HomeMy WebLinkAbout820055_routine_20230816Type of visit: U Uompiiance inspection U operation Review O Structure Evaluation U Technical Assistance
Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: LLi1J Arrival Time: Departure Time: County:I V
Farm Name: Q_Q N ht) 4 C & f:u p—m Owner Email:
Owner Name: JDRPli (/ tl RON Phone:
Mailing Address:
Physical Address:
Region:
Facility Contact: �.V HH b]I w (, - Title: r Phone:
c P—�
Onsite Representative: J me Integrator: �M fi I
Certified Operator: h 'U �T Certification Number: oS r
Back-up Operator: Certification Number:
Location of Farm:
Latitude:
Longitude:
Design Current'
Design
Current
Design ,Current
Swine _
Capacity Pop ;
Wet Poultry
Capacity
Pop
Cattle Capacity R`Pop
. ..
.�
Wean to Finish
Layer
Dairy Cow
t
Wean to Feeder
I
INon-Layer
IDairy
Calf
Feeder to Finish
Dairy Heifer
Farrow to Wean
.
""
s
Design
Current `=
Dry Cow
Farrow to Feeder
Dry.
Ca 'acity
Pop
Non -Dairy
Farrow to Finish
Layers
Beef Stocker
Gilts
Non -Layers
Beef Feeder
Boars
Pullets
Beef Brood Cow
=
Q
Turkeys
o
x Other _e
Turkey Poults
.ffs
.
Other,
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ElApplication Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
No
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
No
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
U No
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
No
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
[�] No
❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Plumber: - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes �] No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
\
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement? .
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Ej No 0 NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): DB tmq
13. Soil Type(s): no I I K
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Yes
No
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA 0 NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Tran fers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? 0 Yes No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E1 No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [:]Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE
Other Issues ""� ��\��\
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes �No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes I `I.No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes��No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. [—]Yes 6,No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWNIP? ❑ Yes ❑ NA ❑NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 01lo
E)�o ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes 6No ❑ NA ❑ NE
Comments (refer to question#): Eirplain any YES answers and/ot any. additionalgrecommendations or any otl%er, comments s . `
Use drawin s of facile ",_to•better,ex lain situations°'use additional° a` es as necessa
TMM is Glo(;Aj jgpons wN Ngcs
Reviewer/Inspector Name:
Phone:
Reviewer/Inspector Signature:
Date:
Page 3 of 3 511212020