HomeMy WebLinkAbout20231155 Ver 1_9689_714 St. Cloud Dr._Wet Ver and PCN App_8.17.23_20230817Preliminary ORM Data Entry Fields for New Actions
ACTION ID 9: SAW- 2023- Begin Date (Date Received): 8.17.23
Prepare file folder ❑ Assign Action ID Number in ORM ❑
1. Project Name [PCN Form A2a]: 714 Saint Cloud Drive
2. Work Type: ❑✓ Private ❑Institutional ❑Government ❑ Commercial
3. Project Description / Purpose [PCN Form B3d and B3e]:
The purpose of the proposed project is to remove unauthorized fill from a stream on the site and restore the stream bank
4. Property Owner / Applicant [PCN Form A3 or A4]: Stanley and Paulette Klein
5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]:
David Brame/Pilot Environmental, Inc.
6. Related Action ID Number(s) [PCN Form B5b]:
7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]:
714 Saint Cloud Drive
35.789262 /-80.811234
8. Project Location —Tax Parcel ID [PCN Form Bla]: 4764278077.000
9. Project Location —County [PCN Form A2b]: Iredell
10. Project Location —Nearest Municipality or Town [PCN Form A2c]: Statesville
11. Project Information —Nearest Waterbody [PCN Form 132a]: Fourth Creek
12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: Yadkin Pee Dee/03040102
Authorization: Section 10 ❑ Section 404 ❑✓
Regulatory Action Type:
❑ Standard Permit
✓ Nationwide Permit 9
Regional General Permit 9
✓ Jurisdictional Determination Request
Section 10 and 404 ❑
❑ Pre -Application Request
::]Unauthorized Activity
❑ Compliance
❑ No Permit Required
Revised 20150602
urisdictional Determination Reauest
US Army Corps
of Engineers.
Wilmington District
This form is intended for use by anyone requesting a jurisdictional determination (JD) from the
U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting
information, as described within each category, with your request. You may submit your request
via mail, electronic mail, or facsimile. Requests should be sent to the appropriate project
manager of the county in which the property is located. A current list of project managers by
assigned counties can be found on-line at:
http://www.saw.usace.aimy.mil/Missions/Re ul�atoiyPermitProi4ram/Contact/CountyLocator.aspx,
by calling 910-251-4633, or by contacting any of the field offices listed below. Once your
request is received you will be contacted by a Corps project manager.
ASHEVILLE & CHARLOTTE REGULATORY
FIELD OFFICES
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801-5006
General Number: (828) 271-7980
Fax Number: (828) 281-8120
RALEIGH REGULATORY FIELD OFFICE
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
General Number: (919) 554-4884
Fax Number: (919) 562-0421
INSTRUCTIONS:
WASHINGTON REGULATORY FIELD OFFICE
US Army Corps of Engineers
2407 West Fifth Street
Washington, North Carolina 27889
General Number: (910) 251-4610
Fax Number: (252) 975-1399
WILMINGTON REGULATORY FIELD OFFICE
US Army Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403
General Number: 910-251-4633
Fax Number: (910) 251-4025
All requestors must complete Parts A, B, C, D, E, F and G.
NOTE TO CONSULTANTS AND AGENCIES: If you are requesting a JD on behalf of a
paying client or your agency, please note the specific submittal requirements in Part H.
NOTE ON PART D — PROPERTY OWNER AUTHORIZATION: Please be aware that
all JD requests must include the current property owner authorization for the Corps to
proceed with the determination, which may include inspection of the property when
necessary. This form must be signed by the current property owner(s) or the owner(s)
authorized agent to be considered a complete request.
NOTE ON PART D - NCDOT REQUESTS: Property owner authorization/notification for
JD requests associated with North Carolina Department of Transportation (NCDOT)
projects will be conducted according to the current NCDOT/USACE protocols.
NOTE TO USDA PROGRAM PARTICIPANTS: A Corps approved or preliminary JD
may not be valid for the wetland conservation provisions of the Food Security Act of
1985. If you or your tenant are USDA Program participants, or anticipate participation in
USDA programs, you should also request a certified wetland determination from the local
office of the Natural Resources Conservation Service, prior to starting work.
Version: May 2017 Page 1
Jurisdictional Determination Request
A. PARCEL INFORMATION
Street Address: 714 Saint Cloud Drive
City, State: Statesville, NC
County: Iredell
Parcel Index Number(s) (PIN): 4764278077.000
B. REQUESTOR INFORMATION
Name: David Brame. Pilot Environmental. Inc.
Mailing Address: Post Office BOX 128
Telephone Number:
Electronic Mail Address:
Select one:
✓❑
Kernersville, NC 27285
336-310-4527
dbrame@pilotenviro.com
I am the current property owner.
I am an Authorized Agent or Environmental Consultanti
Interested Buyer or Under Contract to Purchase
Other, please explain.
C. PROPERTY OWNER INFORMATION
Name: Stanley and Paulette Klein
Mailing Address: 714 Saint Cloud Drive
Statesville, NC 28625
Telephone Number: 704-880-6273
Electronic Mail Address: paulette.k.73@gmail.com
1 Must provide completed Agent Authorization Form/Letter.
2 Documentation of ownership also needs to be provided with request (copy of Deed, County GIS/Parcel/Tax Record).
Version: May 2017 Page 2
Jurisdictional Determination Request
D. PROPERTY ACCESS CERTIFICATION',4
By signing below, I authorize representatives of the Wilmington District, U.S. Army Corps of
Engineers (Corps) to enter upon the property herein described for the purpose of conducting on -
site investigations, if necessary, and issuing a jurisdictional determination pursuant to Section
404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, the
undersigned, am either a duly authorized owner of record of the property identified herein, or
acting as the duly authorized agent of the owner of record of the property.
Paulette Klein
Print Name
Capacity: ❑✓ Owner ❑ Authorized Agents
6.28.23
Date
Attached
Signature
E. REASON FOR JD REQUEST: (Check as many as applicable)
❑ I intend to construct/develop a projector perform activities on this parcel which would be
designed to avoid all aquatic resources.
❑ I intend to construct/develop a projector perform activities on this parcel which would be
designed to avoid all jurisdictional aquatic resources under Corps authority.
I intend to construct/develop a projector perform activities on this parcel which may
require authorization from the Corps, and the JD would be used to avoid and minimize
impacts to jurisdictional aquatic resources and as an initial step in a future permitting
process.
❑✓ I intend to construct/develop a projector perform activities on this parcel which may
require authorization from the Corps; this request is accompanied by my permit application
and the JD is to be used in the permitting process.
❑ I intend to construct/develop a project or perform activities in a navigable water of the
U.S. which is included on the district Section 10 list and/or is subject to the ebb and flow of
the tide.
❑ A Corps JD is required in order obtain my local/state authorization.
❑ I intend to contest jurisdiction over a particular aquatic resource and request the Corps
confirm that jurisdiction does/does not exist over the aquatic resource on the parcel.
❑ I believe that the site may be comprised entirely of dry land.
❑✓ Other:
s For NCDOT requests following the current NCDOT/USACE protocols, skip to Part E.
a If there are multiple parcels owned by different parties, please provide the following for each additional parcel on a
continuation sheet.
s Must provide agent authorization form/letter signed by owner(s).
Version: May 2017 Page 3
Jurisdictional Determination Request
F. JURISDICTIONAL DETERNIINATION (JD) TYPE (Select One)
ZI am requesting that the Corps provide a preliminM JD for the property identified herein.
A Preliminary Jurisdictional Determination (PJD) provides an indication that there may
be "waters of the United States" or "navigable waters of the United States"on a property.
PJDs are sufficient as the basis for permit decisions. For the purposes of permitting, all
waters and wetlands on the property will be treated as if they are jurisdictional "waters of
the United States". PJDs cannot be appealed (33 C.F.R. 331.2); however, a PJD is
"preliminary" in the sense that an approved JD can be requested at any time. PJDs do
not expire.
❑ I am requesting that the Corps provide an approved JD for the property identified herein.
An Approved Jurisdictional Determination (AJD) is a determination that
jurisdictional "waters of the United States" or "navigable waters of the United
States" are either present or absent on a site. An approved JD identifies the limits of
waters on a site determined to be jurisdictional under the Clean Water Act and/or
Rivers and Harbors Act. Approved JDs are sufficient as the basis for permit
decisions. AJDs are appealable (33 C.F.R. 331.2). The results of the AJD will be
posted on the Corps website. A landowner, permit applicant, or other "affected
party" (33 C.F.R. 331.2) who receives an AJD may rely upon the AJD for five years
(subject to certain limited exceptions explained in Regulatory Guidance Letter 05-
02).
❑ I am unclear as to which JD I would like to request and require additional information
to inform my decision.
G. ALL REQUESTS
Map of Property or Project Area. This Map must clearly depict the boundaries of the
I I review area.
✓❑ Size of Property or Review Area —0.62 acres.
❑ The property boundary (or review area boundary) is clearly physically marked on the site.
Version: May 2017 Page 4
Jurisdictional Determination Request
H. REQUESTS FROM CONSULTANTS
Project Coordinates (Decimal Degrees): Latitude:
35.789262
Longitude:-80.811234
zA legible delineation map depicting the aquatic resources and the property/review area.
Delineation maps must be no larger than I Ix 17 and should contain the following: (Corps
signature of submitted survey plats will occur after the submitted delineation map has been
reviewed and approved).6
■ North Arrow
■ Graphical Scale
■ Boundary of Review Area
■ Date
■ Location of data points for each Wetland Determination Data Form or tributary
assessment reach.
For Approved Jurisdictional Determinations:
■ Jurisdictional wetland features should be labeled as Wetland Waters of the US, 404
wetlands, etc. Please include the acreage of these features.
■ Jurisdictional non -wetland features (i.e. tidal/navigable waters, tributaries,
impoundments) should be labeled as Non -Wetland Waters of the US, stream, tributary,
open water, relatively permanent water, pond, etc. Please include the acreage or linear
length of each of these features as appropriate.
■ Isolated waters, waters that lack a significant nexus to navigable waters, or non -
jurisdictional upland features should be identified as Non -Jurisdictional. Please
include a justification in the label regarding why the feature is non jurisdictional (i.e.
"Isolated", "No Significant Nexus", or "Upland Feature"). Please include the acreage
or linear length of these features as appropriate.
For Preliminary Jurisdictional Determinations:
Wetland and non -wetland features should not be identified as Jurisdictional, 404,
Waters of the United States, or anything that implies jurisdiction. These features can be
identified as Potential Waters of the United States, Potential Non -wetland Waters of
the United States, wetland, stream, open water, etc. Please include the acreage and
linear length of these features as appropriate.
Completed Wetland Determination Data Forms for appropriate region
(at least one wetland and one upland form needs to be completed for each wetland type)
6 Please refer to the guidance document titled "Survey Standards for Jurisdictional Determinations" to ensure that the
supplied map meets the necessary mapping standards. hM2://www.saw.usace.4rmy.mil/Missions/Regulatoly-Permit-
Pro gram/Jurisdiction/
Version: May 2017 Page 5
Jurisdictional Determination Request
F4Completed appropriate Jurisdictional Determination form
• PJDs, please complete a Preliminary Jurisdictional Determination Form' and include the
Aquatic Resource Table
• AJDS• please complete an Approved Jurisdictional Determination Form'.
W1 Vicinity Map
zAerial Photograph
z USGS Topographic Map
Soil Survey Map
zOther Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site
Plan, previous delineation maps, LIDAR maps, FEMA floodplain maps)
Landscape Photos (if taken)
NCSAM and/or NCWAM Assessment Forms and Rating Sheets
❑ NC Division of Water Resources Stream Identification Forms
hJ Other Assessment Forms
' www.saw.usace.4rmy.mil/Portals/59/docs/regulatory/readocs/JD/RGL 08-02_App A Prelim _JD_Form fillable.pdf
8 Please see hM2://www.saw.usace.4M.mil/Missions/Regulatory-Permit-Program/Jurisdiction/
Principal Purpose: The information that you provide will be used in evaluating your request to determine
whether there are any aquatic resources within the project area subject to federaljurisdiction under the regulatory
authorities referenced above.
Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local
government agencies, and the public, and may be made available as part of a public notice as required by federal
law. Your name and property location where federal jurisdiction is to be determined will be included in the
approved jurisdictional determination (AJD), which will be made available to the public on the District's website
and on the Headquarters USAGE website.
Disclosure: Submission of requested information is voluntary; however, if information is not provided, the
request for an AJD cannot be evaluated nor can an AJD be issued.
Version: May 2017 Page 6
Proposal for Environmental Services
Pilot Proposal 9689
June 19, 2023
AGENT AUTHORIZATION
This form authorizes Pilot to act as our agent in stream/wetland matters including U.S. Army
Corps of Engineers and North Carolina Division of Water Resources field verification and
permitting.
Property Address:
Applicant Information:
Name:
Address: �r/° �� nocla>
Telephone Number:
Fax Number:
E-mail Address:
Signature: _4 . k Date:
4
PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PJD: August 17, 2023
B. NAME AND ADDRESS OF PERSON REQUESTING PJD: David Brame, Pilot Environmental, Inc.
Post Office Box 128, Kernersville, North Carolina 27285
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, 714 Saint Cloud Drive, SAW 2023-
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The site is located at 714 Saint Cloud Drive in
Statesville, NC. The site contains wooded land, a lawn and a single-family residence. A stream bank repair/restoration is
proposed for the eastern bank of a stream that crosses the site.
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR
AQUATIC RESOURCES AT DIFFERENT SITES)
State: North Carolina County/parish/borough: Iredell City: Statesville
Center coordinates of site (lat/long in degree decimal format): Lat.: 35.789262 Long.: -80.811234
Universal Transverse Mercator: WGS 84
Name of nearest waterbody: Fourth Creek
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
❑ Office (Desk) Determination. Date:
❑ Field Determination. Date(s):
TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY
JURISDICTION.
Site
Number
Latitude (decimal
degrees)
Longitude
(decimal degrees)
Estimated amount of
aquatic resources in
review area (acreage
and linear feet, if
applicable
Type of aquatic
resources (i.e.,
wetland vs. non-
wetland waters)
Geographic authority to
which the aquatic resource
"may be" subject (i.e.,
Section 404 or Section
10/404)
SA
35.789137
-80.811339
245 linear feet
Non -wetland
404
1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the
review area, and the requestor of this PJD is hereby advised of his or her option to request
and obtain an approved JD (AJD) for that review area based on an informed decision after
having discussed the various types of JDs and their characteristics and circumstances when
they may be appropriate.
2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide
General Permit (NWP) or other general permit verification requiring "pre- construction
notification" (PCN), or requests verification for a non -reporting NWP or other general permit,
and the permit applicant has not requested an AJD for the activity, the permit applicant is
hereby made aware that: (1) the permit applicant has elected to seek a permit authorization
based on a PJD, which does not make an official determination of jurisdictional aquatic
resources; (2) the applicant has the option to request an AJD before accepting the terms and
conditions of the permit authorization, and that basing a permit authorization on an AJD could
possibly result in less compensatory mitigation being required or different special conditions;
(3) the applicant has the right to request an individual permit rather than accepting the terms
and conditions of the NWP or other general permit authorization; (4) the applicant can accept
a permit authorization and thereby agree to comply with all the terms and conditions of that
permit, including whatever mitigation requirements the Corps has determined to be necessary;
(5) undertaking any activity in reliance upon the subject permit authorization without
requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a
permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in
reliance on any form of Corps permit authorization based on a PJD constitutes agreement that
all aquatic resources in the review area affected in any way by that activity will be treated as
jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial
compliance or enforcement action, or in any administrative appeal or in any Federal court;
and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed
as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and
conditions contained therein), or individual permit denial can be administratively appealed
pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to
make an official determination whether geographic jurisdiction exists over aquatic resources
in the review area, or to provide an official delineation of jurisdictional aquatic resources in
the review area, the Corps will provide an AJD to accomplish that result, as soon as is
practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be"
navigable waters of the U.S. on the subject review area, and identifies all aquatic features in
the review area that could be affected by the proposed activity, based on the following
information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply)
Checked items should be included in subject file. Appropriately reference sources below where
indicated for all checked items:
❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor:
Map:
® Data sheets prepared/submitted by or on behalf of the PJD requestor.
❑ Office concurs with data sheets/delineation report.
❑ Office does not concurwith data sheets/delineation report. Rationale:
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
❑ USGS NHD data.
❑ USGS 8 and 12 digit HUC maps.
® U.S. Geological Survey map(s). Cite scale & quad name: Drawing 1
® Natural Resources Conservation Service Soil Survey. Citation: Drawings 2 & 2A
® National wetlands inventory map(s). Cite name: Drawing 3
❑ State/local wetland inventory map(s):
® FEMA/FIRM maps: Drawing 4
❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929)
® Photographs: ®Aerial (Name & Date): Drawing 5
or ❑Other (Name & Date):
❑ Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
IMPORTANT NOTE: The information recorded on this form has not necessarily been
verified by the Corps and should not be relied upon for later jurisdictional
determinations.
Signature and date of Regulatory
staff member completing PJD
Signature and date of person
requesting PJD (REQUIRED,
unless obtaining the signature
is impracticable)'
August 17, 2023
1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the
established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing
an action.
n*�4• f.
`l -
I` i
Cr-
k
AE
I
L2 %
' i ; LEGEND
Site Boundary -
USGS Topographic Map
Drawing 1
x 714 Saint Cloud Drive
USGS Topographic Map ~'' \'� " Approximate 0.62-Acre Tract
Statesville East, NC Quadrangle pII Q'. Statesville, Iredell County, NC
Scale: 1"=2,000' P,L0T ENVIR0NMENTAL.INC Pilot Project9689
J�
Drawing 2A
USDA Soil Survey
of Iredell County, NC
Published 2011
Scale: 1" = 200'
Site Boundary
'r
Published Soil Map
714 Saint Cloud Drive
Approximate 0.62-Acre Tract
p11®131W All
Statesville, Iredell County, NC
PILOT ENVIRONMENTAL,INC Pilot Project9689
'S S '�5P II ' r• ` � ��'p ' 3 x
mi. �-i
A.
1 ' !kF�
4r FI �
14 y(
41
J N
�r
.,; 4
r...
10
•
LEGEND
"r A bf Site Boundary
s ti Freshwater Emergent
r # + Freshwater Forested/Shrub
Estuarine and Marine Deepwater
Estuarine and Marine
5 r,�` � �„ � Freshwater Pond
Lake
Yf Riverine
1111 PIMIOther
,1
NWI Map
Drawing 3 a
714 Saint Cloud Drive
USFWS NWI `
Wetlands Mapper Approximate 0.62-Acre Tract
PILOT Statesville, Iredell County, NC
Scale: 1 =100 PILOT ENVIR0NMENTAL.INC Pilot Project9689
f r
A :'-r - 4
OP
14 x o
1i
AP
40
41 PC In
} ,y
AN L :�
P15► EL r +.
/4
r'
-
LEGEND
AAAAA� Site Boundary
1 %Annual Chance Flood Hazard �
ORegulatory Floodvay CD
Sped al Floodyvay
Area of Undetermined Flood Hazard
0.2%Annual Chance Flood Hazard
Future Conditions 1%Annual Chance Flood Hazard
► Area with R educed Risk Due to Levee
r FEMA FIRM
Drawing 4F, 714 Saint Cloud Drive
National Flood Hazard Layer y
Approximate 0.62-Acre Tract
from FEMA Web Map Service �pl'-Q7. Statesville, Iredell County, NC
Scale.l -1,000 PILOT ENVIR0NMENTAL.INC Pilot Project9689
Y
L
SA
245 LF DP-1 Q
i
THE LOCATIONS OF FEATURES SHOWN ON THIS MAP ARE PRELIMINARY. THEY HAVE NOT BEEN
VERIFIED BY THE USACE. THIS MAP INCLUDES GPS LOCATIONS OF DELINEATED FEATURES.
DELINEATED BY PILOT ON JUNE 14, 2023.
N
.:.
.r4•
LEGEND
Site Boundary
Perennial Stream
Drawing 5 Wetland Map
Aerial Imagery from ESRI =` 714 Saint Cloud Drive
and Pilot GPS Data -T
-- - Approximate 0.62-Acre Tract
Scale: 1" = 100' ��O1' ' Statesville, Iredell County, NC
Date:8.10.2023 OT ENVIR0NMEN7AL,INO Pilot Project9689
U.S. Army Corps of Engineers OMB Control #: 0710-xxxx, Exp: Pending
WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT:
See ERDC/EL TR-07-24; the proponent agency is CECW-CO-R (Authority: AR 335-15, paragraph 5-2a)
Project/Site: 9689/St. Cloud Drive City/County: Statesville/Iredell Sampling Date: 6.14.23
Applicant/Owner: Paulette Klein State: NC Sampling Point: DP-1
Investigator(s): Pilot Section, Township, Range: NA
Landform (hillside, terrace, etc.): Side slope Local relief (concave, convex, none): slope Slope (%): 1-2
Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.789282' Long:-80.811394' Datum: wgs 84
Soil Map Unit Name: Chewacla loam (ChA) NWI classification: None
Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.)
Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No
Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.)
SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc.
Hydrophytic Vegetation Present? Yes No X Is the Sampled Area
Hydric Soil Present? Yes No X within a Wetland? Yes No X
Wetland Hydrology Present? Yes No X
Remarks:
HYDROLOGY
Wetland Hydrology Indicators:
Secondary Indicators (minimum of two required)
Primary Indicators (minimum of one is required: check all that apply)
—Surface Soil Cracks (136)
—Surface Water (Al) —True
Aquatic Plants (1314)
—Sparsely Vegetated Concave Surface (138)
_ High Water Table (A2) —Hydrogen
Sulfide Odor (Cl)
—Drainage Patterns (1310)
—Saturation (A3) —Oxidized
Rhizospheres on Living Roots (C3)
_Moss Trim Lines (1316)
—Water Marks (131) —Presence
of Reduced Iron (C4)
_ Dry -Season Water Table (C2)
_Sediment Deposits (132) _Recent
Iron Reduction in Tilled Soils (C6)
_Crayfish Burrows (C8)
_ Drift Deposits (133) _Thin
Muck Surface (C7)
_ Saturation Visible on Aerial Imagery (C9)
_Algal Mat or Crust (134) _Other
(Explain in Remarks)
_Stunted or Stressed Plants (D1)
—Iron Deposits (135)
_ Geomorphic Position (D2)
_ Inundation Visible on Aerial Imagery (137)
—Shallow Aquitard (D3)
—Water-Stained Leaves (139)
_ Microtopographic Relief (D4)
Aquatic Fauna (1313)
FAC-Neutral Test (D5)
Field Observations:
Surface Water Present? Yes No
X Depth (inches):
Water Table Present? Yes No
X Depth (inches):
Saturation Present? Yes No
X Depth (inches):
Wetland
Hydrology Present? Yes No X
includes capillary fringe)
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Remarks:
ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont — Version 2.0
VEGETATION (Four Strata) - Use scientific names of plants.
Sampling Point: DP-1
Absolute Uominant Indicator
Tree Stratum (Plot size: 30 )
% Cover Species? Status
Dominance Test worksheet:
1
Number of Dominant Species
2.
That Are OBL, FACW, or FAC: 0 (A)
3.
Total Number of Dominant
4.
Species Across All Strata: 1 (B)
5.
Percent of Dominant Species
6.
That Are OBL, FACW, or FAC: 0.0% (A/B)
7.
Prevalence Index worksheet:
=Total Cover
Total % Cover of: Multiply by:
50% of total cover:
20% of total cover:
OBL species 0 x 1 = 0
Sapling/Shrub Stratum (Plot size: 15
)
FACW species 0 x 2 = 0
1.
FAC species 0 x 3 = 0
2.
FACU species 100 x 4 = 400
3.
UPL species 0 x 5 = 0
4.
Column Totals: 100 (A) 400 (B)
5.
Prevalence Index = B/A = 4.00
6.
Hydrophytic Vegetation Indicators:
7.
_ 1 - Rapid Test for Hydrophytic Vegetation
8.
2 - Dominance Test is >50%
9.
3 - Prevalence Index is !-3.0'
=Total Cover
4 - Morphological Adaptations' (Provide supporting
50% of total cover:
20% of total cover:
data in Remarks or on a separate sheet)
Herb Stratum (Plot size: 5 )
-Problematic Hydrophytic Vegetation' (Explain)
1. Festuca arundinacea
100 Yes FACU
'Indicators of hydric soil and wetland hydrology must
2.
be present, unless disturbed or problematic.
Definitions of Four Vegetation Strata:
3.
4.
Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or
5.
more in diameter at breast height (DBH), regardless of
6
height.
7.
Sapling/Shrub - Woody plants, excluding vines, less
8.
than 3 in. DBH and greater than or equal to 3.28 ft
9
(1 m) tall.
10.
Herb - All herbaceous (non -woody) plants, regardless
11.
of size, and woody plants less than 3.28 ft tall.
100 =Total Cover
Woody Vine - All woody vines greater than 3.28 ft in
50% of total cover:
50 20% of total cover: 20
height.
Woody Vine Stratum (Plot size: 30 )
1.
2.
3.
4.
5
Hydrophytic
=Total Cover
Vegetation
50% of total cover:
20% of total cover:
Present? Yes No X
Remarks: (Include photo numbers here or on a separate sheet.)
ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0
SOIL Sampling Point: DP-1
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Depth Matrix Redox Features
(inches) Color (moist) % Color (moist) % Type LoC2 Texture Remarks
0-18 10YR 4/6 100 Loamy/Clayey
Type: C=Concentration, D=Depletion, RM=Reduced Matrix. MS=Masked Sand Grains.
Hydric Soil Indicators:
_ Histosol (Al)
_ Histic Epipedon (A2)
_ Black Histic (A3)
—Hydrogen Sulfide (A4)
—Stratified Layers (A5)
2 cm Muck (A10) (LRR N)
_ Depleted Below Dark Surface (A11)
_Thick Dark Surface (Al 2)
—Sandy Mucky Mineral(S1)
—Sandy Gleyed Matrix (S4)
—Sandy Redox (S5)
—Stripped Matrix (S6)
Dark Surface (S7)
Restrictive Layer (if observed):
Type:
Depth (inches):
Remarks:
_ Polyvalue Below Surface (S8) (MLRA 147, 148)
_Thin Dark Surface (S9) (MLRA 147, 148)
_Loamy Mucky Mineral (F1) (MLRA 136)
_ Loamy Gleyed Matrix (F2)
_ Depleted Matrix (F3)
_ Redox Dark Surface (F6)
_ Depleted Dark Surface (F7)
_ Redox Depressions (F8)
_ Iron -Manganese Masses (F12) (LRR N,
MLRA 136)
_ Umbric Surface (F13) (MLRA 122, 136)
—Piedmont Floodplain Soils (F19) (MLRA 148)
Red Parent Material (F21) (MLRA 127, 147, 148)
2Location: PL=Pore Lining, M=Matrix
Indicators for Problematic Hydric Soi
2 cm Muck (A10) (MLRA 147)
—Coast Prairie Redox (A16)
(MLRA 147, 148)
—Piedmont Floodplain Soils (F19)
(MLRA 136, 147)
—Red Parent Material (F21)
(outside MLRA 127, 147, 148)
_Very Shallow Dark Surface (F22)
Other (Explain in Remarks)
3Indicators of hydrophytic vegetation and
wetland hydrology must be present,
unless disturbed or problematic.
Hydric Soil Present? Yes No X
ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont — Version 2.0
V L���Fa7
NORTH CAROLINA
Environmental Quahry
Water Resources
Office Use Only
Corps Action ID no. SAW 2023- Date received: 8/17/2023
DWR project no. _Click enter.] Date received: 8/17/2023
Site Coordinates:
Latitude (DD.DDDDDD): 35.789207
Longitude (DD.DDDDDD):-80.811206
Form Version 1.5, September 2020
Pre -Construction Notification (PCN) Form
(Ver. 1.5, September 2020)
For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications
Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory
questions are answered.
The online help file may be found at this link:
https:Hedocs.deg.nc.gov/WaterResources/0/edocl6247041PCN%2OHelp%2OFile%202018-1-30.pdf
The help document may be found at this link:
http://www.saw. usace.army. mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre-
construction-Notification/
Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as DWR will not be
able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used to satisfy 40
C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall
request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all
certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority
at least 30 days prior to submitting the certification request.
Attach documentation of Pre -Filing Meeting Request to this Application.
Date of Pre -filing Meeting Request (MM/DD/YYYY) : 6/14/2023
DWR ID # Click to enter. Version Click to enter. (If applicable)
A. Processing Information
County (counties) where project is located:
Iredell Additional (if needed).
Is this a public transportation project?
(Publicly funded municipal, state, or federal road, rail,
❑ Yes ❑x No
or airport project)
Is this a NCDOT project?
❑ Yes ❑x No
If yes, NCDOT TIP or state project number:
Click to enter.
If yes, NCDOT WBS number:
Click to enter.
❑x Section 404 Permit (wetlands, streams, waters,
Clean Water Act)
la. Type(s) of approval sought from the Corps:
❑ Section 10 Permit (navigable waters, tidal
waters, Rivers and Harbors Act)
Pagel of 21 PCN Form - Version 1.5, September 2020
❑x Nationwide Permit (NWP)
1 b. Permit type(s)?
❑ Regional General Permit (RGP)
❑ Standard (IP)
This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps
representative concerning submittals for standard permits. All required items can be included as separate attachments
and submitted with this form.
1 c. Has the NWP or GP number been verified by the Corps?
❑ Yes ❑x No
NWP number(s):
NWP 13
RGP number(s):
Click to enter.
1 d. Type(s) of approval sought from the DWR (check all that apply):
❑ 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express
❑ Non-404 Jurisdictional General Permit ❑ Riparian Buffer Authorization
❑x Individual 401 Water Quality Certification
1e. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification: *
❑ Yes ❑x No
For the record only for Corps Permit: *
❑ Yes ❑x No
1f. Is this an after -the -fact permit/certification application?
❑ Yes ❑x No
1 g. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts?
❑ Yes ❑x No
If yes, attach the acceptance letter from mitigation bank or in -lieu fee program.
1 h. Is the project located in any of NC's twenty coastal counties?
❑ Yes ❑x No
1 i. Is the project located within an NC DCM Area of Environmental
Concern (AEC)?
❑ Yes ❑x No ❑ Unknown
1j. Is the project located in a designated trout watershed?
❑ Yes ❑x No
If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office.
Trout information may be found at this link: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-
Program/Agency-Coordination/Trout.aspx
Page 2 of 21 PCN Form - Version 1.5, September 2020
B. Applicant Information
1 a.
Who is the primary contact?
Paulette Stanley
1 b.
Primary Contact Email:
paulette.k.73@gmail.com
1 c.
Primary Contact Phone: (###)###-####
(704) 880-6273
1 d.
Who is applying for the permit/certification? (check
all that apply)
® Owner ❑ Applicant (other than owner)
1 e.
Is there an agent/consultant for this project?
® Yes ❑ No
2.
Landowner Information
2a.
Name(s) on Recorded Deed:
Klein Stanley J + Paulette S
2b.
Deed Book and Page No.:
1149/1522
2c.
Responsible Party (for corporations):
Click to enter.
2d.
Address
Street Address:
714 St. Cloud Drive
Address line 2:
Click to entei.
City:
Statesville
State/ Province/ Region:
North Carolina
Postal/ Zip Code:
28625
Country:
U.S.
2e.
Telephone Number: (###)###-####
(704) 880-6273
2f.
Fax Number: (###)###-####
Click to entei .
2g.
Email Address: *
Paulette.k.73@gmail.com
3.
Applicant Information (if different from owner)
3a.
Name:
Click to enter.
3b.
Business Name (if applicable):
Click to enter.
3c.
Address:
Street Address:
Click to enter.
Address line 2:
Click to enter.
City:
Click to enter.
State/ Province/ Region:
Click to enter.
Postal/ Zip Code:
Click to enter.
Country
Click to enter.
3d.
Telephone Number: (###)###-####
Click to enter.
3e
Fax Number: (###)###-####
Click to enter.
Page 3 of 21 PCN Form - Version 1.5, September 2020
3f. Email Address: Click to enter.
4. Agent/ Consultant (if applicable)
4a. Name: *
David S. Brame
4b. Business Name:
Pilot Environmental, Inc.
4c. Address: *
Street Address:
743 Park Lawn Court
Address line 2:
Click to enter.
City:
Kernersville
State/ Province/ Region:
NC
Postal/ Zip Code:
27284
Country:
U.S.
4d. Telephone Number: (###)###-####
(336) 708-4617
4e Fax Number: (###)###-####
Click to enter.
4f. Email Address: *
dbrame@pilotenviro.com
Agent Authorization Letter:
Attach a completed/signed agent authorization form or letter. A sample form may be found at this link:
https://www.saw. usace.army. mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre-
construction-Notification/
Page 4 of 21 PCN Form - Version 1.5, September 2020
C. Project Information and Prior Project History
1. Project Information
1 a. Name of project:
714 St. Cloud Drive
1 b. Subdivision name (if appropriate):
Click to enter.
1 c. Nearest municipality/town: *
Statesville, NC
2.
Project Identification
2a.
Property identification number (tax PIN or parcel ID):
4746278077.000
2b.
Property size (in acres):
0.62
2c.
Project Address:
Street Address:
714 St. Cloud Drive
Address line 2:
Click to enter
City:
Statesville
State/ Province/ Region:
NC
Postal/ Zip Code:
28625
Country:
U.S.
2d.
Site coordinates in decimal degrees (using 4-6 digits
after the decimal point): *
Latitude (DD.DDDDDD): 35.789207
Longitude (-DD.DDDDDD):--80.811206
3. Surface Waters
3a. Name of nearest body of water to proposed project:
Fourth Creek
3b. Water Resources Classification of nearest receiving
Class C Waters
water:
The Surface Water Classification map may be found at this link:
https://ncdenr.maps.arcqis.com/apps/webappviewer/index.html?id=6e125ad7628f494694e259c80dd64265
Yadkin-PeeDee
3c. In what river basin(s) is your project located?
Choose additional (if needed)
3d. Please provide the 12-digit HUC in which the project is
030401020402
located:
The Find Your HUC map may be found at this link:
https://ncdenr.maps.arcgis.com/apps/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3
Page 5 of 21 PCN Form - Version 1.5, September 2020
4.
Project Description and History
4a.
Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of
this application:
The central ortion of the site is developed with a single-family residence. The remainder of the site contains
wooded land. Surrounding properties contain single-family residential structures and wooded land.
4b.
Have Corps permits or DWR certifications been obtained for this
❑ Yes ❑x No ❑ Unknown
project (including all prior phases) in the past?
4c.
If yes, please give the DWR Certification number and/or Corps
SAW 2023-
Action ID (ex. SAW-0000-00000):
jClick to enter.]
Attach any pertinent project history documentation
4d.
Attach an 8'h x 11" excerpt from the most recent version of the USGS topographic map indicating the location of
the project site.
4e.
Attach an 8'h x 11" excerpt from the most recent version of the published County NRCS Soil Survey map
depicting the project site.
4f.
List the total estimated acreage of all existing wetlands on the
0 acres
property:
4g.
List the total estimated linear feet of all existing streams (intermittent
245 linear feet
and perennial) on the property:
4g1.
List the total estimated acreage of all existing open waters on the
0 acres
property:
4h.
Explain the purpose of the proposed project:
The purpose of the proposed project is to remove a wall that has been constructed in a stream and repair the
stream bank.
4i.
Describe the overall project in detail, including the type of equipment to be used:
The overall project includes the removal of a cinderblock wall and associated backfill and repair the stream bank.
In order to remove the wall and make the necessary repairs, graders, haulers, excavators and other heavy
equipment will be used.
4j.
Attach project drawings/site diagrams/depictions of impact areas for the proposed project.
5.
Jurisdictional Determinations
5a.
Have the wetlands or streams been delineated on
the property or in
® Yes ❑ No ❑ Unknown
proposed impact areas?
Comments:
The site was delineated in October, 2022.
Name (if known): David Brame
5b.
If 5a is yes, who delineated the jurisdictional
Agency/Consultant Company: Pilot
areas?
Other:.;11CK to enter
5c.
If the Corps made a jurisdictional determination,
❑ Preliminary ❑ Approved ❑ Emailed Concurrence
what type of determination was made?
❑x Not Verified ❑ Unknown
Corps AID number (ex. SAW-0000-00000):
SAW 2023-
5d.
List the dates of the Corps jurisdictional determination or State determination if a determination was made by
either agency.
Click to enter.
Page 6 of 21 PCN Form - Version 1.5, September 2020
5d1. Attach jurisdictional determinations.
Page 7 of 21 PCN Form - Version 1.5, September 2020
6. Future Project Plans
6a. Is this a phased project?
❑ Yes ❑x No
6b. If yes, explain.
This project is a single phase construction project. Additional impacts beyond those proposed in this permit
application are not anticipated.
Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize
any part of the proposed project or related activity? This includes other separate and distant crossings for linear
projects that require Department of the Army authorization but don't require pre -construction notification.
No other permits are intended to be used.
Page 8 of 21 PCN Form - Version 1.5, September 2020
D. Proposed Impacts Inventory
Impacts Summary
1 a. Where are the impacts associated with your project
(check all that apply):
❑ Wetlands
❑ Buffers
❑ Pond Construction
❑x Streams - tributaries
❑ Open Waters
2. Wetland Impacts
If there are wetland impacts proposed on the site, complete this table for each wetland area impacted.
2a.
2a1.
2b.
2c.
2d.
2e.
2f.
2g.
Site #
Impact
Impact
Wetland Name
Wetland Type
Forested
Jurisdiction
Impact Area
Reason/Type
Duration
?
Type*
(ac)
W1
Choose one
Temp/
Click to enter
Choose one
Choose one
Click to
Perm
enter
W2
Choose one
Temp/
Click to enter
Choose one
Choose one
Click to
Perm
enter
W3
Choose one
Temp/
Click to enter
Choose one
Y/N
Choose one
Click to
Perm
enter
W4
Choose one
Temp/
Click to enter
Choose one
Y/N
Choose one
Click to
Perm
enter
W5
Choose one
Temp/
Click to enter
Choose one
Y/N
Choose one
Click to
Perm
enter
W6
Choose one
Temp/
Click to enter
Choose one
Y/N
Choose one
Click to
Perm
enter
2g1. Total temporary wetland impacts
Click to enter. ac
2g2. Total permanent wetland impacts
Click to enter. ac
2g3. Total wetland impacts
Click to enter. ac
2h. Comments:
Wetlands are not located on the site. Wetland impacts are not proposed.
Page 9 of 21 PCN Form - Version 1.5, September 2020
3. Stream Impacts
If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site,
complete this table for all stream/ tributary sites impacted.
** All Perennial or Intermittent streams must be verified by DWR or delegated local government
Site #
3a.
Impact Reason/
Type
3b.
Impact
Duration
3d.
Stream Name
3e.
Stream
Type
3f.
Jurisdiction
Type
3g.
Stream Width
(avg ft)
3h.
Impact length
(linear ft)
S1
Bank
Stabilization
Permanent
Unnamed
Perennial
Both
10
245
S2
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S3
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S4
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S5
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S6
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S7
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S8
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S9
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S10
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S11
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S12
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S13
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S14
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S15
Choose one
Temp/ Perm
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
3i1. Total jurisdictional ditch impact:
Click to enter. linear ft
3i2. Total permanent stream impacts:
245 linear ft
36. Total temporary stream impacts:
Click to enter. linear ft
3i4. Total stream and ditch impacts:
245 linear ft
3j. Comments:
The eastern bank of the stream is being impacted to repair and stabilize the stream bank. In order to repair the bank a 120
foot cinderblock wall must be removed from the eastern side of the stream. The existing stream bank throughout the 245 foot
stream reach will be laid back and the side slopes will be rip rapped and chinked outside the ordinary high-water mark.
Page 10 of 21 PCN Form - Version 1.5, September 2020
4.
Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries,
sounds, the Atlantic Ocean, or any other
open water of the U.S., individually list all open water impacts in the table below.
4a.
4b.
4c.
4d.
4e.
4e1.
4f.
Site #
Impact Reason/
Impact
Waterbody Name
Waterbody
Jurisdiction
Impact area (ac)'
Type
Duration
Type*
Type
01
Choose one
Temp/
Click to enter.
Choose one
Choose one
Click to enter.
Perm
02
Choose one
Temp/
Click to enter.
Choose one
Choose one
Click to enter.
Perm
03
Choose one
Temp/
Click to enter.
Choose one
Choose one
Click to enter.
Perm
04
Choose one
Temp/
Click to enter.
Choose one
Choose one
Click to enter.
Perm
4g.
Total temporary open water impacts
Click to enter. ac
4g.
Total permanent open water impacts
Click to enter. ac
4g.
Total open water impacts
Click to enter. ac
4h.
Comments:
Open water impacts are not proposed.
5.
Pond or Lake Construction
If pond or lake construction is proposed, complete
the table
below. (*This
does NOT include ofFline stormwater
management ponds.)
5a.
5b.
5c.
5d.
5e.
Pond ID
Proposed use or
Wetland Impacts
(ac)
Stream
Impacts (ft)
Upland
#
purpose of pond
Impacts (ac)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
Click to
Click tL
Click to
Click to
Click to
Click to
Click to
enter.
enter.
enter.
enter.
enter.
enter.
enter.
P2
Choose one
Click to
Click to
Click to
Click to
Click to
Click to
Click to
enter.
enter.
enter.
enter.
enter.
enter.
enter.
5f.
Total
Click to
Click to
Click to
Click to
Click to
Click to
Click to
enter.
enter.
enter.
enter.
enter.
enter.
enter.
5g.
Comments:
Pond or lake construction is not proposed.
5h.
Is a dam high hazard permit required?
❑ Yes ❑ No
If yes, permit ID no.:
Click to enter.
5i.
Expected pond surface area (acres):
Click to enter.
5j.
Size of pond watershed (acres):
Click to enter.
5k.
Method of construction:
Click to enter.
Page 11 of 21 PCN Form - Version 1.5, September 2020
6. Buffer Impacts (DWR requirement)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts.
6a. Project is in which protected basin(s)?
(Check all that apply.)
❑ Neuse ❑ Tar -Pamlico ❑ Catawba
❑ Jordan ❑ Goose Creek ❑ Randleman
❑ Other: Click to enter.
Site #*
6b.
Impact Type*
6c.
Impact Duration*
6d.
Stream Name*
6e.
Buffer
Mitigation
Required?*
6f.
Zone 1 Impact*
(sq ft)
6g.
Zone 2 Impact*
(sq ft)
B1
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B2
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B3
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B4
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B5
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B6
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter
Click to enter.
B7
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter
Click to enter.
B8
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter
Click to enter.
B9
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter
Click to enter.
B10
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter
Click to enter.
6h. Total temporary impacts:
Zone 1: Click to enter. sq ft
Zone 2: Click to enter. sq ft
6h. Total permanent impacts:
Zone 1: Click to enter. sq ft
Zone 2: Click to enter. sq ft
6h. Total combined buffer impacts:
Zone 1: Click to enter. sq ft
Zone 2: Click to enter. sq ft
6i. Comments:
The site is located in the Yadkin River watershed in an area that is designated as Class C waters.
Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project.
Page 12 of 21 PCN Form - Version 1.5, September 2020
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design:
The applicant is proposing to remove an existing cinderblock wall that was recently constructed in a 120 foot section of
the eastern portion of a stream. The fill that has been placed into the stream is being removed. Following the removal
of the wall, the stream bank will be repaired behind the wall footprint and up -gradient and down-gradirent of the wall.
The repair will include laying back the eastern bank and reinforcing the slope with rip rap and chinking. Unauthorozed
impacts (the wall and associated fill) are being removed and additional impacts are being avoided.
1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques:
Disturbed areas will be seeded and mulched to limit sediment from entering the stream. Rip Rap and chinking are
being used to stabilize the slopes.
2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers
2a. If compensatory mitigation is required, by whom is it required? * ❑ DWR ❑ Corps
(check all that apply)
2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank
project? * (check all that apply) ❑ In Lieu Fee Program
❑ Permittee Responsible Mitigation
3. Complete if using a Mitigation Bank
(Must satisfy NC General Statute143-214.11 (d1).)
3a. Name of mitigation bank:
Click to enter.
3b. Credits purchased/requested:
Type: Choose one
Quantity Click to enter.
Type: Choose one
Quantity Click to enter.
Type: Choose one
Quantity Click to enter.
Attach receipt and/or approval letter.
3c. Comments:
Mitigation is not proposed.
4.
Complete if Using an In Lieu Fee Program
4a.
Attach approval letter from in lieu fee program.
4b.
Stream mitigation requested:
Click to enter. linear feet
4c.
If using stream mitigation, what is the stream temperature:
Choose one
NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington
District's RIBITS website: (Please use the filter and select Wilmington district)
https://ribits.usace.army.mil/ribits apex/f?p=107:27:2734709611497::NO: RP: P27 BUTTON KEY:O
4d.
Buffer mitigation requested (DWR only):
Click to enter. square feet
4e.
Riparian wetland mitigation requested:
Click to enter. acres
4f.
Non -riparian wetland mitigation requested:
Click to enter. acres
4g.
Coastal (tidal) wetland mitigation requested:
Click to enter. acres
Page 13 of 21 PCN Form - Version 1.5, September 2020
4h. Comments:
Mitigation is not proposed.
5. Complete if Providing a Permittee Responsible Mitigation Plan
5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan,
including the amount of mitigation proposed.
Click to enter
5b. Attach mitigation plan/documentation.
6.
Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement
6a.
Will the project result in an impact within a protected riparian buffer
❑ Yes ❑x No
that requires buffer mitigation?
If yes, please complete this entire section — please contact DWR for more information.
6b.
If yes, identify the square feet of impact to each zone of the riparian buffer that requires
mitigation. Calculate the
amount of mitigation required in the table below.
6c.
6d.
6e.
Zone
Reason for impact
Total impact (square
Multiplier
Required mitigation
feet)
(square feet)
Zone 1
Click to enter.
Click to enter.
:,hoose one
Click to enter.
Zone 2
;lick to enter.
Click fo enter
" hnnca nna
Click to enter.
6f. Total buffer mitigation required
Click to enter.
6g.
If buffer mitigation is required, is payment to a mitigation bank or
❑ Yes ❑ No
NC Division of Mitigation Services proposed?
6h.
If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services.
6i.
Comments:
Buffer mitigation is not proposed.
Page 14 of 21 PCN Form - Version 1.5, September 2020
F. Stormwater Management and Diffuse Flow Plan (DWR requirement)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers
❑ Yes ❑x No
identified within one of the NC Riparian Buffer Protection Rules?
1 b. All buffer impacts and high ground impacts require diffuse flow or other forms of stormwater treatment. If the
project is subject to a state implemented riparian buffer protection program, include a plan that fully documents
how diffuse flow will be maintained.
All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design
Manual (https://deg.nc.gov/about/divisions/energv-mineral-land-resources/energv-mineral-land-permit-
guidance/stormwater-bmp-manual).
Associated supplement forms and other documentation must be provided.
❑ Level Spreader
What Type of SCM are you
❑ Vegetated Conveyance (lower seasonal high water table- SHWT)
providing?
❑ Wetland Swale (higher SHWT)
(Check all that apply)
❑ Other SCM that removes minimum 30% nitrogen
❑ Proposed project will not create concentrated stormwater flow through the
buffer
For a list of options to meet the diffuse flow requirements, click here:
Attach diffuse flow documentation.
2. Stormwater Management Plan
2a. Is this an NCDOT project subject to compliance with NCDOT's
Individual NPDES permit NCS000250?
El Yes ❑x No
2b. Does this project meet the requirements for low density projects as
defined in 15A NCAC 02H .1003(2)?
❑x Yes ❑ No
To look up low density requirements, click here:
http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20guality/chapter%2002%20-
%20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1003.pdf
2c. IS the project over an acre?
❑ Yes ❑x No
2d. Does this project have a stormwater management plan (SMP)
reviewed and approved under a state stormwater program or state-
❑ Yes ❑x No
approved local government stormwater program?
Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented
stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of
community in -lieu programs should answer "no" to this question.
2e. Which of the following stormwater management program(s) apply?
❑ Local Government
(Check all that apply)
❑ State
If you have local government approval, please include the SMP on their overall impact map.
Page 15 of 21 PCN Form - Version 1.5, September 2020
❑ Phase II ❑ USMP
Local Government Stormwater Programs
❑ NSW ❑ Water Supply
Please identify which local government stormwater program you are using.
GIicK to enter.
❑ Phase II ❑ HQW or ORW
State Stormwater Programs
❑ Coastal Counties ❑ Other
Comments:
Stormwater Management is not applicable to the proposed project.
Page 16 of 21 PCN Form - Version 1.5, September 2020
G. Supplementary Information
1. Environmental Documentation
1 a. Does the project involve an expenditure of public (federal/state/local)
❑ Yes ❑x No
funds or the use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require
preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental
❑ Yes ❑ No
Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been
finalized by the State Clearing House? (If so, attach a copy of the
❑ Yes ❑ No
NEPA or SEPA final approval letter.)
Comments:
A NEPA or SEPA is not required.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A
NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300),
DR Surface Water or Wetland Standards or Riparian Buffer Rules ®Yes El No
W
(15A NCAC 2B .0200)?
2b. If you answered "yes" to the above question, provide an explanation of the violation(s):
This project includes the removal of a wall and associated fill from the stream.
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future
impacts) result in additional development, which could impact nearby
❑ Yes ❑x No
downstream water quality?
3b. If you answered "no", provide a short narrative description:
Additional development as a result of the proposed development is not anticipated.
3c. If yes, attach a qualitative or quantitative cumulative impact analysis (.pdo in accordance with the most recent
DWR policy.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project? I ❑ Yes ❑ No ❑x N/A
4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater
generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity
available at that plant.
Click to enter.
Page 17 of 21 PCN Form - Version 1.5, September 2020
5.
Endangered Species and Designated Critical Habitat (Corps Requirement)
5a.
Will this project occur in or near an area with federally protected
® Yes ❑ No
species or habitat? (IPAC weblink: https://www.fws.gov/ipac/ Ifws.govl)
5b.
Have you checked with the USFWS concerning Endangered Species
❑ Yes ❑x No
Act impacts?
5c.
If yes, indicate the USFWS Field Office you have contacted.
;hoose one
5d.
Is another federal agency involved?
❑ Yes ❑x No ❑ Unknown
If yes, which federal agency?
Click to enter.
5e.
Is this a DOT project located within Divisions 1-8?
❑ Yes ❑x No
5f.
Will you cut any trees in order to conduct the work in waters of the
U.S.?
®Yes ElNo
5g.
Does this project involve bridge maintenance or removal? "
❑ Yes ❑x No
Link to NLEB SLOPES document: http://saw-reg.usace. army. mil/NLEB/1-30-17-signed NLEB-
SLOPES&apps.pdf
5h.
Does this project involve the construction/ installation of a wind
turbine(s)?
❑ Yes ❑x No
If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdo
5i.
Does this project involve blasting and /or other percussive activities
that will be conducted by machines, such as jackhammers,
❑ Yes ❑x No
mechanized pile drivers, etc.?
If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this
activity on the property (attach .pdo
5j.
What data sources did you use to determine whether your site would impact Endangered Species or Designated
Critical Habitat?
US Department of the Interior — Fish and Wildlife Service Official Species List from IPaC (Report attached)
4 listed species are identified on the IPaC report (attached). Tricolored bat (Proposed Endangered), Bog turtle
(Similarity of Appearance/Threatened), Monarch butterfly (Candidate), Schweinitz's sunflower (Endangered) and Small
whorled pogonia (Threatened).
We observed the impact area, including areas within 100 feet of impact area, for these species/potential habitat. The
area contains a cinderblock wall with associated fill, grass -covered areas and a few scattered trees. The grass -
covered area is routinely mowed and contains moss and mixed weeds. The area does not contain potential habitat for
Schweinitz's sunflower or small whorled pogonia. Additionally, there are no documented populations of Schweinitz's
sunflower within the HUC that includes the site.
The project will not impact turtles that are similar in appearance to the protected bog turtle. The other two species are
not currently afforded protection under the ESA.
Attach consultation documentation.
6. Essential Fish Habitat (Corps Requirement)
Page 18 of 21 PCN Form - Version 1.5, September 2020
6a. Will this project occur in or near an area designated as
an Essential Fish Habitat?
❑ Yes
❑x No
Are there submerged aquatic vegetation (SAV) around
the project vicinity?
El Yes
❑x No El Unknown
Will this project affect submerged aquatic vegetation?
❑ Yes
❑x No ❑ Unknown
Explain:
Dlick to enter.
6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat?
Essential Fish Habitat Mapper— NOAA Fisheries
Page 19 of 21 PCN Form - Version 1.5, September 2020
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data):
http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or
❑ Yes ❑x No
properties significant in North Carolina history and archaeology)?
7b. What data source(s) did you use to determine whether your site would impact historic or archeological
resources?
NC Historic Preservation Office's HPOWEB 2.0. Historic properties were not identified in the area of the impact, on the
site or within one mile of the site. A copy of the SHPO Map is included as an attachment.
7c. Attach historic or prehistoric documentation.
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
i] Yes ❑x No
8b. If yes, explain how the project meets FEMA requirements.
Click to enter.
8c. What source(s) did you use to make the floodplain determination?
National Flood Hazard Layer from FEMA Web Map Service — Drawing 4 (Attached)
Page 20 of 21 PCN Form - Version 1.5, September 2020
H. Miscellaneous
Comments:
Thank -you for your assistance.
Attach pertinent documentation or attachments not previously requested
I. Signature *
❑x By checking the box and signing below, I, as the project proponent, certify to the following:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to
the best of my knowledge and belief;
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time;
• The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter
66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66,
Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• The project proponent hereby understands that an electronic signature has the same legal effect and can be
enforced in the same way as a written signature; AND
• As the project proponent, I intend to electronically sign and submit the PCN/online form.
Full Name: David S. Brame
Signature:
8/17/2023
Page 21 of 21 PCN Form - Version 1.5, September 2020
1
Mall
V
Streambank
Stabilization Extent
245 LF
THE LOCATIONS OF FEATURES SHOWN ON THIS MAP ARE PRELIMINARY. THEY
HAVE NOT BEEN VERIFIED BYTHE USACE. THIS MAP INCLUDES GPS LOCATIONS
OF DELINEATED FEATURES. DELINEATED BY PILOT ON JUNE 14, 2023.
Drawing 6
Aerial Imagery from ESRI =`
and Pilot GPS Data -
Scale: 1" = 30'
Date:8.10.2023 PILOT EN VIR.....IAL,I.[
LEGEND
Site Boundary
Perennial Stream
Site Plan
714 Saint Cloud Drive
Approximate 0.62-Acre Tract
Statesville, Iredell County, NC
Pilot Project 9689
Typical cross-section — not to scale.
A
A S 1'
21 Lay slope back to
BaseX_
flow the extent possible.
2:1 Slope Preferred.
Streambed
1 8-10' j
1. Remove backfill and masonry block wall carefully. Avoid over excavation during removal of wall.
2. Do not excavate beneath the bottom of the current channel.
3. Any holes or voids created by removal of the concrete footer should be backfilled with riprap and smaller stone to eliminate any voids.
4. Establish new toe slope based on up and downgradient reference reaches.
5. Lay the slopes back as much as possible. A 2:1 slope is preferred.
6. Over excavate the bank so that the channel maintains its up and downstream widths.
7. Ensure that the stream channel is not choked after placement of riprap material. The toe slope after placement of riprap should be
consistent with the up and downgradient toe slope.
8. Install riprap on sloping bank. Placement of fabric beneath riprap is not recommended.
9. Use large stone on bottom (See Example Photograph 1).
10. Chink voids within riprap using smaller stone (See Example Photograph 2). Ensure that all voids are filled.
11. Seed, straw, mat and revegetate areas disturbed by grading activities (See Example Photograph 3). Installation of trees and shrubs is
recommended.
ti
• 1 fl 3 I
4'. VF },
� r • �' f k y_ w _
• # _Ir"#-, ;
s
Place largest stone on the "face," of the rip -rap placement, where the greatest velocities are.
la"1 f fI'Sr�R
01.
EM
i
5 UT A
+` �Wr ap t . .
AW
4 41
4 .
qIb
look. r
Chinking/choking in the voids between thgular stones helps "knit"' them
together. Use the largest size possible that will still find the voids in the racks.
Irk rl
I-pr
MIR
Michael Brame
From: Heather LaGamba
Sent: Wednesday, June 14, 2023 6:44 PM
To: 401 PreFile@ncdenr.gov
Subject: Pre -File Notice - Saint Cloud Drive (9689)
We would like to submit a Pre -filing Notice for the following project:
Project Name: Saint Cloud Drive (9689)
Project Owner: Ms. Paulette Stanley
Project Owner's Address: 714 Saint Cloud Drive, Statesville, North Carolina 28625
Project County: Iredell
Type of project/Approval Sought: 401 WQC, Pre -Application Request Meeting Declined
Thank you and have a wonderful day!
Sincerely,
Heather LaGamba
336.345.9536 (c)
336.310.4527 (o)
P.O. Box 128
Kernersville, NC 27285
www.-ilotenviro.com
hiagamba@pilotenviro.com
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Asheville Ecological Services Field Office
160 Zillicoa Street
Asheville, NC 28801-1082
Phone: (828) 258-3939 Fax: (828) 258-5330
In Reply Refer To:
Project Code: 2023-0116679
Project Name: 714 St Cloud Drive
August 14, 2023
Subject: List of threatened and endangered species that may occur in your proposed project
location or may be affected by your proposed project
To Whom It May Concern:
The enclosed species list identifies threatened, endangered, proposed and candidate species, as
well as proposed and designated critical habitat, that may occur within the boundary of your
proposed project and/or may be affected by your proposed project. The enclosed species list
fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the
Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.).
Please note that new species information can change your official species list. Under 50 CFR
402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list
should be verified after 90 days. The Service recommends you visit the ECOS-IPaC website at
regular intervals during project planning and implementation to ensure your species list is
accurate or obtain an updated species list.
The purpose of the Act is to provide a means whereby threatened and endangered species and the
ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the
Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to
utilize their authorities to carry out programs for the conservation of threatened and endangered
species and to determine whether projects may affect threatened and endangered species and/or
designated critical habitat.
A biological assessment (BA) or biological evaluation (BE) should be completed for your
project. A BA is required for major construction activities (or other undertakings having similar
physical impacts) considered to be Federal actions significantly affecting the quality of the
human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c))
(NEPA). For projects other than major construction activities, the Service suggests that a BE be
prepared to determine effects of the action and whether those effects may affect listed species
and/or designated critical habitat. E?ects of the action are all consequences to listed species or
critical habitat that are caused by the proposed action, including the consequences of other
08/14/2023
activities that are caused by the proposed action. A consequence is caused by the proposed action
if it is reasonably certain to occur and would not occur "but for" the proposed action..
Recommended contents of a BA/BE are described at 50 CFR 402.12. More information and
resources about project review and preparing a BA/BE can be found at the following web link:
https://www.fws. gov/office/asheville-ecological-services/asheville-field-office-online-review-
process-overview.
If a Federal agency determines listed species and/or designated critical habitat may be affected
by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR
402. The Service is not required to concur with "no effect" determinations from Federal action
agencies. If consultation is required, the Service recommends that candidate species, proposed
species, proposed critical habitat, and at -risk species be addressed within the consultation. More
information on the regulations and procedures for section 7 consultation, including the role of
permit or licensed applicants, can be found in the "Endangered Species Consultation Handbook"
at the following web link: https://www.fws.gov/media/endangered-species-consultation-
handbook.
Migratory Birds: In addition to responsibilities to protect threatened and endangered species
under the Act, there are additional responsibilities under the Migratory Bird Treaty Act (MBTA)
and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -
related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds,
including eagles, is prohibited unless otherwise permitted by the Service (50 C.F.R. Sec. 10.12
and 16 U.S.C. Sec. 668(a)). More information about MBTA and BGEPA can be found at the
following web link: https://www.fws.gov/program/migratory-birds.
We appreciate your consideration of Federally listed species. The Service encourages Federal
agencies to include conservation of threatened and endangered species in their project planning
to further the purposes of the Act. Please contact our staff at 828-258-3939, if you have any
questions. In any future correspondence concerning this project, please reference the
Consultation Code which can be found in the header of this letter.
Attachment(s):
• Official Species List
• USFWS National Wildlife Refuges and Fish Hatcheries
• Migratory Birds
• Wetlands
OFFICIAL SPECIES LIST
This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the
requirement for Federal agencies to "request of the Secretary of the Interior information whether
any species which is listed or proposed to be listed may be present in the area of a proposed
action".
08/14/2023
This species list is provided by:
Asheville Ecological Services Field Office
160 Zillicoa Street
Asheville, NC 28801-1082
(828) 258-3939
08/14/2023
4
PROJECT SUMMARY
Project Code: 2023-0116679
Project Name: 714 St Cloud Drive
Project Type: Stream/Waterbody - Channel/Diversion Structures
Project Description: Stream Bank Restoration
Project Location:
The approximate location of the project can be viewed in Google Maps: https:
www.google.com/maps/@35.789218000000005,-80.81119045031849,14z
7
Counties: Iredell County, North Carolina
08/14/2023
ENDANGERED SPECIES ACT SPECIES
There is a total of 5 threatened, endangered, or candidate species on this species list.
Species on this list should be considered in an effects analysis for your project and could include
species that exist in another geographic area. For example, certain fish may appear on the species
list because a project could affect downstream species.
IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA
Fisheriesi, as USFWS does not have the authority to speak on behalf of NOAA and the
Department of Commerce.
See the "Critical habitats" section below for those critical habitats that lie wholly or partially
within your project area under this office's jurisdiction. Please contact the designated FWS office
if you have questions.
1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an
office of the National Oceanic and Atmospheric Administration within the Department of
Commerce.
MAMMALS
NAME S TATU S
Tricolored Bat Perimyotis sub flavus Proposed
No critical habitat has been designated for this species. Endangered
Species profile: https://ecos.fws.gov/ecp/species/10515
REPTILES
NAME
S TATU S
Bog Turtle Glyptemys muhlenbergii
Similarity of
Population: U.S.A. (GA, NC, SC, TN, VA)
Appearance
No critical habitat has been designated for this species.
(Threatened)
Species profile: https://ecos.fws.gov/ecp/species/6962
INSECTS
NAME
S TATU S
Monarch Butterfly Danaus plexippus
Candidate
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/9743
08/14/2023
FLOWERING PLANTS
NAME S TATU S
Dwarf -flowered Heartleaf Hexastylis nani flora Threatened
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/2458
Schweinitz's Sunflower Helianthus schweinitzii Endangered
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/3849
CRITICAL HABITATS
THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S
JURISDICTION.
YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HAVE EFFECTS ON ALL
ABOVE LISTED SPECIES.
USFWS NATIONAL WILDLIFE REFUGE LANDS
AND FISH HATCHERIES
Any activity proposed on lands managed by the National Wildlife Refuge system must undergo a
'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to
discuss any questions or concerns.
THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA.
MIGRATORY BIRDS
Certain birds are protected under the Migratory Bird Treaty Act! and the Bald and Golden Eagle
Protection Act2.
Any person or organization who plans or conducts activities that may result in impacts to
migratory birds, eagles, and their habitats should follow appropriate regulations and consider
implementing appropriate conservation measures, as described below.
1. The Migratory Birds Treater of 1918.
2. The Bald and Golden Eagle Protection Act of 1940.
3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)
The birds listed below are birds of particular concern either because they occur on the
USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your
project location. To learn more about the levels of concern for birds on your list and how this
list is generated, see the FAQ below. This is not a list of every bird you may find in this location,
nor a guarantee that every bird on this list will be found in your project area. To see exact
locations of where birders and the general public have sighted birds in and around your project
08/14/2023
area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species
on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing
the relative occurrence and abundance of bird species on your list are available. Links to
additional information about Atlantic Coast birds, and other important information about your
migratory bird list, including how to properly interpret and use your migratory bird report, can be
found below.
For guidance on when to schedule activities or implement avoidance and minimization measures
to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE
SUMMARY at the top of your list to see when these birds are most likely to be present and
breeding in your project area.
NAME
BREEDING SEASON
Cerulean Warbler Dendroica cerulea Breeds Apr 28 to Jul
This is a Bird of Conservation Concern (BCC) throughout its range in the continental 20
USA and Alaska.
https:Hecos.fws.gov/ecp/species/2974
Chimney Swift Chaetura pelagica
Breeds Mar 15 to Aug
This is a Bird of Conservation Concern (BCC) throughout its range in the continental
25
USA and Alaska.
Eastern Whip -poor -will Antrostomus voci ferns
Breeds May 1 to Aug
This is a Bird of Conservation Concern (BCC) throughout its range in the continental
20
USA and Alaska.
Prairie Warbler Dendroica discolor
Breeds May 1 to Jul
This is a Bird of Conservation Concern (BCC) throughout its range in the continental
31
USA and Alaska.
Prothonotary Warbler Protonotaria citrea
Breeds Apr 1 to Jul
This is a Bird of Conservation Concern (BCC) throughout its range in the continental
31
USA and Alaska.
Red-headed Woodpecker Melanerpes erythrocephalus
Breeds May 10 to Sep
This is a Bird of Conservation Concern (BCC) throughout its range in the continental
10
USA and Alaska.
Rusty Blackbird Euphagus carolinus Breeds elsewhere
This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation
Regions (BCRs) in the continental USA
Wood Thrush Hylocichla mustelina Breeds May 10 to
This is a Bird of Conservation Concern (BCC) throughout its range in the continental Aug 31
USA and Alaska.
PROBABILITY OF PRESENCE SUMMARY
The graphs below provide our best understanding of when birds of concern are most likely to be
present in your project area. This information can be used to tailor and schedule your project
activities to avoid or minimize impacts to birds. Please make sure you read and understand the
08/14/2023
FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting
to interpret this report.
Probability of Presence (■)
Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your
project overlaps during a particular week of the year. (A year is represented as 12 4-week
months.) A taller bar indicates a higher probability of species presence. The survey effort (see
below) can be used to establish a level of confidence in the presence score. One can have higher
confidence in the presence score if the corresponding survey effort is also high.
How is the probability of presence score calculated? The calculation is done in three steps:
1. The probability of presence for each week is calculated as the number of survey events in
the week where the species was detected divided by the total number of survey events for
that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee
was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is
0.25.
2. To properly present the pattern of presence across the year, the relative probability of
presence is calculated. This is the probability of presence divided by the maximum
probability of presence across all weeks. For example, imagine the probability of presence
in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12
(0.25) is the maximum of any week of the year. The relative probability of presence on
week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2.
3. The relative probability of presence calculated in the previous step undergoes a statistical
conversion so that all possible values fall between 0 and 10, inclusive. This is the
probability of presence score.
Breeding Season( )
Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across
its entire range. If there are no yellow bars shown for a bird, it does not breed in your project
area.
Survey Effort (1)
Vertical black lines superimposed on probability of presence bars indicate the number of surveys
performed for that species in the 10km grid cell(s) your project area overlaps. The number of
surveys is expressed as a range, for example, 33 to 64 surveys.
No Data (—)
A week is marked as having no data if there were no survey events for that week.
Survey Timeframe
Surveys from only the last 10 years are used in order to ensure delivery of currently relevant
information. The exception to this is areas off the Atlantic coast, where bird returns are based on
all years of available data, since data in these areas is currently much more sparse.
0 probability of presence breeding season I survey effort — no data
08/14/2023
E
SPECIES
JAN FEB MAR APR MAY JUN JUL
AUG SEP OCT
NOV DEC
Cerulean Warbler
++++ ++—+ +—++ ++'I
I � ++—
1 — — 1
BCC Rangewide
Blip
pma+�
(CON)
Chimney
BCC R ng wlide
11'_—
++++ ++—+ +III `III Jill Jill
rt-1— 11+— +'--
+- — . — . 1
(CON)
Eastern Whip -poor -
will
++++ ++—+ +—++ +++—
I
— -+— 4-4—+-
— —
BCC Rangewide
(CON)
Prairie Warbler
BCC Rangewide
++�
+ + +—+ +—gill
IIII
IIII
�� �—
—
—
(CON)
Prothonotary
Warbler
++++ ++�+ +�++IIII
IIII
IIII
IIII
— — — — --+— 4-4—
+--- ---+
BCC wide
(CON)
Woo
++11 ++—+ +—++ +++— +III
IIII
IIII
IIII
11-4-- 4-4—
+---BCC ---+
Rangewide
(CON)
Rusty Blackbird ++" ++—+ +—++ +++— +--- +— — — — — — — — — --+— ++— +--- ---+
BCC-BCR
Wood Thrush
BCC Rangewide
(CON)
Additional information can be found using the following links:
• Birds of Conservation Concern https://www.fws.gov/program/migratory-birds/species
• Measures for avoiding and minimizing impacts to birds https://www.fws.gov/librqu/
collections/avoiding-and-minimizing-incidental-take-migratorv-birds
• Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/
documents/nationwide-standard-conservation-measures.Ddf
MIGRATORY BIRDS FAQ
Tell me more about conservation measures I can implement to avoid or minimize impacts
to migratory birds.
Nationwide Conservation Measures describes measures that can help avoid and minimize
impacts to all birds at any location year round. Implementation of these measures is particularly
important when birds are most likely to occur in the project area. When birds may be breeding in
the area, identifying the locations of any active nests and avoiding their destruction is a very
helpful impact minimization measure. To see when birds are most likely to occur and be breeding
in your project area, view the Probability of Presence Summary. Additional measures or permits
08/14/2023 10
may be advisable depending on the type of activity you are conducting and the type of
infrastructure or bird species present on your project site.
What does IPaC use to generate the list of migratory birds that potentially occur in my
specified location?
The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern
(BCQ and other species that may warrant special attention in your project location.
The migratory bird list generated for your project is derived from data provided by the Avian
Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding_,
and citizen science datasets and is queried and filtered to return a list of those birds reported as
occurring in the 10km grid cell(s) which your project intersects, and that have been identified as
warranting special attention because they are a BCC species in that area, an eagle (Eagle Act
requirements may apply), or a species that has a particular vulnerability to offshore activities or
development.
Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your
project area. It is not representative of all birds that may occur in your project area. To get a list
of all birds potentially present in your project area, please visit the Rapid Avian Information
Locator (RAIL) Tool.
What does IPaC use to generate the probability of presence graphs for the migratory birds
potentially occurring in my specified location?
The probability of presence graphs associated with your migratory bird list are based on data
provided by the Avian Knowledge Network (AKN). This data is derived from a growing
collection of survey, banding, and citizen science datasets.
Probability of presence data is continuously being updated as new and better information
becomes available. To learn more about how the probability of presence graphs are produced and
how to interpret them, go the Probability of Presence Summary and then click on the "Tell me
about these graphs" link.
How do I know if a bird is breeding, wintering or migrating in my area?
To see what part of a particular bird's range your project area falls within (i.e. breeding,
wintering, migrating or year-round), you may query your location using the RAIL Tool and look
at the range maps provided for birds in your area at the bottom of the profiles provided for each
bird in your results. If a bird on your migratory bird species list has a breeding season associated
with it, if that bird does occur in your project area, there may be nests present at some point
within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not
breed in your project area.
What are the levels of concern for migratory birds?
Migratory birds delivered through IPaC fall into the following distinct categories of concern:
1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern
throughout their range anywhere within the USA (including Hawaii, the Pacific Islands,
Puerto Rico, and the Virgin Islands);
08/14/2023 11
2. 'BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation
Regions (BCRs) in the continental USA; and
3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on
your list either because of the Eagle Act requirements (for eagles) or (for non -eagles)
potential susceptibilities in offshore areas from certain types of development or activities
(e.g. offshore energy development or longline fishing).
Although it is important to try to avoid and minimize impacts to all birds, efforts should be made,
in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC
species of rangewide concern. For more information on conservation measures you can
implement to help avoid and minimize migratory bird impacts and requirements for eagles,
please see the FAQs for these topics.
Details about birds that are potentially affected by offshore projects
For additional details about the relative occurrence and abundance of both individual bird species
and groups of bird species within your project area off the Atlantic Coast, please visit the
Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides
birds that may be helpful to you in your project review. Alternately, you may download the bird
model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical
Modeling and Predictive MaDDing of Marine Bird Distributions and Abundance on the Atlantic
Outer Continental Shelf project webpage.
Bird tracking data can also provide additional details about occurrence and habitat use
throughout the year, including migration. Models relying on survey data may not include this
information. For additional information on marine bird tracking data, see the Diving Bird Study
and the nanotag studies or contact Caleb Spiegel or Pam Lorin.
What if I have eagles on my list?
If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid
violating the Eagle Act should such impacts occur.
Proper Interpretation and Use of Your Migratory Bird Report
The migratory bird list generated is not a list of all birds in your project area, only a subset of
birds of priority concern. To learn more about how your list is generated, and see options for
identifying what other birds may be in your project area, please see the FAQ "What does IPaC
use to generate the migratory birds potentially occurring in my specified location". Please be
aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that
overlap your project; not your exact project footprint. On the graphs provided, please also look
carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no
data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey
effort is high, then the probability of presence score can be viewed as more dependable. In
contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of
certainty about presence of the species. This list is not perfect; it is simply a starting point for
identifying what birds of concern have the potential to be in your project area, when they might
be there, and if they might be breeding (which means nests might be present). The list helps you
know what to look for to confirm presence, and helps guide you in knowing when to implement
conservation measures to avoid or minimize potential impacts from your project activities,
08/14/2023
should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell
me about conservation measures I can implement to avoid or minimize impacts to migratory
birds" at the bottom of your migratory bird trust resources page.
WETLANDS
Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section
404 of the Clean Water Act, or other State/Federal statutes.
For more information please contact the Regulatory Program of the local U.S. Army Corps of
Engineers District.
Please note that the NWI data being shown may be out of date. We are currently working to
update our NWI data set. We recommend you verify these results with a site visit to determine
the actual extent of wetlands on site.
RIVERINE
• R4SBC
08/14/2023
IPAC USER CONTACT INFORMATION
Agency: Pilot Environmental, Inc.
Name: Michael Brame
Address: 743 Park Lawn Court
City:
Kernersville
State:
NC
Zip:
27284
Email
mbrame@pilotenviro.com
Phone:
3367084620
SHPO Map
it .r- �:.,osarcg�smm
0 Q Type here tO "aF[h 6 Hu0'x- v U V I Fnem -- (, 95BB' Is m-5,- i. , Geepl 7 E-, 0 90`{ , 4b
q
G
Fk
m
G"
E�
f79v■d Neal r�,-
wwzu3