Loading...
HomeMy WebLinkAboutNCC211291_NOT Closeout Documents_20230822 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Wayne Project: Precision Tune Autocare River basin: Neuse Person financially responsible:Precision Franchising,Inc.-Jason Albert,CEO Project#: WAYNE-2021-016 Address: 106 Woodwinds Industrial Ct,Cary,NC 27511 1. Project Location: N Spence Ave,Goldsboro Pictures: No 2. Weather and soil conditions: sunny,warm,wet Initial inspection: NO 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one Title: Inspection report: Sent Report Date given/sent: September 15,2022 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self- inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Bradley West Others present: Date of inspection: September 13,2022 Time arriving on site: 12:50 PM Time leaving site: 1:10 PM CC: