HomeMy WebLinkAboutCCF_0003684a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:"
ev-'rjio 51.a �ae tt; 6,2 Sf641: ll' zcd
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?'`
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
4g. List the total estimated linear feet of all existing streams on the property:
(nWr t1e card perennial)
4h. Explain the purpose of the proposed project:"
1150' Shoreline stabilization by barge, to prevent further erosion
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
Using an excavator on a barge, rock will be placed along the bank to prevent erosion. 2' below full pond, 6' above full pond
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?"
Yes No
Comments:
5b. If the Corps made a Jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
Example: SAW-2017-99999
5c. If 5a Is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
6. Future Project Plans
* Z I acres 4-0,l j O 52 uCrZS
W��Qcerrc,r� Gv,CI • ) 5 O.erZi i .�latnd
Unknown
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This Includes other
separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries
Open Waters Pond Construction
Buffers
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open
water impacts below.
4al. Impact Reason
4b. Impact type* M
4c. Name of waterbody (1)
4d. Activity type
4e. Waterbody type"
4f. Impact
area
Dry Creek 36
shoreline stabilization
P
Lake James
Stabilization
Lake
�Cj
(acres)
4g. Total temporary open water Impacts:
0.00
4g. Total permanent open water impacts:
0.40
4g. Total open water impacts:
0.40
4h. Comments: