HomeMy WebLinkAbout20190211 Ver 2_ePCN Application_20230822DW R
DHlsloo of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes
No
Is this project a public transportation project?*
Yes No
Change only If needed.
Pre -Filing Meeting Date Request was submitted on:
8/23/2016
BIMS # Assigned
20190211
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Select Project Reviewer*
Garcy Ward:garcy.ward@ncdenr.gov
Information for Initial Review
1a. Name of project:
Allen Road Widening
1a. Who is the Primary Contact?*
Casey Whitley
1b. Primary Contact Email: *
ckwhitley@ncdot.gov
Date Submitted
8/22/2023
Nearest Body of Water
Greens Mill Run
Basin
Tar -Pamlico
Water Classification
C, NSW
Site Coordinates
Latitude:
35.591942
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Pitt
Is this a NCDMS Project
Yes No
Longitude:
-77.428315
Version#*
2
Reviewing Office*
Washington Regional Office - (252) 946-6481
1c. Primary Contact Phone:*
(252)439-2811
Is this project a public transportation project?*
Yes No
Is this a NCDOT Project?*
Yes No
(NCDOT only) T.I.P. or state project number:
U-5875
WBS # (1)
44577.1.1
1a.Type(s)of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
Please provide the date of the previous submission.
2/15/2019
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Regional General Permit (RGP) Number:
RGP Numbers (for multiple RGPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
201902350 - Work associated with bridge construction, widening, replacement, and
interchanges
1e. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Various
2b. Deed book and page no.:
401 Water Quality Certification - Express
Riparian Buffer Authorization
*
Yes No
Yes No
2c. Contact Person:
2d.Address
Street Address
Allen Road
Address Line 2
City
Greenville
Postal / Zip Code
27834
2e. Telephone Number:
(252)439-2811
2g. Email Address:
ckwhitley@ncdot.gov
4. Agent/Consultant (if applicable)
4a. Name:
Anna Reusche
4b. Business Name:
TranSystems
4c.Address
Street Address
1 Glenwood Ave
Address Line 2
Suite 600
city
Raleigh
Postal / Zip Code
27603
4d. Telephone Number:
(919)816-7745
4f. Email Address:"
areusche@transystems.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Greenville
2. Project Identification
2a. Property Identification Number:
State / Province / Region
NC
Country
United States of America
2f. Fax Number
State / Province / Region
NC
Country
United States
4e. Fax Number
2b. Property size:
2c. Project Address
Street Address
SR 1203 (Allen Road) from SR 1467 (Stantonburg Road) to US 13 (Dickinson Avenue Extension)
Address Line 2
City State / Province / Region
Greenville NC
Postal / Zip Code Country
27834 United States
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Greens Mill Run
3b. Water Resources Classification of nearest receiving water:"
C, NSW
3c. What river basin(s) is your project located in?
Tar -Pamlico
3d. Please provide the 12-digit HUC in which the project is located.
030201030403
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: "
Allen Road is in a rural residential section of Greenville that is actively transitioning into a residential, commuter community.
Novant Health System is near the project on Stantonsburg Road. Existing agriculture is transitioning to housing developments,
condos, and apartment buildings.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
SAW-2016-01862,20190211
4f. List the total estimated acreage of all existing wetlands on the property:
0.01
4g. List the total estimated linear feet of all existing streams on the property:
1,911
4h. Explain the purpose of the proposed project: *
The purpose the proposed project is to increase capacity and improve mobility through intersection improvements, the addition of
new travel lanes, and the installation of access control measures throughout the corridor.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The Allen Road project will widen and upgrade SR 1203 (Allen Road) for approximately 2.3 miles from SR 1467 (Stantonsburg
Road) to US 13 (Dickinson Avenue) to a four -lane divided facility with a raised median and curb gutter in Greenville. The project
replaces 3 existing crossings to reinforced concrete box culverts. Typical equipment used for road widening and mechanized
clearing will be used for this project (bulldozer, etc.).
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No O Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2016-01862
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Robert Lepsic
Agency/Consultant Company: TranSystems (Formerly SEPI)
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
November 3, 2016 for USACE PJD Field Determination meeting
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
None
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries 0 Buffers
Open Waters Pond Construction
2. Wetland Impacts
u
E-7 Mechanized Clearing P Bottomland Hardwood Forest WB Yes Both 0.004
(acres)
29. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact
0.000 0.004
2g. Total Wetland Impact
0.004
2i. Comments:
Impact area is <0.01 acres of wetland, for mechanized clearing for the grassed swale installation.
3. Stream Impacts
3a. Reason for impact (?)
3b.lmpact type"
3c. Type of impact*
3d. S. name*
3e. Stream Type*
3f. Type of
3g. S. width
3h. Impact
❑
(?)
Jurisdiction*
length*
g1
Site 1A-Bank Stabilization
Permanent
Bank Stabilization
SA
Intermittent
Both
33
Average (feet)
(linear feet)
S2
Site 1A-Bank Stabilization
Temporary
Bank Stabilization J
SA
Intermittent
Both
8
24
Average (feet)
(linear feet)
S3
Site 1 B-Culvert
Permanent
Culvert
SA
Intermittent
Both
70
Averege (feet)
(linear feet)
S4
Site 1 B-Bank Stabilization
Permanent
Bank Stabilization J
SA
Intermittent
Both
28
Average (feet)
(linear feet)
S5
Site 1B-Dewatering
Temporary
Dewatering
SA
Intermittent
Both
12
Average (feet)
(linear feet)
S6
Site 1C-Culvert
Permanent
Culvert
SA
Intermittent
Both
8
49
Averege (feet)
(linear feet)
g7
Site 1 C-Bank Stabilization
Permanent
Bank Stabilization J
SA
Intermittent
Both
111
Average (feet)
(linear feet)
S8
Site 1 C-Dewatering
Temporary
Dewatering
SA
Intermittent
Both
23
Averege ((eeQ
(linear feet)
S9
Site 2 - Culvert
Permanent
Culvert
Greens Mill Run
Perennial
Both
10
70
Averege (feet)
(linear feet)
S10
Site 2-Bank Stabilization
Permanent
Bank Stabilization
Greens Mill Run
Perennial
Both
10
139
Average(teeq
(linear feet)
S11
Site 2-Dewatering
Temporary
—]
Dewatering
Greens Mill Run
Perennial
Both
10
40
Averege (feet)
(linear feet)
St2
Site 3-Culvert
Permanent
Culvert
SE
Perennial
Both
106
Average (feet)
(linear feet)
St3
Site 3-Bank Stabilization
Permanent
Bank Stabilization
SE
Perennial A
Both
7
78
Average (feet)
(linear feet)
F—�
Site 3-Dewatering
Temporary
Dewatering
SE ::IPerennial::]
Both
13
Averege (feet)
(linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
31. Total permanent stream impacts:
684
3i. Total stream and ditch impacts:
796
3j. Comments:
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
Neuse
Catawba
Goose Creek
Other
3L Total temporary stream impacts:
112
Tar -Pamlico
Randleman
Jordan Lake
116b. Impact Type 116c. Per or Temp 116d. Stream name l6e. Buffer mitigation required? 116f. Zone 1 impact 116g. Zone 2 impact I I
Site 1A-Bank Stabilization
P
SA
No
0
646
Site 1A-Bank Stabilization
T
SA
No
4,255
0
Site 113-Culvert
T
SA
Yes
4,950
3,048
Site 1 B-Roadway Construction
P I
SA 11
Yes
777
458
Site 1C-Culvert
T
SA
Yes
9,109
4,975
Site 1C-Roadway Construction
P
SA
Yes
4,472
2,103
Site 2 - Culvert
T
Greens Mill Run
Yes
13,926
7,416
Site 2 -Roadway Construction
P
Greens Mill Run
Yes
3,695
2,053
Site 3 - Culvert
T
SE
Yes
9,557
5,836
Site 3 - Roadway Construction
P
SE
Yes
3,706
1,977
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 41,797.00 21,275.00
Zone 1 Zone 2
Total Permanent impacts: 12,650.00 7,237.00
Zone 1 Zone 2
Total combined buffer impacts: 54,447.00 28,512.00
6i. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The widening was designed asymmetrically to utilize as much of the existing right of way as possible, with 3:1 slopes in jurisdictional areas.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The proposed project will use protective sediment and erosion control BMP's in accordance with
NCDEQ Design Standards in Sensitive Watersheds. Stormwater runoff control structures will be designed using best management practices as detailed
in the most recent version of NCDWQ Stormwater Best Practices Manual.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
D W R Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
Yes No
4b. Stream mitigation requested:
(linear feet)
4d. Buffer mitigation requested (DWR only):
(square feet)
4f. Non -riparian wetland mitigation requested:
(acres)
4c. If using stream mitigation, what is the stream temperature:
4e. Riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
O
4h. Comments
Proposed impacts have not changed from those previously permitted in 2019. The original request and acceptance letter were for stream and buffer
impacts. The 404 permit was issued in April 2019 and the 401 certification was issued in January 2020. The USACE did not require any stream
mitigation for this project and the DWR only required buffer mitigation. The buffer mitigation payment was processed in April 2022.
6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR
6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information.
Yes No
6b. If yes, then identify the square feet of impact.
6c. Reason for impact
6d. Total impact (square
feet)
Multiplier ]�6e.
Required mitigation
(square feet)
Zone 1
Culvert Installation and Roadway Construction
50,192
3
150,576
Zone 2 Culvert Installation and Roadway Construction 27,866 1.5 41,799
6f. Total buffer mitigation required
192375
6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed?
Yes No
61. If no, then discuss what type of mitigation is proposed.
Proposed impacts have not changed from those previously permitted in 2019. The original request and acceptance letter were for stream and buffer impacts. The 404 permit was issued in
April 2019 and the 401 certification was issued in January 2020. The USACE did not require any stream mitigation for this project and the DWR only required buffer mitigation. The buffer
mitigation payment was processed in April 2022.
6j. Comments:
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
What type of SCM are you providing?
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30 % nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
Yes No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
The project would increase capacity of a roadway in an area currently under development as a result of surrounding growth and changes in land use.
Adjacent growth and changes in land use would occur without the project.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?"`
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
Unknown
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
US Fish and Wildlife and the NC Natural Heritage Program Data, field surveys by SEPI biologist and
NCDOT Biological Surveys Group.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat? *
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
The NOAA EFH (Essential Fish Habitat) mapper.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
SHPO online mapping and coordination with SHPO
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
Yes No
8b. If yes, explain how project meets FEMA requirements:
Overall topography and drainage patterns will not change significantly. No increase in base flood elevations would occur.
8c. What source(s) did you use to make the floodplain determination?*
INC Floodplain Mapping; FEMA FIRM panel 4667 (map no. 37204667400K)
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
U-5875 Allen Road PCN Support Doc 08-22-2023 FINAL.pdf 48.15MB
File must be PDF or KMZ
Comments
In addition to the information included, a PBO submittal form was submitted on 8/22/2023 by Casey Whitley, NCDOT Division 2.
Signature
0
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Anna Reusche
Signature
�NN?,��Y<JIYFP
Date
8/22/2023