Loading...
HomeMy WebLinkAbout20190211 Ver 2_ePCN Application_20230822DW R DHlsloo of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 8/23/2016 BIMS # Assigned 20190211 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Garcy Ward:garcy.ward@ncdenr.gov Information for Initial Review 1a. Name of project: Allen Road Widening 1a. Who is the Primary Contact?* Casey Whitley 1b. Primary Contact Email: * ckwhitley@ncdot.gov Date Submitted 8/22/2023 Nearest Body of Water Greens Mill Run Basin Tar -Pamlico Water Classification C, NSW Site Coordinates Latitude: 35.591942 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Pitt Is this a NCDMS Project Yes No Longitude: -77.428315 Version#* 2 Reviewing Office* Washington Regional Office - (252) 946-6481 1c. Primary Contact Phone:* (252)439-2811 Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only) T.I.P. or state project number: U-5875 WBS # (1) 44577.1.1 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No Please provide the date of the previous submission. 2/15/2019 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 201902350 - Work associated with bridge construction, widening, replacement, and interchanges 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Various 2b. Deed book and page no.: 401 Water Quality Certification - Express Riparian Buffer Authorization * Yes No Yes No 2c. Contact Person: 2d.Address Street Address Allen Road Address Line 2 City Greenville Postal / Zip Code 27834 2e. Telephone Number: (252)439-2811 2g. Email Address: ckwhitley@ncdot.gov 4. Agent/Consultant (if applicable) 4a. Name: Anna Reusche 4b. Business Name: TranSystems 4c.Address Street Address 1 Glenwood Ave Address Line 2 Suite 600 city Raleigh Postal / Zip Code 27603 4d. Telephone Number: (919)816-7745 4f. Email Address:" areusche@transystems.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Greenville 2. Project Identification 2a. Property Identification Number: State / Province / Region NC Country United States of America 2f. Fax Number State / Province / Region NC Country United States 4e. Fax Number 2b. Property size: 2c. Project Address Street Address SR 1203 (Allen Road) from SR 1467 (Stantonburg Road) to US 13 (Dickinson Avenue Extension) Address Line 2 City State / Province / Region Greenville NC Postal / Zip Code Country 27834 United States 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Greens Mill Run 3b. Water Resources Classification of nearest receiving water:" C, NSW 3c. What river basin(s) is your project located in? Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201030403 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: " Allen Road is in a rural residential section of Greenville that is actively transitioning into a residential, commuter community. Novant Health System is near the project on Stantonsburg Road. Existing agriculture is transitioning to housing developments, condos, and apartment buildings. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). SAW-2016-01862,20190211 4f. List the total estimated acreage of all existing wetlands on the property: 0.01 4g. List the total estimated linear feet of all existing streams on the property: 1,911 4h. Explain the purpose of the proposed project: * The purpose the proposed project is to increase capacity and improve mobility through intersection improvements, the addition of new travel lanes, and the installation of access control measures throughout the corridor. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: The Allen Road project will widen and upgrade SR 1203 (Allen Road) for approximately 2.3 miles from SR 1467 (Stantonsburg Road) to US 13 (Dickinson Avenue) to a four -lane divided facility with a raised median and curb gutter in Greenville. The project replaces 3 existing crossings to reinforced concrete box culverts. Typical equipment used for road widening and mechanized clearing will be used for this project (bulldozer, etc.). 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No O Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2016-01862 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Robert Lepsic Agency/Consultant Company: TranSystems (Formerly SEPI) Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR November 3, 2016 for USACE PJD Field Determination meeting 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? None D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries 0 Buffers Open Waters Pond Construction 2. Wetland Impacts u E-7 Mechanized Clearing P Bottomland Hardwood Forest WB Yes Both 0.004 (acres) 29. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.004 2g. Total Wetland Impact 0.004 2i. Comments: Impact area is <0.01 acres of wetland, for mechanized clearing for the grassed swale installation. 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type" 3c. Type of impact* 3d. S. name* 3e. Stream Type* 3f. Type of 3g. S. width 3h. Impact ❑ (?) Jurisdiction* length* g1 Site 1A-Bank Stabilization Permanent Bank Stabilization SA Intermittent Both 33 Average (feet) (linear feet) S2 Site 1A-Bank Stabilization Temporary Bank Stabilization J SA Intermittent Both 8 24 Average (feet) (linear feet) S3 Site 1 B-Culvert Permanent Culvert SA Intermittent Both 70 Averege (feet) (linear feet) S4 Site 1 B-Bank Stabilization Permanent Bank Stabilization J SA Intermittent Both 28 Average (feet) (linear feet) S5 Site 1B-Dewatering Temporary Dewatering SA Intermittent Both 12 Average (feet) (linear feet) S6 Site 1C-Culvert Permanent Culvert SA Intermittent Both 8 49 Averege (feet) (linear feet) g7 Site 1 C-Bank Stabilization Permanent Bank Stabilization J SA Intermittent Both 111 Average (feet) (linear feet) S8 Site 1 C-Dewatering Temporary Dewatering SA Intermittent Both 23 Averege ((eeQ (linear feet) S9 Site 2 - Culvert Permanent Culvert Greens Mill Run Perennial Both 10 70 Averege (feet) (linear feet) S10 Site 2-Bank Stabilization Permanent Bank Stabilization Greens Mill Run Perennial Both 10 139 Average(teeq (linear feet) S11 Site 2-Dewatering Temporary —] Dewatering Greens Mill Run Perennial Both 10 40 Averege (feet) (linear feet) St2 Site 3-Culvert Permanent Culvert SE Perennial Both 106 Average (feet) (linear feet) St3 Site 3-Bank Stabilization Permanent Bank Stabilization SE Perennial A Both 7 78 Average (feet) (linear feet) F—� Site 3-Dewatering Temporary Dewatering SE ::IPerennial::] Both 13 Averege (feet) (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 684 3i. Total stream and ditch impacts: 796 3j. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Catawba Goose Creek Other 3L Total temporary stream impacts: 112 Tar -Pamlico Randleman Jordan Lake 116b. Impact Type 116c. Per or Temp 116d. Stream name l6e. Buffer mitigation required? 116f. Zone 1 impact 116g. Zone 2 impact I I Site 1A-Bank Stabilization P SA No 0 646 Site 1A-Bank Stabilization T SA No 4,255 0 Site 113-Culvert T SA Yes 4,950 3,048 Site 1 B-Roadway Construction P I SA 11 Yes 777 458 Site 1C-Culvert T SA Yes 9,109 4,975 Site 1C-Roadway Construction P SA Yes 4,472 2,103 Site 2 - Culvert T Greens Mill Run Yes 13,926 7,416 Site 2 -Roadway Construction P Greens Mill Run Yes 3,695 2,053 Site 3 - Culvert T SE Yes 9,557 5,836 Site 3 - Roadway Construction P SE Yes 3,706 1,977 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 41,797.00 21,275.00 Zone 1 Zone 2 Total Permanent impacts: 12,650.00 7,237.00 Zone 1 Zone 2 Total combined buffer impacts: 54,447.00 28,512.00 6i. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The widening was designed asymmetrically to utilize as much of the existing right of way as possible, with 3:1 slopes in jurisdictional areas. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The proposed project will use protective sediment and erosion control BMP's in accordance with NCDEQ Design Standards in Sensitive Watersheds. Stormwater runoff control structures will be designed using best management practices as detailed in the most recent version of NCDWQ Stormwater Best Practices Manual. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): D W R Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: (linear feet) 4d. Buffer mitigation requested (DWR only): (square feet) 4f. Non -riparian wetland mitigation requested: (acres) 4c. If using stream mitigation, what is the stream temperature: 4e. Riparian wetland mitigation requested: (acres) 4g. Coastal (tidal) wetland mitigation requested: (acres) O 4h. Comments Proposed impacts have not changed from those previously permitted in 2019. The original request and acceptance letter were for stream and buffer impacts. The 404 permit was issued in April 2019 and the 401 certification was issued in January 2020. The USACE did not require any stream mitigation for this project and the DWR only required buffer mitigation. The buffer mitigation payment was processed in April 2022. 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. Yes No 6b. If yes, then identify the square feet of impact. 6c. Reason for impact 6d. Total impact (square feet) Multiplier ]�6e. Required mitigation (square feet) Zone 1 Culvert Installation and Roadway Construction 50,192 3 150,576 Zone 2 Culvert Installation and Roadway Construction 27,866 1.5 41,799 6f. Total buffer mitigation required 192375 6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed? Yes No 61. If no, then discuss what type of mitigation is proposed. Proposed impacts have not changed from those previously permitted in 2019. The original request and acceptance letter were for stream and buffer impacts. The 404 permit was issued in April 2019 and the 401 certification was issued in January 2020. The USACE did not require any stream mitigation for this project and the DWR only required buffer mitigation. The buffer mitigation payment was processed in April 2022. 6j. Comments: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30 % nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. The project would increase capacity of a roadway in an area currently under development as a result of surrounding growth and changes in land use. Adjacent growth and changes in land use would occur without the project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?"` Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish and Wildlife and the NC Natural Heritage Program Data, field surveys by SEPI biologist and NCDOT Biological Surveys Group. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? The NOAA EFH (Essential Fish Habitat) mapper. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? SHPO online mapping and coordination with SHPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8b. If yes, explain how project meets FEMA requirements: Overall topography and drainage patterns will not change significantly. No increase in base flood elevations would occur. 8c. What source(s) did you use to make the floodplain determination?* INC Floodplain Mapping; FEMA FIRM panel 4667 (map no. 37204667400K) Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document U-5875 Allen Road PCN Support Doc 08-22-2023 FINAL.pdf 48.15MB File must be PDF or KMZ Comments In addition to the information included, a PBO submittal form was submitted on 8/22/2023 by Casey Whitley, NCDOT Division 2. Signature 0 By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Anna Reusche Signature �NN?,��Y<JIYFP Date 8/22/2023