Loading...
HomeMy WebLinkAbout20140843 Ver 1_STORM WATER PLAN SW3 July 2015 Revised_20150712DocuSign Envelope ID: 46DF0602- D1CA- 4B9A- 9FFD- 4F9AE6E9BO44 d: OVERFLOW ELEVATION\ THICKNESS ('d') = 1,5 X MAX ROCK DIAMETER - 6" MIN SE ❑TI ❑N A -A 05 X D MIN _ _ '- La-6 x D MIN A� PLAN NOTES: L La - LENGTH OE APRON DISTANCE La SHALL BE OE SUFFICIENT LENGTH TO DISSIPATE ENERGY, 2. APRON SHALL BE SET AT ZERO GRADE AND ALIGNED STRAIGHT. 3, FILTER MATERIAL SHALL BE FILTER FABRIC OR 6" THICK MINIMUM GRADED GRAVEL LAYER, (ET) PIPE Q z CULVERT SIZE 15 18 24 30 (IN) Q 5 12,00 APRON WIDTH S,0 &0 0 z (ET) 3 0.35 0.107 0.86 TOP ELEV 2585 J w TOP ELEV 2584 INLET CULVERT (FT) 5 0.35 BOTTOM ELEV 25816 0.75 Q BOTTOM ELEV 258025 BASIN #2 ELEV 2577,34 6 6 6 THICKNESS (IN) 1 0.95 EXTEND 24" CULVERT 192' 0.99 ING ELEVATION 4 6 10 16 27 OUTLET INTO WETLAND 0.107 0.86 0.087 4 0.95 21 1 92 ELEV 2576 0.109 5 0.95 EXISTING 24' CULVERT 0.75 0.076 INLET CULVERT 4 less than 2581 operating volume 2007 2581 BASIN #3 ELEV 2576,74 3272 �= 10.0 1. Obtain Erosion Control Permit and other applicable permits prior to the start of grading. 5390 �j1,0 freeboard 5279 24" CULVERT ELEVATI ❑N DETAIL '' 1.0 �I _ - '% 4. Stake area around remaining wetland for perimeter protection fence. 0.5 _J1. Cumulative Volume (cf) during the remainder of the year. The Engineer will determine the exact dates for 2.0 a d ° A a ' 0 within the wetland boundary that is not to be disturbed. 0, 5 l� 0 ..4 4. Install silt fence at all locations shown on plan sheet. Silt fence shall be manually installed along the 5 outside of the 10 foot wetland buffer. 1806 1806 Fertilizer used for pdres shall be 16-8 -8 grade and shall be applied at the 5. Layout the areas for the construction of the temporary skimmer basins. --2,0 5108 6. Construct the temporary skimmer basins to the appropriate dimensions. Construct the baffles in the 0 5108 05 X D MIN _ _ '- La-6 x D MIN A� PLAN NOTES: L La - LENGTH OE APRON DISTANCE La SHALL BE OE SUFFICIENT LENGTH TO DISSIPATE ENERGY, 2. APRON SHALL BE SET AT ZERO GRADE AND ALIGNED STRAIGHT. 3, FILTER MATERIAL SHALL BE FILTER FABRIC OR 6" THICK MINIMUM GRADED GRAVEL LAYER, FILTER BLANKET (SY) ENEREY ❑CSIPAT ❑P AT PIPE ❑CLET )KUSE WITH BASIN #1, #2 & #3 WEIR L-❑❑H DRAINAGE AREA WEIR LENGTH (ACRES) (ET) PIPE 4,00 CULVERT SIZE 15 18 24 30 (IN) 10,00 5 12,00 APRON WIDTH S,0 &0 8 10 (ET) 3 0.35 0.107 0.86 APRON LENGTH 7.50 9 12 15 (FT) 5 0.35 0.107 0.75 RIP RAP STONE 6 6 6 6 THICKNESS (IN) 1 0.95 0.107 0.99 SYNTHETIC 4 6 10 16 FILTER BLANKET (SY) ENEREY ❑CSIPAT ❑P AT PIPE ❑CLET )KUSE WITH BASIN #1, #2 & #3 WEIR L-❑❑H DRAINAGE AREA WEIR LENGTH (ACRES) (ET) 1 4,00 2 6,00 3 8,00 4 10,00 5 12,00 PR ❑CI C VCW OVERFILL TRUCTURAL STONE 6' FOR SETTLEMENT EMERGENGY BY -PASS EL0W SETTLED TOP OF MAX FILL nWEIR 5' nLENGT PLUS 5 FEET ATURAL GROUND OR POOR DEFINED CHANNELS )KUSE WITH BASIN #4 CROSS SCCTI❑❑ BYPASS WEIR fA 2' LEVEL SPREADER DETAIL BLIND SWALE DETAIL ROADWAY SCHEDULE U EXISTING GROUND A 3' SF 95B C GABION BASKET WALL B 8' I -190B D 12" ABC CENTER OF ROADWAY 9' 9 PARKING PARKING LOT Vp in /ft LOT Stabilization Requirements: ) B DO 0/ 0 Stabilization for this project shall comply with the time frame guidelines as j� 30 7-:1 1 r4. 0 - - 7.5 specified by the NCG- 010000 general construction permit effective August 3, 2011 issued by the North Carolina Department of Environment and Natural Resources Division of Water Quality. Temporary or permanent ground cover STATI ❑NS 0 +00 TO 2 +00 #57 S T ❑ N E stabilization shall occur within 7 calendar days from the last land- disturbing �-B L I N D S W A E E activity, with the following exceptions in which temporary or permanent ground FROM B M P cover shall be provided in 14 calendar days from the last land- disturbing activity: 7 �j �� �� • Slopes between 2:1 and 3:1, with a slope length of 10 ft. or less �� • Slopes 3:1 or flatter, with a slope of length of 50 ft. or less • Slopes 4:1 or flatter CENTER of ENERGY ROADWAY DISSIPATER SEEDING AND MULCHING: -LEVEL The kinds of seed and fertilizer, and the rates of application of seed, fertilizer, and 5' 2.5' 9' 9' limestone, shall be as stated below. During periods of overlapping dates, the kind SPREADER of seed to be used shall be determined. All rates are in pounds per acre. VEGETATED FILTER STRIP _V, = /ft August 1 - June 1 May 1 - September 1� = - NATURAL 100# Tall Fescue 100# Tall Fescue f< GROUND /GRASS 15# Kentucky Bluegrass 15# Kentucky Bluegrass F5 30# Hard Fescue 30# Hard Fescue A ® Q 0 25# Rye Grain 10# German or Browntop 3RASS Millet SHOULDER 500# Fertilizer 500# Fertilizer 4000# Limestone 4000# Limestone VEGETATIVE FILTER STRIP /LEVEL Approved Tall Fescue Cultivars STATIONS 2 +00 TO 4 +75 SPREADER CRESS SECTION 2nd Millennium; Duster; Magellan; Rendition; Avenger; Endeavor; Masterpiece; Scorpion; Barlexas; Escalade; Matador; Shelby; Barlexas II; Falcon II, III, IV & V; Matador GT; Signia Barrera; Fidelity; Millennium; Silverstar; Barrington; F' II M k S h Ch ' II B 1 F' b' A AA 3 S GABION BASKET WALL Description Construct a gabion basket wall to the dimensions shown on the plans. Materials Galvanized steel baskets ASTM standard A1057/A1057M Washed Stone ASTM C615/C615M Rip Rap ASTM C615/C615M Construction Methods Grade a 5' wide area for the foundation stone. Place 6 -8" of washed stone as the wall foundation. Construct baskets to a dimension of 4 feet wide by 5 feet deep by the specified length. Fill baskets with 6" nominal size rip rap; arranging the rip rap to minimize voids. Secure the baskets with galvanized steel wire. Stack baskets to the specified height offsetting each subsequent row by 1 Y2 '. Backfill with 6" of stone. Peak Flow Calculations 1 year 24 hour storm Q =C )KI )KA Drainage Area 4.0 11 (in /hr) JA (acres) IQ(cfs) Pre Development (� 0,5 4:j 1 0.35 Ati 0.99 BLIND SWALE DETAIL ROADWAY SCHEDULE U EXISTING GROUND A 3' SF 95B C GABION BASKET WALL B 8' I -190B D 12" ABC CENTER OF ROADWAY 9' 9 PARKING PARKING LOT Vp in /ft LOT Stabilization Requirements: ) B DO 0/ 0 Stabilization for this project shall comply with the time frame guidelines as j� 30 7-:1 1 r4. 0 - - 7.5 specified by the NCG- 010000 general construction permit effective August 3, 2011 issued by the North Carolina Department of Environment and Natural Resources Division of Water Quality. Temporary or permanent ground cover STATI ❑NS 0 +00 TO 2 +00 #57 S T ❑ N E stabilization shall occur within 7 calendar days from the last land- disturbing �-B L I N D S W A E E activity, with the following exceptions in which temporary or permanent ground FROM B M P cover shall be provided in 14 calendar days from the last land- disturbing activity: 7 �j �� �� • Slopes between 2:1 and 3:1, with a slope length of 10 ft. or less �� • Slopes 3:1 or flatter, with a slope of length of 50 ft. or less • Slopes 4:1 or flatter CENTER of ENERGY ROADWAY DISSIPATER SEEDING AND MULCHING: -LEVEL The kinds of seed and fertilizer, and the rates of application of seed, fertilizer, and 5' 2.5' 9' 9' limestone, shall be as stated below. During periods of overlapping dates, the kind SPREADER of seed to be used shall be determined. All rates are in pounds per acre. VEGETATED FILTER STRIP _V, = /ft August 1 - June 1 May 1 - September 1� = - NATURAL 100# Tall Fescue 100# Tall Fescue f< GROUND /GRASS 15# Kentucky Bluegrass 15# Kentucky Bluegrass F5 30# Hard Fescue 30# Hard Fescue A ® Q 0 25# Rye Grain 10# German or Browntop 3RASS Millet SHOULDER 500# Fertilizer 500# Fertilizer 4000# Limestone 4000# Limestone VEGETATIVE FILTER STRIP /LEVEL Approved Tall Fescue Cultivars STATIONS 2 +00 TO 4 +75 SPREADER CRESS SECTION 2nd Millennium; Duster; Magellan; Rendition; Avenger; Endeavor; Masterpiece; Scorpion; Barlexas; Escalade; Matador; Shelby; Barlexas II; Falcon II, III, IV & V; Matador GT; Signia Barrera; Fidelity; Millennium; Silverstar; Barrington; F' II M k S h Ch ' II B 1 F' b' A AA 3 S GABION BASKET WALL Description Construct a gabion basket wall to the dimensions shown on the plans. Materials Galvanized steel baskets ASTM standard A1057/A1057M Washed Stone ASTM C615/C615M Rip Rap ASTM C615/C615M Construction Methods Grade a 5' wide area for the foundation stone. Place 6 -8" of washed stone as the wall foundation. Construct baskets to a dimension of 4 feet wide by 5 feet deep by the specified length. Fill baskets with 6" nominal size rip rap; arranging the rip rap to minimize voids. Secure the baskets with galvanized steel wire. Stack baskets to the specified height offsetting each subsequent row by 1 Y2 '. Backfill with 6" of stone. Peak Flow Calculations 1 year 24 hour storm Q =C )KI )KA Drainage Area 1C 11 (in /hr) JA (acres) IQ(cfs) Pre Development (� 2580 4093 1 0.35 0.107 0.99 0.037 2 0.35 0.107 1.2 0.045 3 0.35 0.107 0.86 0.032 4 0.35 0.107 1.07 0.040 5 0.35 0.107 0.75 0.028 Post Development Chariot; Nordic; Rhino; Warwick; Firefly; Oxford; Scaldis 11; Heron; Reliant 1I; Y; > over 2581 freeboard 1 0.95 0.107 0.99 0.101 2 0.95 0.107 1.2 0.122 3 0.95 0.107 0.86 0.087 4 0.95 0.107 1.07 0.109 5 0.95 0.107 0.75 0.076 Runoff Volume Calcu(ations: Rv= 0.05 +0,9 )KIa V= 3630wRdwRvwA Dry Detention Basins NOTES: messe , on an , out ern oice , i tmore; >re it , us tang , tetson; 1, THE TOPSOIL IN THE VEGETATIVE FILTER STRIP MUST BE Bingo; Focus; Olympic Gold; Tarheel; Bravo; Grande II; Padre; Titan Ltd; CENTER OF AMENDED WITH LIME AND ORGANIC MATTER, SELECT GRASSES Cayenne; Greenkeeper; Paraiso; Titanium; Chapel Hill; Greystone; Picasso; ROADWAY FROM STABILIZATION TABLE ❑N SHEET SW -3. Tomahawk; Chesapeake; Inferno; Piedmont; Tacer; Constitution; Justice; Pure 2. ENERGY DISSIPATER AT BASIN #1 IS OVERSIZED T ❑ Gold; Trooper; Chipper; Jaguar 3; Prospect; Turbo Coronado; Kalahari; Quest; 9' 9' UNIFORMLY C ❑ N N E C T T ❑ LEVEL SPREADER. Ultimate; Coyote; Kentucky 31; Rebel Exeda; Watchdog; Davinci; Kitty Hawk; GRASS GRASS Rebel Sentry; Wolfpack; Dynasty; Kitty Hawk 2000; Regiment II; Dominion; SHOULDER SHOULDER 3, PROVIDE AN IMPERVIOUS FILTER BARRIER UNDER BASINS � t WHERE THE SHWT IS WITHIN 2 FEET OF THE BOTTOM Lexington; Rembrandt ELEVATI ❑N, Stage Storage Volume Calculation Table Drainage Area Elevation Surface Area (sf) 1 less than 2580 operating volume (� 2580 4093 Ld � Z 00 2581 5111 3.33 I 15 I 0.25 over 2581 freeboard (Drainage Area Elevation Surface Area (sf) 2 less than 2579 operating volume 0 2579 1456 0 2580 2558 > 2581 3986 Chariot; Nordic; Rhino; Warwick; Firefly; Oxford; Scaldis 11; Heron; Reliant 1I; Y; > over 2581 freeboard (Drainage Area Elevation Surface Area (sf) 3 less than 2579 operating volume K , t (days) 2579 1175 used provided the 1 -2 -2 ratio is maintained and the rate of application adjusted to 2580 2437 0 2581 4167 0 over 2581 freeboard (Drainage Area Elevation Surface Area (sf) 4 less than 2581 operating volume 2007 2581 3626 3272 2582 4472 1. Obtain Erosion Control Permit and other applicable permits prior to the start of grading. 2583 5390 over 2583 freeboard 25% Drainage Sediment V (cu ft) V (cu ft) Area la Rv Rd A (acres) V (cu ft) Storage needed provided 2 0.91 0.87 1 1.2 3779 945 4724 5279 3 0.92 0.88 1 0.86 2737 684 3421 5108 Bioretention Drainage Area la Rv Rd 1 0.89 0.85 1 4 0.70 0.68 1 *soil type DsC, DiUslooro Loam Ponding Required Depth, Surface Ksat* Drawdown A (acres) V (cu ft) inches Area (in /hr) , t (hours) 0.99 3066 9 4088 0.75 12 1.07 2644 9 3526 0.75 12 Emergency Outlet Q Q= CwwLwH ^1.5 13'x3' box Cw L crest H (ft) Q(cfs) Approved Kentucky Bluegrass Cultivars: CD U q LO 3.33 1 8 0.3 4.4 (� O ® p (Overflow Structure Ld � Z 00 Alpine; Bariris; Envicta; Rugby; Apollo; Bedazzled; Impact; Rugby II; Arcadia; O/ 3.33 I 15 I 0.25 6.2 Bordeaux; Kenblue; Showcase; Arrow; Champagne; Midnight; Sonoma; Award; �2:\ Incremental Volume (cf) Cumulative Volume (cf) Chicago II; Midnight II 4r1 A'1 it 0 0 Approved Hard Fescue Cultivars: 0 0 > 4602 4602 Chariot; Nordic; Rhino; Warwick; Firefly; Oxford; Scaldis 11; Heron; Reliant 1I; Y; > STATI ❑NS 4 +75 TO 6 +70 0 4602 Spartan II; Minotaur; Reliant IV; Stonehenge Drawdown OVERFLOW DITCH Area (sf) c g (fps) Fertilizer shall be 10 -20 -20 analysis. A different analysis of fertilizer may be K , t (days) Incremental Volume (cf) Cumulative Volume (cf) used provided the 1 -2 -2 ratio is maintained and the rate of application adjusted to 1.02893E -05 3.1 0 0 provide the same amount of plant food as a 10 -20 -20 analysis and as directed. 9.84233E -06 3.3 0 0 CONSTRUCTION SCHEDULE TEMPORARY SEEDING: 2007 2007 3272 5279 Fertilizer shall be the same analysis as specified for Seeding and Mulching and 1. Obtain Erosion Control Permit and other applicable permits prior to the start of grading. 2. Install rain gauge in an accessible area. Dedicate a log book to record rain events and weekly inspections. 0 5279 applied at the rate of 400 pounds and seeded at the rate of 50 pounds per acre. 3. Maintain the temporary gravel construction entrance from phase I. German Millet, or Browntop Millet shall be used in summer months and rye grain 4. Stake area around remaining wetland for perimeter protection fence. Incremental Volume (cf) Cumulative Volume (cf) during the remainder of the year. The Engineer will determine the exact dates for 3. Manually nstall a perimeter protection fence around the delineated wetland. No equipment is allowed y P P 0 0 using each kind of seed. within the wetland boundary that is not to be disturbed. 0 0 4. Install silt fence at all locations shown on plan sheet. Silt fence shall be manually installed along the FERTILIZER TOPDRESSING: outside of the 10 foot wetland buffer. 1806 1806 Fertilizer used for pdres shall be 16-8 -8 grade and shall be applied at the 5. Layout the areas for the construction of the temporary skimmer basins. 3302 5108 6. Construct the temporary skimmer basins to the appropriate dimensions. Construct the baffles in the 0 5108 s acre. rate of 500 pounds per acre. A different analysis of fertilizer may be used temporary skimmer basins. provided the 2-1-1 ratio f maintained and the rate of application adjusted to 7. Establish temporary cover according to stabilization table schedule and the seeding schedule on ECP 2. Incremental Volume (cf) Cumulative Volume (cf) Provide the same amount of plant food as 16 -8 -8 analysis and as directed. 8. Seed, fertilize and mulch all exposed areas using the seeding schedule included on ECP2, adjusting to the 0 0 SUPPLEMENTAL SEEDING: schedule for the season. All disturbed areas should be treated with ground cover within 7 to 14 calendar days of completion of grading activities according to the stabilization table on ECP 2. 0 0 The kinds of seed and proportions shall be the same as specified for Seeding and 9. Once grading is complete, install temporary silt fence around permanent drainage easement. 4049 4049 Mulching, and the rate of application may vary from 25# to 75# per acre. The 10. Stabilize drainage area #2 and #3 prior to construction of the dry detention basin. Construct storm 4931 8980 actual rate per acre will be determined prior to the time of topdressing and the Water basins and outlet structures. 0 8980 Contractor will be notified in writing of the rate per acre, total quantity needed, 11. Seed and fertilize areas. Stabilize drainage area #1 and #4 prior to construction of the bioretention cell. and areas on which to apply the supplemental seed. Minimum tillage equipment, 12. Construct bioretention cell. Cover with sod as specified. consisting of a sod seeder shall be used for incorporating seed into the soil as to 13. Re -seed and fertilize areas as needed. prevent disturbance of existing vegetation. A clodbuster (ball and chain) may be 14. Once vegetation has been established, remove all temporary erosion control devices. used where degree of slope prevents the use of a sod seeder. MOWING: The minimum mowing height on this project shall be six inches. Emergency Outlet Q Q= CwwLwH ^1.5 13'x3' box Cw L crest H (ft) Q(cfs) z� H CD U q LO 3.33 1 8 0.3 4.4 (� (Overflow Structure Ld � Z 00 A � Q LD U 3.33 I 15 I 0.25 6.2 - d= �2:\ Orifice Outlet Drawdown Time //�� 4r1 A'1 it 1,25 "diameter orifice Z� � 't oz� Q= CdwAwsgrt(2wgwH) �OW03 > Basin Orifice Drainage Area, A Ld Area, a Drawdown OVERFLOW DITCH Area (sf) c g (fps) (sf) K , t (days) 2 3986 0.6 32.2 0.008518 1.02893E -05 3.1 3 4167 0.6 32.2 0.008518 9.84233E -06 3.3 )KUse with Drainage Area #4 SW 3 7 -12 -15 ADD PIPE DETAIL C ESSIp/,'4 S. SEAL Z-D ussgOT15536 7/12/2015 LLJ CL z 00 Q 00 v LLJ <1:z CL Q ED (U z� H CD U q LO > E] 00 (� � Ld � Z 00 A � Q LD U Q o_ z v) O r- Ld - d= �2:\ o LW = CD Z _J U') //�� Ln I �L Z� � 't oz� z 00 Q 00 v LLJ <1:z CL Q ED COUNTY: HAYW❑ ❑D TOWNSHIP: WAYNESVILLE WATERSHED: FRENCH BROAD SCALE: INSERTS: 1 " =30' IJL I AILJ: N I J U CD 1,.D all r I o o LJJ �I Q `p Q Lei J J oz� D �OW03 > #Ln_J Ld H 0 COUNTY: HAYW❑ ❑D TOWNSHIP: WAYNESVILLE WATERSHED: FRENCH BROAD SCALE: INSERTS: 1 " =30' IJL I AILJ: N I J