HomeMy WebLinkAbout20130284 Ver 1_Emails_20110322RE: Reid to North Kannapolis impact question (UNCLASSIFIED)
RE: Reid to North Kannapolis impact question (UNCLASSIFIED)
Euliss, Amy
Sent: Tuesday, March 22, 2011 12:56 PM
To: Thomas, John T JR SAW [ John .T.Thomas.JR @usace.army.mil]; Scott Davis [ sdavis @axiomenvironmental.org];
Amy.Euliss @ncmail.net
Cc: Sandy Smith [ssmith @axiomenvironmental.org]
I concur with John.
- - - -- Original Message---- -
From: Thomas, John T JR SAW [mailto: John .T.Thomas.JR @usace.army.mil]
Sent: Tuesday, March 22, 2011 12:03 PM
To: Scott Davis; Amy.Euliss @ncmail.net
Cc: Sandy Smith
Subject: RE: Reid to North Kannapolis impact question (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Scott,
Page 1 of 2
`ci zs�
Yes, you would take the dominant branch of the braided system and calculate
its meandering length for your stream channel impact and also include the
area of the wetlands in the braided system for a determination of the total
jurisdictional impact for the system.
John Thomas
Raleigh Regulatory Field Office
919 554 -4884 ext. 25
- - - -- Original Message---- -
From: Scott Davis [ mailto :sdavis @axiomenvironmental.ora]
Sent: Monday, March 21, 2011 4:36 PM
To: Thomas, John T JR SAW; Amy.Euliss @ncmail.net
Cc: Sandy Smith
Subject: Reid to North Kannapolis impact question
John and Amy,
I hope that you're having a nice afternoon. As I have been sorting through
our Reid to North Kannapolis project information that I sent to you earlier,
I have come across an issue that I believe.may explain our confusion as to a
change in the delineation mapping. I am.attaching a figure which depicts two
locations - on Figure 6E, we stood beside the stream channel and discussed
mitigation for some time (this was the first location we visited after
meeting on the morning of our field visit). I believe that we discussed the
idea that the two stream channels (Streams SH and SI) draining the wetland
area WJ were anabranches of a braided system. If this is the case, it is our
understanding that mitigation is generally .required for the length of one
channel of such a system. Are impacts also calculated by using a single
branch of a system as such? At the time of our field visit, we knew the
lengths of impacts, yet we all left feeling that a NWP 14 would fit the bill.
Inclusion of both of these channels at the current design level potentially
raises our impacts above 300 linear feet for this crossing and into
Individual Permit territory. Please let me know when you might have the
opportunity to discuss this issue.
https:Hmai l.nc. gov /owa/ ?ae= Item &t= IPM.Note &i d= RgAAANDMS zLcd9W 2TJM4%2bm... 6/6/2011
RE: Reid to North Kannapolis impact question (UNCLASSIFIED) Page 2 of 2
Sincerely,
Scott
Scott G. Davis
Senior Scientist
Axiom_Logo.jpg
Axiom Environmental, Inc.
218 Snow Avenue
Raleigh, NC 27603
919 - 696 -3045
sdavis @axiomenvironmental.org
Classification: UNCLASSIFIED
Caveats: NONE
https : / /mai 1. nc . gov /ow a/ ?ae= Item &t= IPM.Note &i d= RgAAAADMS zLcd9W 2TJHI4%2bm... 6/6/2011