HomeMy WebLinkAboutWQ0031521_Permit (Modification)_20230822DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8FO94190DOD8
ROY COOPER tv
Governor
ELIZABETH S. BISERSecretary
RICHARD E. ROGERS,JR. NORTH CAROLINA
Director Environmental Quality
August 22, 2023
Rich Cappola, Town Manager
Town of Clayton (via e-mail)
P.O. Box 879
Clayton, NC 27528
Subject: Permit No. WQ0031521 Modification
Town of Clayton
Clayton to Raleigh Pump Station Improvements
Wastewater Collection System Extension Permit
Johnston County
Dear Permittee:
In accordance with your application received May 3, 2023, and additional clarifying information received
June 14, 2023 we are forwarding herewith Permit modification No. WQ0031521 Modification dated
August 22, 2023, to the Town of Clayton (Permittee) for the construction and operation upon
certification of the subject wastewater collection system extension. This permit shall be effective from
the date of issuance until rescinded, shall void the original permit of the same number issued December
27, 2007, and shall be subject to the conditions and limitations as specified therein. This cover letter
shall be considered a part of this permit and is therefore incorporated therein by reference.
This permit modification allows the construction and replacement of three existing pumps (in Neuse 2
Pump Station and the Clayton to Raleigh Pump Station in the same location) to three submersible
pumps (rated for 1560 gpm at 300 ft TDH; serving as a triplex pump station) including standby power
and associated piping modifications to accommodate conversion to the triplex pump station. Other
components of the permit originally issued December 27, 2007 remain in effect.
The Division of Water Resources understands that flow will be diverted to the City of Raleigh
temporarily, until completion of construction of the Town of Clayton's new Sam's Branch Water
Reclamation Facility. Any new tributary flow will be permitted in future sewer extension permits and
tracked by the Town of Clayton.
Please pay particular attention to the following conditions contained within this permit:
Condition 1.1: This permit shall become voidable unless the agreement between the Town of Clayton
and the City of Raleigh for the collection and final treatment of wastewater is in full
force and effect. [15A NCAC 02T.0304(g)]
North Carolina Depmn mt of Eavira=entrl Qt Uly I Division of Water mources
71�✓�j Meigh RegooA Office I 3900 Barrett Dnre I Raleigh. North Carolina 27409
919.791.4200
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8F094190DOD8
Town of Clayton
Permit No. WQ0031521 MOD
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 02T .0403 or any individual system -wide collection
system permit issued to the Permittee.
Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities,
the completed Engineering Certification form with checklist attached to this permit
shall be submitted with the required supporting documents to the address provided on
the form. Permit modifications are required for any changes resulting in non-
compliance with this permit, regulations, or the Minimum Design Criteria. [15A NCAC
02T.0116]
It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the
appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North
Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right
to request an adjudicatory hearing upon written request within 30 days following receipt of this permit.
This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina
General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
NC 27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Susan Wilson via e-mail at
susan.wilson@deq.nc.gov.
Sincerely,
ocuSigned by:
E�D
f. A1.A.I AXL
2916E6AB32144F...
for Richard E. Rogers, Jr.
Director, Division of Water Resources
by Vanessa E. Manuel, Assistant Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
cc: Joshua Baird, Town of Clayton (via email)
John Kiviniemi, City of Raleigh (via email)
Stephen Brown, HDR Inc. (via email)
Johnston County Health Department (via email)
DWR Laserfiche
Page 2 of 9
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8FO94190DOD8
NORTH CAROLINA
Environmental Quality
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
Town of Clayton
Johnston County
for the construction and replacement of three existing pumps (in Neuse 2 Pump Station and the
Clayton to Raleigh Pump Station in the same location) to three submersible pumps (rated for 1560
gpm at 300 ft TDH; serving as a triplex pump station, with one as a standby pump) including standby
power with automatic switchover, telemetry, audio/visual alarms and associated piping modifications
to accommodate conversion to the triplex pump station [with approximately 32,000 linear feet of 16
inch force main, approximately 58 linear feet of 21 inch gravity sewer, approximately 16 linear feet of 24
inch gravity sewer issued December 7, 2007 as Neuse River Pump Station No. 2 project] for the Clayton
to Raleigh Pump Station Improvements project to transfer collected wastewater into the Town of
Clayton's WWTF and/or the City of Raleigh's NRRRF, pursuant to the application received May 3, 2023,
and additional information received June 14, 2023 in conformity with 15A NCAC 02T; the Division's
Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated in March 2008, as
applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and
approved by the Department of Environmental Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
specified conditions and limitations contained therein.
DocuSigned by:
P901 RFR G P191 AAP
for Richard E. Rogers, Jr.
Director, Division of Water Resources
By Authority of The Environmental Management Commission
Permit Number: WQ0031521 MOD
Permit Issued: August 22, 2023
Page 3 of 9
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8FO94190DOD8
SUPPLEMENT TO PERMIT COVER SHEET
The Town of Clayton is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension.
The sewage and wastewater collected by this system shall be treated in the Town of Clayton's
Treatment Plant in accordance with Permit Number NCO025453 and/or the City of Raleigh's Neuse River
Resource Recovery Facility with Permit Number NCO029033 (after conversion of the pump station).
Permitting of this project does not constitute an acceptance of any part of the project that does not
meet 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996
as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations
and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division
approval is based on acceptance of the certification provided by a North Carolina -licensed Professional
Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed
project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
1. This permit shall become voidable unless the agreement between the Town of Clayton and the City
of Raleigh for the collection and final treatment of wastewater is in full force and effect. [15A NCAC
02T.0304(g)]
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0116; G.S 143-215.1(d3)]
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 02T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
Page 4of9
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8F094190DOD8
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 02T .0403. If an individual
permit is not required, the following performance criteria shall be met:
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or
surface water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e.
365 days per year). Pump stations that are connected to a telemetry system shall be inspected
at least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections
are documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in
accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North
Carolina General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of
three years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Raleigh Regional
Office, telephone number (919) 791-4200, as soon as possible, but in no case more than 24 hours,
following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable of adequate wastewater transport, such as mechanical or electrical failures of
pumps, line blockage or breakage, etc.; or
Page 5 of 9
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8FO94190DOD8
b. Any SSO and/or spillover 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the
initial verbal report. Overflows and spills occurring outside normal business hours may also be
reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919)
733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and
submitting Part I of Form CS-SSO (or the most current Division approved form) within five days
following first knowledge of the occurrence. This report must outline the actions taken or proposed
to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current
Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-
215AC(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form with checklist attached to this permit shall be submitted with the
required supporting documents to the address provided on the form. A complete certification is
one where the form is fully executed and the supporting documents are provided as applicable. Any
wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Engineer's Certification shall be considered a violation of the permit and shall subject the
Permittee to appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the
Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been
appropriately filed with the applicable County's Register of Deeds office shall be submitted with
the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines &
force mains) of the wastewater collection system extension. Final record drawings should be
clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings
that are marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing,
velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage,
surge protection, detention time in the wet well, and force main, ability to flush low points in
force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power
source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, include travel
timeframes, shall be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Page 6 of 9
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8FO94190DOD8
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting
in non-compliance with this permit (including but not limited to pipe length changes of 10% or
greater, increased flow, pump station design capacity design increases of 5% or greater, and
increases in the number/type of connections), regulations, or the Minimum Design Criteria.
Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -
case basis and each on its own merit. Please note that variances to the Minimum Design Criteria
should be requested and approved during the permitting process prior to construction. After -
construction requests are discouraged by the Division and may not be approved, thus requiring
replacement or repair prior to certification & activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greater than ten percent below the minimum required slope per the
Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified
until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and
submitting the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the individual permit and construction record drawings shall be maintained on file by the
Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 02T; the
Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted
June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an
enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A
through §143-215.6C, construction of additional or replacement wastewater collection facilities,
and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A
NCAC 02T .0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or replacement
facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or
Local government agencies which have jurisdiction or obtaining other permits which may be
required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-
215.1(b)]
Page 7 of 9
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8FO94190DOD8
CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116.
Certifying Engineer:
Certification Review Date:
Project Name:
W Q00.
Project County:
1) Has permittee information changed since the permit was issued (or last modified): change of mailing address,
change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No
• If yes, please provide either a change of ownership form or new contact information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ❑ Yes ❑ No
3) Final Engineering certification? ❑ Yes ❑ No
If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase, what was previously certified (if applicable), and what is left to be certified.
4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines.
• Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches).
5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A
• Ensure power reliability option was selected per 15A NCAC 02T.0305(h).
6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers (latest version), and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other
pertinent information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable, specific language regarding the variance
will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines (15A NCAC 02T .0402(2))? ❑ Yes ❑ No
• If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with
the appropriate language.
8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including but not
limited to pipe length changes of 10% or greater, change in flow, pump station design capacity design change of 5% or
greater, and/or change in the number/type of connections)? ❑ Yes ❑ No
• If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.
North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 1 1628 Mail Service Center, Raleigh, NC 27699-1628
Physical Address: 3800 Barrett Drive, Raleigh, NC 27609 919-791-4200
DocuSign Envelope ID: 22598D5B-FCD8-46EC-9C57-8F094190DOD8
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE: Town of Clayton
PERMIT #: WQ0031521 MOD
PROJECT: Clayton to Raleigh Pump Station Improvements; formerly Neuse River Pump Station #2
ISSUE DATE: August 22, 2023
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation.
It should be submitted in a manner that documents the Division's receipt. Send the required
documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title Signature Date
ENGINEERS CERTIFICATION
I, , as a duly registered Professional En Ineer in the State of North Carolina,
having been authorized to observe (❑ periodically, ❑ weekly,] full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the following construction:
construction and replacement of three existing pumps (in Neuse 2 Pump Station and the Clayton to
Raleigh Pump Station in the same location) to three submersible pumps (rated for 1560 gpm at 300 ft
TDH; serving as a triplex pump station, with one as a standby pump) including standby power with
automatic switchover, telemetry, audio/visual alarms, and associated piping modifications to
accommodate conversion to the triplex pump station; such that the construction was observed to be
built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources'
(Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the
Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains
adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date:
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
.......................................................................:
North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 1 1628 Mail Service Center, Raleigh, NC 27699-1628
Physical Address: 3800 Barrett Drive, Raleigh, NC 27609 919-791-4200