HomeMy WebLinkAboutNC0021229_Pretreatment Annual Review Form 2021_20221027Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included?
ADEQUATE?
POTW noted Corrections?
Regional Office: ARO
Narrative
YES NO NA
YES NO NA
POTW: Old Fort
PPS Form
YES NO
YES NO
NPDES Permit No. NC0021229
SNCR
YES NO
YES NO
Report Period: 01/2021 to 12/2021
IDSF
YES NO
YES NO
Full Modified
For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC.
Allocation Table
YES NO
YES NO
Compliance Schedules
YES NO NA
YES NO NA
Public Notice
YES NO NA
YES NO NA
Program Information
YES NO
YES NO
YES NO
Historical SNC
YES NO NA
YES NO NA
YES NO NA
If No, check recommendation below:
1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table).
Yes No Not req’d
NOD
NOV
QNCR
NCP
Civil Penalty Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form)
Yes No Not req’d
NOD
NOV
QNCR
NCP
Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in SNC, including those causing pass-through or interference? (See Narrative and SNCR Form)
Yes No NA
NOD
NOV
QNCR
NCP
Civil Penalty
Assessment
4. Does public notice cover all SIUs in SNC?
Yes No NA
NOD
NOV
QNCR
NCP
Civil Penalty
Assessment
Note: Exceptions should be explained in the comment section below:
The PCA was conducted in August 2022. Refer to that report for details on the program. The STMP was recently modified, and Mr. Cagle is in the process of sampling for the HWA. Mr. Cagle
started in September 2021 and was unable to find a lot of the pretreatment paperwork from the previous ORC. Hillman Beer had one BOD exceedance in 2021, and a NOV was not issued. This
was addressed in the PCA.
Reviewed By: Lauren Armeni Date: 10/27/22