Loading...
HomeMy WebLinkAboutSW8051112_Historical File_20090721HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS, LAND PLANNIEM 1123 FWRAL WNW. WILMINGTON, NC 28403 PH. (9101343.50[Y2 FAX: (910) 343-9941 DATE SUBJECT 7 cE9 0 6 t 1 v*Z c`E- t6�'FC�G _aJ41 R '�c�c� , ❑ Please reply ❑ No reply necessary e3.,'Cr ��s'f-C� e�'�-e. " SIGNED L S L Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality March 29, 2007 Candi Alexander Dominion Land Corporation PC Box 3167 Wilmington, NC 28406 Subject: Westgate Subdivision Stormwater Project No. SW8 051112 Brunswick County Dear Candi: Thank you for your kind words regarding the recent Home Builders meeting. I appreciate your willingness to allow me to get a few things out in the open regarding the process and the deficiencies in the applications. I also appreciate your willingness to invest a few minutes of your time reviewing the packages for your projects before the consultant submits them. It will be well worth the time investment. I've done some checking of the Westgate application and have found that a number of factors influenced the process. At the time this application was first being considered for Express, we had a long backlog of proiects. In August of 2006. we took in over 60 Express projects. Clearly, this was too many for the reviewers to schedule in a timely manner, and as a result, the submittal dates were being pushed out into November and December. We also lost one of our Express reviewers, so we had to temporarily reassign Rhonda to Express. While the protracted submittal date was certainly not what the Express program envisioned, it was the reality of our situation at the time. The agreed -upon review date for this project was December 12, 2006. This is the date to consider when determining the length of time that this application took to review, not the date of the first pre -application meeting. The time period from scheduled review date to issue date is less than 3 months. The application was received in our office on November 21, 2006, in the hopes that if her schedule opened up, Mary Jean could review the project before the scheduled review date. She was able to review it on November 30, 2006, for some of the more obvious deficiencies, such as whether it should be one permit or two, and to clarify the ownership. This information was apparently resubmitted on or about December 1, 2006. When Mary Jean got backed up with her reviews, Rhonda was assigned to review it, but I am not sure what date she received the application. She reviewed the application on January 3, 2007, which was .less than 30 days after the scheduled review date. There were 2 subsequent rounds of comments between your consultant and Rhonda, but each time the additional information was submitted, it was reviewed within 10 days of receipt. The last additional information was received on February 27, 2007, and the permit was issued 5 days later on March 5, 2007. There was also a question of the one new project (originally assigned project number SW8 060859), actually being a modification to two projects, SW8 051112, and SW8 980403,as well. Rhonda eventually straightened it all out and both permits were modifieu and issuer' on the same day, justifying the need for the second $4000.00 Express fee. N%Carolina North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Internet: www.ncwaterquality.or¢ Fax (910) 350-2004 An Equal OpportunitylAffirmative Action Employer— 50% Recycled/10% Post Consumer Paper Customer Service 1-877-623-6748 Ms. Alexander March 29. 200' Taking all of this information into consideration, I cannot recommend that the Division refund any of the express fees. Had the application been complete when it was reviewed on January 3, 2007, a permit would have been issued that day, which would have been less than 30 days after it's scheduled review date, well within the expected time frame for Express. We have since implemented new procedures, which should facilitate and shorten the process even more. I look forward to serving you in the future in my new capacity as the technical oversight coordinator for Express permitting. If you have any questions, please do not hesitate to call me at (910) 796-7335. Sincerely, X46G� Linda Lewis Environmental Engineer III ENB1arl: S:\WQS\STORMWATER\LETTERS\2007\051112.marO7 cc: Linda Lewis Ed Beck Edythe McKinney Page 2 of 2 idominion lanb (!Corporation \� V® 39ox $167 Wilmington, AC 28406 March 22, 2007 N.C.D.W.Q. Linda Lewis, Environmental Engineer 127 Cardinal Drive Wilmington, NC 28405 Dear Linda, Thanks so much for taking the time to meet with all of us from the Home Builders Association yesterday. I think we are heading in the right direction on this issue. I'll look forward to future progress. I will also know what to expect from my engineers when they submit an application to your office. On most all of my permits I review them before they submit, so I should be able to make sure what they send you is complete. As we discussed I have enclosed a copy of my history for obtaining the permit for Westgate. I would greatly appreciate any help with getting our fast track fees refunded. I'm just not sure how this one got so far off track. Thanks Again, 644-�' Candi Alexander Development Director/VP MAR 2 3 Z007 SelePbone 910-701.1106 ♦ -fargimiie 910-452.0261 e,-mail: bominion.ranblrekoantobomeg.tom