Loading...
HomeMy WebLinkAboutNCC202512_NOT Closeout Documents_20230822 ROY COOPER STATE, Governor . ELIZABETH S.BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on-site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act on 1973. Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earlies possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely Land Quality Section Mooresville Regional Office North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-663-1699 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699 County: Cabarrus Project: PetSuites-Harrisburg River basin: Yadkin-PeeDee Person financially responsible:Harrisburg Pet Suites,LLC-Glen D Cherry, Project#: CABAR-2020-088 Co-Founder&Principle Address: 106 Foster Avenue,Charlotte,NC 28203 1. Project Location: Main Street,Harrisburg Pictures: No 2. Weather and soil conditions: Sunny,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): no one on site Title: Inspection report: Sent Report Date given/sent: July 31,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Matthew Gigante Others present: Date of inspection: July 25,2023 Time arriving on site: 2:30 PM Time leaving site: 2:35 PM cc: