Loading...
HomeMy WebLinkAbout20110089 Ver 3_More Info Received_20150729 (2)Strickland, Bev From: Dev ne,8ovd Sent: Wednesday, July Z0'ZUl5ll:37AK4 To: Strickland, Bev Subject: Air|ie Industrial (HvdacTech) 11-0089 v3 Please files this. thanks From: David Lutz [mai|to:d|utz()ces'qnouu.neD Sent: Tuesday, ]uh21,2O15]:15PM To: ]ohnson,Alan Cc: Oevane,Boyd Subject: RE: Airlee The site is stable with 2 skimmer basins. VVe will ensure vve finalize the permit once a final occupant is identified and the upOtbegins. From:]ohnson Alan [mai Ito: kan.iohnsonAcbncdencoovl Sent: Monday, ]uh20,]0152:20PM To: David Lutz Cc: Oevane,Boyd Subject: RE:Airlee Before the building can be occupied and operating, there MUST be an approved storm water management plan for that site. The site at minimum must be stable from an erosion control standpoint. From: David Lutz [nlaiKo:d|utz(d)ces'qnouu.net Sent: Monday, ]uh20, 2015 2:09 PM To: ]nhnson,Alan Cc: Oevane,Boyd Subject: RE: Airlee Submitted the 0 & M to the contractor that owns the property and constructed the spec building, but since they don't intend to be the ones owning the property when it is completed and the erosion control measures are converted to permanent SWM, they felt we should hold off on permitting at this time. Once the property is sold and the upfit begins with new owners, I'll plan to resume or resubmit the permit. From:]ohnson Alan [mai Ito: kan.iohnsonAcbncdencoovl Sent: Wednesday, 3uly 08, 2015 3: 18 PM To: d|utz(cbces'onouo.net Cc: Oevane,Boyd Subject: Airlee Some clarifications are needed. Please forward to Boyd Devane. 1) |n general it looks "good",hovvever—. Z) Which parcel/lot is this for? And does the lot number coincide with the lot number shown in the 4O1. 3) There isno[)& M form included. This isneeded E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.