HomeMy WebLinkAbout20231164 Ver 1_BP8.R006_Permit Drawings_20220503 (1)_2023082110
0
0
See Sheet 9 A For Index of Sheets
See Sheet 9 B For Conventional Symbols
157
1155 } ��
ICHMOND
\. COUNTY
i
/ I
ANSON
COUNTY i
M 1148
Ln
Ln
I >
b � o
,
PROJECT
BP8.R006
1151
1150
1149
100
Bruton '
Cemetery
1146
entzi�00
- 1148
1319
0
' \ 1339
1005
1 1307
L� L146 L e� 147
VICINITY MAP
entzton a
1148 o a
O
0
0 0
0
1005 0
1307
a�
DENOTES OFF —SITE DETOUR
`LO
V
RICHMOND
COUNTY
LOCATION: BRIDGE 1110. 91 ON SR 1148 (GRASSY ISLAND RD)
OVER COLEMAIVS CREEK
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
TOTAL
SHEETS
N.C.
BP8.RO06
I
STATE PROD. NO.
F. A. PROD. NO.
DESCRIPTION
BP8.R006
PE
TYPE OF WORK: GRADING, DRAINAGE, PA VING, AND STR UCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
TO N
BEGIN PROJECT BP8.RO06
—L— POC STA. 13 +15.00
BEGIN BRIDGE
-L- Sta. 15 + 85 +/-
-L- SR 1148
(GRASSY ISLAND RD.)
BRIDGE 91
END BRIDGE
-L- Sta . 16 + 40 +/-
END PROJECT BP8-R006
—L— POT STA. 19 + 40.00
SITE 1
TO ELLERBE
PERMIT DRAWING
SHEET 1 OF 5
3/182022
ti
INCOMPLETE PLANS
DO NOT USE FOR R % W ACQUISITION
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL CITY LIMITS DOCUMENT NOT CONSIDERED FINAL
CLEARING ON THIS PROJECT SHALL BE PERORMED TO THE LIMITS ESTABLISHED BY METHOD UNLESS ALL SIGNATURES COMPLETED
el GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
Prepared in the Office of:
2610 ROAD
HYDRAULICS ENGINEER
,.WYCLIFF
SUITE 410
••, Dewberry PHONE-
50 25 0 50 100
ADT 2022 = 150
ADT 2042 = 300
K = %
LENGTH ROADWAY PROJECT BP8.R006 = 0.108 MILES
919.8819939
''�''
FOR NC
DIVISION OF HIGHWAYS
n
2018 STANDARD SPECIFICATIONS
PLANS
D = %
LENGTH STRUCTURE PROJECT BP8.R006 = 0.010 MILES
PE
a
50 25 0 50 100
T = % *
TOTAL LENGTH PROJECT BP8.R006 = 0.118 MILES
RIGHT OF WAY DATE:
BENJAMIN STORMER, P.E.
SIGNATURE:
� o
ROADWAY DESIGN',
V = 60 MPH
/TTST = %+DUAL %
l
MARCH 2O22
ENGINEER
a
�� o��Q
PROFILE (HORIZONTAL)
PROJECT ENGINEER
10 5 0 10 20
FUNC CLASS =
LETTING DATE:
ANDREW TYSINGER
o� ynp��Q
LOCAL
NCDOT CONTACT: TIMOTHY F. WELCH, PE
NOVEMBER 2022
PROJECT DESIGN ENGINEER
PE
PROFILE (VERTICAL]
SUBREGIONAL TIER_1101111
SIGNATURE:
f
w
n
i
CO
tN
z
O
W
W
36'
towel
Dewberry
mi
C
LSD
D-
i
i
c9
El
CZD
rr
00
w
m
/
C
3
L
C�
— N,
N EL
N C
O<
N L,
CL
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "B5750-2"
WITH NAD 83/NSRS 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 480012.111(ft) EASTING: 1732106.299(ft)
ELEVATION: 192.756(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.9998735818
\cncP THE N.C. LAMBERT GRID BEARING AND
x O LOCALIZED HORIZONTAL GROUND DISTANCE FROM
B5750-2 TO -L- STATION IS
ALL INEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
P/ St w 8.43
� = �° 03' 30.6" (RT )
D = 2° 5/' 53.2"
L = 3/6.20'
T = 158.43'
R = 2,000.00'
DETAIL A
SPECIAL CUT BASE DITCH
(Not to Scale)
Natural A Front
Ground 2•� D `) Ditch
Slope
Min. D= 2 Ft.
B= 1 Ft.
FROM STA. 14 + 75 TO STA. 15 + 85 -L- LT
z
00
N �
NOTE: LAND POSTED WILDLIFE GAMELANDS/CONSERVATION EASEMENT o
BETWEEN PROPERTY LINES. NO RECORDS FOUND Im
O
EVERGREEN TIMBERCO NC LLC
DB 1870 PG 01
DS = EXISTING
SE = EXISTING
o
RO = EXISTING
-
�'---
_ _ _ _=_ _-_-_-_-_- _
_ 216- _ --�^�
-\"�------ ,�/ �jj // I IIIITm l 111 lrl l�l III
----------—Lr�ll�C.l�.l5� L /
-------
=-'2-
�
__
--------------- - ---- - - ---
�--- LL�i�TT-C:1=--��__
II 11111111 I
- �ztt�
-'-ze9----'
-'
--------.�-__zms---_'�/
_-_-_-_E_Ci�SL=T
1T11 I II
1
_______=- '_ =---zee---_____-_
- - - -- ----- - - - - ---207--' -- _ _
- .'
_ - -- /-
�i---------
--------=
--,2n-_-\'-_ __ -
20 - _ --
—_ &{i: —1—T //i/1/11 �1 1111 II R`
-- - _-- _
_ ----------- - - - -- -,zm6-__--_--'--------'/-
-----------=_a0=_==-_
_-_��'T
204-
_ -=�d- - - - --
'
'- __ -----_ _ -- ' _______ / W-�-----
-- - - - _-
/
--- -
- -- - - -
�__ _----------_---
L�_J�
C
----_ /--
_ _-
�----------'-'-_-- i�/// /_
-
-'i-�--'
-_-_ _- -%_ --
/
— — ——
_--/__
-- -- _— —'
- - - - - - - - -� - - - - - - - - --J- - - -
-_- _ -_- -
_-
- - - -
-
- -a
- - -
-
X C�RRSS� L
w
N
AD S(d�
/48
I -
Ic.
` _ _ _ _
- - _ _ _ _ _ - -' /GASSY ISLAND ROAD SR IM8 I
19.5I FA_VED_ RGIABW"A _ -'
P
4
9DkY o
I,
i Or _ _ _ _ -187- - G3, _ - - - - - - - - - -
------------- �' TI G R/W
Exls
,- __,_ a<---' _-__'�
-183-
26.5' EX.ILW
CLASS "II" RIPRAP
82, =
,\
-=-------------
W09DS
\-' i //
-40.00' RT,
\ .---------_/'WOODS
'- ,-
- /-----,a,-' �,_-',---- `�
9"
ARMdR-EEXIST BANKS AT 1.5:1
WITH CLASS 11-RIP\RAP Of STREAM
-
AND DOWNSTREAM OF -EXISTING
EVERGREEN TIMBERCO NC LLC /\ - ---'�
DB 1870 PG 01
N q
�' '' 1
MUD SILLS. SEE DETAIL B. �/ \
l5°35' q3„ W
N \5�eg8'
BEGIN PROJECT BP8. R006
-L- STA. 13 + 60.00
BEGIN BRIDGE
-L - Sta. /5 f84.38
DETAIL B
INLETOUTLET CHANNEL
( Not to Scale) VARIES
EXCAVATION SEE SITE PLAN
CLASS II RIP RAP
@ 1.5:1 OR FLATTER
TO TOP OF BANK
(2.5' THICK)
SEE STRUCTURE PLANS AND QUANTITIES
r 11r r
zzZZ4,A
2610 WYCLIFF ROAD
SUITE 410
RALEIGH, NC 27607
PHONE: 919.881.9939
NC GOA No. F-0929
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DENOTES IMPACTS IN
SURFACE WATER
SITE 1
EVERGREEN TIMBERCO NC LLC
DB 1870 PG 66
NOTE:LAND POSTED WILDLIFE GAMELANDS/CONSERVATION EASEMENT
BETWEEN PROPERTY LINES. NO RECORDS FOUND
+ 10.00
40.00' LT
O
N
PROJECT REFERENCE NO. SHEET NO.
BP8.RO06 EC-5/CONST.4
R/W SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
INCOMPLETE PLANS
DO NOT USE FOR R / W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING
SHEET 3 OF 5
3/1 &nz- 0 2 2
IMPERVIOUS DIKE
ID APRRO H SLAB
Sta. 2.5/-
�,. #I tELE\VATIOIv = 183�16' EIR 1 \ nor q`.\\ ; \� - ;-="
N �Y7953,7 E 17331781Cf
\ \ IS
BL STA\TION +85 84' LEFT
RR SPIKE \IN BIASE OF 28, PINE
\ 1 1, \� \ \\ � \ C�\. � �' i\ --__ �--89-_ -- __'-----_'- - - �" �� \ \ I I \�1
„{ „1 _ \ \ ` \ ` \----- ----\ / \ \�' f SIP
1 \ +50. i] 30' TAPER \ \ \ \ . < \ /' ` ,aa - 1�k��BB \
—CLASS N\ RIPRAP 1 40.00' LT / \ \ \,/ , - \ \ \ f O
\ ` LT&RT W/O \ \ \ \SIR \
R MARK lam. \ > I' +50. 0 \_� ''B�\\N\12°10'27'� _ _' /\ \�\�a \\ RETAIj�
r EX. RYW\0 S 1 1
O - - lazes' \ - - - = - - - �\ 1 I U € ISTtNG R/W 1
I lE hi,�
_ .. .. _ f
O � _ �11,�C,Lr!—�zi�`-z�
—
_ -184_ _ � \ 1 \ I _- - - -_- _ _
_♦ �,a _ - - - -
6
IAI,FrG GRE�TV _ _-
=Eg1-- ___
_-� -__- ___-__=---
1�"9P ---------
-
---0 ---- - - - - --
_'----- - - - - --
_,
EL—
o w
-L —
GR S�F7A1NlLBIl�fDI�D R0 ll�? 1148
/' TO ELLERBE
P 40 GI f
o IIIIIIIIIIIIIIIIIIIIIIII'w
—
1----n
-- -- - -- F
-------------
---------- - - ---��------
---- ---
'--- BL-102
i,•
--- ___ -. _
.- -12 _
_- -.-_
.----. -._
r e
15'^ R -V +50 0+
-__�
--_---�
\\ L \�I\ r i
EXI ING /W. \
W{iitl lr BRI
_
GE E +83.00 EX. ,',26�5'- - \-,
� \-\\\\� i\-� `-\ \�\,
HOOD
& EL 40.00' RT +50.00
TYP.
WOODS
�'\--_WOODS
4 /
+57.00 +83.00 40.00' RT
\-_-
//lilll
--- EX. RxW EX. RYW';
ez;_
i I'il'I
45.00' RT 45.00' RT
,, II\
+57.00 CLASS B RIPRAP
\\
40.00' RT l YON
ii it i
5<'SY GEOTEXTILE
/
^
-
/
END BRIDGE
-L- Sta. 16+4/.63
END
PROJECT BP8.R006
-L- STA. 18 + 40.00
0
0
CAROLINA - & LIGHT
O DB 680 PG 543
+ NOTE: LAND POSTED WILDLIFE GAMELANDS/CONSERVATION EASEMENT
O
O NO RECORDS FOUND
O
O
BRIDGE APPROACH SLAB
0 PROP PAVED SHOULDER
w
w
/
1n
SEE SHEET 5 FOR -L- PROFILE
L'L■Ci■LLLJ■
ME■■■■■■■■
-mmmmmmm
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■ ■■■■■■■■■■■
-�-----M■■■■
SEE SHEET 4 FOR ■■■■■
■■■■■
WETLAND AND SURFACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
I (ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
I (ft)
1
15+90 to 16+29
Riprap Bank Stabilization
60
75
TOTALS*:
i
i
i
i
i
j 60
j 75
j 0
*Rounded totals are sum of actual impacts
NOTES:
2018 Feb