HomeMy WebLinkAbout20181097 Ver 2_RES_Dogtown_SAW_2018-1097v2_Tasks_2&3_Credit_Release_Request_8.2023docx_20230825ID#* 20181097 Version* 2
Select Reviewer:
Katie Merritt
Initial Review Completed Date 08/28/2023
Mitigation Project Submittal - 8/25/2023
Is this a Prospectus, Technical Proposal or a New Site?* Yes No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name: * Email Address:
Ben Carroll bcarroll@res.us
Project Information
ID#: * 20181097 Version:* 2
Existing ID# Existing Version
Project Type: DMS Mitigation Bank
Project Name: Dogtown Riparian Buffer Mitigation Bank
County: Catawba
Document Information
Mitigation Document Type:*
Mitigation Credit Release Request
File Upload: RES_Dogtown_SAW_2018-
1.84M6
1097v2_Tasks_2&3_Cred it_Release _Req uest_8.2...
Please upload only one PDF of the complete file that needs to be submitted...
Signature
Print Name:* Benton R Carroll
Signature: *
�.rCo'r�c�7t to//
fires
August 251h, 2023
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Benton Carroll (bcarroll@res.us, 336.514.0927)
Through: Environmental Banc and Exchange, LLC
3600 Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Corporate Headquarters
6575 West Loop South, Suite 300
Bellaire, TX'7'7401
Main: 713.520.5400
We formally request a credit release for the Dogtown Riparian Buffer Mitigation Bank (DWR ID#
2018-1097v2) for partial completion of Task #2 and completion of Task #3 per the approved credit
release schedule, which is included in the Attachments with this request. The following documents
have been submitted to DWR for Task #2 and #3 and are either pending review or have already been
approved: Dogtown Riparian Buffer Mitigation Bank Parcel As -Built Report, Dogtown Riparian
Buffer Mitigation Bank Parcel Adaptive Management Plan. Approved RES Dogtown Mitigation
Banking Instrument Credit Schedule. Approved Dogtown BPDP Credit Table.
Credits requested for release are detailed below:
Credit Type
% Release
Credit Amount
Notes/Comments
include Units
Buffer Restoration
20
140,230.256
(Additional 55% of credits
generated from within pond
footprint)
Buffer Preservation
10
4,217.260
Signature:
� ;
Attachments: 1) Approved BPDP Credit Table, 2) Approved RES Dogtown Mitigation Banking
Instrument Credit Release Schedule, 3) Dogtown Credit Release Schedule, 4)As-Built Credit Table,
Approved BPDP Credit Table
Table 1. Dogtown, 2018-1097v2, Project Credits
Catawba Buffer
Project Area
N Credit Conversion Ratio (k2/pound)
P Credit Conversion Ratio (ftt/pound)
N/A
N/A
Credit Type
Location
Subject? (enter
NO if
ephemeral or
ditch')
Feature Type
Mitigation Activity
Min -Max Buffer
Width (ft)
Feature Name
Total Area (ft')
Total (Creditable)
Area of Buffer
Mitigation (k')
Initial Credit
Ratio (x:l)
%Full Credit
Final Credit
Ratio (x:l)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible
to Nutrient
Offset?
Delivered
Nutrient Offset:
N (Ibs)
Delivered
Nutrient
Offset: P (Ibs)
Buffer
Rural
No
In -Line Pond
Restoration
0-50
3 Ponds (PA, PB, PC)
63,848
63,848
1
100%
1.00000
Yes
63,848.000
No
—
—
Buffer
Rural
No
I / P
Restoration
0-50
Sl
107,826
107,826
1
100%
1.00000
Yes
107,826.000
No
—
—
Buffer
—
—
—
Buffer
Rural
No
I / P
Restoration
101-200
S1(151-200)
10,221
10,221
1
1 33%
3.03030
1 Yes
3,372.933
No
—
—
Buffer
—
—
—
Buffer
Rural
No
I/P
Restoration
0-50
52
26,465
26,465
1
100%
1.00000
Yes
26,465.000
No
—
—
Buffer
Rural
No
I/P
Restoration
0-50
S3
75,836
75,836
1
100%
1.00000
Yes
75,836.000
No
—
—
Buffer
—
No
—
—
Buffer
Rural
No
I / P
Restoration
0-50
DTI
32,368
32,368
1
100%
1.00000
Yes
32,368.000
No
—
—
Buffer
—
—
—
Buffer
Rural
No
I/P
Restoration
0-50
DT2
3,294
3,294
1
100%
1.00000
Yes
3,294.000
No
—
—
Buffer
Rural
No
I/P
Restoration
0-50
DT3
92,742
92,742
1
100%
1 1.00000
Yes
92,742.000
No
—
—
Buffer
Rural
No
I/P
Restoration
0-50
DT4
97,361
97,361
1
100%
1.00000
Yes
97,361.000
No
—
—
Buffer
Rural
No
I/P
Restoration
0-50
Baker's Creek
87,770
87,770
1
100%
1.00000
Yes
87,770.000
No
—
—
Totals:
597,731
597,731
Enter Preservation Credits Below
Eligible for Preservation (ft2): F 199,244
Credit Type
Location
Subject?
Feature Type
Mitigation Activity
Min -Max Buffer
Width (ft)
Feature Name
Total Area (sf)
Total (Creditable)
Area for Buffer
Mitigation (k')
Initial Credit
Ratio (x:1)
%Full Credit
Final Credit
Ratio (x:1)
Riparian
Buffer Credits
Rural
No
I / P
0-50
DT3, DT2, DT3,
DT4, S1, S2, S3
483,424
199,244
5
100%
5.00000
39,848.800
Rural
No
I / P
101-200
Baker's Creek, S2, DT2,
DT4, DT3
203,974
0
5
33%
—
Rural
Yes
I/P
10
—
Rural
Yes
I/P
10
—
Rural
Yes
I/P
10
—
Buffer
Rural
Yes
I/P
Preservation
10
—
Rural
Yes
I/P
10
—
Rural
Yes
I/P
10
—
Rural
Yes
I / P
10
—
Rural
Yes
I / P
10
—
Rural
Yes
I/PI
1
10
—
Preservation Area Subtotal (ft'): 199,244
Preservation as %Total Area of Buffer Mitigation: 25.0%
Ephemeral Reaches as %Total Area of Buffer Mitigation: 0.0%
1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).
last updated O1/17/2020
TOTAL AREA OF BUFFER MITIGATION (TABM)
Mitigation Totals
Square Feet
Credits
Restoration:
597,731
590,882.933
Enhancement:
0
0.000
Preservation:
199,244
39,848.800
Total Riparian Buffer:
796,975
630,731.733
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Square Feet
Credits
Nutrient
Offset:
I Nitrogen:
0
0.000
I Phosphorus:
0.0 00
DocuSign Envelope ID: C6580047-982B-4ED0-9A89-52BA73C64D21
VIII. CREDIT RELEASE SCHEDULE
A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by
DWR, it is agreed that the riparian buffer credits associated with the Bank Parcel will become
available for sale to a third party in accordance with the Credit Release Schedule below in Table
3.0.
Table 3.0 - Credit Release Schedule for Riparian Buffer Credits
% Credit
% Credit Release
Task
Project Milestone
Release
within the Pond
Footprints
Instrument and BPDP Approved by DWR, Draft Stream Mitigation Plan
No credits released
1
Approved by the IRT, Conservation Easement Recorded and Assigned
25
for areas within
according to Item B (1) of Section X in this Instrument* and Financial
pond footprints
Assurance Posted
Mitigation Site Earthwork, Planting and Installation of Monitoring Devices
No credits released
2
Completed and all Applicable Permits Obtained
20
for areas within
and oot rints
3
Monitoring Financial Assurance Posted and Approval of As -Built Report
10
55
4
Monitoring Report #1: Approved by the DWR** & financial assurance
10
10
renewed
5
Monitoring Report #2: Approved by the DWR** & financial assurance
10
10
renewed
6
Monitoring Report #3: Approved by the DWR** & financial assurance
10
10
renewed
7
Monitoring Report #4: Approved by the DWR** & financial assurance
5
5
renewed
8
Monitoring Report #5: Approved by the DWR** and final site visit by
10
10
DWR has been conducted
Total
100%
100%
* For specification, please see Section V in this Instrument
** DWR Approval provided upon a determination that the site is meeting performance standards contained within the
approved BPDP
B. DWR may modify the credit release schedules based on the information submitted or the order in
which required information is received. DWR will notify the Sponsor of any modification to the
credit release schedule.
C. DWR may consider a Credit Release Schedule for a Bank Parcel based on the extent of change
between current onsite conditions and proposed post construction conditions.
D. The Sponsor must initiate implementation of the approved BPDP for the site under this Instrument
in concurrence with all stream mitigation activities proposed in the approved Mitigation Plan
referenced in Item D of Section IV of this Instrument.
10
Project Milestone
% Credit Release
% Credit Release within the Pond Footprints
Credits
Instrument and BPDP Approved by DWR, Conservation Easement Recorded* and
Financial Assurance Posted
25%
No Credits Released for Areas within Pond
Footprint
157,682.933
Mitigation Site Earthwork, Planting and Installation of Monitoring Devices
Completed, Acceptance of Adaptive Management Plan
10%
No Credits Released for Areas within Pond
Footprint
42,611.644
Full implementation
on of Supplemental Planting and Adaptive Management Plan
10%
Credits Released for Areas within Pond
Footprint
57,227.022
Monitoring Financial Assurance Posted and Approval of As -Built Report
10%
55%
101,835.872
Monitoring Report #1: Approved by the DWR** & financial assurance renewed
10%
10%
65,337.722
Monitoring Report #2: Approved by the DWR** & financial assurance renewed
10%
10%
65,337.722
Monitoring Report #3: Approved by the DWR** & financial assurance renewed
10%
10%
65,337.722
Monitoring Report #4: Approved by the DWR** & financial assurance renewed
5%
5%
32,668.861
Monitoring Report #5: Approved by the DWR** and final site visit by DWR has
been conducted
10%
10%
65,337.722
Total
100%
100%
653,377.221
As -Built Credit Table
Table 1. Dogtown, 2018-1097v2, Project Credits
Catawba Buffer
Project Area
N Credit Conversion Ratio (ftz/pound)
P Credit Conversion Ratio (ft2/pound)
N/A
N/A
Credit Type
Location
Subject? (enter
NO if
ephemeral or
ditch'
Feature Type
Mitigation Activity
Min -Max Buffer
Width (ft)
Feature Name
:
Total Area (ft)
Total (Creditable)
Area of Buffer
i
Mitigation (ft)
Initial Credit
Ratio (x:l)
%Full Credit
Final Credit
Ratio (x:l)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible to
Nutrient Offset?
Delivered
Nutrient
Offset: N (Ibs)
Delivered
Nutrient
Offset: P (Ibs)
Buffer
Rural
No
In -Line Pond
Restoration
0-50
3 Ponds (PA, PB, PC)
81,107
81,107
1
100%
1.00000
Yes
81,107.000
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
51
107,998
107,998
1
100%
1.00000
Yes
107,998.000
No
-
-
Buffer
Rural
No
I / P
Restoration
101-200
51 (151-200)
10,443
10,443
1
33%
3.03030
Yes
3,446.193
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
1 52
29,064
29,064
1
1 100%
1.00000
Yes
29,064.000
No
-
-
Buffer
Rural
No
I / P
Restoration
101-200
52 (151-200)
21,474
21,474
1
33%
3.03030
Yes
7,086.427
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
53
79,886
79,886
1
100%
1.00000
Yes
79,886.000
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
DTl
29,425
29,425
1
100%
1.00000
Yes
29,425.000
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
DT2
5,387
5,387
1
100%
1.00000
Yes
5,387.000
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
DT3
96,783
96,783
1
100%
1.00000
Yes
96,783.000
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
DT4
94,390
94,390
1
100%
1.00000
Yes
94,390.000
No
-
-
Buffer
Rural
No
I / P
Restoration
0-50
Baker's Creek
76,632
76,632
1
100%
1.00000
Yes
76,632.000
No
-
-
Totals (ft2):
Total Buffer (ft2):
Total Nutrient Offset (ft2):
632,588
632,588
611,204.621 1 0.000 0.000
632,588
632,588
0
N/A
Total Ephemeral Area (ft) for Credit
Total Eligible Ephemeral Area (ftZ).
Enter Preservation Credits Below Total Eligible for Preservation (ft)
Credit Type Location Subject? Feature Type Mitigation Activity Min -Max BufferWidth (ft) Feature Name `
Rural No / P
Rural No / P
TOTAL AREA OF BUFFER MITIGATION (TABM)
Mitigation Totals
Square Feet
Credits
Restoration:
632,588
611,204.621
Enhancement:
0
0.000
Preservation:
210,863
42,172.600
Total Riparian Buffer:
843,451
653,377.221
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
I Square Feet
I Credits
Nutrient Offset:
Nitrogen:
0
0.000
Phosphorus:
0.000
0-50
101-200
Preservation Area Subtotals (ft)
1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).
0
0
210,863
0.0%
210,863
25.0%
Total Area (sf)
Total (Creditable)
Area for Buffer
Mitigation (ft)
489,633
210,863
171,083
0
660,716
210,863
Ephemeral Reaches as %TABM
preservation as %TABM
Initial Credit %Full Credit Final Credit I Riparian
Ratio (x:l) I Ratio (x:l) I Buffer Credits
5 100% 1 5,00000 1 42,172,600