Loading...
HomeMy WebLinkAboutWQ0029653_Monitoring - 06-2023_20230731Monitoring Report Submittal Permit Number#* WQ0029653 Name of Facility:* SCOTCH HALL PRESERVE WWTP Month: * June Year: * 2023 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR doc00823820230731124532.pdf 1.82MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * BKJSHP@GMAIL.COM Name of Submitter: * BRIAN JERNIGAN Signature: ff a r ostw4P" Date of submittal: 7/31/2023 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* WQ0029653 Is the monitoring report accepted?* Yes No Regional Office* Washington Reviewer: _anonymous Review Date: 8/22/2023 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (N®AR-1) Page _ of __ FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page - of FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) —page — of - r�E i x, M; ti t • � Page of Did the application rates exceed the limits in Attachment B of your permit? 2 compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? D compliant © Non -Compliant Was a suitable vegetative cover maintained on all sites as specified In your permit? 21 Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? [21 Compliant ® Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Q compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. ., r 6 NON -DISCHARGE MONITORG REPORT (NDMR)gag" of FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page — of Sampling Person(s) Certified Laboratories Name: Name, Name: Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? n/ compliant El Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary.