HomeMy WebLinkAboutNCC211291_NOT Signed Certification_20230822 NCGO. Notice of Termination (NOT) Certification Form
i) r actions:
Print this form, complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral& Land Resources Stormwater Program
512 N.Salisbury Street, 6th Floor
1612 Mail Service Center
Raleigh, NC 2i699 1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM:'CL' MAIL MUST BE COW/PLE!ED{WITH Ar ORIGINAL SIGNATURE(NOT DIGITAL} [40 CFR 12 .2 s]
General Permit Certificate of Coverage (COC) No.: NCC211291
Name of Project: Precision Tune Auto Care
Per NC General Statute 143-215.68 (i), any person who knowingly makes any false statement, representation,or
certification in any application, record, report, plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge
and belief,such information is true,complete, and accurate.
Legally Responsible Organizational Entity(must match eNOT): Precision Franchising, Inc.
*Legally Responsible Person (must match eNOT): Jason Allbert
*Title of Legally Responsible Person: Manager
Print Name&Title of Signed if Authorized individual Differs from Legally Responsible Person:
*Signature: Date: $ • (--) Z 3
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity, such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV, Section 8, Item (6)of the NCG010000 permit.
For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCGO10000 permit.