Loading...
HomeMy WebLinkAboutNC0021491_NOV2023PC0403_Response Letter_20230825Mocksville Town Hall 171 S. Clement Street Mocksville, NC 27028 Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ SUBJECT: Notice of Violation Tracking Number: NOV-2023-PC-0403 Permit No. NC0021491 Davie County Mr. Snider, dt Incorporated 1839 ■ A Phone (336) 753-6700 Fax (336)751-9187 www.mocksvillenc.om Thank you for allowing us the opportunity to respond to the Notice of Violation dated July 27, 2023, received August 7, 2023. This response is in regard to the Pretreatment Compliance Inspection of the Town of Mocksville conducted on June 28, 2023, by Ms. Tricia Lowery (NCDEQ). The Town of Mocksville currently has (1) active SIU, Brakebush Brothers Inc. (IUP #0004) -- a chicken processing facility located in Mocksville, NC (Davie County). Our responses to the findings presented in your letter are provided below. Finding: Permittee did not conduct annual inspection of SlU (in 2022). Response: In response to this concern, we have created a recurring work order in our CMMS system reminding staff to conduct an annual inspection of the SIU. Aside from 2022, inspections of the Brakebush facility were otherwise performed every year that the SIU was active. An annual inspection of the SIU was conducted on August 8, 2023. The facility was observed to be well maintained. The SIU has overall been highly communicative with the Town and the POTW's wastewater treatment plant operations staff. Finding: PAR was inadequate and missing several required documents when submitted in March 2023. Permittee submitted missing documentation after PAR was reviewed by the Division, however, the allocation table was not submitted, and as of 7/27/2023, has not been submitted. Response: The Town of Mocksville received correspondence from NCDEQ dated June 15, 2023 stating that the PPS and SNCR forms were not included with the PAR package that was submitted in March 2023. A discrepancy in understanding arose when it was not stated in the Pretreatment Program Info Database sheet that a PPS, SNCR, and AT would need to be included in the package. In response to this concern, the SNCR and PPS forms were submitted immediately upon awareness, on June 21, 2023. The Division later requested a copy of the AT in July. In addition, all personnel have gone through additional pretreatment program compliance training and are required to obtain refresher training annually. Response: The allocation table was immediately emailed to Ms. Lowery upon awareness. An allocation table was last completed in March of 2022 at the time of the renewal of the SIU's Industrial User Permit. The POTW's NPDES permit was renewed in March of 2023, however, it was determined that no changes were needed to be made to the AT, nor were any adjustments needed to the pretreatment program, since there were no updates made to the WWTP's NPDES permit that would directly impact pretreatment. In response to this concern, pretreatment program coordination staff conducted a thorough review of rule 15A NCAC 02H .0916 (c)(4)(A) to ensure that we remain compliant with this requirement in the future. Sincerely, I Kenneth Gamble, Town Manager Town of Mocksville CC: Tricia Lowery, NCDEQ Joshua Powers, Envirolink, Inc. Todd Robinson, Envirolink, Inc. Madelyn Mills, Envirolink, Inc. August 22, 2023