Loading...
HomeMy WebLinkAbout20130610 Ver 1_Certification of Completion_20150728Pat McCrory Governor ����� ���� NCDENR North Carolina Department of Environment and Division of Water Resources Thomas A. Reeder Director DWQ Project No.: 20130610V.2 County: Henderson Natural Resources Applicant: NC Department of Transportation Project Name: Bridge No. 42 on SR 1734 (Stepp Mill Road) over Saconon Creek ,C�— .33'�� Date of Issuance of 401 Water Quality Certification: July 5, 2013 Certificate of Completion John E. Skvarla, III Secretary Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Planning Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Mark S. Davis, Division 14 Environmental Program Supervisor, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: � ' �� �/_7 , Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation ofthe construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Transportation and Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-733-1290 Internet: www.ncwaterqualitv.orq An Equal Opportunity 1 Affirmative Action Employer Registration No. � ����d� �D JLlL2�2015 DENR • WATER RESOURCES TRANSPORTATION PERMITTING UNIT NorthCarolina �aturallr�