Loading...
HomeMy WebLinkAboutPAULIKcompletion1.0Environmental and Geological � � Services r1�Ip _ Paulik - NOV CAP Construction Completion Action ID: SAW-2021-01557 BWR Project #20211440 January 5, 2022 Project Information CreekStone, PLLC (CS, PLLC) was retained by Istvan Paulik to resolve the NOV associated with 854 Meadow Brach Road, Robbinsville, NC 28771. CS, PLLC developed and implemented a corrective action plan associated with the NOV. CreekStone personnel completed construction oversight of the corrective action plan which was approved by the USACE and NCDEQ on November 8, 2021. CAP Construction Under CreekStone guidance, construction of the correction action plan began on November 29t" and was completed on December 1st, 2021. The CAP was executed as designed with the exception of one additional log vane. The additional log vane was vital to increase water level desired for wetland restoration. The ditch plugs were installed as indicated and showed signs of immediate function. Specified livestakes are to be installed in February 2022 by CreekStone, PLLC personnel. A monitoring period of 18 months shall begin on January 15tn 2022 and continue through June 15t", 2023 at which time a monitoring report along with a request for no further action will be submitted. Please refer the following photographs and attached as -built survey G5: Ronnie Dilbeck, PG CreekStone, PLLC CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734 (828) 200-4585, Ronnie@creekstonewnc.com Page 2of8 Project Photographs: Slopes reduced to 3H:1 V CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734 (828) 200-4585, Ronnie@creekstonewnc.com Page 3of8 Stabilization in progress CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734 (828) 200-4585, Ronnie@creekstonewnc.com Page 4 of 8 Log vane # 1 CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734 (828) 200-4585, Ronnie@creekstonewnc.com Page 5of8 1� e Log vane #2 CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734 (828) 200-4585, Ronnie@creekstonewnc.com Page 6of8 a�n� �vr asp Ne kµv�i, ri�.'Sk la lS4 N k 1�k '. Mtn n s�kgS �•, t �c`"�_ •Kk sip }, . Log vane #3 CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734 (828) 200-4585, Ronnie@creekstonewnc.com Page 7of8 Ditch #2 open water resulting from plug installation CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734 (828) 200-4585, Ronnie@creekstonewnc.com ram, _ �� �s�7 I rya �a � AitI�At1a. �i rI.f a m,r�"', q gt t �j� ,.✓rGl i Xsa t i .��'�" .. *•'- � '4s'�`„� &�i�.� ___""�'^- _ � l� -tea.. 'r:�. i. M h