Loading...
HomeMy WebLinkAboutNCC232582_ESC Approval Submitted_20230825 v, ROY COOPER 1/ b` T Governor 1 , �11`' ,r_ ELIZABETH S.BISER Secretary '-, a BRIAN WRENN NORTH CAROLINA Director Environmental Quality October 15, 2021 LETTER OF APPROVAL Hickory Construction Company ATTN: Mr. C. Mark Baucom PO Box 1769 Hickory, NC 28603 RE: Project Name: DPS - Morganton Regional Readiness Center Phase II: New Construction Acres Approved: 34.4 Project ID: BURKE-2020-013 County: Burke City: Morganton Address: 5155 Western Avenue River Basin: Catawba Stream Classification: Hunting Creek, C Submitted By: Mr. Francis Slinsky III, P.E. Date Originally Received by LQS: February 6, 2020 Date Revision Received by LQS: September 30, 2021 Plan Type: Institutional Dear Mr, Baucom, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COG) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this NORTH CAROLINA D _E -4) North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa,North Carolina 28778 828.296.4500 Letter of Approval Hickory Construction Company ATTN: Mr. C. Mark Baucom October 15, 2021 Page 2 of 2 project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. S' er Mic ael Smith Assis ant Regional Engineer Division of Energy Mineral and Land Quality Enclosures: NPDES NCG01 Fact Sheet ec: Mr. Frank Slinsky, P.E. frank.slinsky@timmons.com cc: Regional Office file