Loading...
HomeMy WebLinkAboutNCC202710_NOT Closeout Documents_20230818 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Brunswick Project: West Brunswick High School River basin: Lumber Person financially responsible:Brunswick County Board of Education-Craig Project#: BRUNS-2020-043 Eckert,Director of Capital Projects&Planning Address: 35 Referendum Drive,Bolivia,NC 28422 1. Project Location: NC Hwy 130,Whiteville Road,Shallotte Pictures: Yes-Digital 2. Weather and soil conditions: 80s clear,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): none Title: Inspection report: Sent Report Date given/sent: August 11,2023 9. Corrective action needed: 10. Comments: The project is complete.Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.The E&SC file will be closed.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01) must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at deq.nc.gov/NCG01.Please note that this correspondence must be uploaded as part of completing the NOT process. austin.turbitt@deq.nc.gov Reported by: Austin Turbitt Others present: Date of inspection: August 10,2023 Time arriving on site: 2:45 PM Time leaving site: 3:00 PM CC: