HomeMy WebLinkAboutNCS000049_Request for Additional Information_20230825 VA STATE„r
"Lvw}n
ROY COOPER A
Governor `�,�
ELIZABETH S.BISER ,.�� .
Secretary `$`QkAmm
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
August 25, 2023
IGM Resins USA, Inc.
Attn: Plant Manager
3300 Westinghouse Blvd
Charlotte,NC 28241
Subject: Request for Additional Information
IGM Resins USA, Inc.
NPDES Permit NCS000049
Mecklenburg County
Dear Permittee:
The IGM Resins USA, Inc. stormwater permit NCS000049 expired on October 31, 2021. A
renewal application was received on October 21, 2020. To enable us to complete our review in
accordance with NCGS 143-215.1 and 15A NCAC 02H .0105, the Division requested the
following additional information:
I. An update of permit facility contacts.
2. A description of industrial activity occurring and chemicals stored onsite;
3. Confirmation on the number of outfalls and associated coordinates;
4. Description of industrial activity in each drainage area;
5. SIC (NAICS) code;
6. An electronic spreadsheet summarizing all of the monitoring data that has been collected
since the effective date of the current permit;
7. Verification that the information in the renewal application is still complete and correct;
and
8. An explanation of any operational changes since the renewal application was submitted.
Per 15A NCAC 02H .0107(b) and the terms found in Part III, Section A. 8. of your stormwater
permit, you are required to provide information to the Division when requested. On May 3, 2023,
the Division sent the additional information request. The Division followed up on this request on
June 7, 2023 and July 7,2023. Our records indicate that as of the date of this letter,the additional
information requested has not been received.
Failure to provide requested information to the Division is a violation of the terms of your
permit, subjecting you to a possible enforcement action(s). In order to reduce the risk of
receiving enforcement action,you must submit the requested information to the Division
within sixty (60) calendar days of receipt of this notice. If no response is received within 60
calendar days, the application will be withdrawn from our review process, the existing permit
will be rescinded, and any future discharge of stormwater from the site will be considered a
discharge without permit coverage and subject to enforcement action(s). If you need additional
DE Q� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
_ 512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
919.707.9200
Page 2 of 2
time to submit the information, please submit your request for a time extension to the Division at
the contact below. The request must indicate the date by which you expect to submit the required
information.
If you have any questions about this letter, please contact Brianna Young at 919-707-3647 or via
e-mail at brianna.young@deq.nc.gov.
Sincerely,
r
Michael Lawyer, Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
cc: NPDES Stormwater Program Files (Laserfiche)
Mooresville Regional Office
Matthew Murray, Safety, Health, and Environmental Manager,IGM Resins USA, Inc.