HomeMy WebLinkAbout20150724 Ver 1_401 Application_20150715LETTER OF TRANSMITTAL I
community infrastructure consultants
616 Colonnade Dnve Charlotte, North Carolina 28205 704 334 5348 tel 704.334 0078 fax
TO: NC DWQ, WBSCP Unit
512 North Salisbury Street
Raleigh, NC 27604
ATTENTION: TO WHOM IT MAY CONCERN
DATE: 07 -21 -2015
Pharr Mill Road and Rocky River Road
RE: Water Line Extensions
PCN Package
Town of Harrisburg, NC
We are sending via: ® Overnight ❑ Regular Mail ❑ Pick -up ❑ Hand Delivered
The following items: ® Correspondence ® Plans ❑ Specifications ❑ Other as listed
below:
COPIES
DATE
NO.
DESCRIPTION
5
07 -21 -15
1
PCN Package
5
07 -21 -15
2
Planset, sheet pages 24" x 36"
1
07 -21 -15
3
$240 for review fee
THESE ARE TRANSMITTED as checked below:
® For Approval ❑ As Requested ❑ Approved as Submitted ❑ Returned for Corrections
❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ Forward to
Subcontractor
REMARKS:
Derek Slocum, Town of
COPY TO: Harrisburg SIGNED: Ward Marotti
,} OF WATF9
° °•. oa °� 2 0 1 5 0 7 4 Office Use Only
Corps action ID no
DWQ project no
J Form Versioan 1 4 January 2_009
VIA I'I -,A
Pre - Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a Type(s) of approval sought from the Corps ❑X Section 404 Permit ❑ Section 10 Permit
1b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number
1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No
1d Type(s) of approval sought from the DWQ (check all that apply)
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
le Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit
because written approval is not required? 401 Certification
❑ Yes ❑X No ❑ Yes ❑X No
1f Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank ❑ Yes ❑X No
or in -lieu fee program
1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h ❑ Yes ❑X No
below
1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No
12. Project Information
2a Name of project Pharr MITI Road and Rocky River Road Waterline Extensions
2b County Cabarrus
2c Nearest municipality / town Harrisburg
2d Subdivision name Pharr MITI Road and Rocky River Road Waterline Extensions
2e NCDOT only, T I P or state project no
3. Owner Information
3a Name(s) on Recorded Deed See attached narrative for ownership Information
3b Deed Book and Page No
3c Responsible Party (for LLC if 2
applicable) M I K
3d Street address D�
3e City, state, zip AHL 2 2 2015
3f Telephone no
3g Fax no OENR • WATER RESOURCE$
AM &BUFFER PERMITTING
3h Email address
Page 1 of 10
PCN Form — Version 1 4 January 2009
• 4.
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent X❑ Other, specify
4b
Name
Mike Rose, Town Administrator
4c
Business name
Town of Harrisburg
(if applicable)
4d
Street address
P O Box 100
4e
City, state, zip
Harrisburg, NC 28075
4f
Telephone no
(704) 455 -5614
4g
Fax no
(704) 455 -1206
4h
Email address
mrose @harnsburgnc org
5.
Agent/Consultant Information
(if applicable)
5a
Name
Ward Marotti
5b
Business name
WK Dickson & Co, Inc
(if applicable)
5c
Street address
616 Colonnade Dr
5d
City, state, zip
Charlotte, NC 28205
5e
Telephone no
704- 334 -5348
5f
Fax no
704- 334 -0078
5g
Email address
wmarotti @wkdickson corn
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a Property identification no (tax PIN or parcel ID) I See Section A Item #3 in attached narrative
1b Site coordinates (in decimal degrees) I Latitude 35 3103 Longitude -80 6047
1c Property size
2. Surface Waters
2a Name of nearest body of water to proposed project
2b Water Quality Classification of nearest receiving water
2c River basin
acres
Back Creek
C
Yadkin -Pee Dee
3. Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
See attached narrative
3b List the total estimated acreage of all existing wetlands on the property 0
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
3d Explain the purpose of the proposed project
The two water lines are being constructed to provide an important system loop for the Town of Harrisburg
3e Describe the overall project in detail, including the type of equipment to be used
See attached narrative
4. Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the ❑ Yes ❑X No ❑ Unknown
Corps or State been requested or obtained for this property / Comments
project (including all prior phases) in the past?
4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final
of determination was made?
4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company
Name (if known) Other
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5. Project History
5a Have permits or certifications been requested or obtained for I El Yes ❑X No ❑ Unknown
this project (including all prior phases) in the past?
5b If yes, explain in detail according to "help file" instructions
6. Future Project Plans
6a Is this a phased project?
6b If yes, explain
❑ Yes ❑X No
Page 3 of 10
PCN Form — Version 1 4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands 0 Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of impact
Type of wetland
Forested
Type of jurisdiction
Area of
number
3g
Stream impact
Type of impact
Corps (404,10) or
impact
Permanent (P) or
intermittent (INT)? jurisdiction stream
length
DWQ (401, other)
(acres)
Temporary (T)
(linear
Temporary (T)
(feet)
feet)
W1 -
Choose one
Choose one
Yes /No
-
W2
Choose one
Choose one
S3
Yes /No
Choose one
W3
Choose one
Choose one
Yes/No
W4
Choose one
Choose one
Yes /No
S6
W5 -
Choose one
Choose one
Yes /No
W6 -
Choose one
Choose one
Yes /No
-
2g Total Wetland Impacts:
2h Comments
3. Stream Impacts
If there are perennial or intermittent stream
impacts (including temporary impacts) proposed on the site, then complete
this
question for all stream sites impacted
3a 3b
3c 3d 3e 3f
3g
Stream impact
Type of impact
Stream name Perennial (PER) or Type of Average
Impact
number
intermittent (INT)? jurisdiction stream
length
Permanent (P) or
width
(linear
Temporary (T)
(feet)
feet)
S1 T
Excavation
Back Creek PER Corps 30
15
S2
Choose one
-
S3
Choose one
S4
Choose one
S5
I
Choose one
S6
Choose one
31 Comments
See attached narrative
3h Total stream and tributary impacts 15
Page 4 of 10
PCN Form — Version 1 4 January 2009
4. Open Water Impacts
6e
6f
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then individually list all open water impacts
below
Zone 1
4a 4b
4c
4d 4e
Open water Name of waterbody
impact
Permanent (P) or
impact number (if applicable)
Type of impact
Waterbody Area of impact (acres)
Permanent (P) or
type
Temporary (T)
61
Yes /No
01
Choose one
Choose
Yes /No
02
(Choose one
Choose
Yes /No
03
Choose one
Choose
Yes/No
04
Choose one
Choose
Yes /No
4f Total open water impacts
4g Comments
Yes /No
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below
5a 5b 5c 5d 5e
Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland
purpose of pond (acres)
Flooded Filled Excavated Flooded Filled Excavated
P1 Choose one
P2 Choose one
5f Total:
5g Comments
5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
51 Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other
6b 6c 6d
6e
6f
6g
Buffer Impact Reason for impact
Stream name Buffer
Zone 1
Zone 2
number —
mitigation
impact
impact
Permanent (P) or
required?
(square
(square
Temporary (T)
feet)
feet)
61
Yes /No
B2
Yes /No
B3
Yes /No
B4
Yes/No
B5
Yes /No
B6
Yes /No
6h Total Buffer Impacts:
61 Comments
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
See attached narrative
lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
See attached narrative
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for ❑ Yes ❑X No
impacts to Waters of the U S or Waters of the State?
2b If yes, mitigation is required by (check all that apply)
2c If yes, which mitigation option will be used for this
project?
3. Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
3c Comments
❑ DWQ ❑ Corps
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
Type Choose one Quantity
Type Choose one Quantity
Type Choose one Quantity
4. Complete if Making a Payment to In -lieu Fee Program
4a Approval letter from in -lieu fee program is attached ❑ Yes
4b Stream mitigation requested linear feet
4c If using stream mitigation, stream temperature Choose one
4d. Buffer mitigation requested (DWQ only) square feet
4e Riparian wetland mitigation requested acres
4f Non - riparian wetland mitigation requested acres
4g Coastal (tidal) wetland mitigation requested acres
4h Comments
5. Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) —required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No
buffer mitigation?
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c 6d 6e
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1
3 (2 for Catawba)
Zone 2 I 1 5
6f Total buffer mitigation required:
6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
lb If yes, then is a diffuse flow plan included? If no, explain why
2. Stormwater Management Plan
2a What is the overall percent imperviousness of this protect?
2b Does this project require a Stormwater Manaqement Plan?
2c If this project DOES NOT require a Stormwater Management Plan, explain why
No new impervious surface will be generated as a result of this project
❑ Yes ❑X No
❑ Yes ❑ No
0%
❑ Yes ❑X No
2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
2e Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a In which local government's jurisdiction is this project?
3b Which of the following locally - implemented stormwater management programs
apply (check all that apply)
3c Has the approved Stormwater Management Plan with proof of approval been
attached?
4. DWQ Stormwater Program Review
4a Which of the following state - implemented stormwater management programs apply
(check all that apply)
4b Has the approved Stormwater Management Plan with proof of approval been
attached?
5. DWQ 401 Unit Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements?
5b Have all of the 401 Unit submittal requirements been met?
❑ Phase II
❑ NSW
❑ USMP
❑ Water Supply Watershed
❑ Other
❑Yes ❑ No
❑Coastal counties
❑HQW
❑ORW
❑Session Law 2006 -246
❑Other
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a Does the project involve an expenditure of public (federal /state /local) funds or the ❑x Yes ❑ No
use of public (federal /state) land?
lb If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes 0 No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter ) ❑ Yes ❑ No
Comments
2. Violations (DWQ Requirement)
2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑Yes Q No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b Is this an after - the -fact permit application? ❑Yes ❑X No
2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
3. Cumulative Impacts (DWQ Requirement)
3a Will this project (based on past and reasonably anticipated future impacts) result in I El Yes ❑X No
additional development, which could impact nearby downstream water quality?
3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
4. Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
Page 9 of 10
PCN Form — Version 1 4 January 2009
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
impacts?
5c If yes, indicate the USFWS Field Office you have contacted
❑ Yes ❑X No
❑ Yes ❑X No
5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical
Habitat?
North Carolina National Heritage Program database
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat? I ❑ Yes ❑X No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NOAA's National Marine Fisheries online database
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ❑ Yes ❑X No
status (e g , National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
NC State Historic Preservation Office online database
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA- designated 100 -year floodplain?
8b If yes, explain how project meets FEMA requirements
See attached narrative
8c What source(s) did you use to make the floodplain determination?
FEMA Flood Insurance Maps
t c d
Applicant/Agent's Printed Name
❑X Yes
a��
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided )
Page 10 of 10
❑ No
�// %//5
Date
PCN Narrative
Pharr Mill Road and Rocky River Road
Water Line Extensions
For Town of Harrisburg
Nationwide Permit 12
Pre - Construction Notification
Name and Address of the Applicant:
Town of Harrisburg
c/o Mike Rose, Town Administrator
PO Box 100
Harrisburg, NC 28075
PCN Section A. Applicant Information
Item #3. Owner Information
Water
Parcel PIN
Name on Deed
Line
ID
5500 Hwy 49 S.
Harrisburg, NC
Pharr
5527040174
Now or Formally:
Mill
7271 Pharr Mill
Canterfield HOA
Pharr
5527035992
Now or Formally:
Mill
7301 Pharr Mill
Mirsad Selimbegovic
Pharr
5527035697
Now or Formally: Judy
Mill
7333 Pharr Mill
E. Hager
Pharr
5527036489
Now or Formally:
Mill
7383 Pharr Mill
Tracie Swicegood
Pharr
5527038322
Now or Formally:
Mill
7435 Pharr Mill
James H. Canter, Sr.
Pharr
5527038122
Now or Formally:
Mill
7451 Pharr Mill
Robert G. Williams
Pharr
5527028949
Now or Formally:
Mill
7465 Pharr Mill
Michael E. Scheuerman
Pharr
5527029748
Now or Formally:
Mill
162 Briarcliff Dr.
Louise M. Linker
Pharr
5527120557
Now or Formally:
Mill
7525 Paul Linker
Jeanette L. Lefler
Pharr
5527123144
Now or Formally: Jason
Mill
7775 Pharr Mill
A. Linker
Pharr
5527118756
Now or Formally:
Mill
7940 Rocky River
Margaret B. Linker
Pharr
552721734
Now or Formally:
Mill
Rocky River
Presbyterian Church
Deed Book/
Address
City, Sate, Zip
Page Number
DB 3390
5500 Hwy 49 S.
Harrisburg, NC
PG 250
STE 200
28075
DB 9436
7271 Pharr Mill
Harrisburg, NC
PG 164
Rd.
28075
DB 485
7301 Pharr Mill
Harrisburg, NC
PG 314
Rd.
28075
DB 8836
7333 Pharr Mill
Harrisburg, NC
PG 190
Rd.
28075
DB 691
7383 Pharr Mill
Harrisburg, NC
PG 130
Rd.
28075
DB 1154
7435 Pharr Mill
Harrisburg, NC
PG 170
Rd.
28075
DB 1679
7451 Pharr Mill
Harrisburg, NC
PG 310
Rd.
28075
DB 473
7465 Pharr Mill
Harrisburg, NC
PG 258
Rd.
28075
DB 2044
162 Briarcliff Dr.
Kannapolis, NC
PG 200
28081
DB 567
7525 Paul Linker
Harrisburg, NC
PG 125
Pl..
28075
DB 221
7775 Pharr Mill
Harrisburg, NC
PG 115
Rd.
28075
DB 234
7940 Rocky River
Harrisburg, NC
PG 67
Rd.
28075
1
6
Pharr
5527215067
Now or Formally:
DB 1191
7873 Pharr Mill
Harrisburg, NC
Mill
Sharon M. Twitty
PG 76
Rd.
28075
Pharr
5527206814
Now or Formally:
DB 6069
7877 Pharr Mill
Harrisburg, NC
Mill
William K. McCachren,
PG 261
Rd.
28075
Jr.
Pharr
5527206814
Now or Formally:
DB 564
7877 Pharr Mill
Harrisburg, NC
Mill
William K. McCachren,
PG 470
Rd.
28075
Jr.
Rocky
5526094782
Now or Formally:
DB 6696
1959 Stallings Rd.
Harrisburg, NC
River
Alvice G. Miller, Jr.
PG 119
28075
Rocky
5527104543
Now or Formally:
DB 7543
8032 Rocky River
Harrisburg, NC
River
Harold W. Holste
PG 299
Road
28075
Rocky
5527109116
Now or Formally:
DB 2474
8030 Rocky River
Harrisburg, NC
River
Michael D. Biggers
PG 188
Road
28075
Rocky
5527217340
Now or Formally:
DB 234
7940 Rocky River
Harrisburg, NC
River
Rocky River
PG 67
Road
28075
Presbyterian Church
*note: the project will
be constructed on these
properties within easements held by the Town of
Harrisburg, NC
PCN Section B. Project Information & Prior Project History
Item #3a: Existing Condition
There are two primary water lines associated with this project serving 1) Pharr Mill Road and 2)
Rocky River Road. The two water lines will be constructed within: a proposed easement;
within an existing NCDOT maintained corridor.
Item #3e: Project Description and Equipment
The water lines will consist of the following:
1. Pharr Mill Road - Approximately 5,491 LF of 12 -inch DIP water line;
2. Rocky River Road - Approximately 1,854 LF of 16 -inch DIP water line; and,
3. Various appurtenances for a successful project completion.
Typical equipment expected to be used includes, but is not limited to; track hoe excavator, backhoe,
frontend loader, etc. The proposed water lines will connect to existing water lines and will be
constructed in several segments. The water line along Pharr Mill Road will connect to the existing
12 -inch water line near Sequoia Hills Dr. It will traverse southward on the east side of Pharr Mill
Road and connect to the proposed 16 -inch water line on Rocky River Road. The water line along
Rocky River Road will connect to an existing 16 -inch water line near Pembrook Road. It will
traverse eastward on the north side of Rocky River Road and terminate near Lower Rocky River
Road. At a later date, an additional water supply interconnect will be made with the City of
Concord at this location.
PA
The alignment for the proposed water lines were determined based on the existing water line
locations, existing buildings, existing infrastructure such as overhead power lines, roadways,
underground utilities, and topography.
PCN Section C. Proposed Impacts Inventory
Item #3i: Description of Proposed Stream Impacts
There will be no permanent stream impacts. There will be 1 temporary stream impact of 15
linear feet. A temporary stream crossing is not proposed as the adjacent NCDOT bridge
provides a means to transport equipment and material across the stream. The construction
details contained in the plan drawings depict stream bank and bed stabilization. While rip -rap
is proposed within the stream bed, it will be placed beneath a 12" thick layer of in situ soil
material.
PCN Section D. Impact Justification and Mitigation
Item #1a & #1b: Avoidance and Minimization
To minimize impacts to surface water resources during project construction and maintenance;
an approved sediment and erosion control plan will be included in the project's final design
plans; in locations where water line installation across streams uses "open cut" method,
crossings will be as close to perpendicular as possible, completed during low flow events, and
monitored at least every three months for maintenance during the first 24 months following
construction and annually thereafter; insecticides and herbicides will not be used within 100
feet of perennial streams or within 50 feet of intermittent streams or within wetlands and
floodplains associated with those streams.
Ongoing on -site construction inspections will ensure that construction contractors are following
all approved plans.
PCN Section F. Supplementary Information
Item #8b: Flood Zone Designation
Portions of the proposed water line are located in the FEMA 100 -year floodplain of Back Creek.
The water line will be installed below grade at the crossing of Back Creek. Stockpiling and
disposal of material or spoils from excavation of the water line will not be temporarily or
permanently stored inside the FEMA 100 -year floodway. Stockpiling and disposal of spoils will
take place outside the FEMA 100 -year floodway in designated areas with approved sediment
and erosion control measures.
3
`. Shamrock
i
.fig c
f t 00
Via . OOP '
v
r' f
9s Ra : e0
i*
1� / Y• (�, 4 Chrys
- o
- i RJR � •' .
_j qtr- w S1 (T) Back Creek -
15 LF
Rocky Ri; er-Rd�4 •
.� C O
u,•J c��, !•
j s�
o
J�
Legend
Proposed Water Line
Existing Concord Water Line
—Existing Harrisburg Water Line
Lei
N
�S
t r ii
.V�--red 5,500 LF
.1112-inch Water Line
1
• f
; S �A
?757;In �I/Ij_
.r
0
•o Proposed 2,400 LF
�J 8 -inch Water Line 6
,Kee—"
Pharr Mill Road and Rocky River Road
Waterline Extensions
Town of Harrisburg, NC
February, 2015
er
•
•
I Wr �i , Se ie�ty, i,c�uu ed-
N
0 ]]5 ]30 1,125 1,500
�DIICKSON