HomeMy WebLinkAbout20231181 Ver 1_Shoreline Stabilization_20230825Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
........ ......... ......... .........
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email* Jef£Page@yahoo.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 8/23/2023
submitted on: *
Owner Information:
Name: *
Email: *
Phone Number:
Mailing Address: *
Michael McClam
mikefmcclam@aol.com
(843)315-8940
(xxx)xxx-xxxx
Street Address
14075 Claybom Street
Address Line 2
City
Midland
Postal / Zip Code
28107-0090
Is there an agent working on the project?* Yes
No
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name: * 114 Evergreen Pt
State / Province / Region
NC
Country
US
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads.
Upload File
Look up address
Upload Map:
Pt -
Latitude: * 35.287940 Longitude: *-80.090320
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level *
Pt -
Please use the diagram at the link below:
https:Hedocs.deq.nc.gov/WaterResources/0/edoc/616616/Shorel i ne%2OLayout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
Pt-
4. Location of the property (where work is to be conducted)
Nearest Town: * Mt. Gilead
County: * Montgomery
Lake/ river/ ocean adjacent to Lake Tillery
property:
Subdivisions name or site address: * Tillery Tradition
Include phase/lot number
Directions to site:
Norwood
North Carolina 28128
Take College St to S Main St
2 min (0.3 mi)
Take NC-731 E to Lillys Bridge Rd in Montgomery County
7 min (5.0 mi)
Continue on Lillys Bridge Rd. Drive to Evergreen Point
12 min (7.6 mi)
Turn left onto Lillys Bridge Rd
6.7 mi
Turn left onto Tradition Dr
0.8 mi
Turn left onto Evergreen Point
141 ft
114 Evergreen Point
Mt Gilead, NC 27306
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application:
No existing structures. New Lot. See the Picture Provided.
Residential, undeveloped, etc.
6. Property Size 1.24
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
Want to build a new 1200 sq ft boat dock per attached drawing and install 117' Rip rap Shoreline
8. How will the work be done?* From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level:
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
351
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
702
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted: *
(number of trees, for instance)
See attached Photo
Sketch:
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
ci $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
d I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act');
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
d I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* Jeff Page
Signature:
lq� Title,
Submittal Date: 8/23/2023
Initial Review
Is this accepted into the review process?* Yes O No
Project Number: * 20231181 Version:*
Select Reviewer: *
Select Reviewing Office
Has payment been received?*
What amount is owed?*
Chad Turlington:chad.turlington
Fayetteville Regional Office - (910) 433-3300
No Payment Needed
Fee Received
Need Fee - send electronic notification
$240.00
$570.00