Loading...
HomeMy WebLinkAbout430024_Routine Inspection_20230814for Visit: fd'Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Lam/ Arrival Time: EEZDeparture Time: County: Farm Name:_ �o/,�q/,rye Owner Email: Owner Name Phone: Mailing Address: Physical Address: Facility Contact: �, { Title: Onsite Representative: r Certified Operator: tr Back-up Operator: Location of Farm: Latitude: Phone: Region: F1_6 Integrator: Z,/l��t Certification Number: ©Z :i l �� Certification Number: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yesj�jlo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes —a" No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [—]Yes f7No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facility Number: Date of Inspection: x /a Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes J'IQo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate throats to the integrity of any of the structures observed? ❑ Yes E5'No ❑ NA ❑ Ni (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑.No ❑ NA ❑ NE waste management or closure plan? T If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ff No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 1:],No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Q'No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [f]'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes F-1 �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of WindDriiftt ❑ Application Outside of Approved Area � 12. Crop Type(s): G��e� ,[12� yee , ! Pj � C f la ri l� 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes F7rNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ,QNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes _[allo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes .®-No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ,[?No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 4;]-No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Q-No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. 12- Yes [:]No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard 4 - aste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes J:allo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes , [�1(Io ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: jDate of Inspection: J, 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes LQ-No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [,__.No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes _EJ'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes E_LNo ❑ NA ❑ NE J, Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E'No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ETNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [:[No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes L]-No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [2-No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes J:g-No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes _[2,No ❑ NA ❑ NE i es on§$k Y9 fid. a:a*a 3m 1°tg$ifta9!aao a4�lyal agesanecesssty).*a maMite a Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 tan e Phone: ?/(/� Date: 511212020 FACT LYM � FARM NAME: ' IFLAGOON PERMIT mal DUE EVERY 5 YEARS - EXPERIATION DATE _ - CURRENT NUMBER OF OIC CARD YES OR NO NUMBER OF ANIMALS WASTE UTILIZATION PLAN (WUP) (420) SOIL TYPES CROP TYPES - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD FOR 60 DAYS BEFORE OR AFTER // DATE4// NITROGEN LEVEL / ! 6 2. -22 a DATE 0 ( 2 NITROGEN LEVELZ('-',V I j ?)-- NITROGEN LEVEL SOIL REPORT (*21) - EVERY 3 YEARS: DATE � L - P-1 (NO MORE THEN 400) - PH (Notalf4 or leas) - Cu/ZN (NO MORE THEN 8000) CU ZN (IF PEANUTS NO MORE THEN 300) IRR2 (#21) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES - FLOW RATES NITROGEN (N)_ Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION (*24) EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR DATE OF CALIBRATION J`' &-> FLOW RATES -'&d . RAIN FALL(#21) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED. SLUDGE (ari a2s) -DU VERYYEAR: DATE a(� O: o _Z P: 3-G % RATIO OF SLUDGE !� O: P: -2 '7 % RATIO OF SLUDGE S� O: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE OTHER FORMS (a22 AND #21) RAIN BREAKER FORM CROP YEILDS MORTALITY_ *If fields are grazed there will be no crop yields - VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE Bermuda grass: Opens March 1�t- Ends September 30' Small Grain. Over seed: Opens October 1 � - Ends March 31.t Corn: Opens February 15' - Ends June 30u Cotton: Opens March 15t - Ends August 1st Rye: Opens September 1n- Ends March 31� Oats: Opens September 1�t- Ends April 15w - Wheat: Opens September 1st- Ends April 30th Soybeans: Opens April 1st -Ends September 15t Fescue: Opens August 1st -Ends July 31•t Sorghum Hay: Opens March I Sth - Ends August 31 st