Loading...
HomeMy WebLinkAbout20231158 Ver 1_Agent Authorization_20230822CATAWBA RIPARIAN BLUFFER NOTIFICATION FORM P. aject Name/addre%.. ii.OP J �- 4� C! � County, [.sntrattarl��en:: Lll= ,fit ature C S ure Ppr0�r9l is for -he pclr"se and design described in your application. Impacts not indicated in the ata?ication is a riolaaon of the Buffer Rule. Site specific %hvrk should be provided in the application, [ISA NCAC C - Lz-." 3. �-:13A ?,-,'CAC 028.0243(8)! -es are no: ailowea co be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless r.. �ru,eu.:.. c,t L.wI,.: w5e ifei, ;hat are severely undermined along the immedlazc shoreline can be removed. an.; s.up:ria aicng the irninwdiate snorehne is allowed. I15A NCAC 023.OZ43(6)) 6c-",cning, grading in The outfer is not allowed- Excessive disturbance of ground cover. 115A NCAC 0211 M43 (6)7 ratios, ifnpervious warkways, e.c. are not allowed in the buffer unless specifically approved f �ivis,•; 7:,�,t are can size for oecks. [15A NCAC Q8.0243(4; and (0'); ., at k to be L-and-ictei from end must indicate do access and indicate any trees treat are to be removed. The ►-.crk corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction oe „t,ioe me t)urfer. 25A NCA'- 02i, .0502 and 15A NCAC 02B -0243 j4j, (6), I8)3 S'.,r.mwater cannot je olped or channeled for direct discharge to the lake_ All constructed stormwater c;�r,atjes r�sr :+e a! the t6atural e>evation and discharged prior to entering the buffer directed as diffuse or s..z-t f:ow;: ron-ei,};ive aeiot�tie to the ,ake. [15A NCAC 025.0243(5), (6j] -' cknosvledgement pj Norlftcarion -1bPA-' .j hereby state that l have been inforr:-ad of the Catawba -_ inn 5c e :.,.a. --tv .►om conc,;cted in the buffer, not specifically stated in the application and approved Div''-sio-- of ► wer Resources IDWR), is a violation and subject to enforcement. Due diligence will be -..4 y c :rill be built within substantial compliance and Intent of the 4ol Water _u.:ty Certit-:-ation and Buffer Rules, the approved plan(s) and specification(s), and other supporting Date: fellyJ