINGRATES: b. THE BEST SEEDING DATES ARE BETWEEN FEBRUARY 15 THROUGH MARCH 2O. AND SEPTEMBER I THROUGH SEPTEMBER 30. e. PRIOR TO FEBRUARY 15 DR AFTER OCTOBER I, ADD 25 USACREANNUAL RYE (GRAIN) 3. MULCH(INCIDENTALTO PERMANENT SEEDING) e. DN GRADEDBANKS BEINVEEN NORMALWATER ELEVATION AND BANKFULL ELEVATION , INSTALLCONR FABRIC MATTING IN AGCORDPNCE WITH TEDETALOIN SHEET 6.1 b. FORAREASMOVEBANKFULLELP/ATION. EA APRY4,ODDLBIACRESTRAW. ANCHOR STRAW BY TACKING WTH ASPHALT ORA MULCH ANCHORING TOOL. ADISK WITH BIADES SET NEARLY STRAIGHTCM BE USED ASIA MULCH ANCHORINIGTOCL, OR h.2. INSTALLATEMPOMRY DODEGMDMLE, PHOTWEGM MLE ROLLED EROSION CMTRW PROW CT (RECPI (TENSE EWNET D31 BJ OR EOUAD, ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. 4 THEGUJTRAGTOR SHALLKEEPALLSEEDED AREAS WATEAEp AND IN GOW CONDITION. RESEEINGBMLLBEWNEIFAMWHENNEGESSARYUWILAGOW,HEALTHY, UNIFORM GROWTH IS ESTABLISHED CVER THE ENTREAREA SEEDED. 5, ONSLOPES,THEWWMCTORSWLLLPROVIDEAMMTWMHOUTSBYANAPPROVEDMETIWD. ANYWASHOLITTYATWWRSSHPLLBEREGRADEDANDRESEEDEDAT THE CONTRACTORS EXPENSE UNTIL AN AWEPTABHE STAND OF VEGETATION IS ESTABLISHED. ZONE UNLESS OTHERWISE DESIGNATED, AREASCUTSIDEOF THE STREAM BUFFERS WHICH HAVE BEEN IMPACTED BY CONSTRUCTCN (DISTURBED, COMPACTED BYCO,NSTRUCTION TRAFFX:, MATERIALETOMGE ARMS, ETC.), SHALL BE PREPARED AS DESCRIBED ARMEAND PLANTED WITH A NON -WETLAND, NON RIPARIAN AREA SEED MI%AS FOLLOWS: PERMANENT SEEDING OF NONVETLAND, NON -RIPARIAN AREAS DATES SEED MIXTURE SPECIES APPLICATION RATE(LBIACRE) CREEPING RED FESCUE 115 JM 1 DEC 31 KENIUCKY BLUEGRASS 35 PERENNIAL RYE 25 ZONE = UNLESS 07HERWBE DESIGNATED, AREAS WITHIN THE STREAM BUFFERS WHICH ARV'- DI BEEN IMPACTED BY CONSTRUCTION (STURBED. COMPACTED BY CONSTRUCTION TRAFFIC. MATEPIAL—FACE AREAS, ETC.M6HALL BE PREPARED AS OFSCRLBEO ABOVE All FLAMED WITH A RIPARIAN SEED MIX AS FOLLOWS PERMANENT SEEDING OF RIPARIAN AREAS DATES SEED MIXTURE SPECIES APPLICATION RATE (LBIACRE) Vginre Wldry Ma Ii (EliM, dgn-,,'IAadisoa') 4.p Fowl Bluegmee(PoepaWa4isJ 4.0 hdiaeU-ma Tomahawlf (mrghaNumnu(ma, ipmehewFJ 4.S Beaked Paaiiglaae Yak—anceps) 3.4 JAN I -DEG 31 Fox—B., PA Ecotype (Case.1pi dea, PA Eaoype) B6 PeMdge Pee, PA Eaoype (Chasm b MxIaNMa, PA EaNype) 0.B W ftX! Bneezewee . VA EXN" LHelenNm 8­ VA Eaoype) CA New —, PA_wy (Vn _aovehore 'PA Ea ") 10.4 BASED .71 w a z J o W W W o Q CL I NTTIAL PLAN DATE:D6/G2/2023 REVISIONS. WRJOBNUMEER 08221122m I DRNiDGN: KEW(BGB CKD:SJM LANDSCAPE PLAN C4.0 0 I / I / I / I I / I / I / I / I / I / I / I / I / I I / / Y I / I I:LI 1 l$ L8 -CHAIN eSILT FILTER BA6 c OFFERCA�-� OONTRAOTOR IDREStRI / IMPACTED BANKS AFTER CONSTRUCTION USING DETAIL( 1 1 I / l � I I I `REGULATORY / FLOODWAV PER I FIRM 3]008609.0 , j /F 1 5 i Cp`��� CONTRACTOR TO REST RE ?/ IMPPLTFDRANKRAFTER �,O CONSTRUCTION USING DUAL 6 STREPM CENTERLINE REGULATORY j F—Al PER FIRMM 37038 3]GD8609001 / MATERIAL STAGING AND STORAGE AREA 30' H 150' TCRNAROUNDAREA�[ OERRIS PILES % � v�s ' SILT FENCE - (CONSTRUCTION ENTRANCE e FEL y\\ `3U' ACCESS & UTILITY EASEMENT DB 379 PG 55 30' ACCESS b UTILITY EASEJ.T j DB379 55 / 15.OD'11 / REINFDRCED SILT / < FENCEOIJRET CONSTRUCTION FENCED �� 3 ELECTRIC FENCE / // ff I / / I / I / I / 1I / I ` 30' ACCESS & UTILITY EASEMENT DID 3]9 PG 55 E%CAVATORACCESSAREA CONTRACTOR TO RESTORE IMPACTED RANKS AFTER 6 CONSTRUCTION USING DETAIL HANK AARON ROSS REEK DUNCAN ROSS DB 1006, PG 166 CAB D. PG B83 PIN: 8609-95-0540 CHP u RA, W J moo= QOy CH3 LG nU. o 0 3 0 •, �ZH CARo �swn.4*r� Q oFESS/p� y �141VES SEAL �ea.ar 039751 c F HEN I_MP.,, INITIAL PLAN DATE:06/02/2023 REVISIONS. -JOG NUMBER 0G221122.OD DRNiDGN: KEW/BGB CKD:SJM E&SC PLAN C5.0 D... Sig, Envelope ID. 42E3ADC6-F2FOA433-8454-F50284BCA57D Date: GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the Oemlls and speciflcatbns on Nls plan sheetdll result In the.ndmglon activi train considered cam liantwith Me Grountl Sbbilba0on antl Mebnaa Hentllin ,colons of the NCG01 Cgh Me Enco.o.od perm. (Seandl E ant F, rasp by Me d The permpDea shall complywith Me Erosionantl Setlimen[CodMoplan .1. on May apply depending having,corcti... All dttallsand spot d4hbns shownonthishose[may not apply daponding on site wndilions and the delegated authority h aving junstlidion. SIaDBIze the ground suKConily so plat rain will not didodge ills sail. Use one of Me techniques in the brie below: Tam ra tion Stabiliza Permanent Sbbllbaflnn Temporary grass So. covered with straw a Permanent grass seed -tied with draw other mulches and .ekRerm. - Hyd-.diM ...'arulorwe antl to ..a Gw.dple Mon. such as permanenl soil Polled erosion.nrDl poduds with or rehforsocard mad., .in "Ompoerygmnasacd Hydoodw ing Appropriately apPant stew or Other mulch Plasticsheeling Shrubs or other permsranl planrings covered with mulch Unibrm and ovary diddbuted ground cove aumalenl to restrain doolon SWcerel mebatls such as concrete, aspha.a cosiong wale Rolled erosion control poduds with glass auetl EQUIPMENT AND VEHICLE MAINTENANCE 1. Mainbin vehicles and eq,lp.wt to prevent SiSpRage of guide. 2. Provide drip pane under any stead equipment. 3. loll leaks and Repairs soon as rea¢ible, or remove leaking equpment from the project d. Coiled all spent guide, pore in separate eonteh,, and pmpeRy dlsposa as hazed... waste (recycle when possible). 5. Remove leaking vehicles and cod ruct a, equipment from drAce uMI the problem has been corrected. 6. Bring used fuels, lub icalls, woleirauli hydc guide and elver pebobum products to a ragdng or diaposal center Mat rdbs Mesa "O'do'. LITTER BUILDING MATERIAL AND LAND CLEARING WASTE 1ryar . Newm bubum waste. Place litter and debris in approved waste wntemans. 2. Provide a..Mclen. number and size of....ocnbinds(eg dumpsua. trash receptacle) on alto to whaw m nswadon and d.rha do wester. 3. Lora. waste containers at least 50 feet away tram storm drain inlets and suriace waters unless no other altamatives are reasonably available. 4. L as Mi not mcelve supsbnilal amounts of mnoff rom upland aiausts .. do sot drs n directly to a doon drain, sedan, or wetland. 5, Cov waste cois nos M to and of -1, workday and beore storm scene or provide whoo,conteinmenl. Repa-rapacedamagedweds.. papnero. 8. Anchorall lightweight items in waste containers during times of high wino. 1. Empty waste cone as needed to prevent oveMow. Clean up immedioo y D wn.lners OverAcw_ 8. Dispose waste oR-site at an ap,-d disposal fackt, it On business days, clean up and disposeofwaste in designated waste container,. PAINT AND OTHER LIQUID WASTE 1. Do no[dump paint and oher fiqud wade into dwm drains, streams or wall2. Locate paint washouts at leap 50 pant away from dorm drain trials and suriace waters unless no other alternatives are reasonably available. 3. Contain lid wastes inacordrolled area. 4. Cnnbtem.L must be Iabelal, sized and placed d,,hpipately for the heads M site. 5. Prevent the diaoiuge of wasps.solvents, detergents and oMer liquid whites from .O-..n sites. PORTABLE TOILETS 1. Install portable WOM on level ground st leas[ 50 feet away from storm drains, streams wetlands unless there Is no sIt... We reasonably available. If 50 foot offst p. not attalnable, provpe raioce- of portal, tool behind sitt.ace or place on a gravel pad and upro-d with and .,. 2. Provide staking or arlchord,ofpotable Wide during perioie of high wins or in high foal Moth, areas. 3. x4onibr portable bilds for leaking and popedy diapose of any leaked noden.l. Wilpzea licensed sonitary waste hauler M remove leaking portable toilets an replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show d.kpile locations on plans. Locate earth-M.W. all areas at least 50 feat away hom sto. drelo betels, sediment beeln.. peRmetersedood d controls and surface waters unless. on, be shown no oMer alternatives are reasonably available. 2. Protect alacxpile with sill fence insa l along toe of dope with a mpnlmum offset of five fact from the toe of stockpile. 3, Provide able done apes point when feasible. POLYACRYLPMIDE31PAMSIMDFLOCCULANTS 4. Sa ilpze stockpile within the tmafranni provided on this sfea[ and in aocodance with HERBICIDES. PESTIDIDESAND RODENTICIDES i. 6oectnopuana Mat ale a.ropdab for the soils beingMa approved plan ant any didNDnal requirements. Soil gabilication is defined as 1. Store and apply herbicides,pesdodes and r.d.rfGtles in. -do - with label exposetl during wnsWcllon, vegetative, physical or chemical coverage tedmiq.. that in metreh accelerated mandiohs.ppr help IMOOom the NC OWR List o/Approved PAMSrF/wculenfs. roslon on c1durbed adle for temporary or permanent...I-is 2. Apply gowulaMa at or before Me inlets to Ernst . and Sediment Control Me..und, ° 2. Store herbicides, pesticides and rotlantaitles in their original wnteiners with the label, L Apply flowular. at the wnceniretions specified in the NC CWR List oiApprovetl which list di - in use, ingretlietM and rrst aid steps in case of OccidentalPAMSrFlowpmho, and in accordance with Me mdufadureys inshudions. poisoning. 4. Provide pondirg area for chmainni of treated Stpmwater before discharging offil jHAlEARDOUS AND TOXIC WASTE 3. Uo.t sore Indeddes, peddles and rordroodes in areas where thodnge, possibe 5. Store fla. Moto, in lack -proof containers that are kept antler dorm-OReate nt coves or 1. Create designated hazand-was. collection areas....Se. .,-a they may spill or leak into wells, smrmw ter tlrelns, laauntl waterssu�ace adhoundl ec by secondary containment sin ures. 2, Pb. hazardous waste wntahers under cover or in secondary coominmerd, water. If a spill wars, clean area immediately. a 3. Do not sore M1azardws demiwls. drams or baggetl materals directlyw Me groan. C Dc, W sto k,p k, Des, materials onsite. STRUCTURE WITH LINER ° �Ic mbu rax Den -do ILD 0 0 0 �M�4��T�\\�' 0 anwwnsarrrr-\,mea,wcruaor eaw wn, SECTION A -A oa srnaLasS oDmc,. aetwa,Nona. N wuw.l so IxrruD 0S oersxsmso opT0 0 0 nonce 0 0 w snctau aaa C D 1N vr rna'Rn Co aemr) ter,. ,gxnq,x ravel SECTION B-B PO STPReS v.r xwa wow xour CONCRETEWASHOUTS 1. Do not discharge wnaate, or cement slurry from the site. 2. Discos of, or recycle settled, hardened wncou. residua in aowdance with local end state adid waste re lula mna and at an epprovetl facility. 3. Manage washout from mortar milers in accedence with Iha ebwe item an in atltl.ion place the mixer and nowd,ted mstands on inw,bus banter and w ildn lot perimeter silt fence. 4. Indatltempomrywnaeeweshdulsperlo imquimmeMs,whemappiwble. Nan alternate mothod or protluctis tc be used contact your approval outhody for mvlew antl approval. If local dendad decals ere not available, use one of the Nvo types of temporary concrete washtub provided on the detail. 5. Do not... 0.- washouts for dowasring or snoring defective curb or ddewaik seelbna. Son-water..-ula:etl wi1Nn the washout may not be pumped prim or dischargetl is the dorm drain system or receiving surface waters. Liquid waste must be pumped cut and removed from project. 6. Locate washout in lead W feetfrom... drain inlets and nurbce waters unless. can be shown Mal no other.1...... are reasenaby available.. a minimum, install protection o storm drain inlat(s) closest to Me washout which -to -we spills or ovedow. 7. Locate washouts in an sadly -able area, on level ground and install a stone ..- had In front of Me washout Atltlitional whroa may be egOl- by the approvteg dModry. 8. Insthel at Isis[ ore sign direcurlgwMIm tracks W Me washout within Me project limits. Post signage on do, wed.ut i.elf to iaa4Ny this location. a. Rarwveleavings from the washout wM1en at approximately TSYa cepaciryblima -Aow event. Replace Me MV, send begs or other lemp,,,y dull wmporneMs when no longer fundbnal. When utilizing akematpve or pmpn.ry products, follow manufacturers Instructions 10, At Me, compleibn of Me.naete work, nanow,melninp teaNng, a no dispose of In an approved disposal.tllity. Fill pt. If applicable and stabllire any disturbance caused by romovaldwashad. NCG-01 GROUND COVER & MATERIALS HANDLING 1)ete: PART II, SECTION G. REM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSEOUT Sediment basins and ire host racove runoff from aloha some acre or more shalluacoWet strodureathat withdraw water hom the surfaac when these devices need to badmwn down for manlenenac ord.a out unlesalhiais infeasible. Thecirama.nces lnwhichdisnot p 9e area feasible b withdraw water hom Me surface shall bnmre (for example, times with extendetl cold wsa0nar). Non -surface withdrawals from satliment basins shall be allmvatl only when all of Me followng criteria have been met (a) The EBSC plan authordy M1as been pwvkletl with documentation d the m„emsurtew withdrawal an Me epecNo time periods orcondiGons in which it well occur. The non-6urtwe withM1awal shell not epnmence unlit the E85C plan authortty has approved iheee items, (b) The non-dKow withdrawal has been reported as an anticipated byte. ,-nw with Part II I, Sedion C, Item (2)(c) and (d) of Ma peonlL (0) Dewateng discharges are treated will, c.rroa. minimize diasindliq llutanb hom dortnwater Matteremoved from Me sadimeM basin. Examples ofappropriate controls intlMa properly sled. designed and maintained tlewabdng tanks, weklenks, antlfitmtien sl (d) Vege..d, upland areas of the atlas or a p.Mly deeignetl darn pad pa a to Me extern biotic at Me outlet tithe dawatarirg tmatment-roo. daacribed in learn (a) shave, (a) Velodty aisopafion devices such as check dams, sediment (raps, and ipap are pmvidea al to dpsManga ponds of an dwa.ng devices, and (I) SedimaM re.,,ad tram Me dewa.ring treatment aaNws described in Item (c) above Is disposed of In a manna. that does not cease deposigon of eadimant into waters of the U. Sta.. SELF-M6PEC7ION, RECORDKEEPING AND REPORTING SECTION A: SELF4NSPECTION Sdf-inspections are equine during normal business hours in a wroo with the table bebw. WM1en adverse weather or age wntlitions woultl rouse Me safely of Me inspection parso nil to be hleopardy, the Inspectionmaybe aelayad until t" next business day on which it is sale to pal- the odooduon. In anion, when a a.. event of equal to or greeter an 1.0 inch occum outside M none] business nouns, the So inspection shall be performed upon the wmmencemenl of the mut business, day. Any lime when inappctons were delayed shall be noted In Me Inspection Record. burped Frequenoy Iw nsgl i, re.rom s ust Include: (dump nDlmal busing. hours (1)Rath gauge meiraaned in Daily ally min snamouna. Ifhc MR aingeugeob.a .... ..do.&I, waaken good working on holiday periods, and no individualday rainfall information a order M onarecord e cumulative min neaerann-terthose llable, unattended day, (Mis will determine If a site inspection e nestled). Days on which no moral accurtetl shall be rewdetl as'Zom.' The pern rise may use another rain-ming ontor device approvetl by the DM.I.n. (2)Ei At lion once pal 1. loan[ ficefion of Me msedras pnspedetl Measures wlanwr days and 2. Date ant Time of Me ingsdfion wilM1n24h.mo 3. Name d thewrw apeoisming Me inawdien I In vents10 nett I, 24 hours. easus was.,ddgproperly 9 Indication of whether in measures 5 DeRhplinn d-iMerence needs for Me measure D. bescd Ian, Evdence, antl date Awrremrva adlons taken M) Shonwekr Al lean once pal l 1. Idm4fi al of Ma Cadage.-Is i-Innood do.- wlenoar day. and 2. Date end Time dd, inspection oulbba(SDOs) aloud 24 h.m Of 1 o tin 3. Name of the ierean performing In. Inspection 4. Evdance of Ioc catom of atomwala polutbn such as ill nilevanta 24 hour, db fioaf g or suspended sold, or diswlomaw 5. hadcagon of -boo sediment caving the site e. Desaipbon,Evdenw, and Isla wredivs actions taken (4)Pon"ka, At laud once par t ltospbla Sedimernalkni.bud.doidesite limie,undodoN d Si. Lalen d, toys and of Me blowing shall be made: wood 24 has of a rain event alo 11 Action mood, b clean up or dealxze sediment that has left Ma ane timDa Inch in24 h- 2) De oMficn Evidence an data of wnedi. actions taken 3) An a holanatlon as, M the no taken to contra future mabason or Atl upon-diso, Ilona M1m,froon lfiheside or walmhof(5)Sdsls we.I. .achy.-- relend. douraril 24hwrs i--pu be has-oh,dincreasedN Stan hom Me wn.o-adlon emviy, Men a aaing anal)IS, or ogn.(where onion Di rant , of co 1)RaROhJ ofsequienceaud�.o wiappive acrn6lon en ccessible) 24hours. inch In 24 hours. RsMh,,I Wo arP reports. Ma a. hdr teDivision Repbnal ONw per Pon 114 Sediw C,.em(2)(al of this pemtit (6) Ground After adip phase 1. The phase of Gatlin Iinstallstan of con-, EBSC Sbbilizalli Measures Ofgreding. measures,dodirg andgrubbirg, indalladon deb.m drainage bolded, completion of all. olion.N'mg actively, or redevelopment, pemlannot ground rover) S Dowmenlalien Nat Ma required ground sbbilpzden ow-res have Wren provided within the required Rd roe Mal Merwt11 be podded. soon. Possible. NOW: The Min irspecldon resets Me requlred 7 calendar day inslaclion requirement. PART III SELF414SPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E85C Plan D....... do. The approved EBSC plan aswell as any approved tleuiation shall be kep[on the site. Thal approved EBSC plan must be kept up -rodeo throughout the wverege under tops period Time following Delos pertaining to Me EBSC plan shall be kept on site and avallable for inspection at all times during normal budress hours. ham. Dneumwt Dxumad Raidadro ds 1.111M and data Rich E&SC measure on a copy M (a) Each E&SC measure has been installed and Ma approved E&SC plan or complete, dab antl sign an Insped'nn report Mel lists each EBSC does no agnDbangy a"11 from Me.cations, dimenaki and motive elevations or. on the sure shown on the approved E85C plan. TM oedocumentation approved E85C pan. i. requirtl upon Me inilitl iraelar.. of he E&SC meacumcre m aodid t after ind"I Insbllaticn. MR A phase of grading has bean completed I.,ho antl date o agy of Me approved Elun plan or complete, Bare and sign an irvpadon roport to are indicate completion dare construction phase. Gmun cove a I.Rded and Moulled'n Initial ant date a copy of Me approved E85C pan eaodsnca with the appros's EBSC plan. or wmpleb, data and sign an inspection rapid to onirate mmpl'anrs with approvad ground -1 apealocauor.. (d) The malne dance and repair requlremanG for compete, data and sign an lospec al report all E&SC measures have been performed. (a) Coredlvd adlons he. dodo taken to E65C In Mai an eta. a cosy ofMe epp ck. E&SO plan measures. Or complete, dab inspection and sign an insction mood to ndirets Me completion of Me corrective action. 11 O sO, nape on atN In addimn b the pan do.menis above, the following items shall be kept on the site ant available for Ispedorm at all Dross during normal business hours, unless Me Divisioni,..nt a preside cexemption basedcunique age contlitions that make Mis requirement not pacti- (a) This General Penrod d, well as the Cerdficate of Coverage, after it Is received. (b) Records of inspections made tlunrg the previous foetus months, The permitter ¢halt record the required observations on the Inspection Record Form pevdetl by the Division dmilar inspecilon tam that includes all Me requireal e.mense use o eledmnicoll,lSwe lale recprds in lieu of the required .Par.ples witl be allowetl if sbown to povitla equal access and uOiy as ire hadcapy recoils. S. Documanb0on to be Robbed forThma Yearn Ni dab used to complete Mee-NOI and all R.pdd.h records shall be main.ired fo a period ofthree years after pojed camplefion and made a mNe upon request(40 CFR 12 41] NCG-01 SELF INSPECTION SELF -INSPECTION, RECORGKEEPING AND REPORTING SECTION C: REPORTING 1. Ocoamenaes that ..at be Reported Pefmittees shall report the following occurmnce (a) Visible sediment deposition bt a stream a wetland. (b) Oil optll. if: They are 25 gallons or more, They ere lass Men 25 gaiters but cennol be cleaned up within 24 hours, They cafes sheen on suriace waters (regaMless q vdume), or They are within 100 feet of surface waters (,godless of d,Ium j. Raise , (c) order Section, 311 of Me Clwn Water, Act (Rep 40 CFRnRced, of 110.3 an 40 CR 1117.3) or Sedicn 102 of CERCLA (Ref. 40 CFR 302.4) or G.S. 143-215.85. (d) AnoddIoted bypasses and ... htbipated bypasses. (a) Noncompliance with the condlums oMle permit Mal may endanger health or Me meni. 2 Raprating Tlmetramaa and Otlar Requladra de After a permitter becomes aware of an ocourence that must be repo Stud, he steal content Me appropriate DHapon regional oMoo within the timahamea and pn a dance with Me other to Mee Mee listed below. Orsumnces getaitle nomal business hours may -03 tea reported [o Me OepartmenCs Environmanel Emergency Center personnel at (800) 858-038D. Owurence Rewmtg Tdeirame(Ader Dlswvery) ace Other Regdremods ;a) Visible • WDhi 24 hours, an oral or lactoonk, notification . im sedent deposition in a •WIN, 7Calendar Day,, a report Mad contains a decolptpon of the sadimeM an actions taken b addmaa Me was of Me depo,kbn. dream or weDantl oiviowsteftmayvalvetherequrementparewnrcenrepwewacase- byca rob • If Me stream Is named on Me NC 303M) lid as, imwlred for aediment- related caused, Me permithes may be required to perform addigoral mon4oring, inN edbns or apply mare shi gent practices if doff C6terion. Mat a�ItlOnal mqulremenis are parade] to essuR m liar with Me federal orabte ire aired -warm candiana. b) OI spills and --In 24 Houm en oral orelecronic ndficedon. The notification dol released a hM. induda h.rmadon aboutthe date, time, nature, wlume and lool M Me spill or release. substances Pa tam I(b)I.)above c)Antiopated •Ampod al lead ton days before she dal. of Me bypass, ifposaible. Dypase.,[on GFR i22.91(m)(3)] The pecal ..It induda an evaluation olive anfidwiea quarry an efectofftlondss. Id) Unanticpated • WIMh 24 Hours, an sal or eactonic ni nficetion 5ypases [40 CFR 12261(m)(3)] • Within 7 colander days, s report that includes an evaluation tithe as aftectdMME, al' andOn' Ie)Nonwmpl.nca •.Min 24 HOum an anal orele E,nic not'Ification with [he contlitlwa •..In 7raI.M.,day. a report day can.ns a dsscnpdon M the dthis permit Met compliancewu; M , and its aese perioww d of nmplpanca, Including eadddex mayenan0er health or Me and Mn.,RodfMen..-M,b-h..o.ba .Ireded,ire adi led rime n.c.oOlance Is-Rded to wntlrue; rm.nt [40 and steps taken or planned toreduce, eliminate and prevent CFR 12291p)(])] cal of Me ochoomplience.[40 CFR 12241(I)(6). • Diviabn step may wave the requitement par a with n report on a ress- a..aa Page: A� AY� a YI C fir/ _ • Z o: 2v wit as LoM1 rrLs� , 01 r L4.f J J Q i N Li D l9pi u. Qoy C u0i no 0 Z 3 O M, Q In. W IY W `W W J a 2� T �ZH CARo usMmrRur�- Q OfESS/�� T S �1 VES SEAL B�fjsuhj­. 03,751 C � INITIAL PLAN DATE:O67D2y2D23 REVISIONS. WRJOBNUMBER o82211220o DRNiDGN: SEWMISS CKDiS!A E&SC DETAILS C5.1 D.E.Sign STR FABRIC ON FACE (MINIMUM 8 MIL THICK) TO PUMP I STRI PLAN 12 MIN FROM PUMP TOPGFBANN air air als�alr_ -r^_fc_.: r'..a 2=f�'i,-a -•s_-a`• a{'. -n .:<�..r'y.c,.e+::-�:: - WATER PROOF POLYETHYLENE Ea STREAM BOTTOM) FPBRIC ON-(BMILTHICK) TEMPOPL RYSTONECAM SECTION A -A TEMPORARY STREAM BYPASS NOTTOSOALE (ea:adanucEmannarresadrmanlconnolaannnganeoa6rgnManpaf,sra�aa��ro�s�a) PUMP -AROUND NOTES 1, T IS RECOMMENDED THAT WORK BE SCHEDULED SUCH THE CULVERT REPLACEMENTOM BECOMPLETED DURING A TIME OF MINIMAL PRECPTATION 2, 3YPAS3PLANI5SCHEMgTILGONIRACTORISRESFOIGELEFORTIE DEBGN, INSTALLATION,MAINTENANCE, OPERATION AND REMOVAL OF ALL EDUIPMENT AND TEMPORARY CONSTRUCTION TG N8URE -DRY' WOWN G CONOITIGNS. S. PUMPAND LINE SIZES TO BE DETERMINED BYTIE CONTRACTOR. 4, ESTIM4TEDPEAKFLOWSAREASFCLLOWS: DIN • Q2 15CF6(47DOGPM) • 0-18 CFS(-8,t DO GPNH • Q10=210FSI-IL"GPM) HMS: • W-70GF9 (-31,IPo GPM) • Q5=87 CFS (-39,W0 GPM) • Q10-100CF8(-45,000GP1.1) • EROSION STONE TO BE CLASs'P OR E' RIP -RAP AS SHOWN, UNLESS DESIGNATED DIFFERENTLY ON CONSTRUCTON PUN MAINTENANCE NOTES: I. INSPECTWEEKLYANDAFTEREACHRAINFALLEVENTT TPRODUCES)5 INCH OR MORE OF FAIN. 2. REMWESEDh£NTANDWOODYDEBRISPRIXvPTLY. 3. REMOVECOLLECTEO SEDIMENT FROM STONEIRIP-RAPAREA3 AS NECESSARY. TOPDRESS NTH 2. WASHED STONE AS NECESSARY. ,MINIMUM, Cron -sea hn view III S Spadnrat'Ima 4a••: o.•ew 1. Gkarihe areas untle Ne arbankmentand sinpof rods andohambkU M ke Ddaytl gW irarea unlll the tlam'sin T•F °f fO`k0b'aa'al plain 2. Cararfle MUNaflonerea bdudng Re ebutrneds vdea extra-atre,gM fiMMab' bet beckfll' g N od.lf wRberaM1 srecu red sbp•f e ovate at ar,terlPddam ew�dmalltlewe din, An Rh aYftfil IAVI lanvi ud b moklll bankned fmmlhe zm �al'°'r upsbeam edge d9re thin bMe tlowndream atlge dha �mn Uedap fill material artibmvim of 1 MdataA ldnb. wah 0ce Upsueama rip laM osvrilmmwnaheamaRp Rna. ra 3. ConsOoel We embankmmtw.Nwall�mded rack and gavalblhe simand tlimensims drown mNeerewi tatisiagorhnt lh Ra, Fa aaaaank beian 2aIhigher Wan wespllWay cred antl al keelifool hgher Wentle dem, dI We srMbite tldmatreamia,lopreven[ ur andemaim atlhe abulmeNs. 4. Sedmenl-laden wets bombe mnatmWian dl shouts be tliveeetl lnbihe basin zeservdr eithe lurMeatarea from We dam. 5. Inma-UWa roakdam before We haein sea ie deared w m n m zesedment ymM from mnstmrom ofMre beef,.ImmedNelysGb lizeaA astlislurbed aunrQ We mnsmcfim Dflhe dam¢xcepl the seament pool (Rddence6:6dface 5ladflzafion). 8. Sakry-Sedmenl badns shwld baconsitlsad dangamuaberause lheya0radchiltlren Sleep ode dopes sM1guM beavoaetl, Fences wiW roaming signs maybe nestled ilhespaming isllkety.Al ddeand local regaremeMs muatbe fdlowed. Mai". an. Ghao aaalmenibasins dmreaCh minlall,RempVe aedimen-dasare DhJl,ld vOWmewN¢n%amen admmWatesm apoul me4mFNaeeslgn vowrre. Ssdimenl.Nadel heda -n Web'naedadarvslely awbilieed. Chxk be nBucwra M amsbn, piping, e N rwh d'epl ammed weetJy and alter each d9^ifiaM ('h inch or 9maw4 reindom, and mPk imrre Ihht . nR.R urwlaMaxadimanlinmadnlelyinlet Wemndmr,a mates. PIH,.Mawlszm. ah Ea Inaoninsflew dem rob d.I ign n dckspQ area ana ard,.N All wabr ana lato aantsleala ra .ga.yboar ng PHI --. remove. SealmeM sMdtl De placed in desgnateddkpoaM xeaa ana noldlowtd loflow ink streams ar tlrainage waysduri,g sauchre removal. TEMPORARY ROCK 5 COFFERDAM DAM (Baaadm NG Emdanasdsadmamcamalwanai,Wamoaag^NTanua', srerdaro rveab'aa s.asl ea w` 2-3' GDarse aggregale Zito- --tain, NSTALLATION: 1. Ckar Neenbance and..,t areaofall vegaadm-,and odleroMdHlonable.-id and praw,'ratle I,. 2. N.iM1egmWe -MI to and then. ned-m We IIII-A. 3. Provde tlrainagebrarrywabrbas iimenl trapmoRer unable artlet. 4. Use geomxlileMARcs because tlrey knPoae d�iey of Ne foubaOm lnlocdlimsasyedto seepage orhigh roarer wbk. e TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT TO SOALE HOSE FROM PLMP NOTES: PRECAST CONCRETE SECURE TO MANHOLE BECTON WITH CHAIN, MNYL WEB OR OTHER SUITABLE 1. SET 4' DIAMETER PRECAST RISER SECTIONLEVELTOALLOW MANHOLE RISER SECTION MATERIAL DISCRARGE TO OVERFLOW SIDES 2. CAREFULLY SECURE PUMP SUCTION TO FLOATING DEWCESTO PREVENTSEDIMENT. 3. USE WP RAP GLASS B STONE. 4B'MIN. MINIMUM I6'DEPTH, DIED=F, DIAMETER PLAGEO F HEM THE GOTTGM ON A I SLOPE OR FLATTER FABRIC UNDER STONE BYPASS PUMP DISCHARGE VELOCITY DISSIPATOR DETAIL (-Z1 NOT 105CALE 'EN ml 1 FENCE MATERIAL: _ IlJ ORANGE, UV RESISTANT of HIGH TENSILE STRENGTH j POLYETHYLENE LAMINAR o BARRICADE FABRIC cal ATTACH SIGN wl TO POST (MINIMtIMI 1. ALL PLANTOESIGNATEDTOBESAVEO SHALL BE PROTECTED BY FENCING. AS ILLUSTRATED. 2. INSTALL TREE PROTECTION FENCE A MINIMUM OF 12- OUTSIDE OF DRIP LINE OF TREE TO BE PROTECTED, OR AT EDGE OF DISTURBED AREA, PRIOR TO START OF CONSTRUCTION. S. SPACETREEPROTECTION ZONE SIGNS A MINIMUM OF ONE EVERY 150 FEET. THE SRE OF EACH SIGN MUST BE A MINIMUM OF 2' X Z AND BE VISIBLE FROM BOTH SIDES OF THE FENCE, THE SIGN MUST CONTAIN THE FOLLOWING LANGUAGE:'TREE PROTECTION ZONE, KEEP CUT' AND 'ZONA DE PROTECC16N PARA ARBOLES, NO ENTRAR' (ENGLISH & SPANISH). 4. THERE SHALL BE NO STORAGE OF MATERIALS WITH THE BOUNDARIES OF THE TREE PROTECTION FENCING. S. TREE PROTECTION FENCING SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. II..._ II __...... u -_„ 11' ul (MINMMM u u IMUMI� 1,13 LBSJFT STEEL POST CONSTRUCTION FENCE TREE PROTECTION FENCED NOTTOSCALE 3LEEVEFORPUMI OISCHARGEHOSE OPTIONAL LIFTNG STRAPS SILT FENCE VARIED WITH GROUN D SLOPE DEWATERING FILTER BAG 24-MIN AG FROM UND LINE TONE PAD E FABRIC �i VARIES WRH VAF948LE GROUN03LOPE (10'MIN.) REINFORCED SILT PER. IYIENESHEETING FENCE OUTLET Ili MIL MIN) PLAN I DEWATERING rGEOTIXTIIE FABRICI FILTER BAG I Steel P°n Cro se.1 oM vi- 4 MIN VARIESWITHGROUNDSLOPE I min 1 I U�' 4' MIN f0'MIN SILT FENCE 24" SILTFENCE ftEINFORGEO SILT FENCE OUTLET p57STCNE TO LEVEL B4G FROM EXISTING GRADE N4TUMGRWNO LINE POLYETHYLENESHEETING INSTALLATION. t The baseW WWeM ports steUtl bedkestmefm hgha Wan Ue mgtlledNe fence. CAesk WWlevelnremssary. SECTION 2 Irmbl pcds4lealapaR n a",a' areas and Ghat apadon a andardapp' cegans. NOIEBNEWATERINGFINFRBAGI' 3. nswl paMs2feeltleep on Ure tlawnaN a DIN dltferrce antl as arose aspM, II NNE,, en all, paskto 1 CmhaclD NW Uipn,wlwmrdarCa plledexaclrN RbinA M1m WmPDA• "" the(aGicho 0pstre Waterp 2. 1Mtl' Son dtre0aweleNg Nkalgg Shvmm Netlrasin9 maY NPar dN6P6�R AMI6. 4 Irrslal goals vnlh ppksf gexayfrwn lh 11 br . 1 Oe kd DbaW ahl be equpPauiWasexn<,Neeveds,Mloenl- w MWspump9ipAon tlkdarP hse. theadv Jelaax skWbeeNeMalinblhb 5 Ad- fie TV-W aaU, post mt,tl,ree Aes aII,M l mNe Wa by 8 1 Atha bb^o Aflach ead,tI daBonally 45 tlareae hro here fat 0aaah misre al least l I yaR lW.H.bs..b W11-ld be imadl io ba skeveamrimumdsunchme,M be ABNy dzuml wMahasxdemParolhersu,aElemeansbpa'mtkaYau.Hoes'rrla1bntlsougAa9ltin tlreDal y,R Mbe 9 pl I p+ Yap pca r5 papm1madhentl9hbnaelope.^..ABOinp. 4.B he punptl 11aeAommnnacNpla. reshallbN-afyATa"ha, tlsp adds I, avalemgfikerbap Ta'Jaleakage M ademdaedlmeMa. B. WRpappmxl 24 ndaaal.ol0briearountl Ne eMIas ands=sure xiN,]Oe6. 5. Thedraa alRd- IS, a, Pa le an ft mad-c dlhap l hasanmuMetivin aonNa„cevntl,Ca manubsMeh mmmmentlafions T. Namore Nan24 nd,as ofa38ad ..bris is allowed aydaMa,-level. 6 ENANCbr SSYvsMbagbmetlmlM1e,maimenflmvdihe Pumpdapgn repwmmnM. B. ThBlndellzllmaJIyi 1p.HPH tlaMwrrea.Ra mydeNadom beore aarpaceon. MANIENANCENOlES: 9. CmnPchnk Mtally impoRaniMeRedva result. Cmpadihewil i,m,eaidelynen to Rre siltfenre hbTbwiW lMhart t. InspaztlaitytludnD brpassryweeu,.arrytlanagaWtl'esetlYremfilBrbag a�mW be,apairaiimmetliat9y. Ikeof 2. ear.A dde twicefora Vela. s,Vdsleet,erel¢Nryl alIPoSI fi0pawds per sgnre inch.GompaA Ne upsVeam sde hrsl, arp OewakdnB fiHerbaBdlNlberepkseo'whene'dseSmenlhmamm,�letlorin axatla„cewN,VamanuMCWrefsrttommeMatlwo. then bml oia1.L4 Mps. 1 MmnordewakvgfldrNegmgdaR,br MapewredwrdtlweW kav,gdaMWad,ganY wrb4 xakru bskgdadagetl Yemticeb4gtlwsihabndal ham *.nd knmetliataM llwmpaary Elrtlug+ aremtlontl, aseeneltebag sN�'meMlapedlyaMreplareim 1'mYy SEESECTIONBELOW OVERWP HA�WARE CLOTHS' (MINI SILT FENCE EACHENO� 14'(MINI� SILT FENCE TO BE 1T TALLER (MIN) THAN STONE DEPTH _JL__ _IL- 0 U 0 o II o LBURY WIRE FENCE All FILTER FABRIC (SEE . LPOSTSINN as(MAXI 6EOIMENTFENCEDETAIL) STEEL POST ORNE 24'(MIN) INTO GROUND SURYHARDWARECLOTH151MIN) WIREFMOE ELEVATION HAROSVARECLOTH� 12'(MINI FILTER STONE � 3F (WPSRECI FILTER FABRIC OR DJHi WATILE .. , NOTES: • HARDWARE CLDTHTOBEn MESH, 0GA. GALVANIZED STEELWIRE. BURY WIRE FENCE AND FILTER FABRIC ..II REMOVE SEDIMENT WHEN SEDIMENT DEPTH REACHES HALF OF THE (SEESEOIMENT FENCE DETAIL) M STONE HEIGHT. BURY HARDWARE CLOTH B" • REPLACESTONEAS NEEDED TO ENSURE FLOW THROUGH FILTER. SECTION NOTTOSEALE •, tH CARD uswnvR_m'r$I Q oFESs/p� y S 61 V S SEAL B'aaabem.a= 039751 c � INITIAL PLAN DATE:06/02/2023 REVISIONS. WRJOBNUMBER 08221122.00 I ORNMOIN KEW/BGB CKD:SJM E&SC DETAILS C5.2 L i02 i500 249lf _ »5 24va z49z ]4Vfl 24d8 �491 2500 250e 2496 25,12 a,l �nvo za92 za9n z44I1 t4v�. 2488 2492 ' 50 40 3o 20 10 0 10 ''-0 30 'to248G za )0 0450,00 nW n B RIP EO GRADE VEGETATE05DILL1 15LOPETYP. 1 EXISTINGG. \ \ m8 ICIASS N 3 RIPR ♦' LOI W TOE I NOTE: CONTRA. LIPTS WIT LEVEE ORTOTE IN EKLSTING 2502 25DD 2496 2496 2494 2498 2504 ?S00 21. 2496 �' �•� 40 ]0 �. li c _ )0 40 0 24138 1+00.00 2502 2501 2ial 2502 2498 2 00 !496 249tl "1 2496 2490 2492 .4AN 2498 _ C 2496 2499 b iG .t.. 10 20 30 40 50 40 30 ;li LU 0 50 6 0+25.00 0+75.00 / I 2300 2498 24" 2494 a92 119, 00 N j O I, RAW _ J J Q W_ o �pz QOy °na O Z O F z U 0 O a_ w _ 5 z 1+50.00 LLJ ° W J w W W 2E., 2504 2502 2sns Zan 00 '411 9ti 1411, 2494 2492 2498 24YO .46 \ I Z ° H O 5Q U Z Q I F Z nu O PSN CARD 2446 usgneBae?I Q OFES S/Qy 9 S �Y�cS SEAL � 2490 2— 2492 2498 2496 P R'FN INITIAL PLAN DATE:06/02/2023 REVISIONS. _n s a0 30 20 10 0 LO 20 30 40 1+25.00—JOBNLIMBER 06224122W DkIv,DGN:KEN!/l1GR CKD_S1M " PROFILE VIEW GRAPHIC SCALE CROSS SECTIONS 1" = 10' HORZ. I 1"=2' VERT. 0 0 10 20 X-1