Loading...
HomeMy WebLinkAboutMaggie Valley WWTP Levee Repair Revised Impact TableIMPACT REASON FOR IMPACT STREAM TEMPORARY PERMANENT LF SF AC LF SF AC S1 Construction Access/Dewatering 167.70 3,781.70 0.087 - - - S2 Northern Cofferdam 12.16 364.46 0.008 - - - S3 Southern Cofferdam 8.79 247.96 0.006 - - - S4 Access ramp 8.64 133.37 0.003 - - - S5 Bank Stabilization - - - 102 1,059.59 0.024 S6 Rip Rap - - - 95 671.32 0.015 TOTALS 197.29 4,527.49 0.104 197 1,730.91 0.039