Loading...
HomeMy WebLinkAboutNCC230825_MODIFICATION Supporting Doc (LEG RESP CHANGE)_20230821 NCGO1 Legally Responsible Individual Charge Form Use this form when: The person who is legally responsible for the permit has changed, but there is NO CHANGE in the project name or ownership. **If the project name has changed, or if the ownership of the project has changed,do NOT use this form.** Instead,you must submit a new NCG01 electronic Notice of Intent(eNOI). Directions: Print this form, complete,scan and upload to the Construction Stormwater Permit MODIFICATION Form. Then, mail the original form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N.Salisbury Street, 61"Floor(Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR MODIFICATION HAS BEEN REVIEWED AND ACCEPTED AS COMPLETE. THE FORM;YOU MAIL DUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 GFR 122.22] Certificate of Coverage (COC) Number: NCC230825 Name of Project: Holly Springs Utley Creek 230kV Substation Legally Responsible Organizational Entity: Duke Energy Progress Inc PREVIOUS Legally Responsible Individual: Josh Witherspoon NEW Legally Responsible Individual: Nuwan Wijesuriya The following section is to be completed and signed by the NEW Legally Responsible Individual. Per NC General Statute 143-215.6B(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Page 1 of 2 NCG01 Legally Responsible Individual Change Fare THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] Under penalty of law, I certify that (check all boxes to indicate your agreement): I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. ' 1 1 will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control Plan. If the approved Erosion and Sediment Control Plan is not compliant with Part li (Stormwater Pollution Prevention Plan) of the NCGO10000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. This form has been reviewed and is accurate and complete to the best of my knowledge. ` i *Signature: �1�-L----- . w-; 9 Date: / 7/ 3 Print Name of Signed: �[.{ VVAA/ I X I yA Title: Mailing Address: 410 South Wilmington Street, Raleigh, NC 27601 Street Address: same Email Address: nuwan.wijesuriya@duke-energy.com Phone Number: 919-546-2090 * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item (6)of the NCGO10000 permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of the NCG010000 permit. Page 2 of 2