Loading...
HomeMy WebLinkAbout20190157 Ver 3_Perry Hill II_MY3_Credit Release Request Letter Task 7_20230829ow W WILDLANDS ENGINEERING August 29, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Andrea Eckardt, aeckardt(c�wildlandseng.com, 704.332.7754 x101 Through: Wildlands Holdings V, LLC We formally request a credit release for the Perry Hill 11 Mitigation Bank Parcel (DWR ID# 2019- 0157 v3) for completion of Task 97 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task 97 and are pending review: Recorded Assignment of Conservation Easement Credits requested for release are detailed below: Credit Type % Release Credit Amount Notes/Comments include Units Buffer Restoration 5 1,644.100 ft2 (0.05 x 32,882.000 ft2 = 1,644.100 ft2) Buffer Preservation Buffer Enhancement 5 577.531 ft2 Cattle Exclusion. (0.05 x 11,550.621 ft2 _ 577.531 ft2 Generated Nitrogen Nutrient 5 1,530.021 lb-N (0.05 x 30,600.429 lb-N=1,530.021 lb-N) Offset Delivered Nitrogen Nutrient Offset Jordan sites only) Generated Phosphorus Nutrient 5 98.545 lb-P (0.05 x 1,970.904 lb-P = 98.545 lb-P) Offset Delivered Phosphorus Nutrient Offset Jordan sites only) Signature: � ouvt� !�' L Attachments: 1) Approved Project Credit Table (Monitoring Year 2) 2) Approved Credit Release Schedule (BPDP) wWildlands Engineering, Inc. (P) 919.851.9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 /]{ \ / „ §o / , o om9 _ - _ ) „ § ),,,§\§( )|ƒ } = ao }o a a }_}_ \) ( �oo (/(,m },},/, o o \ }\} m 5 1 } ( \ o lw m. «w \ �\ ( ow \ a „aaa # )ƒ _ , , cc cc f \ \ \ \ /\\ ! � ����}} ���� ƒ22}} § � \\\\\\\f !!!lfaaaa aaaao }�}\�\�ƒ}; }\�\ �~ (\$\ƒ(°ƒ\(\ 2w ƒ\ \�\L �\\ ®3; \ \\ )) _® Approved Credit Release Schedule (BPDP) Perry Hill II Mitigation Bank Parcel Bank Parcel Development Package % Credit Available for Task Project Milestone Sale Instrument and BPDP approved by DWR, full -delivery mitigation plan 1 approved by DWR, conservation easements recorded and financial 20% assurance posted Mitigation Site earthwork, planting and installation of monitoring 2 devices completed for both the Perry Hill full -delivery site (DMS 20% ID#100093) and the Bank Parcel 3 Monitoring financial assurance posted and approval of As -Built report 10% Monitoring Report #1 approved by DWR* & financial assurance 4 Renewed 5%** Monitoring Report #2 approved by DWR* & financial assurance 5 15%** renewed Monitoring Report #3 approved by DWR* & financial assurance 6 renewed 10% Item B(1) of Section X in the Instrument has been completed and approved by DWR o 5� No remaining credits will be released until the conservation easement has been assigned to an approved land trust or steward Monitoring Report #4 approved by DWR* & financial assurance 8 5% renewed Monitoring Report #5 approved by DWR* and final site visit by DWR has 9 10% been conducted Total 100% *DWR approval provided upon a determination that the Parcel is meeting performance standards contained within the approved BPDP. **Percentages adjusted for partial credit release in Monitoring Year 1.