Loading...
HomeMy WebLinkAboutBPDP Review - Bandit FarmsFrom: Merritt, Katie To: Menefee -Dunn, Barbara A Cc: Hartshorn, Blake; Baker, Caroline D Subject: FW: BPDP Review - Bandit Farms Date: Monday, August 28, 2023 4:54:35 PM Attachments: Bandit Farms Comment Summarv.Ddf Barbara, Please file email thread below and attachment in the same PDF. Thank you!!! I'm also copying Caroline Baker on this too so she can make sure everything went into LF successfully. Lately, there have been some issues with LF docs, so hopefully it works okay. If not, she'll let us know. Project Number — 2016-0393v4 File Name: same as subject of this email Date: the date I sent the email below 8/28/23 From: Merritt, Katie Sent: Monday, August 28, 2023 4:52 PM To: Daniel Ramsay <dramsay@restorecology.com> Cc: Hartshorn, Blake <blake.hartshorn@deq.nc.gov> Subject: BPDP Review - Bandit Farms Hey Daniel, Pursuant to Titles 15A NCAC 02B .0295 and 15A NCAC 02B .0703 (e), a provider shall submit a project plan proposal to the Division for review and approval that includes specific elements of the project. On June 5, 2023, RestorEcology Jordan, LLC (RestorEcology) submitted a Bank Parcel Development Package (Plan) for the Bandit Farms Site, to the Division, for review and approval. According to the initial review by DWR staff of the subject Plan, some elements were either not provided, not explained thoroughly, not accurate or lacking in sufficient information. Therefore, until DWR receives an updated Plan addressing all comments and edits provided in the attached 1) comment summary and 2) PDF version of the document itself, DWR cannot finalize the review of the Plan or issue an approval of the Plan. In an effort to be as efficient as possible at providing comments to RestorEcology during this busy time, I have provided my comments in a unique format. Attached are the comments & edits provided within the actual PDF of a condensed Plan (without Appendices) as well as a comment summary. When RestorEcology is ready to submit their final project Plan, please include a summary of all responses by RestorEcology to the DWR comments acknowledging how RestorEcology addressed the comments. Please upload the final Plan using our Mitigation Project Information Upload Form through this link: https://edocs.deg.nc.gov/Forms/Mitigation_ Information_ Upload . Please note the DWR ID# 2016-0393 (version 4) on all electronic submissions for this project. Thank you for your patience during this time and if you have any difficulty reading though the comments or edits please let Blake or I know. Katie Merritt Nutrient Offset & Buffer Banking Coordinator 401 & Buffer Permitting Unit North Carolina Department of Environmental Quality Office: 919-707-3637 Work Cell: 919-500-0683 Website: https://deg.nc.gov/about/divisions/water-resources/water-quality permitting/401-buffer- permittin8-branch NEW EMAIL!! katie.merrittna deq.nc.8ov 512 N. Salisbury Street, Raleigh, NC 27620 1617 Mail Service Center, Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Summary of Comments on 20160393 Ver 3_BPDP - Bandit Farms - FOR SUBMITTAL 060523 20230605 Page: 1 Number: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:56:06 PM 8-digit HUC is irrelevant. replace with the 14 digit HUC Number: 2 Author: bhartshorn Subject: Sticky Note Date: 8/14/2023 4:14:31 PM Please add the DWR# on title page UNumber: 1 Author: kymerritt Subject: Cross -Out Date: 8/28/2023 2:56:23 PM Number: 2 Author: kymerritt Subject: Inserted Text Date: 8/28/2023 2:56:46 PM Mitigation Number: 3 4 Author: bhartshorn Subject: Cross -Out Date: 8/14/2023 4:13:53 PM 0T Number:4 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 12:02:14 PM proposed ITO Number: 5 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 12:02:37 PM intending to be made Number: 6 Author: bhartshorn Subject: Cross -Out Date: 8/17/2023 12:07:01 PM This rule is not applicable..0273 is for permitees with stormwater. ITO Number: 7 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 12:01:06 PM proposed I�Number: 8 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 12:08:21 PM Bank Parcel (DWR#2016-0393v1) Number: 9 Author: bhartshorn Subject: Cross -Out Date: 8/17/2023 12:09:06 PM Number: 10 Author: bhartshorn Subject: Cross -Out Date: 8/17/2023 12:09:11 PM Number: 11 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 12:08:46 PM nutrient offset credits ITQ Number: 12 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 12:08:58 PM nutrient offset credits Number: 13 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 12:09:43 PM Sub -watershed Page: 5 Number: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 4:37:32 PM there is no "existing conditions" labeled figure. Number: 2 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 12:16:12 PM Please indicate if there have been any land use changes within the riparian areas proposed in Fig2 and shown in Appendix A. If there have not been any land use changes please indicate that in this section. Number: 1 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 12:39:45 PM Please provide the source for where you got this information (does not need to be in the reportjust in the comment response). Number: 2 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 12:40:54 PM Please do not include anything about credit potential in the Parcel Summary. We have the project credit table for that. Number: 3 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:58:13 PM when referring to nutrient offset, the term "mitigation" is irrelevant. we do not refer to nutrient offsets as "mitigation" �Number:4 Author: kymerritt Subject: Cross -Out Date: 8/28/2023 2:57:42 PM Page: 7 Number: 1 Author: bhartshorn Subject: Sticky Note Date: 8/28/2023 4:36:23 PM Please provide the drainage area that is relative to what is needed for .0295(o) (7) along the Ephemeral channel of C1 and verify in writing that the riparian restoration of C1 meets the reclirements in (o)(7). Page: 10 ;Number: 1 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 1:14:46 PM This site should be considered for fescue treatment during the site preparation stage. Lands historically used as managed cattle pasture and grazing are also usually compacted and would make planting of bare roots susceptible to poor soil conditions. Why is the Bank Sponsor not proposing to amend soils, provide fescue treatments, or rip as part of this site preparation phase? Number: 2 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 1:10:02 PM DWR does not allow Black Walnut to be planted due to the allelopathic properties. Page: 11 ;Number: 1 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 1:19:54 PM It says you want to use trees and shrubs towards your performance standard however Table 8 does not indicate tree vs. shrub. Please add a column with this information clearly identifying what is shrub and tree. Number: 2 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 1:16:32 PM If 15 species (I excluded black walnut) of trees are shown in the table, DWR expects 15 species to be planted. If anticipating to plant only 7 from the list, DWR cannot confirm the density percentages column would comply with the performance standard of "no one tree species will be greater than 50W as noted on Rule .0295 (n)(2). At this time the density according to Table 8 is not accurate unless all 15 species are planted. It is understood that changes to planting plans can happen. If any changes are needed to the planting list before planting, the Provider will need to submit a request to DWR for approval of the modified planting list if not listed as an approved tree in Table 8. DWR will accept a few substitutions if RestorEcology wants to include a table as potential substitutions in a Table 8b but you must include the % those subs are intended to be utilized in the case you need those substitutions. Number: 3 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:50:27 PM change all terminology from "buffer" to "riparian" �Number:4 Author: bhartshorn Subject: Cross -Out Date: 8/17/2023 1:21:26 PM buffer and adjacent riparian area Number: 5 Author: bhartshorn Subject: Cross -Out Date: 8/17/2023 1:22:44 PM riparian buffer credit and nutrient offset credit area Number: 6 Author: bhartshorn Subject: Cross -Out Date: 8/17/2023 1:22:47 PM Number: 7 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 1:24:01 PM please add vigor into the evaluation 4.1 Number: 8 Author: bhartshorn Subject: Inserted Text Date: 8/17/2023 1:25:12 PM and data included in the annual monitoring report. Page: 12 Number: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:51:15 PM there is no Jordan protected buffer here. remove last sentence. Page: 13 Number: 1 Author: kymerritt Subject: Cross -Out Date: 8/28/2023 2:51:40 PM ji Number: 2 Author: kymerritt Subject: Cross -Out Date: 8/28/2023 2:51:46 PM Number: 3 Author: bhartshorn Subject: Sticky Note Date: 8/14/2023 4:24:01 PM Please add the credit table attachment in Section 7.0 instead of a separate appendix 4)Number:4 Author: bhartshorn Subject: Sticky Note Date: 8/17/2023 12:37:30 PM Generated Credits are no longer needed therefore they do not need to be referenced in the BPDP's. Number: 5 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:53:15 PM how did you confirm this HUC? what link did you use? Appendix G. Bandit Farms, 2016-0393, Project Credits IN credit conversion Ratio (W/PoUld NEW — Totals (ft2): Total Nutrient Offset ®® �® Total Ephemeral Area (ft,} for Credit: Total Eligihle Ephemeral Area (ft'), Enter Preservation Credits Below Total Eli idle for Preservation ft' Credit Type Loration Suhje R? Feature Type Mitigation Acts" Min-Mda Buffer Wrdth Iftl Feature Nime Rural Yes II, 0100 A Rural Yes I/P 0-100 E? Rural Yes IIP 0 100 C2 Rural Yes 1/1 0100 Morgan Creek Preservation Area Subtotals (ft'(, TOTAL AREA OF BUFFER MITIGATION (TABM) MI Her, Totals Squara Feat Credits Restoration: iao,277 498,732,565 E nhanrement: C 0.000 preservation: 163.524 16.352.400 Total Riparian Buffer: 712.30: 515,0S4,965 TOTAL NUTRIENT OFFSET MITIGATION Ming. ti—Totals Square Feet Credits Nutrient OHseF: Nitrogen: Phosphorus, °059 IB0 a53 S.6Ei 1. The Randleman Lake buffer rules allow iomeditchei t6 be classified 2i iubjett according io 15A NCAC U28 .0250 (5��2(. last updated 08/03 S],5;9 85,737 1R3,fi90 22.1% Total Area lsf( Total l[retlhablel Area for Buder Mitigatiun(ft'( 40,200 40,200 54,677 53,242 34,328 32,662 37,420 3],920 166,626 163, 529 Ephemeral Reaches as %TABM Preservation as%TABM Initial Credit Final Credit Riparian R2tio(a:1j %FuBCredIt Ratio(8:11 Butler CRdits 10 100% I0A0000 4,020.000 10 100'% 1000000 5,324. Z00 10 100% 10.00000 3,266.200 10 100% 10.00000 3,742.000 Page: 15 *Number: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:41:18 PM for simplicity, since all these streams are subject, you could consolidate all the streams (A, Morgan, C2, B1, B2) into one row for each width category. remember, the survey has to match this table and your corresponding figure. The more complicated the table, the more complicated the survey has to be. ;,Number: 2 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:37:52 PM the grey area on Figure 7 has to be quantified here in a transparent way. this area will also have to be shown on the asbuilt survey. choose "Buffer" for credit type, for Feature Name, label it "Non-credit Area <30' ". Do not put a ft2 amount in the "Total (Creditable) area column and check "No" for RBC and NOC. — Number: 3 Author: bhartshorn Subject: Sticky Note Date: 8/11/2023 12:13:07 PM can these rows be consolidated like on the other BPDP? *Number:4 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:55:44 PM make sure you are using the most recent table updated in July 2023, which is found only online here: https://deq.nc.gov/water-qual ity/su rface-water-protection/401 /mitigation/project-credit-table-tem plate-updated-novem ber-2022 Page: 19 Number: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 4:41:05 PM i like this. can you add this to other figures? Number: 2 Author: kymerritt Subject: Inserted Text Date: 8/28/2023 4:41:14 PM Bank Parcel Conservation Page: 20 FTI Number: 1 Author: kymerritt Subject: Inserted Text Date: 8/28/2023 2:21:50 PM for Riparian Buffer Credits & Nutrient Offset Credits Number: 2 Author: kymerritt Subject: Inserted Text Date: 8/28/2023 2:22:31 PM Jordan Lake Number: 3 Author: kymerritt Subject: Inserted Text Date: 8/28/2023 2:22:17 PM qbNumber:4 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:21:07 PM there is no reason to list the Lower New Hope service area because this bank site cannot provide credits to that service area. Remove that boundary. Number: 5 Author: kymerritt Subject: Cross -Out Date: 8/28/2023 2:20:55 PM Sltrearn 9l 1a 2 or ✓" T Stream 82 Ephemeral Cl y Crossing sr - „c1 IF Stream C2 �- r � y .1 o rgan�Cieek - Legend Top of &3nk C,ed,'t, o ar Parcel: Bandit Farms neEl °morgm �(0-1w) N'�`°� Figure 7: Credit Areas OdM�t terms basement � Bolter AesmraeorQ � No rGe7i a ®RESTORECOLOGY A 0 10D 200 400 ® Feet Page: 24 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:28:52 PM it may be more appropriate for the nutrient offset credits to be generated off C1 instead, leaving this area as Buffer. It's okay as proposed, just may want to reconsider. Number: 2 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:31:02 PM It is hard to tell where this easement line is. please add a callout here and a zoomed in picture of this easement line. I need to confirm that the easement line includes the other site of the Ephemeral channel, not the center -line. I also need to see if this is the Greyed out area called out in the legend as "no credit". QNumber: 3 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:26:15 PM change to "Riparian Restoration for RBC" QNumber:4 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:29:30 PM change to "Riparian Preservation for RBC Number: 5 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:26:27 PM change to "Riparian Restoration for NOC" QNumber: 6 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 4:40:01 PM change this to read "Proposed Conservation Easement Boundary". Make this change on all figures. QNumber: 7 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:25:53 PM Change to Riparian Restoration for RBC QNumber: 8 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:29:27 PM where is this area? why is it "no credit"? Page: 25 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:44:42 PM show the C2 origin point on all Figures Number: 2 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:43:07 PM see comments on Figure 7 and change Number: 3 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 4:39:53 PM the esaement boundary is black and the 100' is dark blue. Change the easement boundary color so that it doesn't get confused with the 100' boundary. Make this change on all figures. �Number:4 Author: kymerritt Subject: Inserted Text Date: 8/28/2023 2:33:46 PM Riparian Number: 5 Author: kymerritt Subject: Inserted Text Date: 8/28/2023 2:32:20 PM Riparian Number: 6 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:33:30 PM we don't use the term Buffer loosely. it should only be used when describing the Zone 1 and Zone 2 of the Jordan lake protected riparian buffer, which doens't apply to this site. All areas adjacent to the streams on this site should be referred to as "riparian areas" and not "buffer" areas. Be sure to correct this throughout your BPDP. Stream 91 LI Stream 82 + `k '` .•Y f 8 Al' Bp e era! C1. LI f �fc X ❑ Al CrassinK LI -yam" � ❑ � �. - - Iz. r ❑YON 1 ¢ 3qF ;Wl�f aLegend ■ WruboiingPI= Credit Areas BufferReS—dw Parcel: Bandit Farms R TQP of u.w Buffer Pruuvanon o ttB1-x•, ® R ESTO R ECOLOGY A —7 a Ito -too, D�-10[r)ReSt-tion Figure 9: Monitoring Components Q BBrdit r "s Fase rt Buffer Aevoranon — No Cretlit as-nao) o too- zoo aoa ® Feei Page: 26 *Number: 1 Author: kymerritt Subject: Sticky Note Date: 8/28/2023 2:43:21 PM see comments on Figure 7 and change