HomeMy WebLinkAboutSWA000214_Email_20230824
Peck, Kaitlin
From:Farkas, Jim J
Sent:Thursday, August 24, 2023 3:27 PM
To:ralph_dickson4@dicksonap.com
Cc:Smith, Mike M; Aiken, Stan E; James Baldwin; spowell@sccoast.net;
joescoggins@townofforestcity.com; Shelton, Tyler J
Subject:RE: SWA000214; Napa Auto & MSUC (Rutherford)
Attachments:Fast Track ATC Cover Letter & Permit 8-24-23.pdf
Good Afternoon,
The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete, Stormwater Management Permit
Authorization to Construct (ATC) Application for the subject project on August 23, 2023. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in
Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding ATC Permit No. SWA000214, dated August 24, 2023, for the
construction of the subject project and the stormwater system. This permit shall be effective from the date of issuance
and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency
permits that may be required.
The original signed permit package and plans are being mailed to the permittee, Ralph Dickson, at the following address
(NOTE: An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
RD3/4, LLC
Attn: Ralph Dickson, Owner
PO BOX 458
Gastonia, NC 28053
I will hold onto our hard copies of this project for 30 days (in case any issues/typos with the permit are noticed and
corrections need to be made) after which point, they will be kept on file at the Asheville Office. If you have any
questions, or need additional information concerning this matter, please contact me at jim.farkas@deq.nc.gov.
Reminder: Please be aware that per 15A NCAC 02H .1044(2), the Erosion & Sediment Control (E&SC) permit for this site
cannot be closed out until the as-built stormwater plans for this project are approved by our office.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@deq.nc.gov
1
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, June 29, 2023 4:26 PM
To: James Baldwin <jbaldwinventure@gmail.com>; ralph_dickson4@dicksonap.com
Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov>
Subject: SWA000214; Napa Auto & MSUC (Rutherford)
Good Afternoon,
We received your post-construction stormwater Authorization to Construct (ATC) permit application for the subject
project on 6/16/2023. Reviews under the Fast-Track permitting process can take up to 30 calendar days to complete.
You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has
the review queue on it). Please upload all documents that you mailed into our office through the link provided
below. Be sure to choose the Central Office as the Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the
“State Stormwater Information Uploads” section of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST-
CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type
dropdown as you upload the various files (without adding additional file uploads) will upload all of the files as the last
file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not
upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file
type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps
expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan
sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc…) as these files are not needed for
review.
Please type in permit #: SWA000214
This project will be reviewed by Jim Farkas, if you have any questions, please contact them at jim.farkas@deq.nc.gov or
at 919-707-3646.
Thank you,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
2
From: James Baldwin <jbaldwinventure@gmail.com>
Sent: Wednesday, June 28, 2023 12:04 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov>
Subject: Re: \[External\] Re: Napa Auto & MSUC; Forest City, Rutherford County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Kaitlin - No problem, I understand.
We just sent everything out so hopefully it will be there in the next day or two. Thanks for your help.
Thanks,
James Baldwin, E.I.T.
Venture Engineering, Inc.
209 Hwy 544
Conway, SC 29526
Office: (843) 347-5851
Cell: (843) 458-3099
On Wed, Jun 28, 2023 at 10:55 AM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Hi James,
Unfortunately, I cannot pass it off to the engineers to review until I have all the hard copies of necessary documents so
that I can give a complete package. That being said, once all of the hard copies are in, the admin review team is
relatively quick with additional info submissions.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
3
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: James Baldwin <jbaldwinventure@gmail.com>
Sent: Wednesday, June 28, 2023 8:26 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov>
Subject: Re: \[External\] Re: Napa Auto & MSUC; Forest City, Rutherford County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good Morning,
I will work on getting them mailed out this morning. Given that they were "delivered" back on the 16th is it possible
that our review period start from that date? Just wondering so I can relay the status to our client as they are eager to
move forward.
Thanks,
James Baldwin, E.I.T.
Venture Engineering, Inc.
209 Hwy 544
Conway, SC 29526
4
Office: (843) 347-5851
Cell: (843) 458-3099
On Tue, Jun 27, 2023 at 3:11 PM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Hi James,
I checked in with our mail room and they have not been able to find this package. You may need to re-send your hard
copies.
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: James Baldwin <jbaldwinventure@gmail.com>
Sent: Tuesday, June 27, 2023 9:10 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov>
Subject: Re: \[External\] Re: Napa Auto & MSUC; Forest City, Rutherford County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
5
Hi Kaitlin,
We looked back at our UPS documents (see attached) and they say that everything was delivered to the "mail room"
back on 06/16. I also re-checked the shipping address and everything looks correct. Can you please double check and
see if it may have gotten misplaced?
Thanks,
James Baldwin, E.I.T.
Venture Engineering, Inc.
209 Hwy 544
Conway, SC 29526
Office: (843) 347-5851
Cell: (843) 458-3099
On Mon, Jun 26, 2023 at 1:24 PM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Hi James,
We still have not received your set of hard copies.
Thank you for checking in.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
6
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: James Baldwin <jbaldwinventure@gmail.com>
Sent: Monday, June 26, 2023 1:19 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Subject: Re: \[External\] Re: Napa Auto & MSUC; Forest City, Rutherford County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
Hi Kaitin,
Just checking back in on this one? If still not received, we may need to send out another set of hard copies as we
mailed these out back on the 15th.
Thanks,
James Baldwin, E.I.T.
Venture Engineering, Inc.
209 Hwy 544
Conway, SC 29526
Office: (843) 347-5851
7
Cell: (843) 458-3099
On Wed, Jun 21, 2023 at 7:46 AM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Good Morning James,
The additional items submitted have not hit my desk yet, but I can send you a follow up email when I receive them.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: James Baldwin <jbaldwinventure@gmail.com>
Sent: Tuesday, June 20, 2023 8:22 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Subject: Re: \[External\] Re: Napa Auto & MSUC; Forest City, Rutherford County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
8
Hi Kaitin,
Just wanted to check in to make sure you received the hard copy submittal items that were needed for this project?
Thanks,
James Baldwin, E.I.T.
Venture Engineering, Inc.
209 Hwy 544
Conway, SC 29526
Office: (843) 347-5851
Cell: (843) 458-3099
On Thu, Jun 15, 2023 at 7:47 AM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Good Morning James,
Yes, that works.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
9
From: James Baldwin <jbaldwinventure@gmail.com>
Sent: Wednesday, June 14, 2023 3:21 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Subject: Re: \[External\] Re: Napa Auto & MSUC; Forest City, Rutherford County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
Kaitlin - Thanks for the quick response. Will the attached application work?
Thanks,
James Baldwin, E.I.T.
Venture Engineering, Inc.
209 Hwy 544
Conway, SC 29526
Office: (843) 347-5851
Cell: (843) 458-3099
On Wed, Jun 14, 2023 at 2:31 PM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Hi James,
10
Section A: In order to qualify for Fast-Track your project must bear the signature and seal of a professional
licensed pursuant to either Chapter 89A or 89C of the NC General Statutes. Without this, your project is
not eligible. If your project does in fact have this signature and seal with these requirements, please the
check the box on the application.
Section H: The signature for your design professional must be an original signature.
All of the other items are good to send over as they appear in the attachments.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: James Baldwin <jbaldwinventure@gmail.com>
Sent: Wednesday, June 14, 2023 2:07 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov>
Subject: \[External\] Re: Napa Auto & MSUC; Forest City, Rutherford County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
Hi Kaitlin,
11
Please let me know if the attached items would make for a correct full submission. If so, I will have the two sets of
hardcopies for each item mailed out today.
Thanks,
James Baldwin, E.I.T.
Venture Engineering, Inc.
209 Hwy 544
Conway, SC 29526
Office: (843) 347-5851
Cell: (843) 458-3099
On Fri, Jun 9, 2023 at 11:15 AM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Good Morning,
We received your application for a new Fast-Track post-construction stormwater permit on 6/1/23. At this time,
the submission is not administratively complete and cannot be accepted for review in its current condition.
Please provide the following submittal items within 30 calendar days (by close of business on 7/9/23) so that we
may accept the project and begin the review process, otherwise, the project will be returned as administratively
incomplete.
This application is not eligible for Fast-Track submittal as:
The project application does not bear the signature and seal of a professional licensed pursuant
to either Chapter 89A or 89C of the Nc General Statutes. This conflicts with 15A NCAC 02H
.1043(2). Please revise the application or submit a standard submittal.
2x hard copies and 1x electronic copy of the Application with the following corrections made (These
items are required per 15A NCAC 02H .1043(3)(a) and per Section F of the Application):
12
Section B, 3 – Please provide accurate information concerning the physical location (street
address) of the project. This is required per 15A NCAC 02H .1043(3)(a)(ii). NOTE: This comment is
in reference to Section B, 3. Please provide a more specific street address.
Section H – Please provide the design professional’s original, notarized and sealed signature in
this section of the Application.
2x original, signed hard copies and 1x electronic copy of a site plan depicting the boundary of the project
or project phase currently being permitted, including the locations of SCMS, streams, wetlands, and
buffers. This item is required per 15A NCAC 02H .1043(3)(f) and per Section F,4 of the Application. NOTE:
Please revise include wetland delineation or a note on the plans stating that there are no wetlands
located on-site. NOTE: Please revise to include a signature on these site plans.
2x hard copies and 1x electronic copy of a construction sequence that discusses how any future
development on the project may be phased. This is required per 15A NCAC 02H .1043(3)(g) and per
Section F, 5 of the Application. The construction sequence does not need to be lengthy, just a brief
description of how future development on the project (beyond what is shown on the plans) will be
phased. If no future development is planned for the project, you can simply state that in the construction
sequence. This item is different than the E&SC sequence of construction.
2x hard copies and 1x electronic copy of documentation from the NC Secretary of state, or other official
documentation, which supports the titles and positions held by the persons listed in Section c, 2 per 15A
NCAC 2H .1043(3)(b). The corporation or LLC must be listed as an active corporation in good standing
with the NC Department of the Secretary of state; otherwise, the application will be returned.
NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other
issues that may be brought up during the engineering review.
If these items are received within the stipulated timeframe, we can accept the project and begin the review
process. Once accepted, reviews under the Fast-Track permitting process can take up to 30 calendar days per
statute.
Hard copies should be mailed to the following address:
For FedEx/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
13
Raleigh, NC 27699-1612
If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deq.nc.gov or at (919) 707-9209.
Thank you,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an
authorized state official.
14