HomeMy WebLinkAboutNCC202710_NOT Closeout Documents_20230818 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Brunswick Project: West Brunswick High School River basin: Lumber
Person financially responsible:Brunswick County Board of Education-Craig Project#: BRUNS-2020-043
Eckert,Director of Capital Projects&Planning
Address: 35 Referendum Drive,Bolivia,NC 28422
1. Project Location: NC Hwy 130,Whiteville Road,Shallotte
Pictures: Yes-Digital
2. Weather and soil conditions: 80s clear,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): none Title:
Inspection report: Sent Report Date given/sent: August 11,2023
9. Corrective action needed:
10. Comments: The project is complete.Permanent ground cover sufficient to restrain erosion has been
established.No additional self-monitoring or self-inspections are required.Project is in
compliance and released under the SPCA.The E&SC file will be closed.Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)
must be requested by the permittee via a Notice of Termination(NOT).The NOT is available
at deq.nc.gov/NCG01.Please note that this correspondence must be uploaded as part of
completing the NOT process.
austin.turbitt@deq.nc.gov
Reported by: Austin Turbitt Others present:
Date of inspection: August 10,2023 Time arriving on site: 2:45 PM Time leaving site: 3:00 PM
CC: